Belledune Generating Station

Last updated
Belledune Generating Station
Belldune 1.jpg
Belldune Power plant. Taken in 2021.
Belledune Generating Station
Belledune Generating Station, New Brunswick
CountryCanada
Location Belledune, New Brunswick
Coordinates 47°54′21″N65°51′48″W / 47.905962°N 65.863468°W / 47.905962; -65.863468
StatusOperational
Construction began1991
Commission date 1993
Owner(s) NB Power
Thermal power station
Primary fuel Coal
Power generation
Nameplate capacity 450  MW

The Belledune Generating Station is a 450 MW coal-fired electrical generating station located in the community of Belledune in Gloucester County, New Brunswick. It is a thermal generating station owned and operated by provincial Crown corporation NB Power.

Construction of the plant began in 1991 and it began generating electricity in 1993. [1] At 450 MW, it is designed to burn coal which is delivered by ship through the Port of Belledune and occasionally by rail or truck. Coal is mostly sourced in the United States and South America but local sources mined at Minto, NB and Sydney, NS have been used on occasion.

The Belledune plant is attractive for shipping as it is situated on the shore of Chaleur Bay adjacent to a ship-unloading pier; Terminal II at the Port of Belledune was built in 1991-1992 by the Canada Ports Corporation as part of the Belledune Generating Station project. Terminal II has a 307 metre long wharf with a 28 metre wide apron and depth alongside of 15.9 metres, thus capable of handling up to Capesize vessels of 100,000 DWT. An automated coal continuous ship unloader moves coal at 1750 metric tonnes per hour to stockpiles adjacent to the plant.

As part of the project, the Belledune River was dammed in the early 1990s to create a reservoir approximately 4 km (2.5 mi) upstream from its discharge point into Chaleur Bay. This reservoir is visible from New Brunswick Route 11 which was built on a new right of way that crosses the southern part of this reservoir, opening in the early 1990s. The construction of the Belledune Generating Station also resulted in the realignment of a 3 km (1.9 mi) section of local road New Brunswick Route 134.

The plant itself features a single boiler and a single 169 meter (554 ft) tall smokestack. [2] The plant was the first in Canada to install scrubbers to help reduce sulphur dioxide emissions; it also has an electrostatic precipitator that removes over 99% of particles in the flue gases, as well as special burners to limit nitrogen oxide emissions. The plant was designed to accommodate construction of a parallel second generating station (phase II) should one be built. An upgrade began in July 2004 which saw a Titan ProAsh facility built to recapture 75% of fly ash produced by the generating station. This has resulted in production of a synthetic gypsum byproduct which is sold by NB Power to J.D. Irving Limited for production into wallboard.

The plant consumes approximately 1 million tons of coal per year, and currently generates approximately fifteen percent of the province's electricity, [3] while producing roughly thirty percent of the province's air pollution and greenhouse gas emissions (among large industrial polluters). [4] [5]

In October 2009 the provincial government announced that it had reached an agreement with Hydro Quebec to sell NB Power to that company (see Proposed sale of NB Power). The sale was not completed, however, the initial memorandum of understanding would have seen NB Power transfer all of its generating assets except for the thermal stations at Dalhousie, Belledune and Coleson Cove.

The sale of NB Power to Hydro Quebec was canceled in spring 2010, presumably sparing the Belledune Generating Station from any major changes to its operation.

The future of the coal power plant is a topic of ongoing controversy. Canada has committed to phasing out the use of coal for electricity by 2030 to reduce greenhouse gas emissions as part of its Nationally Determined Contribution to the Paris Agreement, and the Pan-Canadian Framework on Clean Growth and Climate Change. However, New Brunswick energy minister Mike Holland (politician) has argued for its continued operation through 2040, but only in the winter months. There have been proposals to replace its electricity generation with small modular reactors and with Hydroelectricity from Hydro-Québec. [6] In November, 2021, a spokesperson for the federal Environment and Climate Change Minister confirmed that there would be no exemption to the 2030 deadline for coal-burning plants to close. [7]

See also

Related Research Articles

<span class="mw-page-title-main">Electricity generation</span> Process of generating electrical power

Electricity generation is the process of generating electric power from sources of primary energy. For utilities in the electric power industry, it is the stage prior to its delivery to end users or its storage, using for example, the pumped-storage method.

<span class="mw-page-title-main">Hydroelectricity</span> Electricity generated by hydropower

Hydroelectricity, or hydroelectric power, is electricity generated from hydropower. Hydropower supplies one sixth of the world's electricity, almost 4,500 TWh in 2020, which is more than all other renewable sources combined and also more than nuclear power. Hydropower can provide large amounts of low-carbon electricity on demand, making it a key element for creating secure and clean electricity supply systems. A hydroelectric power station that has a dam and reservoir is a flexible source, since the amount of electricity produced can be increased or decreased in seconds or minutes in response to varying electricity demand. Once a hydroelectric complex is constructed, it produces no direct waste, and almost always emits considerably less greenhouse gas than fossil fuel-powered energy plants. However, when constructed in lowland rainforest areas, where part of the forest is inundated, substantial amounts of greenhouse gases may be emitted.

Puget Sound Energy, Inc. (PSE) is an energy utility company based in the U.S. state of Washington that provides electrical power and natural gas to the Puget Sound region. The utility serves electricity to more than 1.2 million customers in Island, King, Kitsap, Kittitas, Pierce, Skagit, Thurston, and Whatcom counties, and provides natural gas to 877,000 customers in King, Kittitas, Lewis, Pierce, Snohomish and Thurston counties. The company's electric and natural gas service area spans 6,000 square miles (16,000 km2).

<span class="mw-page-title-main">NB Power</span> Electric utility company

New Brunswick Electric Power Corporation, operating as NB Power, is the primary electric utility in the Canadian province of New Brunswick. NB Power is a vertically-integrated Crown corporation by the government of New Brunswick and is responsible for the generation, transmission, and distribution of electricity. NB Power serves all the residential and industrial power consumers in New Brunswick, with the exception of those in Saint John, Edmundston and Perth-Andover who are served by Saint John Energy, Energy Edmundston, and the Perth-Andover Electric Light Commission, respectively.

<span class="mw-page-title-main">Electricity sector in Canada</span>

The electricity sector in Canada has played a significant role in the economic and political life of the country since the late 19th century. The sector is organized along provincial and territorial lines. In a majority of provinces, large government-owned integrated public utilities play a leading role in the generation, transmission, and distribution of electricity. Ontario and Alberta have created electricity markets in the last decade to increase investment and competition in this sector of the economy.

Belledune is a port village in the Canadian province of New Brunswick. It has a population of 1,325, and straddles the boundary between Restigouche County and Gloucester County, New Brunswick.

<span class="mw-page-title-main">Run-of-the-river hydroelectricity</span> Hydroelectric power station

Run-of-river hydroelectricity (ROR) or run-of-the-river hydroelectricity is a type of hydroelectric generation plant whereby little or no water storage is provided. Run-of-the-river power plants may have no water storage at all or a limited amount of storage, in which case the storage reservoir is referred to as pondage. A plant without pondage is subject to seasonal river flows, so the plant will operate as an intermittent energy source. Conventional hydro uses reservoirs, which regulate water for flood control, dispatchable electrical power, and the provision of fresh water for agriculture.

<span class="mw-page-title-main">Energy policy of Canada</span>

Canada has access to all main sources of energy including oil and gas, coal, hydropower, biomass, solar, geothermal, wind, marine and nuclear. It is the world's second largest producer of uranium, third largest producer of hydro-electricity, fourth largest natural gas producer, and the fifth largest producer of crude oil. In 2006, only Russia, the People's Republic of China, the United States and Saudi Arabia produce more total energy than Canada.

<span class="mw-page-title-main">Coal-fired power station</span> Type of thermal power station

A coal-fired power station or coal power plant is a thermal power station which burns coal to generate electricity. Worldwide there are over 2,400 coal-fired power stations, totaling over 2,130 gigawatts capacity. They generate about a third of the world's electricity, but cause many illnesses and the most early deaths, mainly from air pollution. World installed capacity doubled from 2000 to 2023 and increased 2% in 2023.

According to the International Hydropower Association, Canada is the fourth largest producer of hydroelectricity in the world in 2021 after the United States, Brazil, and China. In 2019, Canada produced 632.2 TWh of electricity with 60% of energy coming from Hydroelectric and Tidal Energy Sources).

Coal reserves in Canada rank 13th largest in the world at approximately 10 billion tons, 0.6% of the world total. This represents more energy than all of the oil and gas in the country combined. The coal industry generates CDN$5 billion annually. Most of Canada's coal mining occurs in the West of the country. British Columbia operates 9 coal mines, Alberta nine, Saskatchewan three and New Brunswick one. Nova Scotia operates several small-scale mines, Westray having closed following the 1992 disaster there.

The Coleson Cove Generating Station is a 1050 MW fuel oil-fired power station located at 4077 King William Road in the community of Lorneville on the extreme western boundary of the city of Saint John, New Brunswick.

The proposed sale of NB Power was an attempted takeover of New Brunswick's Crown corporation public utility assets by Hydro-Québec, Canada's largest utility. Announced on October 29, 2009, by premiers Shawn Graham of New Brunswick and Jean Charest of Quebec, the deal ultimately collapsed in March 2010 after months of controversy.

The Dalhousie Generating Station was a 315 MW coal and oil-fired electrical generating station that operated from 1969-2012 in the community of Dalhousie in Restigouche County, New Brunswick.

<span class="mw-page-title-main">Energy in Portugal</span>

Energy in Portugal describes energy and electricity production, consumption and import in Portugal. Energy policy of Portugal will describe the politics of Portugal related to energy more in detail. Electricity sector in Portugal is the main article of electricity in Portugal.

<span class="mw-page-title-main">Energy in Slovenia</span>

Total primary energy supply (TPES) in Slovenia was 6.80 Mtoe in 2019. In the same year, electricity production was 16.1 TWh, consumption was 14.9 TWh.

<span class="mw-page-title-main">Tracy Thermal Generating Station</span> Thermal power station in Sorel-Tracy, Quebec, Canada

The Tracy Thermal Generating Station is a retired 660-megawatt heavy fuel oil-fueled thermal power station built from 1962 by the Shawinigan Water & Power Company and completed by Hydro-Québec after the buyout of all private electric utilities by the government of Quebec in 1963. Commissioned between 1964 and 1968, the plant is located on the banks of the Saint Lawrence River in the city of Sorel-Tracy, in the Montérégie Region.

Carbon pricing in Canada is implemented either as a regulatory fee or tax levied on the carbon content of fuels at the Canadian provincial, territorial or federal level. Provinces and territories of Canada are allowed to create their own system of carbon pricing as long as they comply with the minimum requirements set by the federal government; individual provinces and territories thus may have a higher tax than the federally mandated one but not a lower one. Currently, all provinces and territories are subject to a carbon pricing mechanism, either by an in-province program or by one of two federal programs. As of April 2023 the federal minimum tax is set at CA$65 per tonne of CO2 equivalent, set to increase to CA$170 in 2030.

<span class="mw-page-title-main">World energy supply and consumption</span> Global production and usage of energy

World energy supply and consumption refers to the global supply of energy resources and its consumption. The system of global energy supply consists of the energy development, refinement, and trade of energy. Energy supplies may exist in various forms such as raw resources or more processed and refined forms of energy. The raw energy resources include for example coal, unprocessed oil & gas, uranium. In comparison, the refined forms of energy include for example refined oil that becomes fuel and electricity. Energy resources may be used in various different ways, depending on the specific resource, and intended end use. Energy production and consumption play a significant role in the global economy. It is needed in industry and global transportation. The total energy supply chain, from production to final consumption, involves many activities that cause a loss of useful energy.

References

  1. gnb.ca: "FACILITY PROFILE - New Brunswick Power Corporation for the Belledune Thermal Generating Station" Archived 2016-03-04 at the Wayback Machine Prepared by: Industrial Processes Section, Impact Management Branch Department of Environment and Local Government. September 2014
  2. "Environment and Climate Change Canada - NPRI Data Search".
  3. nbpower.com: "Learn about electricity"
  4. ghgregistries.ca Archived 2011-07-06 at the Wayback Machine
  5. ec.gc.ca: "Greenhouse Gas Emissions Reporting Program Online Data Search – Facility Reported Data" Archived June 12, 2011, at the Wayback Machine
  6. Poitras, Jacques (21 July 2021). "New Brunswick can't meet 2030 deadline for coal phaseout, minister says". CBC News . Retrieved 21 Nov 2021.
  7. Poitras, Jacques (25 Nov 2021). "No extension past 2030 for Belledune coal-fired power plant, Ottawa says". CBC News. Retrieved 3 August 2024.