Kanti Thermal Power Station (NTPC Kanti) | |
---|---|
Official name | Muzaffarpur Thermal Power Station, MTPS/KBUNL/GFTPS |
Country | India |
Location | Kanti, Bihar |
Coordinates | 26°04′N85°14′E / 26.07°N 85.24°E |
Status | Operational |
Commission date | 1985 |
Owner(s) | NTPC and BSPHCL or BSEB |
Operator(s) | Kanti Bijlee Utpadan Nigam Ltd. (KBUNL) |
Thermal power station | |
Primary fuel | Coal |
Power generation | |
Units operational | 2 X 195 MW |
Make and model | BHEL |
Nameplate capacity | 390 MW |
7 MW ( approx) |
NTPC Kanti also known as George Fernandes Thermal Power Plant Station [1] is located in Kanti, Muzaffarpur, Bihar. [2] George Fernandes was former Member of Parliament from Muzaffarpur constituency of Bihar. It is wholly owned subsidiary company of NTPC. [3] The share of the company is 100% of the NTPC. The plant was not functional between 2003 and 2013; however, renovation of both older units paved the way for commercial production of electricity by the end of 2013. [4]
In November 2013, Chief Minister Nitish Kumar said that another new 500 MW power plant will be set up at Kanti. The first 195 MW unit was commissioned by BHEL at the 2×195 MW plant in March 2015. [5] [6]
The second unit of the 2×195 MW was commissioned on 13 June 2016. Muzaffarpur Thermal Power Station has an installed capacity of 610 MW. Another 500 MW extension has been planned. East Central Railway will provide uninterrupted supply of coal to the thermal power station. [7] The electrification work between Kaparpura and Kanti stations will be completed.
First started in 1985, Kanti Power Plant had an initial installed capacity of 110×2 MW. An additional capacity of 195×2 MW was erected in 2015–16. Kanti thermal Power Plant came into existence with the efforts of then MP of Muzaffarpur, George Fernandes. [8] [9] [10] The construction of the plant began during George's first tenure as MP of Muzaffarpur in 1978. [11] In November 2014, Kanti plant was renamed as George Fernandes Thermal Power Plant to acknowledge his contribution. [12] [13] To take over Muzaffarpur Thermal Power Station (2*110MW), a subsidiary company named Vaishali Power Generating Company Limited with NTPC on 06/09/2006,-contributing 51% of equity; and the balance equity was contributed by Bihar State Electricity Board. The company was rechristened as ‘Kanti Bijlee Utpadan Nigam Limited’ on April 10, 2008. [14] [15] Present equity holding is 100% by ntpc and now it's not a joint venture but is a wholly owned subsidiary company of ntpc. The company renovated and modernized the existing unit.The total cost of its renovation and modernization has been over Rs. 500 crores.
In March 2013, the renovation work of two old units was completed. MTPS started commercial production from November 1, 2013, by supplying 94 MW. This is first generation in 11 years since 2002. [16] On 17 April 2018, Bihar state cabinet, headed by chief minister Nitish Kumar, gave its nod to handing over of Kanti Thermal Power Station to National Thermal Power Corporation. [17] On 15 May 2018, Bihar Government signed a memorandum of understanding (MoU) to hand over the thermal plant to National Thermal Power Corporation for a 33- years lease. [18] [19] [20]
In May 2023, NTPC Kanti secured the first position in Bihar and tenth position in India among power generation corporations, in terms of better plant load factor in the rankings released by Central Electricity Authority (India). Its plant load factor stood at 87.58%.
Stage | Unit number | Installed capacity (MW) | Date of commissioning | Status | Notes |
---|---|---|---|---|---|
Stage-1 | 1 | 110 | March 1985, recommissioned November 2013 | Under dismantling | This unit went down in 2003 and then its renovation started by Bharat Heavy Electricals in April 2008 and was running at full capacity since November 2013 till 2022. Being old unit the same was decided to scrap down. [21] |
Stage-1 | 2 | 110 | March 1986, recommissioned November 2014 | Under dismantling | This unit too is non functional since 2003 and was also renovated by Bharat Heavy Electricals. [22] But, since November 2014 this unit has been functional after the renovation and modernization work and was running at full capacity till 2022. Being old unit the same was decided to scrap down. [23] [24] |
Stage-2 | 3 | 195 | 5 May 2015 | Operational | The original planned capacity of the unit was 250 MW but was reduced to 195 MW Scheduled after Airport Authority of India raised concern over its chimney height. [25] Bhel commissioned the first 195MW unit at Muzaffarpur Thermal Power Station in India on 5 May 2015. The commissioning is the first of the two units at 390MW Muzaffarpur Thermal Power Station (TPS). [26] [ unreliable source? ] |
Stage-2 | 4 | 195 | 13 June 2016 | Operational | Original planned capacity was 250 MW but reduced to 195 MW. [27] Total installed capacity becomes 610 MW. |
Total | 610 |
Muzaffarpur District is one of the thirty-eight districts of Bihar state, India. Muzaffarpur district is part of and also the headquarters of Tirhut Division Tirhut is the ancient name of all of northern Bihar.
Aurangabad is a city in Aurangabad District, Bihar, India. It is the district's centre of governance and has a population of 102,244 as of 2011. The people of this region speak Magahi and Hindi.
Navinagar is a city cum Nagar Panchayat in Aurangabad district in the Indian state of Bihar, and is the location of Navinagar Super Thermal Power Project.
Bihar is a state located in the eastern part of India.
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL) is wholly owned state thermal power utility with present generating capacity of 6134 MW, operating 4 Thermal Power Stations within Uttar Pradesh.
NSPCL is a joint venture of National Thermal Power Corporation and Steel Authority of India Limited. engaged in power generation primarily to meet the captive power requirement of various steel plants of SAIL throughout India. It is one of the institutional category III profit making Indian PSEs.
NTPC Limited, formerly known as National Thermal Power Corporation, is an Indian central Public Sector Undertaking (PSU) under the ownership of the Ministry of Power and the Government of India, who is engaged in the generation of electricity and other activities. The headquarters of the PSU are situated at New Delhi. NTPC's core function is the generation and distribution of electricity to State Electricity Boards in India. The body also undertakes consultancy and turnkey project contracts that involve engineering, project management, construction management, and operation and management of power plants.
The Koldam Hydropower Station, commonly known as Koldam, is an embankment dam on the Sutlej River upstream of the Dehar Power House. It is 18 km from Bilaspur off the Chandigarh-Manali Highway (NH-21) near Barmana, Himachal Pradesh, India. The main purpose of the dam is hydroelectric power generation and it will support an 800 MW power station. The dam was constructed by NTPC Limited.
Kahalgaon Super Thermal Power Station (KhSTPP)is located in Kahalgaon in Bhagalpur district of Bihar. The power plant is one of the coal based power plants of NTPC. The coal for the power plant is sourced from Rajmahal coalfield of Eastern Coalfields Limited. Source of water for the power plant is Ganga River.
Talcher Thermal Power station is located in Talcher sub-division of Angul district in the Indian state of Odisha Pin.759101. The existing plant was closed on 31 March 2021 with the plans to set up a new plant still in discussion phase. The power plant is one of the coal-based plants of NTPC. The coal for the power plant is sourced from Jagannath Mines of Mahanadi Coalfields Limited. Source of water for the plant is from Brahmani River. It has its own railway station and is well connected to three other important stations in close vicinity: Talcher Road, Angul and Talcher Stations. This power plant has been ranked among the best power plants in the country despite being the oldest plant in the state. It has consistently topped the charts in NTPC for the last four years and was also the nation's top power plant in 2015-16.
Bihar State Power Holding Company Limited (BSPHCL), formerly Bihar State Electricity Board (BSEB) is a state-owned electricity regulation board operating within the state of Bihar in India. BSEB was established in 1958 as a statutory corporation under the Electricity (Supply) Act, 1948. As of November 2012, BSEB has nearly 1,700 officers and 14,850 employees. The derated capacity comes to just 530 MW. The BSEB was unbundled on 2 August 2011. Power Finance Corporation was the main consultant for BSEB's restructuring.
The Rampal Power Station is a 1320 megawatt coal-fired power station currently under construction at Rampal Upazila of Bagerhat District in Khulna, Bangladesh. The power plant, being constructed over 1834 acres of land, is situated 14 kilometres north of the world's largest mangrove forest Sundarbans, which is a UNESCO World Heritage Site. It will be the country's largest power plant.
Barh Super Thermal Power Station or NTPC Barh is located in Barh in the Indian state of Bihar. NTPC Barh is located barely four kilometres (2.5 mi) east of the Barh sub-division on National Highway-31 in Patna district. The project has been named a mega power project, and is owned by Indian energy company National Thermal Power Corporation.
NTPC, Barauni Or Barauni Thermal Power Station is an existing 500 megawatt coal-fired power station earlier owned by Bihar State Electricity Board (BSEB)and currently by NTPC Limited. The power station is located at Barauni in Begusarai district, Bihar, India. Barauni thermal power station in Bihar came into existence in association with the Russian collaboration and came into operation in the year 1962. Bihar Government was mulling over the idea to hand over Barauni Thermal Power Station to NTPC Limited. On 17 April 2018, Bihar state cabinet, headed by chief minister Nitish Kumar, gave its nod to handing over of Barauni Thermal Power Station to National Thermal Power Corporation. On 15 May 2018, Bihar Government signed a memorandum of understanding (MoU) to hand over the thermal plant to National Thermal Power Corporation for a 33- years lease. East Central Railway will provide uninterrupted supply of coal to thermal power station. NTPC completed the acquisition of 720 MW Barauni thermal power plant with effect from 15 December 2018. Unit-6 & 7 retired w.e.f. 31st March 2024. The units of Barauni power station will be progressively put under commercial operation.
Mauda Super Thermal Power Station or NTPC Mauda is located at Mauda a Tehsil in Ramtek subdivision of Nagpur district in Nagpur revenue Division in the Berar region in the state of Maharashtra, India. The power plant is one of the coal based power plants of National Thermal Power Corporation. 1000 MW Stage 1 was dedicated to nation by Prime Minister Narendra Modi on 21 August 2014.
Vallur Thermal Power Station is a power plant located in Vallur, Thiruvallur district, India. The power plant is operated by NTPC Tamil Nadu Energy Company Limited, a joint venture between NTPC Limited and TANGEDCO and has three units with 500 MW each.
Nabinagar Super Thermal Power Project is a coal-based thermal power plant located at Sivanpur village in Ankorha in Nabinagar taluk in Aurangabad district, Bihar. It was conceptualised in 1989 by the then Chief Minister of Bihar Satyendra Narayan Sinha who sent the proposal to set up a NTPC's super thermal power project at Nabinagar in Bihar's Aurangabad district to then Prime Minister of India Rajiv Gandhi; but the project went into limbo as the following state governments failed to follow it. In 2007, Manmohan Singh's government finally put a stamp of approval on it.
Gadarwara Super Thermal Power Station is a coal based thermal power project located at near by Gangai village in Gadarwara Tehsil in Narsinghpur District in Indian state of Madhya Pradesh. The power plant is one of the coal based power plants of NTPC Limited. are the critical equipment supplier.
The Nabinagar Thermal Power Station Project (NTPS) of Bhartiya Rail Bijlee Company Limited is a wholly owned subsidiary of the Indian Railways, Ministry of Railways, Government of India. It installs a 4X 250 MW thermal power plant at Nabinagar in Aurangabad district, Bihar, India. Nearly 90 per cent of the electricity generated from the plant is supplied to the railways to meet nationwide requirements and remaining 10 per cent is given to Bihar.
The Singareni Thermal Power Plant (STPP) is a coal-fired power station in Pegadapalli, a village in Jaipur mandal in Mancherial district of Telangana, India. The power plant has an installed capacity of 1200 MW, consisting of two 600 MW units, and is operated by the Singareni Collieries Company.