Shanghai Metro AC01 and AC02

Last updated
Shanghai Metro 01A03/01A04/02A01
AC01A/AC01B/AC01C/AC02A
20160716AC02LoveLiveLie Che Xia Xing Tong Guo Long Yang Lu -Zhang Jiang Gao Ke Zhi Jian Gao Jia .png
A train of 02A01 entering the viaduct between Longyang Road station and Zhangjiang High Technology Park station on July 16, 2016
Stock typeClass A EMU
In service1999-present
Manufacturer Adtranz and Siemens Mobility
CSR Zhuzhou Locomotive
Built at Hamburg, Germany
Zhuzhou, China
Constructed1998-2001
2006-2008
2011
Entered service1999
Retired2009 (2 wrecked cars)
Number built298
Number in service01A03: 72
01A04: 96
02A01: 64
(64 cars undergoing modification)
FormationTc-Mp-M-Mp+M-Mp-M-Tc
Fleet numbers98011-98061, 99011-99541, 00011-00781, 01011-01841, 013631-014342, 14673 and 14682
Capacity310 per car
Operators Shentong Metro Group
DepotsMeilong Depot
Fujin Road Yard
Beidi Road Depot
Longyang Road Depot
Chuansha Yard
Lines served  1    2  
Specifications
Car body construction Aluminum alloy
Train length139.98 m (459 ft 3 in)
Car length23.54 m (77 ft 3 in)
Width3 m (9 ft 10 in)
Height3.8 m (12 ft 6 in)
DoorsPneumatic doors
Electric doors (expansion cars of 01A04; modified 01A03 and 02A01 cars)
Maximum speed80 km/h (50 mph)
Traction systemSiemens Mobility G1500 D1150/580 M5-1 GTO-VVVF (converted to IGBT-VVVF during the expansion) [1]
01A04: Siemens Mobility G1500 D1100/400 M5-1 IGBT-VVVF
Traction motors Siemens Mobility 1TB2010-1GA02 3-phases AC induction motors [2]
Acceleration Maximum 3.2 km/(h⋅s) (1.988 mph/s)
Deceleration 3.6 km/(h⋅s) (2.237 mph/s) (service)
4.7 km/(h⋅s) (2.920 mph/s) (emergency)
Electric system(s) 1,500 V DC
Current collector(s) Single-arm Pantograph
Bogies DUEWAG or Simens Mobility SF2100 [3]
Track gauge 4 ft 8+12 in (1,435 mm)

The 01A03, 01A04 and the 02A01 train (formerly known as AC01 and AC02) are current rolling stocks used on the Line 1 and Line 2 of Shanghai Metro. [4] They are built by Adtranz, Siemens Mobility and CSR Zhuzhou Locomotive, with modified by Shentong Metro between 2023 and 2024.

Contents

The contract was for a total of 216 cars (36 sets) initially, with an additional order of 12 cars (2 sets) in 2001. They are divided into two types of stock, AC01 for the Line 1, and AC02 for the Line 2.

Before the delivery of AC03, AC01 and AC02 trains were also assigned to the services of Line 3. [5]

Features

AC01 trains have livery in red and white and AC02 trains have livery in green and white. 01A03, 01A04 and 02A01's original cars are using the pneumatic doors and installed five-color indicators. 01A04's expansion cars are using the electric doors. 02A01s have no PIS (Passenger Information System) inside. [6]

Every carriage's lampshades were changed from grids to white plastic boards during the second general overhaul.

Formation

Original sets

Like the DC01, The initial contract for Line1 and Line 2 was designed as 6-cars sets, for the lower expected ridership in 1990s and 2000s. Trains were formed as Tc-Mp-M+Mp-M-Tc. [7]

Expansion

Since 2006, CSR Zhuzhou Locomotive expanded AC01 and AC02 trains. 8 AC01 trains (118–125) and 16 AC02 trains (201–216) each expanded 2 additional cars. These cars were from another 12 sets (126–129 and 217–224). During the expansion, all carriages' traction systems were changed from GTO-VVVF to IGBT-VVVF. These AC01 trains renamed AC01A and AC02 trains renamed AC02A. [6]

The second contract for CSR Zhuzhou Locomotive included 72 cars for expanding the remaining 12 trains. During the expansion, 8 AC02 trains (217–224) renumbered 130–137. All trains (126-129 and 130-137) renamed AC01B and assigned to Line 1 service together. [8]

Set 117 was the last to be expanded. Before the expansion project, this set involved in a crash at Shanghai Railway Station station on December 22, 2009, and was taken out of service. [9] In 2011, the third contract awarded to CSR Zhuzhou Locomotive again, including 4 cars (98022, 98033, 14673 and 14682). 98022 and 98033 used for replacing two wrecked carriages, 14673 and 14682 used for expanding the set. Set 117 was renamed AC01C separately.

Post-expansion

In 2014, all four types of train renamed again. AC01A and AC01C renamed 01A03, AC01B renamed 01A04, AC02A renamed 02A01. [10]

Incidents

Accident

Cars 98033 and 98042 wrecked on December 22, 2009, at the Shanghai Railway Station station. [9] 98033 and 98042 were hit by car 013151. In 2011, they were stripped for removing parts, mothballed and replaced by the new carriages built by CSR Zhuzhou Locomotive. In 2015, car 98042 was converted into SMTC Experimental Car by CRRC Dalian R&D and used for train maintenance worker training. [11]

Mishap

On July 15, 2018, set 133 was out of service at North Zhongshan Road station due to the fault. While the train was moving to the Fujin Road Yard, a defective motor dropped on a signal equipment, causing delays for all northbound trains on Line 1. [12] Eventually, This set required an extensive repair and returned to service almost three years later on July 28, 2021.

Modifications

01A03

Between 2023 and 2024, all 01A03s were modified at Fujin Road Yard and Meilong Depot. Every car's doors were replaced with electric doors from the pneumatic doors used before. [13]

02A01

Cars 00071–00121, 01262 and 01273 were taken out of service since 2023 for signalling upgrading and replacing pneumatic doors to electric doors. They are the first to be modernized and backed to service in December 2023. [14]

The rest 02A01s were getting modified and backed to service gradually since January 2024.

See also

Related Research Articles

<span class="mw-page-title-main">Line 1 (Shanghai Metro)</span> Metro line of the Shanghai Metro

Line 1 is a north–south line of the Shanghai Metro. It runs from Fujin Road in the north, via Shanghai Railway Station to Xinzhuang in the south. The first line to open in the Shanghai Metro system, line 1 serves many important points in Shanghai, including People's Square and Xujiahui. Due to the large number of important locations served, this line is extremely busy, with a daily ridership of over 1,000,000 passengers. Generally, the line runs at grade beside the Shanghai–Hangzhou railway in the south, underground in the city center and elevated on the second deck of the North–South Elevated Road in the North. The line is colored red on system maps.

<span class="mw-page-title-main">Line 2 (Shanghai Metro)</span> Metro line of the Shanghai Metro

Line 2 is an east–west line in the Shanghai Metro network. With a length of nearly 64 km (40 mi), it is the second longest line in the metro system after line 11. Line 2 runs from National Exhibition and Convention Center in the west to Pudong Airport Terminal 1&2 in the east, passing Hongqiao Airport, the Huangpu river, and the Lujiazui Financial District in Pudong. With a daily ridership of over 1.9 million, it is the busiest line on the Shanghai Metro. The eastern portion of the line, Guanglan Road - Pudong International Airport section, was operated as an independent service route until April 19, 2019, when through service began. The line is colored light green on system maps.

<span class="mw-page-title-main">Chengdu Metro</span> Rapid transit system of Chengdu, Sichuan, China

The Chengdu Metro is the rapid transit system of Chengdu, the capital of Sichuan, China. With the opening of Line 1 on 27 September 2010, the system had thirteen subway lines and one light rail line. It has subsequently undergone rapid expansion. Since the opening of Lines 6, 8, 9, and 17 on 18 December 2020, the Chengdu Metro is the 4th longest metro system in the world.

<span class="mw-page-title-main">Line 16 (Shanghai Metro)</span> Metro line in Shanghai, China

Line 16 is a rapid transit line serving the south-eastern suburban areas of Shanghai. The line was formerly known as the Lingang line. It was originally designated as Line 21 and was planned as the south part of line 11. The line runs entirely in Pudong New Area, starting from Longyang Road, via Shanghai Wild Animal Park, Huinan Town, ending at Dishui Lake in Nanhui New City. The line is 59 km (37 mi) long and has 13 stations of which three are underground and the rest elevated. Construction begun in early 2009, and the line opened on 29 December 2013. The second phase was completed at the end of 2014.

<span class="mw-page-title-main">Beijing Subway rolling stock</span>

All Beijing Subway trains run on 1,435 mmstandard gauge rail and draw power from the 750 V DC third rail, except those on Lines 6, 11 14, 16, 17 and 19, which use 1,500 V DC overhead wires. Lines 6, 15, Fangshan, and Changping lines have a designed maximum service speed of 100 km/h (62 mph). The Airport Line is linear motor driven with a designed maximum service speed of 110 km/h (68 mph) All other Lines have a maximum service speed of 80 km/h (50 mph). Currently, Lines 1, 2, 4, 5, 8, 9, 10, 13, 15, Batong, Daxing, Changping, Fangshan, Yanfang, and Yizhuang lines use 6 car B size trains. Initially, the Batong line and Line 13 was originally used 4 car trains and now expanded into six.

<span class="mw-page-title-main">Line 7 (Guangzhou Metro)</span> Line of the Guangzhou Metro

Line 7 of the Guangzhou Metro is a rapid transit line in Guangzhou and Foshan, Guangdong Province, China. It is envisioned as tangential line that runs across southeast Guangzhou and Foshan, allowing for orbital traffic between the suburbs of Shunde, Panyu and Huangpu to avoid the crowded stations in the city center. Line 7's color is light green.

<span class="mw-page-title-main">Line 4 (Wuhan Metro)</span> Line of Wuhan Metro

The Line 4 of Wuhan Metro is the third line in Wuhan Metro system, and it will be the second metro line crossing the Yangtze river in Wuhan. It is colored grass-green, which is the identifying color of this line, which would appear on its trains, station signs, and the official subway map.

<span class="mw-page-title-main">Line 3 (Wuhan Metro)</span> Line of Wuhan Metro

The Line 3 of Wuhan Metro is a metro line in Wuhan. This line crosses five districts of Wuhan: Jiang'an District, Jianghan District, Qiaokou District, Hanyang District and Caidian District, and is the first line to cross the Han River. It started operation on December 28, 2015.

This article lists the rolling stock of the Shanghai Metro, a rapid transit system serving Shanghai. The table below contain the 1,190 trains with 7,394 carriages on the Shanghai Metro operational as of January 2021. There are 49 types of stock in service as of June 2024.

<span class="mw-page-title-main">China Railway DDJ1</span> Chinese 1st generation high-speed electric multiple unit

The DDJ1 is a first generation high-speed electric multiple unit built for China Railway, built by Zhuzhou Electric Locomotives, Changchun Railway Vehicles, Sifang Railway Vehicles, Tangshan Passenger vehicle factory, Nanjing Puzhen and developed by Zhuzhou Electric Locomotive Research Centre. It was built in 1999, and was an experimental vehicle, with only one set built, as it did not enter mass production. The design was well received as part of national science in the 9th five year plan. The DDJ1 is in a push–pull configuration, with only one locomotive in the set and the other end being a trailer with a driver's cabin.

<span class="mw-page-title-main">China Railway DJF2</span> Experimental electrical multiple unit of China

The DJF2"Xianfeng" electric multiple unit is a model operated formerly by China Railway with traction motors distributed throughout the unit. It was developed in 2001 as a key task of the science and technology targets of the Ninth Five-Year Plan. It was an innovative and advanced design being the first Chinese multiple unit train to achieve 200 km/h (124 mph) and achieving a top test speed of 292.8 km/h (181.9 mph) in tests, but had numerous flaws in the design that complicated operations.

<span class="mw-page-title-main">China Railway KDZ1</span>

The KDZ1 is the first electrical multiple unit built in China. It is an experimental alternating current electrical multiple unit, developed by Changchun Railway Vehicles, CRRC Zhuzhou Institute and China Academy of Railway Sciences in 1978 and completed in 1988, though it never saw passenger service, with it being stored after it completed its initial tests.

<span class="mw-page-title-main">China Railway DJF1</span> Electric multiple unit of China Railway

The DJF1 "Zhongyuan Star" was an electric multiple unit of China Railway. It only operated in service for less than five years, before it was removed from service due to its various flaws and high maintenance costs. The train was initially built as a six car set, and subsequently lengthened to a fourteen car set. The two driving motors and the middle two motor cars have been preserved, with the other carriages being scrapped.

<span class="mw-page-title-main">Line 6 (Changsha Metro)</span> Metro line in Changsha, China

Line 6 of the Changsha Metro is a rapid transit line in Changsha, Hunan, China. The line opened on 28 June 2022, running 48.11 kilometres (29.89 mi) with 34 stations.

<span class="mw-page-title-main">Line 16 (Xi'an Metro)</span> Metro line in Xian, China

Line 16 of the Xi'an Metro is a rapid transit line in Xi'an, Shaanxi Province, China. The line is 15.03 km (9.34 mi) long with 9 stations. Phase 1 of Line 16 opened on 27 June 2023.

<span class="mw-page-title-main">Shanghai Metro DC01</span> Shanghai Metro rolling stock

The 01A01 and the 01A02 train are current rolling stocks used on the Line 1 of Shanghai Metro. They are built by Adtranz and Siemens Mobility, with first delivery in 1992. These cars are numbered 92011–92241, 93011-93481 and 94011-94241.

<span class="mw-page-title-main">A1 (Guangzhou Metro car)</span> Rolling stock of Guangzhou Metro Line 1

The A1 is a rolling stock built by the Adtranz and Siemens Mobility from 1996 to 1997 for the Line 1, with operation in Guangzhou Metro. They are refurbished from 2021 to 2024 by CRRC Guangzhou Rail Transit Equipment in Dazhou Depot.

<span class="mw-page-title-main">Shanghai Metro AC03</span> Rolling stock of Shanghai Metro Line 3

The 03A01 train is a current rolling stock used on Line 3 of Shanghai Metro. They are developed by Alstom and built by CSR Nanjing Puzhen. The first train delivered on 5 December 2001 and entered service on 5 November 2002.

<span class="mw-page-title-main">Shanghai Metro AC04</span> Rolling stock of Shanghai Metro Line 9

The 09A01 train is a current rolling stock used in Shanghai Metro, which originally ordered for Line 1 extension, but is currently assigned to Line 9 service due to the production discontinued of expansion cars. The trains were developed by Bombardier and built by CNR Changchun Railway Vehicles.

<span class="mw-page-title-main">Shanghai Metro AC05</span> Rolling stock of Shanghai Metro Line 4

 The 04A01 train is a current rolling stock used on Line 4 of Shanghai Metro. They are developed by Siemens Mobility and built by CSR Zhuzhou Locomotive. AC05s entered service on 31 December 2005.

References

  1. 余强,李晓靖,袁登科,陶生桂 (2008). "上海地铁车辆主逆变器GTO牵引相模块的IGBT替代研制". 电力机车与城轨车辆 (3): 29–31. Archived from the original on 2021-09-29. Retrieved 2021-09-29.
  2. 杨斌,宁新军 (2009). "上海地铁1号线增能扩编项目(6改8)车辆". 机车电传动 (4): 44–48. Archived from the original on 2021-07-09. Retrieved 2021-09-29.
  3. "First Class Bogies" (PDF). Siemens Mobility . Archived from the original (PDF) on 2019-07-22.
  4. "上海地铁车辆". 电力机车技术 (3): 18–22. 2001.
  5. "这些地铁线里,藏着你不知道的浦东历史". 上观新闻 (in Chinese). 2020-04-15. Retrieved 2024-07-07.
  6. 1 2 崔俊国,陶生桂 (2002). "上海地铁2号线车辆交流传动系统仿真分析". 机车电传动 (1): 34. Archived from the original on 2022-01-07. Retrieved 2022-01-07.
  7. "上海轨道交通DC01型列车6改8项目车钩缓冲性能研究". 电力机车与城轨车辆 (in Chinese). 34 (6). 2011.
  8. 杨斌,宁新军 (2009). "上海地铁1号线增能扩编项目(6改8)车辆". 机车电传动 (4): 44–48. Archived from the original on 2021-07-09. Retrieved 2021-09-29.
  9. 1 2 "关于"12·22"轨道交通一号线列车侧面冲撞事故调查处理情况的通报". 市“12·22”事故调查组. 上海市城乡建设和交通委员会. 2010-01-22. Archived from the original on 2016-03-05. Retrieved 2012-01-04.
  10. "上海轨道交通2号线02A01型列车制动系统改造方案研究". 城市轨道交通研究 (in Chinese). S1. 2023.
  11. "培训中心117号实训列车首次驶入张江实训线". 2016-10-31. Archived from the original on 2024-03-23. Retrieved 2024-03-23.
  12. 上海地铁 (2018-07-15). "【突发运营信息:1号线】目前,1号线因车辆故障,中山北路往通河新村方向列车限速运行,发车班次间隔延长,预计晚点时间15分钟以上,请乘客们及时调整出行路径,以免耽误行程。" (in Chinese).
  13. 今日车辆 (2023-09-20). "这是一次"魔改"——车辆分公司开展气动门改电动门的列车车门改造工作" (in Chinese).
  14. 地铁万象 (2024-04-26). "2号线信号新增CBTC系统工程LTE-M无线集群通信系统顺利完成割接" (in Chinese).