Coleson Cove Generating Station | |
---|---|
Country | Canada |
Location | Lorneville, New Brunswick |
Coordinates | 45°09′13″N66°12′11″W / 45.153611111°N 66.20305555°W |
Status | Operational |
Construction began | 1974 |
Commission date | 1976 |
Owner(s) | NB Power |
Thermal power station | |
Primary fuel | Fuel oil |
Cooling source | Seawater |
Power generation | |
Units operational | 3 × 350 MW |
Nameplate capacity | 1050 MW |
The Coleson Cove Generating Station is a 1050 MW fuel oil-fired power station [1] located at 4077 King William Road in the community of Lorneville on the extreme western boundary of the city of Saint John, New Brunswick.
A thermal generating station, Coleson Cove is situated on a cove of the same name, along the shore of the Bay of Fundy 16 km (9.9 mi) southwest of the mouth of the Saint John River at the city's central core. The generating station is owned and operated by New Brunswick Power Coleson Cove Corporation (Colesonco), a wholly owned subsidiary of New Brunswick Power Generation Corporation (Genco), which is itself a wholly owned subsidiary of provincial Crown corporation NB Power.
Coleson Cove opened in 1976 and was designed to burn #6 fuel oil, also known colloquially as "bunker C". Fuel is delivered via the 20 km (12 mi) underground Lorneville Pipeline, which runs from Irving Oil's Canaport bulk oil tanker unloading station off Red Head, 4 km southeast of the city's central core, crossing to the city's west side via the Reversing Falls Railway Bridge. The #6 fuel oil is stored in two 1.5 million barrel tanks at Canaport and four 300,000 barrel tanks at Coleson Cove.
The plant features three boiler units powering three 350 MW generators for a total output of 1,050 MW, which is approximately 33% of the utility's generating capacity. To achieve this, Coleson Cove burns 5 million barrels of oil annually and discharges its exhaust through twin 183 m (600 ft) smoke stacks.
In late 2001, NB Power announced its intention to refurbish Coleson Cove and convert its fuel source to orimulsion, which was sole-sourced from Petróleos de Venezuela S.A. (PDVSA) in a $2 billion 20-year supply agreement. The $2.2 billion refurbishment project involved reconfiguring the boilers, as well as on-land storage tanks, Lorneville Pipeline, and some equipment at Irving Oil's Canaport unloading facility. The project was envisioned to be complete in November 2004 with a cost of $818 million. Part of this refurbishment saw Coleson Cove fitted with LO-NOx burners and the addition of six flue gas desulphurization (FGD) scrubbers which were designed to also remove hydrochloric acid.
Political instability in Venezuela in 2003 is believed[ by whom? ] to have contributed to PDVSA balking at formally signing a contract to implement an orimulsion deal with NB Power for Coleson Cove. [2] By winter 2004 it was apparent that the fuel supply agreement with PDVSA had fallen through and NB Power launched a $2.2 billion lawsuit that was filed simultaneously with the United States District Court for the Southern District of New York in Manhattan and the Court of Queen's Bench of New Brunswick in Fredericton during the last week of February, naming both PDVSA and its United States subsidiary Bitumenes Orinoco S.A. (Bitor) as defendants and citing the companies' inability to negotiate and sign a contract to deliver orimulsion to Coleson Cove. [3] On March 16, 2004 PDVSA announced that it was phasing out all orimulsion production; since NB Power's Dalhousie Generating Station's fuel supply agreement ends in 2010, it is assumed that both plants will be forced to switch to an alternative.
The failure to secure a fuel supply agreement with PDVSA for the Coleson Cove Generating Station overshadowed the final term of Premier Bernard Lord and is believed[ by whom? ] to have played a role in his government's subsequent 2006 electoral defeat, since the publicly owned utility's write-down of the loss added substantially to the provincial long-term debt.
On 3 August 2007, the NB Power Group settled the lawsuit with PDVSA over the failed contract for a total book value of $333m, split between a cash payment of $115m and a (then) future supply of fuel valued at $218m. [4] On 23 August 2007, the Energy and Utilities Board (EUB) approved a regulatory deferral for the purpose of returning the benefit of the lawsuit settlement with PDVSA to customers in a levelised manner. The deferral will be allocated over a period of 17 years in order to best match the benefit from the settlement to the customers that the customers will pay for the Coleson Cove Generating Station Refurbishment. [5]
Forced to continue its reliance upon heavy fuel oil, NB Power realized several environmental benefits and plant efficiencies resulting from the refurbishment as the generating station moved ahead 2 generations from its original polluting 1970s technology: SO2 emissions were reduced by 77%, NOx emissions were reduced by 70% and particulate release was reduced by 75%. In addition, the changes in the burners and addition of scrubbers saw the production of a gypsum byproduct which was commercially resold for wallboard through a subsidiary of J.D. Irving Limited. [6]
Despite the improvements reducing emissions, the Coleson Cove Generating Station remains the largest thermal generating station in Atlantic Canada and has been cited by the New Brunswick Environmental Network and the Clean Energy Coalition of New Brunswick as the largest single point source of air pollution and greenhouse gases in the region. [7] Emissions from the station in the form of particulates have been, and remain, a frequent source of pollution complaints in the region.
In May 2011 NB Power announced that it was considering converting Coleson Cove to burn natural gas. The high price of fuel oil in recent years, coupled with the plant's still-high emissions, has meant that it has sat idle for much of the last decade as it has been cheaper for NB Power to purchase imported electricity to replace the generating capacity. The decline in natural gas prices in recent years, increased cost of the mid-life refurbishment of the nearby Point Lepreau Nuclear Generating Station, and the rising cost of replacement imported electricity has provided an economic case for converting Coleson Cove, however, the project must be approved by the Government of New Brunswick and undergo environmental study. Additionally, a natural gas pipeline to supply the plant must be constructed from either the Saint John Lateral of the Maritimes & Northeast Pipeline or the Brunswick Pipeline. [8]
Orimulsion is a registered trademark name for a bitumen-based fuel that was developed for industrial use by Intevep, the Research and Development Affiliate of Petroleos de Venezuela SA (PDVSA), following earlier collaboration on oil emulsions with BP.
Point Lepreau Nuclear Generating Station is a nuclear power station located 2 km northeast of Point Lepreau, New Brunswick, Canada. The facility was constructed between 1975 and 1983 by NB Power, the provincially owned public utility.
Irving Oil Ltd. is a Canadian privately-owned intergenerational gasoline, oil, and natural gas producing and exporting company, a subsidiary of the parent company Irving Group of Companies,—one of the largest "private conglomerates" in North America. Irving Oil was one established in 1924 by Canadian oil baron and billionaire, Kenneth "K.C." Irving, whose family fortune when he died in 1992 was estimated by Forbes at USD$5 billion. His son, Arthur, became chairman and president of Irving Oil.
New Brunswick Power Corporation, operating as NB Power, is the primary electric utility in the Canadian province of New Brunswick. NB Power is a vertically integrated Crown Corporation wholly owned by the Government of New Brunswick and is responsible for the generation, transmission, and distribution of electricity. NB Power serves all the residential and industrial power consumers in New Brunswick, with the exception of those in Saint John, Edmundston and Perth-Andover who are served by Saint John Energy, Energy Edmundston, and the Perth-Andover Electric Light Commission, respectively.
The electricity sector in Canada has played a significant role in the economic and political life of the country since the late 19th century. The sector is organized along provincial and territorial lines. In a majority of provinces, large government-owned integrated public utilities play a leading role in the generation, transmission, and distribution of electricity. Ontario and Alberta have created electricity markets in the last decade to increase investment and competition in this sector of the economy.
The Reversing Falls Railway Bridge is the name given to two different steel truss bridges crossing the Saint John River at the same location in Saint John, New Brunswick, Canada.
Ballylumford power station "C" station is a natural-gas-fired power station in County Antrim, Northern Ireland, UK. With its main plant generating 600 megawatts of electricity, it is Northern Ireland's largest power station and provides half its power. Overall the station produces 600 MW. The plant is located at the tip of the Islandmagee peninsula, which separates Larne Lough from the Irish Sea. The lough is a Site of Special Scientific Interest. The 3 chimneys of the now decommissioned "B" station are 126 metres tall. East of the station is the Ballycronan More converter station, the Northern Ireland end of the Moyle Interconnector, a subsea HVDC interconnector connecting the NI electricity system to Great Britain.
Tufts Cove Generating Station is a Canadian electrical generating station located in the Dartmouth neighbourhood of Tufts Cove in Nova Scotia's Halifax Regional Municipality.
FortisBC is a Canadian owned, British Columbia based regulated utility providing natural gas, and electricity. FortisBC has approximately 2,600 employees serving more than 1.2 million customers in 135 B.C. communities and 58 First Nations communities across 150 Traditional Territories.
A coal-fired power station or coal power plant is a thermal power station which burns coal to generate electricity. Worldwide there are over 2,400 coal-fired power stations, totaling over 2,000 gigawatts capacity. They generate about a third of the world's electricity, but cause many illnesses and the most early deaths, mainly from air pollution.
Venezuela has the largest conventional oil reserves and the second-largest natural gas reserves in the Western Hemisphere. In addition Venezuela has non-conventional oil deposits approximately equal to the world's reserves of conventional oil. Venezuela is also amongst world leaders in hydroelectric production, supplying a majority of the nation's electrical power through the process.
Burning of renewable resources provides approximately 90 percent of the energy in Uganda, though the government is attempting to become energy self-sufficient. While much of the hydroelectric potential of the country is untapped, the government decision to expedite the creation of domestic petroleum capacity coupled with the discovery of large petroleum reserves holds the promise of a significant change in Uganda's status as an energy-importing country.
Energy consumption across Russia in 2020 was 7,863 TWh. Russia is a leading global exporter of oil and natural gas and is the fourth highest greenhouse emitter in the world. As of September 2019, Russia adopted the Paris Agreement In 2020, CO2 emissions per capita were 11.2 tCO2.
Kilroot power station is a Fossil fuel power plant power station on the north shore of Belfast Lough at Kilroot near Carrickfergus in County Antrim, Northern Ireland. The plant currently has a 141 megawatt (MW) capacity from four standby Gas Turbines and a 10 MW battery energy storage capacity from the Kilroot Advancion Energy Storage Array.
Thor Cogeneration is a planned, but undeveloped, gas-fired cogeneration plant, which was to be built on Seal Sands near Billingham, in County Durham, North East England.
The proposed sale of NB Power was an attempted takeover of New Brunswick's government-owned public utility assets by Hydro-Québec, Canada's largest utility. Announced on October 29, 2009 by premiers Shawn Graham of New Brunswick and Jean Charest of Quebec, the deal ultimately collapsed in March 2010 after months of controversy.
The Dalhousie Generating Station was a 315 MW coal and oil-fired electrical generating station that operated from 1969-2012 in the community of Dalhousie in Restigouche County, New Brunswick.
The Belledune Generating Station is a 450 MW coal-fired electrical generating station located in the community of Belledune in Gloucester County, New Brunswick. It is a thermal generating station owned and operated by provincial Crown corporation NB Power.
Total primary energy supply (TPES) in Slovenia was 6.80 Mtoe in 2019. In the same year, electricity production was 16.1 TWh, consumption was 14.9 TWh.