British Rail MPV

Last updated

Railtrack Multi-Purpose Vehicle
SwRS100279.JPG
DR98926 at Swanwick
In service1999 - Present
Manufacturer Windhoff
Built at Münster
Family name CargoSprinter
Constructed1998-2001, 2012
Entered service1999-present
Number built
  • 18 single units
  • 32 double units
Formation1 or 2 cars
Operators Network Rail
Specifications
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge
Railtrack MPV, nos. DR98917+DR98967, at Doncaster Works on 27 July 2003. These purpose-built departmental vehicles were built to replace older trains converted from former passenger vehicles. DR98917 and DR98967 at Doncaster Works.JPG
Railtrack MPV, nos. DR98917+DR98967, at Doncaster Works on 27 July 2003. These purpose-built departmental vehicles were built to replace older trains converted from former passenger vehicles.
DR98915 and DR98965 passing through Lincoln on 26 October 2007 HPIM1807.JPG
DR98915 and DR98965 passing through Lincoln on 26 October 2007
DR98915 and DR98965 passing through Lincoln on 26 October 2007 HPIM1808.JPG
DR98915 and DR98965 passing through Lincoln on 26 October 2007

The Multiple-purpose Vehicle or MPV is a purpose-built departmental derivative of a diesel multiple unit. Twenty-five two-car units were ordered by Railtrack to enable it to replace its varied collection of ageing departmental vehicles, many of which were converted from redundant passenger stock.

Contents

The vehicles were built in Germany by Windhoff. The design is based on the Windhoff "CargoSprinter" units that are operated by Deutsche Bahn (Germany) and CRT Group (Australia). Normally a unit consists of one powered vehicle fitted with twin 265 kW (355 hp) Railpac diesel engines, [1] semi-permanently coupled to an unpowered slave unit without engines. The later orders for the South East of England and for overhead line replacement are instead composed of two powered units, to give better acceleration and top speed. [1] When first built there were problems with the vehicles being 'out of gauge' when running empty.[ citation needed ]

The concept of the design is that each vehicle has a driving cab and an under floor engine/transmission with Multiple unit (MU) control. The majority of each vehicle is a flat load bed that can carry combinations of 10-foot and 20-foot modules that are secured using the locking system for ISO standard containers. Modules can be changed as required to suit current requirements.

In 2005, two powered MPV units were used to form a "Freight Multiple Unit" for freight trials, made by coupling standard freight wagons in between the pair of MPV units. Temporary multiple unit control cables were run along the wagons in order to connect the two MPVs, which are acting as locomotives working as a push-pull train.

Variants

There are five distinct types of MPV unit that represent the development of the concept for use in the UK. All are owned by Network Rail.

Number RangeDescriptionComments
DR98901-902+DR98951-952PrototypesWork in semi-permanently coupled pairs, e.g. DR98907+DR98957.
DR98903-925+DR98953-974Production units
DR98926-932+DR98976-982
DR98001-014Overhead-Line MPVSome painted in White livery and some now in Network Rail yellow livery. Were used on West Coast Main Line, most are now stored.
DR97011-014Painted in Blue livery. Used on High Speed 1.

High output wiring train

For the replacement of overhead lines on the West Coast Main Line at the start of the 2000s, Railtrack designed and ordered two new self-powered High Output Wiring Trains (HOWT). The order was placed with Windhoff in July 1999 and the first train available for trials in Germany in June 2000 before being shipped to the United Kingdom shortly afterwards. The replacement program using the new trains began in November 2000. [2]

Replacement of a tensioned overhead span measuring 1000–1500 metres takes four hours with a HOWT, compared to sixteen hours for original method (using rolling stock and road-rail vehicles). [2] Up to 30 crew are required to operate the HOWT. [3]

The full train comprises nine vehicles; four MPV CargoSprinter-based units and five flatbed units. All of the units were designed to accept standard shipping container modules, secured with standard ISO twistlock clamps, allowing modules to be transferred as needed. After the full train has arrived at the work site it is split into five sections. The sections follow each other along the length of wire to be replaced, each performing a step in the wiring renewal process, according to the modules it carries: [2]

  1. Old wire recovery
    • MPV unit (short working platform), facing forwards
    • Flatbed unit (old wire cable drums)
  2. Catenary cleanup
    • Flatbed unit (long working platform)
    • Flatbed unit (long working platform)
  3. New wire deployment and tensioning
    • Flatbed unit (new wire cable drums)
    • MPV unit (short working platform), facing backwards
  4. Registration and alignment
    • MPV unit (short working platform), facing forwards
    • Flatbed (long working platform)
  5. Measuring and recording
    • MPV unit (recording/pantograph cabin; rotating working platform), facing backwards [2]

At the end of February 2003, a total of 650 wire lengths had been replaced by the two trains. Two conventional wiring trains would have taken over seven years, [2] as the conventional trains would be limited to one single sixteen-hour engineering possession per week (only available at weekends). [2] The cost of each of the two trains was £3.3 million. [3]

Welsh freight trials

For a five-week period beginning in March 2005, trials were undertaken in Wales, transporting timber from Aberystwyth to a wood-chip factory at Chirk.

The daily service, arrived at Aberystwyth at 09:22, allowed approximately 2.5 hours for loading of the timber and then departed, loaded, at 11:50 as 6Z21. [4] On the single-track Cambrian Line the freight service was timed to follow in the footsteps of a regular passenger service to avoid potentials for delay. [5] The combined freight multiple unit (FMU) reversed in platform three at Wrexham General railway station and continued to the Kronospan private siding at Chirk.

The formation used the two halves of an MPV pair, sandwiched around seven open-sided air-braked timber (OTA) wagons. The MPV vehicles are normally designed to carry a combination of short shipping containers, and for the trial, one specially built containerised timber carrying module was constructed for the trial at a cost of around £15,000 [5] and mounted on MPV DR98919. For the trial, the other MPV vehicle (DR98916) carried a water-tank module for ballast. [4] MPV units normally operate as pair consisting of a powered unit and an unpowered trailer; for the timber trials, both of the MPV units were powered versions. Additional mobile cab signalling equipment had to be carried. [5]

The trial had been scheduled to being on 3 March 2005. The first trip took place on 5 March 2005 and continued on weekdays until 1 April 2005. Loading at the Aberystwyth end was done with the train directly on the running line as no suitable terminal facilities were available and could be managed in as little as 90 minutes, with the use of three lorries delivering the timber supply. [5]

Out of the twenty-five scheduled journeys in the trial, nineteen were run, transporting a total of 2845 tonnes of timber (an average of 150–154 tonnes per trip). [5] Loading capacity was reduced on the first journey by an imposed requirement by Network Rail to tow a British Rail Class 37 at the rear of the train as insurance up the thirteen-mile [4] 1-in-47 incline at Talerddig. [5]

Switches and Crossings video train

DR98008 configured as the S&C video train in 2011 DR98008 , Claycross Tunnel.jpg
DR98008 configured as the S&C video train in 2011

Double-ended single-unit MPV number DR98008 is used by the Network Rail Asset Information department as a track geometry and video train. [6] In the Manchester area the unit is allowed to operate permissively throughout all station areas, replacing a large number of walked inspections. [6]

Accidents and incidents

See also

Related Research Articles

<span class="mw-page-title-main">Locomotive</span> Self-propelled railway vehicle

A locomotive is a rail transport vehicle that provides the motive power for a train. If a locomotive is capable of carrying a payload, it is usually rather referred to as a multiple unit, motor coach, railcar or power car; the use of these self-propelled vehicles is increasingly common for passenger trains, but rare for freight trains.

<span class="mw-page-title-main">Multiple unit</span> Self-propelled train

A multiple-unit train is a self-propelled train composed of one or more carriages joined, which if coupled to another multiple unit can be controlled by a single driver, with multiple-unit train control.

<span class="mw-page-title-main">Electric locomotive</span> Locomotive powered by electricity

An electric locomotive is a locomotive powered by electricity from overhead lines, a third rail or on-board energy storage such as a battery or a supercapacitor. Locomotives with on-board fuelled prime movers, such as diesel engines or gas turbines, are classed as diesel–electric or gas turbine–electric and not as electric locomotives, because the electric generator/motor combination serves only as a power transmission system.

The Train Protection & Warning System (TPWS) is a train protection system used throughout the British passenger main-line railway network, and in Victoria, Australia.

<span class="mw-page-title-main">British Rail Class 73</span> British bi-mode locomotive

The British Rail Class 73 is a British electro-diesel locomotive. This type is unusual in that it can operate on the Southern Region's 650 / 750 V DC third rail power supply, or an onboard diesel engine to allow it to be used on non-electrified routes. This makes it very versatile, although the diesel engine produces less power than is available from the third-rail power supply, so the locomotives are rarely used outside of the former Southern Region of British Rail. It is one of the first bi-mode locomotives ever built. Following the withdrawal and scrapping of the more powerful Class 74 bi-mode locomotives in 1977, the Class 73 was unique on the British railway network until the introduction of the Class 88 bi-mode locomotives in 2017. Ten locomotives have been scrapped.

<span class="mw-page-title-main">Signal passed at danger</span> Train passing stop signal without authority

A signal passed at danger (SPAD) is an event on a railway where a train passes a stop signal without authority. This is also known as running a red, in the United States as a stop signal overrun (SSO) and in Canada as passing a stop signal. SPAD is defined by Directive 2014/88/EU as any occasion when any part of a train proceeds beyond its authorised movement. Unauthorised movement means to pass:

<span class="mw-page-title-main">Railway brake</span> Component of railway rolling stock

A railway brake is a type of brake used on the cars of railway trains to enable deceleration, control acceleration (downhill) or to keep them immobile when parked. While the basic principle is similar to that on road vehicle usage, operational features are more complex because of the need to control multiple linked carriages and to be effective on vehicles left without a prime mover. Clasp brakes are one type of brakes historically used on trains.

A wide variety of diesel and electric multiple units have been used on Ireland's railways. This page lists all those that have been used. Except with the NIR Class 3000, the numbers given by each class in the lists below are those allocated to the coaches that make up the units in that class, otherwise, unit numbers are not used in Ireland.

<span class="mw-page-title-main">Pantograph (transport)</span> Power collection apparatus used by trains and light rail

A pantograph is an apparatus mounted on the roof of an electric train, tram or electric bus to collect power through contact with an overhead line. The term stems from the resemblance of some styles to the mechanical pantographs used for copying handwriting and drawings.

<span class="mw-page-title-main">Cambrian Line</span> Railway line in Wales, and in Shropshire, England

The Cambrian Line, sometimes split into the Cambrian Main Line and Cambrian Coast Line for its branches, is a railway line that runs from Shrewsbury, England, westwards to Aberystwyth and Pwllheli in Wales. Passenger train services are operated by Transport for Wales Rail between the western terminals of Pwllheli, in Gwynedd, and Aberystwyth, in Ceredigion, and the eastern terminal at Shrewsbury, Shropshire, as part of the Wales & Borders franchise. The railway line is widely regarded as scenic, as it passes through the Cambrian Mountains in central Wales, and along the coast of Cardigan Bay in Snowdonia National Park.

<span class="mw-page-title-main">British Rail Class 92</span> British electric railway freight locomotive

The British Rail Class 92 is a dual-voltage electric locomotive, which can run on 25 kV AC from overhead wires or 750 V DC from a third rail. It was designed specifically to operate services through the Channel Tunnel between Great Britain and France. Eurotunnel indicates the Class 92 locomotive as the reference for other locomotives which railway undertakings might want to get certified for usage in the Channel tunnel.

<span class="mw-page-title-main">British Rail Class 319</span> British electric passenger train

The British Rail Class 319 is an electric multiple unit passenger train built by British Rail Engineering Limited's Holgate Road carriage works for use on north–south cross-London services. These dual-voltage trains are capable of operating on 25 kV 50 Hz from AC overhead wires or 750 V DC from a third rail.

<span class="mw-page-title-main">Rail transport in Finland</span>

The Finnish railway network consists of a total track length of 9,216 km (5,727 mi). The railways are built with a broad 1,524 mm track gauge, of which 3,249 km (2,019 mi) is electrified. Passenger trains are operated by the state-owned enterprise VR that runs services on 7,225 km (4,489 mi) of track. These services cover all major cities and many rural areas, though the coverage is less than the coverage provided by the bus services. Most passenger train services originate or terminate at Helsinki Central railway station, and a large proportion of the passenger rail network radiates out of Helsinki. VR also operates freight services. Maintenance and construction of the railway network itself is the responsibility of the Finnish Rail Administration, which is a part of the Finnish Transport Agency. The network consists of six areal centres, that manage the use and maintenance of the routes in co-operation. Cargo yards and large stations may have their own signalling systems.

<span class="mw-page-title-main">British Rail Class 466</span> British Electric passenger trains

The British Rail Class 466 Networker is a fleet of 43 electric multiple units that were built by Metro-Cammell in 1993 and 1994. The units are currently operated by Southeastern.

<span class="mw-page-title-main">CargoSprinter</span> Freight multiple unit

The CargoSprinter is a freight multiple unit designed to transport freight or equipment. The CargoSprinter was designed by Windhoff GmbH (Germany) in the mid-1990s.

<span class="mw-page-title-main">British Rail Class 71</span> Class of electric locomotives

The British Rail Class 71 was an electric locomotive used on the Southern Region of British Railways. Unlike Southern Region electro-diesel locomotives they could not operate away from the electrified system.

<span class="mw-page-title-main">British Rail Class 318</span> British electric multiple-unit passenger trainset

The British Rail Class 318 is an electric multiple unit (EMU) passenger train which operates in west central Scotland. The units were introduced on 29 September 1986 as part of the electrification of the Ayrshire Coast Line between Glasgow Central and Ayr/Ardrossan with alternating current (AC) overhead lines. Their use was extended to Largs in January 1987. They were also used on the Inverclyde Line in small numbers. The trains currently operate Argyle Line, Cathcart Circle Line, North Clyde Line, Whifflet Line, Paisley Canal Line and Inverclyde Line services. Following the withdrawal of the Class 314 fleet in 2019, these units are the oldest working EMUs in Scotland, having been in revenue-earning service for more than 38 years.

Windhoff is a German manufacturer of specialised railways rolling stock, and heavy industrial plant. The company was founded in 1889.

<span class="mw-page-title-main">South African Class 21E</span> South African electric locomotive

The Transnet Freight Rail Class 21E of 2014 is a South African electric locomotive.

<span class="mw-page-title-main">NIR MPV</span>

The Multi-purpose vehicle is a purpose built departmental derivative of a diesel multiple unit constructed for use as a rail adhesion vehicle by NI Railways in Northern Ireland.

References

  1. 1 2 Butcher, Roger (May 2000). "New on-track plant". Rail Infrastructure No. 15. Archived from the original on 8 July 2011.
  2. 1 2 3 4 5 6 Walsh, Terry (3 April 2003). "The Introduction of High Output Wiring Trains to the UK" (PDF). OLE & Distribution Alliance. Archived from the original (PDF) on 15 July 2011. Retrieved 17 May 2009.
  3. 1 2 "New and faster overhead wiring train - Innovative products". International Railway Journal. March 2001. Retrieved 17 May 2009.
  4. 1 2 3 Crump, Eryl (15 March 2005). "Chasing the Cambrian timber train". The North Wales coast railway Notice Board.
  5. 1 2 3 4 5 6 Browne, John (May 2005). "Rail Freight Multiple Unit Trial, Aberystwyth to Chirk, March 2005, Final Report" (PDF). Archived from the original (PDF) on 7 October 2011. Retrieved 17 May 2009.
  6. 1 2 jlegay (21 December 2011). "Current deviations against current and withdrawn RGSs" (PDF). Rail Safety and Standards Board Ltd. Archived from the original (PDF) on 16 October 2011. Retrieved 5 January 2012. GE/RT8000/TS2 … MPV S&C Video Train No. DR98008. … allowed to operate permissively within stations at Manchester … MPV S&C Video train will ultimately allow the removal of daylight (and night) S&C patrols as the train takes over the role.
  7. 1 2 Rail Accident Investigation Branch (11 January 2018). "Runaway of a maintenance train near Markinch, Fife" (PDF). Retrieved 22 November 2020.
  8. "Runaway and derailment of a rail vehicle near Bury, Greater Manchester, 22 March 2016". Rail Accident Investigation Branch. 16 June 2016. Retrieved 8 November 2017.
  9. Dalton, Alastair. "Train crew injured jumping from runaway train in Fife". The Scotsman. Johnston Publishing Ltd. Retrieved 7 November 2017.
  10. "Report 11/2024 October 2024 Collision between on-track machines near to Strood, Kent 16 November 2023" (PDF). Rail Accident Investigation Branch. paras 77-82. Retrieved 24 October 2024.
  11. "Report 11/2024 October 2024 Collision between on-track machines near to Strood, Kent 16 November 2023" (PDF). Rail Accident Investigation Branch. Retrieved 24 October 2024.