Nabinagar Super Thermal Power Project

Last updated

Nabinagar Power Generating Company
Nabinagar Super Thermal Power Project
Location of the Nabinagar Power Generating Company
CountryIndia
LocationAnkorha, Aurangabad district, Bihar
Coordinates 24°46′34″N84°09′29″E / 24.776°N 84.158°E / 24.776; 84.158
StatusOperational
Construction began2011
Commission date under construction
Owner NTPC
OperatorNabinagar Power Generating Company
Thermal power station
Primary fuel Coal
Power generation
Units operational3 Unit 1980 MW is operational
Make and model BHEL and Alstom
Nameplate capacity 1,980 MW upcoming

Nabinagar Super Thermal Power Project is a coal-based thermal power plant located at Sivanpur village in Ankorha in Nabinagar taluk in Aurangabad district, Bihar. It was conceptualised in 1989 by the then Chief Minister of Bihar Satyendra Narayan Sinha who sent the [1] proposal to set up a NTPC's super thermal power project at Nabinagar in Bihar's Aurangabad district to then Prime Minister of India Rajiv Gandhi; but the project went into limbo as the following state governments failed to follow it. In 2007, Manmohan Singh's [2] government finally put a stamp of approval on it.

Contents

The power plant is owned by the Nabinagar Power Generating Company [3] [4] - initially a 50:50 joint venture between NTPC Limited and Bihar State Power Holding Company Limited. [5] The Nabinagar plant will have capacity of 4380 MW( 660MW X 6). [6] The project's generation capacity initially was to be 3960 MW but in 2016, [7] the production capacity was increased to 4380 MW. [8] Nabinagar Super Thermal Power Project will be third largest power project in India, after 4700 MW Vindhyachal Thermal Power Station (Singrauli) and maharashtra belar.

This Super Thermal Power Project is spread over 2970 acres, which includes 150 acre of land for the township and 63 acres of land for construction of rail corridor. [9] On 17 April 2018, Bihar state cabinet, headed by chief minister Nitish Kumar, gave its nod to handing over of Nabinagar Power Generating Company to National Thermal Power Corporation. [10] On 15 May 2018, Bihar Government signed a memorandum of understanding (MoU) to hand over the thermal plant to National Thermal Power Corporation for a 33- years lease. [11] [12] [13] For the Nabinagar plant's Bihar would get 78% of the electricity generated from the plant, while UP would get 11%, jharkhand 3% and Sikkim 1%.

Capacity

The planned capacity of the power plant in 1980 MW (3x660 MW). Unit-1 with capacity to generate 660MW, is scheduled to be commissioned in Dec'18. [14]

StageUnit NumberCapacity (MW)Date of CommissioningStatus
1st1660Sep 6, 2019Running [15]
1st2660July 30, 2021Running
1st3660June 1, 2022Running

Future expansion

There is a plan to add three units of 800 MW each at the site in future.

See also

Related Research Articles

Aurangabad is a city in Aurangabad District, Bihar, India. It is the district's centre of governance and has a population of 102,244 as of 2011. The people of this region speak Magahi and Hindi.

Navinagar is a city cum Nagar Panchayat in Aurangabad district in the Indian state of Bihar, and is the location of Navinagar Super Thermal Power Project.

<span class="mw-page-title-main">Maharashtra State Power Generation Company</span> Wholly owned subsidiary of Maharashtra State Electricity Board (MSEB)

The Mahanirmiti or Mahagenco formerly known as MSEB is a major power generating plants in the state of Maharashtra, India and a wholly owned subsidiary of Maharashtra State Electricity Board. With a total generation of 14,400 MW, it is the largest power producing plants in India controlled by state government. The power generated by Mahagenco is supplied to Maharashtra. It was a part of Maharashtra State Electricity Board until 6 June 2005.

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL) is wholly owned state thermal power utility with present generating capacity of 6134 MW, operating 4 Thermal Power Stations within Uttar Pradesh.

<span class="mw-page-title-main">NSPCL</span>

NSPCL is a joint venture of National Thermal Power Corporation and Steel Authority of India Limited. engaged in power generation primarily to meet the captive power requirement of various steel plants of SAIL throughout India. It is one of the institutional category III profit making Indian PSEs.

<span class="mw-page-title-main">NTPC Limited</span> This page is about Maharatna PSU in India

NTPC Limited, formerly known as National Thermal Power Corporation, is an Indian central Public Sector Undertaking (PSU) under the ownership of the Ministry of Power and the Government of India, who is engaged in the generation of electricity and other activities. The headquarters of the PSU are situated at New Delhi. NTPC's core function is the generation and distribution of electricity to State Electricity Boards in India. The body also undertakes consultancy and turnkey project contracts that involve engineering, project management, construction management, and operation and management of power plants.

<span class="mw-page-title-main">Kahalgaon Super Thermal Power Station</span> Indian coal power plant

Kahalgaon Super Thermal Power Station (KhSTPP)is located in Kahalgaon in Bhagalpur district of Bihar. The power plant is one of the coal based power plants of NTPC. The coal for the power plant is sourced from Rajmahal coalfield of Eastern Coalfields Limited. Source of water for the power plant is Ganga River.

<span class="mw-page-title-main">Talcher Thermal Power Station</span>

Talcher Thermal Power station is located in Talcher sub-division of Angul district in the Indian state of Odisha Pin.759101. The existing plant was closed on 31 March 2021 with the plans to set up a new plant still in discussion phase. The power plant is one of the coal-based plants of NTPC. The coal for the power plant is sourced from Jagannath Mines of Mahanadi Coalfields Limited. Source of water for the plant is from Brahmani River. It has its own railway station and is well connected to three other important stations in close vicinity: Talcher Road, Angul and Talcher Stations. This power plant has been ranked among the best power plants in the country despite being the oldest plant in the state. It has consistently topped the charts in NTPC for the last four years and was also the nation's top power plant in 2015-16.

<span class="mw-page-title-main">Simhadri Super Thermal Power Station</span> Building in India

Simhadri Super Thermal Power Plant is a coal-fired power plant located in the outskirts of Visakhapatnam city in the Indian state of Andhra Pradesh. The power plant is one of the coal fired power plants of NTPC, a Government of India enterprise. The coal for the power plant is sourced from Kalinga Block of Talcher Coal fields in Odisha. The plant is a national asset, and power generated is shared between multiple states, as the operator is national. Power generated by units 1 and 2, making up for 1,000 MW, is dedicated to power distribution companies owned by the Government of Andhra Pradesh and Telangana. The remaining 1,000 MW, generated by units 3 and 4, is allocated to the states of Odisha, Tamil Nadu, Karnataka, Andhra Pradesh, Telangana and Puducherry as per their shares as decided in PPA.

<span class="mw-page-title-main">Kanti Thermal Power Station</span>

NTPC Kanti also known as George Fernandes Thermal Power Plant Station is located in Kanti, Muzaffarpur, Bihar. George Fernandes was former Member of Parliament from Muzaffarpur constituency of Bihar. It is wholly owned subsidiary company of NTPC. The share of the company is 100% of the NTPC. The plant was not functional between 2003 and 2013; however, renovation of both older units paved the way for commercial production of electricity by the end of 2013.

Bihar State Power Holding Company Limited (BSPHCL), formerly Bihar State Electricity Board (BSEB) is a state-owned electricity regulation board operating within the state of Bihar in India. BSEB was established in 1958 as a statutory corporation under the Electricity (Supply) Act, 1948. As of November 2012, BSEB has nearly 1,700 officers and 14,850 employees. The derated capacity comes to just 530 MW. The BSEB was unbundled on 2 August 2011. Power Finance Corporation was the main consultant for BSEB's restructuring.

<span class="mw-page-title-main">Barh Super Thermal Power Station</span>

Barh Super Thermal Power Station or NTPC Barh is located in Barh in the Indian state of Bihar. NTPC Barh is located barely four kilometres (2.5 mi) east of the Barh sub-division on National Highway-31 in Patna district. The project has been named a mega power project, and is owned by Indian energy company National Thermal Power Corporation.

<span class="mw-page-title-main">Barauni Thermal Power Station</span> Building in India

NTPC, Barauni Or Barauni Thermal Power Station is an existing 500 megawatt coal-fired power station earlier owned by Bihar State Electricity Board (BSEB)and currently by NTPC Limited. The power station is located at Barauni in Begusarai district, Bihar, India. Barauni thermal power station in Bihar came into existence in association with the Russian collaboration and came into operation in the year 1962. Bihar Government was mulling over the idea to hand over Barauni Thermal Power Station to NTPC Limited. On 17 April 2018, Bihar state cabinet, headed by chief minister Nitish Kumar, gave its nod to handing over of Barauni Thermal Power Station to National Thermal Power Corporation. On 15 May 2018, Bihar Government signed a memorandum of understanding (MoU) to hand over the thermal plant to National Thermal Power Corporation for a 33- years lease. East Central Railway will provide uninterrupted supply of coal to thermal power station. NTPC completed the acquisition of 720 MW Barauni thermal power plant with effect from 15 December 2018. Unit-6 & 7 retired w.e.f. 31st March 2024. The units of Barauni power station will be progressively put under commercial operation.

Solapur Super Thermal Power Station is under construction located at Fatatewadi and Aherwadi village in Solapur district in Indian state of Maharashtra. The power plant is one of the coal based power plants of National Thermal Power Corporation Limited (NTPCL).

<span class="mw-page-title-main">Meja Thermal Power Station</span> Planned thermal power plant in Uttar Pradesh, India

Meja Thermal Power Station is an upcoming coal-based thermal power plant located in Meja Tehsil in Prayagraj district, Uttar Pradesh. The power plant is owned by the Meja Urja Nigam Private Limited (MUNPL) a joint venture between NTPC Limited and Uttar Pradesh Rajya Vidyut Utpadan Nigam. The planned capacity of the power plant is 1320 MW (2x660MW). Meja Thermal Power Station is an upcoming coal-based thermal power plant located in Meja Tehsil in Allahabad district, Uttar Pradesh.

<span class="mw-page-title-main">North Karanpura Thermal Power Station</span>

North Karanpura Thermal Power Station is an upcoming coal-based thermal power plant located in Tandwa in the Simaria subdivision of the Chatra district, Jharkhand. The power plant is owned by NTPC Limited.

The Nabinagar Thermal Power Station Project (NTPS) of Bhartiya Rail Bijlee Company Limited is a wholly owned subsidiary of the Indian Railways, Ministry of Railways, Government of India. It installs a 4X 250 MW thermal power plant at Nabinagar in Aurangabad district, Bihar, India. Nearly 90 per cent of the electricity generated from the plant is supplied to the railways to meet nationwide requirements and remaining 10 per cent is given to Bihar.

Katwa Super Thermal Power Station is located near Srikhanda Village, 8 km from Katwa town in West Bengal. The power plant is one of the coal based power plants of NTPC. It is under construction.

<span class="mw-page-title-main">Telangana Super Thermal Power Project</span>

Telangana Super Thermal Power Project(TSTPP) is in Telangana, India. The power plant is under construction with power capacity of 1600 MW (2x800 MW) in first phase and in total planned capacity of 4000 MW. It is the coal based power plant of National Thermal Power Corporation. It is being built near Ramagundam city in Peddapalli District. The first Unit, 800MW, was inaugurated by PM Modi on 3 October 2023. The second unit was inaugurated by PM Modi on 4 March 2024.

References

  1. "S N Sinha's brainchild NTPC project gets approval". Hindustan Times. India. Archived from the original on 5 June 2011. Retrieved 23 February 2007.
  2. "PM DR MANMOHAN SINGH APPROVES NTPC PROJECT IN BIHAR PROMISED BY THEN CM SN SINHA". Hindustan Times. India. Archived from the original on 5 June 2011. Retrieved 23 February 2007.
  3. "NTPC to take over Kanti, Nabinagar JV plants for Rs3,000 crore". 11 March 2018.
  4. "NTPC to take over Kanti, Nabinagar JV plants". The Economic Times.
  5. "Archived copy" (PDF). Archived from the original (PDF) on 21 August 2014. Retrieved 21 August 2014.{{cite web}}: CS1 maint: archived copy as title (link)
  6. "Land acquisition a major hurdle". The Times of India .
  7. "Bihar to get 179 MW more power from Nabinagar plant". The Hindu . 14 August 2016.
  8. "Nabinagar plant may start power generation by year end". The Times of India .
  9. "Nabinagar plant may start power generation by year end". The Times of India .
  10. "Patna to hand over 3 power plants to NTPC". The Times of India .
  11. "State happy with power deal". Archived from the original on 18 May 2018.
  12. "Bihar transfers 3 power plants to NTPC on lease for 30 years". The Times of India .
  13. "NTPC signs MoU with Government of Bihar; aims to improve performance of Power Sector in Bihar".
  14. "Aurangabad power plant unit to be commissioned in December". The Times of India .
  15. https://economictimes.indiatimes.com/industry/energy/power/ntpc-commissions-first-unit-of-nabinagar-plant- commercial operation date (COD) completed -660 capacity-reaches-55786mw/articleshow/70247370.cms