Bihar State Power Holding Company Limited

Last updated

Bihar State Power Holding Company Limited (BSPHCL)
FormerlyBihar State Electricity Board (BSEB)
Company type Statutory body
IndustryGeneration, transmission & distribution of electricity
Founded1 November 2013
HeadquartersVidyut Bhawan, Bailey Road, Patna, India
Area served
Bihar
Key people
Pankaj Kumar Pal
(Chairman & Managing Director) [1]
Owner Government of Bihar
Number of employees
14,850 (2012)
Parent Energy Department,Bihar
Website www.bsphcl.co.in//

Bihar State Power Holding Company Limited (BSPHCL), formerly Bihar State Electricity Board (BSEB) is a state-owned electricity regulation board operating within the state of Bihar in India. [2] [3] BSEB was established in 1958 as a statutory corporation under the Electricity (Supply) Act, 1948. As of November 2012, BSEB has nearly 1,700 officers and 14,850 employees. The derated capacity comes to just 530 MW. The BSEB was unbundled on 2 August 2011. [4] Power Finance Corporation was the main consultant for BSEB's restructuring. [5] [6]

Contents

BSEB formally started functioning as 5 companies on 1 November 2012, namely:

Electricity generation capacity in Bihar

The installed electricity generation capacity in Bihar was 6384.88 MW as of April 2020. There are newer projects under construction which will take total electricity generation capacity in Bihar to more than 12000 MW. [10]

Thermal power plants in Bihar

On 17 April 2018, Bihar state cabinet, headed by chief minister Nitish Kumar, gave its nod to handing over of Barauni Thermal Power Station, Kanti Thermal Power Station and Nabinagar Super Thermal Power Project to National Thermal Power Corporation. [11]

Barauni Thermal Power Station

The current installed capacity of this power plant is 470 MW and in future the plant will have a total capacity of 720 MW with projects of 250 MW under construction.

Unit No. 1, 2 & 3 of 15 MW each and Unit No. 4 & 5 of 50 MW each are retired as they are very old to be maintained and are retired. [12]

Unit 6 and 7 of 110 MW each were renovated by BHEL which also originally supplied equipments and are now operational. [13]

New Unit 8 of 250 MW was inaugurated in January 2018. Unit 9 of 250 MW is under construction and expected to be operational by 2020.

There is another ongoing plan for new capacity addition of 500 MW (2x250 MW) to this plant. In March 2013, Central Government assured to provide coal linkage to Barauni Thermal Power Plant. [14]

Barh Super Thermal Power Plant

The current installed capacity of this power plant is 1320 MW and in future the plant will have a total capacity of 3300 MW with projects of 1980 MW under construction.

The project comprises two stages. The EPC contractor for State-1 of 1,980MW (3x660 MW) is Russian firm TPE, and for Stage-2 of 1,320MW (2x660 MW) is BHEL. Stage-1 being built with equipment from TPE is delayed as TPE is asking for more money. In November 2013, 660 MW unit 4 of Stage-2 being built by BHEL got synchronized with the grid. [15] Commercial operation started in November 2014 after resolving faults. Unit 5 of Stage-2 is also now operational.

Buxar thermal power plant

This is an upcoming power plant with a planned capacity of 1320 MW. Larsen & Toubro Limited holds the contract for the construction, at an estimated cost of ₹7,490 crores. It is scheduled to open in 2023.

Kahalgaon Super Thermal Power Station

The current installed capacity of this power plant is 2340 MW and it is located in Kahalgaon, Bhagalpur, Bihar.

Kanti Thermal Power Station

The current installed capacity of this power plant is 610 MW

Units 1 & 2 of 110 MW, originally commissioned in 1985–86, went down in 2002–2003 and were renovated by Bharat Heavy Electricals who originally supplied equipment to these two units.

Units 3 & 4 are of 195 MW each. The plant is also known as George Fernandes Thermal Power Plant Station. [16] [17]

Nabinagar Super Thermal Power Project

The current installed capacity of this power plant is 660 MW and in future the plant will have a total capacity of 4380 MW with projects of 3720 MW under construction.

Nabinagar Power Generation Company Ltd (NPGCL), a 50:50 joint venture of NTPC Ltd and BSEB, is setting up the 4,380 MW (660 MW X 3), [18] which will start generating electricity from December 2017. The project's generation capacity initially was to be 3960 MW but in 2016, the production capacity was increased to 4380 MW. [19] Nabinagar Supercritical Thermal Power Project (STPP) in Nabinagar, Aurangabad, Bihar. [20] [21] [22] BHEL won a 2,854-crore contract for supply of the steam generator package for three coal-fired thermal units of 660 MW each with supercritical parameters. TRF Ltd, a Tata Group company, has won a 360.47-crore order from Nabinagar Power Generating Company Pvt. Ltd for designing, engineering, manufacturing, supplying, erecting, testing and commissioning of a coal handling plant for a 3 x 660MW coal-based super thermal power project coming up at Nabinagar. The coal handling plant will be designed to run at a capacity of 3,630 tons per hour. In March 2013, Alstom was awarded a contract worth approximately $115 million by BHEL, to supply components for three units of 660 MW supercritical boilers of NPGCL. Alstom India will supply transformers for NTPC's Supercritical Nabinagar Power Project, by winning a ₹105 crore order that covers design, engineering, manufacture, supply, testing, erection and commissioning of generator transformers and associated power transformers and shunt reactor. The Nabingar power transformer package is due to be delivered by October 2017. [23]

Nabinagar Thermal Power Project

The current installed capacity of this power plant is 750 MW and in future the plant will have a total capacity of 1000 MW with projects of 250 MW under construction.

Hydel power stations in Bihar

Koshi Hydel Power Station

Koshi Hydel Power Station which has an installed capacity of 19.2 MW (4x4.8) has been handed over to Bihar State Hydel Power Corporation on 11 November 2003.

Bihar Grid Company Limited

Bihar Grid Company Limited (BGCL) is a joint venture of Bihar State Power Holding Company Limited (BSPHCL) and Power Grid Corporation [24] to expand and strengthen electricity transmission in Bihar. [25] [26]

Power grids in Patna

There are 45 power sub-stations. [28] [29] The eight grids supply around 500MW of power to the state capital. [30]

Power grid substations in North Bihar

There are six grid substations in North Bihar. [31]

Forthcoming power plants in Bihar

Other projects

Upcoming Bihar thermal power plants:

Nuclear power plant

The Government of India has decided to reduce the capacity of the proposed nuclear power plant at Rajauli, Nawada by half.[ citation needed ]

Energy park

Karbigahia Thermal Power Station will be developed as the first-ever 'energy park' in Bihar. [38]

Rajiv Gandhi Gramin Vidyutikaran Yojana

In September 2012, 43 projects of rural electrification have been sanctioned for Bihar under Rajiv Gandhi Gramin Vidyutikaran Yojana.[ citation needed ]

See also

Related Research Articles

<span class="mw-page-title-main">Bharat Heavy Electricals Limited</span> Indian government-owned manufacturer

Bharat Heavy Electricals Limited (BHEL) is an Indian central public sector undertaking and the largest government-owned electrical/ industrial technology company. It is owned by the Government of India, with administrative control by the Ministry of Heavy Industries. Established in 1956 with the help of Soviet technology, BHEL is based in New Delhi.

<span class="mw-page-title-main">NLC India Limited</span> Central Public Sector Undertaking

NLC India Limited (NLC) is a central public sector undertaking under the administrative control of the Ministry of Coal, Government of India. It annually produces about 30 million tonnes of lignite from opencast mines at Neyveli in the state of Tamil Nadu in southern India and at Barsingsar in Bikaner district of Rajasthan state. The lignite is used at pithead thermal power stations of 3640 MW installed capacity to produce electricity. Its joint venture has a 1000 MW thermal power station using coal. Lately, it has diversified into renewable energy production and installed 1404 MW solar power plant to produce electricity from photovoltaic (PV) cells and 51 MW electricity from windmills.

Navinagar is a city cum Nagar Panchayat in Aurangabad district in the Indian state of Bihar, and is the location of Navinagar Super Thermal Power Project.

<span class="mw-page-title-main">Economy of Bihar</span>

Bihar has one of the fastest-growing economies in India. It is largely service-based, with a significant share of agricultural and industrial sectors. The GDP of the state was ₹9,76,514 crores at the current market price (2024–25).

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL) is wholly owned state thermal power utility with present generating capacity of 6134 MW, operating 4 Thermal Power Stations within Uttar Pradesh.

Panki Thermal Power Station is located at Panki in Kanpur, Uttar Pradesh. Its first stage was commissioned in 1967 by the then Prime Minister, Indira Gandhi. It has an installed capacity of 660 Mega Watts. The power plant is owned and operated by Uttar Pradesh Rajya Vidyut Utpadan Nigam. It has a 275 Metres high chimney which is one of the tallest structures in India

<span class="mw-page-title-main">Badarpur Thermal Power Station</span>

Badarpur Thermal Power Station was a Power Station located at Badarpur area in NCT Delhi. The power plant was one of the coal based power plants of NTPC. The National Power Training Institute (NPTI) for North India Region under Ministry of Power, Government of India was established at Badarpur in 1974, within the Badarpur Thermal power plant (BTPS) complex. The power plant permanently shut down on 15 October 2018.

<span class="mw-page-title-main">NTPC Limited</span> This page is about Maharatna PSU in India

NTPC Limited, formerly known as National Thermal Power Corporation, is an Indian central Public Sector Undertaking (PSU) under the ownership of the Ministry of Power and the Government of India, who is engaged in the generation of electricity and other activities. The headquarters of the PSU are situated at New Delhi. NTPC's core function is the generation and distribution of electricity to State Electricity Boards in India. The body also undertakes consultancy and turnkey project contracts that involve engineering, project management, construction management, and operation and management of power plants.

<span class="mw-page-title-main">Kanti Thermal Power Station</span>

NTPC Kanti also known as George Fernandes Thermal Power Plant Station is located in Kanti, Muzaffarpur, Bihar. George Fernandes was former Member of Parliament from Muzaffarpur constituency of Bihar. It is wholly owned subsidiary company of NTPC. The share of the company is 100% of the NTPC. The plant was not functional between 2003 and 2013; however, renovation of both older units paved the way for commercial production of electricity by the end of 2013.

<span class="mw-page-title-main">Sagardighi Thermal Power Station</span> Power station in West Bengal, India

Sagardighi Thermal Power Station is a thermal power plant located at Manigram, 13 km north of Sagardighi in the Indian state of West Bengal. The power plant is operated by the West Bengal Power Development Corporation Limited.

<span class="mw-page-title-main">Barh Super Thermal Power Station</span>

Barh Super Thermal Power Station or NTPC Barh is located in Barh in the Indian state of Bihar. NTPC Barh is located barely four kilometres (2.5 mi) east of the Barh sub-division on National Highway-31 in Patna district. The project has been named a mega power project, and is owned by Indian energy company National Thermal Power Corporation.

<span class="mw-page-title-main">Barauni Thermal Power Station</span> Building in India

NTPC, Barauni Or Barauni Thermal Power Station is an existing 500 megawatt coal-fired power station earlier owned by Bihar State Electricity Board (BSEB)and currently by NTPC Limited. The power station is located at Barauni in Begusarai district, Bihar, India. Barauni thermal power station in Bihar came into existence in association with the Russian collaboration and came into operation in the year 1962. Bihar Government was mulling over the idea to hand over Barauni Thermal Power Station to NTPC Limited. On 17 April 2018, Bihar state cabinet, headed by chief minister Nitish Kumar, gave its nod to handing over of Barauni Thermal Power Station to National Thermal Power Corporation. On 15 May 2018, Bihar Government signed a memorandum of understanding (MoU) to hand over the thermal plant to National Thermal Power Corporation for a 33- years lease. East Central Railway will provide uninterrupted supply of coal to thermal power station. NTPC completed the acquisition of 720 MW Barauni thermal power plant with effect from 15 December 2018. Unit-6 & 7 retired w.e.f. 31st March 2024. The units of Barauni power station will be progressively put under commercial operation.

Mauda Super Thermal Power Station or NTPC Mauda is located at Mauda a Tehsil in Ramtek subdivision of Nagpur district in Nagpur revenue Division in the Berar region in the state of Maharashtra, India. The power plant is one of the coal based power plants of National Thermal Power Corporation. 1000 MW Stage 1 was dedicated to nation by Prime Minister Narendra Modi on 21 August 2014.

<span class="mw-page-title-main">Vallur Thermal Power Station</span> Coal-fired power station in Tamil Nadu

Vallur Thermal Power Station is a power plant located in Vallur, Thiruvallur district, India. The power plant is operated by NTPC Tamil Nadu Energy Company Limited, a joint venture between NTPC Limited and TANGEDCO and has three units with 500 MW each.

Lalitpur Power Generation Company Limited is a coal-based thermal power plant located in Mahroni Tehsil in Lalitpur district, Uttar Pradesh. The power plant is owned by Bajaj Hindusthan Limited. Bharat Heavy Electricals is executing the project.

Nabinagar Super Thermal Power Project is a coal-based thermal power plant located at Sivanpur village in Ankorha in Nabinagar taluk in Aurangabad district, Bihar. It was conceptualised in 1989 by the then Chief Minister of Bihar Satyendra Narayan Sinha who sent the proposal to set up a NTPC's super thermal power project at Nabinagar in Bihar's Aurangabad district to then Prime Minister of India Rajiv Gandhi; but the project went into limbo as the following state governments failed to follow it. In 2007, Manmohan Singh's government finally put a stamp of approval on it.

Gadarwara Super Thermal Power Station is a coal based thermal power project located at near by Gangai village in Gadarwara Tehsil in Narsinghpur District in Indian state of Madhya Pradesh. The power plant is one of the coal based power plants of NTPC Limited. are the critical equipment supplier.

Darlipali Super Thermal Power Station at Darlipali village in Sundargarh district in Indian state of Odisha. The power plant is one of the coal based power plants of NTPC Limited. Coal will be obtained from Dulanga and Pakri Barwadih Coal Block and water supply will be sourced from the Hirakund Reservoir on the Mahanadi River through a pipeline at over a distance of about 30.0 km from project site. Plant is under construction by Bharat Heavy Electrical Limited (BHEL), L&T Power.

The Nabinagar Thermal Power Station Project (NTPS) of Bhartiya Rail Bijlee Company Limited is a wholly owned subsidiary of the Indian Railways, Ministry of Railways, Government of India. It installs a 4X 250 MW thermal power plant at Nabinagar in Aurangabad district, Bihar, India. Nearly 90 per cent of the electricity generated from the plant is supplied to the railways to meet nationwide requirements and remaining 10 per cent is given to Bihar.

Buxar Thermal Power Plant is a coal-based thermal power plant located at Chausa village in Buxar district, Bihar, India. It was conceptualized in 2013 when SJVN signed an MoU with Bihar State Power Holding Company Limited (BSPHCL) and Bihar Infrastructure Company (BPIC). Prime Minister Narendra Modi laid the foundation stone for this project in March 2019. Larsen & Toubro Limited holds the contract for the construction, at an estimated cost of Rs 7,000 crores. It is scheduled to open in 2023.

References

  1. "Administrative Setup at BSPHCL". BSPHCL. Retrieved 30 June 2024.
  2. Bihar gets coal block for thermal power projects The Economic Times. Retrieved 5 July 2013
  3. Huge business opportunities beckon in power sector in Bihar
  4. Bihar to take PPP route to trim T&D losses | Business Standard
  5. Bseb Plan size subsidy The Times of India. Retrieved 3 November 2012
  6. high tension wires power supply power board The Times of India. Retrieved 7 July 2013
  7. "High alert issued in Bihar as cyclone Phailin set to hit state". The Times of India. 12 October 2013. Retrieved 5 November 2013.
  8. "vide Bihar State Electricity Reforms Transfer Scheme, 2012 vide notification 17 dated 30.10.2012. (reference: BERC tariff Order 15.03.2013)" (PDF). Archived from the original (PDF) on 4 September 2014. Retrieved 4 November 2018.
  9. "Replace all old electric wires by December 2019: Nitish Kumar". The Times of India . 2 November 2018.
  10. "Coal Based Power Stations | NTPC". Archived from the original on 21 September 2022. Retrieved 6 April 2020.
  11. "Patna to hand over 3 power plants to NTPC". The Times of India . 18 April 2018.
  12. "Power Generation". Archived from the original on 15 October 2013. Retrieved 21 August 2014.
  13. Mishra, Satyavrat (31 March 2013). "Kanit, Barauni power plants to be ready by December | Business Standard News". Business Standard India. Business-standard.com. Retrieved 13 September 2019.
  14. "Centre assures coal linkage to Barauni project in Bihar soon | Business Standard News". Business Standard India. Business-standard.com. 15 March 2013. Retrieved 13 September 2019.
  15. "Barh-I & II power projects in perpetual problems – India's first NewsPortal on Projects". Projectsmonitor.com. 31 May 2014. Retrieved 13 September 2019.
  16. Jamal, Khwaja (30 October 2017). "Nitish vocal tonic to counter BJP claims". Telegraphindia.com. Archived from the original on 28 March 2015. Retrieved 13 September 2019.
  17. Nath Jha, Priti (15 November 2014). "Kanti's 110MW second unit starts power generation". The Times of India. Retrieved 13 September 2019.
  18. "Land acquisition a major hurdle". The Times of India . 27 August 2015.
  19. "Nabinagar plant may start power generation by year end". The Times of India . November 2017.
  20. "Nabinagar SuperTPP –Dist.: Aurangabad" (PDF). energy.bih.nic.in. Archived from the original (PDF) on 21 August 2014. Retrieved 14 September 2019.
  21. Bihar big leap towards ‘power’
  22. NTPC boss soothes Pankri nerves
  23. Sengupta, Debjoy (21 October 2013). "Alstom India will supply transformers for NTPC's Supercritical Nabinagar Power Project". The Economic Times. Economictimes.indiatimes.com. Retrieved 5 November 2013.
  24. "Press Release". Archived from the original on 24 September 2015. Retrieved 22 August 2015.
  25. "Ahead of Bihar polls, Nitish cabinet approves 16 schemes to push power sector". 22 August 2015.
  26. "News18.com: CNN-News18 Breaking News India, Latest News Headlines, Live News Updates". Ibnlive.com. Retrieved 13 September 2019.
  27. "Nitish lauds 'power-ful' all-women team". Archived from the original on 5 July 2018.
  28. "Gift of power for festival". Telegraphindia.com. 5 October 2013. Archived from the original on 21 October 2013. Retrieved 5 November 2013.
  29. CM opens four power grid stations
  30. "Alstom T&D India bags order to renovate Bihar grid | Business Standard News". Business Standard India. Business-standard.com. 21 May 2014. Retrieved 13 September 2019.
  31. "Two more grid substations to come up in north Bihar". The Times of India . 8 November 2016.
  32. Bihar to be self sufficient in power by 2015 – Rediff.com Business
  33. Bihar to buy 1,000 MW to provide power to all by 2015 | NDTV.com
  34. Additional power supply to light up more areas in Bihar this year | Business Line
  35. "Nitish Kumar hints at Bihar becoming a power surplus state". NDTV.com. 4 October 2013. Retrieved 5 November 2013.
  36. Raj, Anand (30 October 2017). "Land red flag for power plant". Telegraphindia.com. Archived from the original on 21 August 2014. Retrieved 13 September 2019.
  37. "Bihar CM Nitish Kumar says power condition has improved in Bihar". The Economic Times.
  38. "Bihar's first-ever energy park soon". The Times of India. 4 October 2013. Retrieved 5 November 2013.