Bruce Mansfield Power Plant | |
---|---|
Country | United States |
Location | Shippingport, Pennsylvania |
Coordinates | 40°38′04″N80°25′01″W / 40.63444°N 80.41694°W |
Status | Operational |
Commission date | Unit 1: 1976 Unit 2: 1977 Unit 3: 1980 |
Decommission date | Units 1–2: February 5, 2019 Unit 3: November 7, 2019 |
Owner | FirstEnergy |
Operator | FirstEnergy |
Thermal power station | |
Primary fuel | Coal |
Cooling source | Ohio River |
Power generation | |
Nameplate capacity | 2,490 MW |
External links | |
Commons | Related media on Commons |
Bruce Mansfield Power Plant was a 2.49-gigawatt (2,490 MW), coal power plant located in Shippingport, Pennsylvania in Beaver County, Pennsylvania. The plant was operated by FirstEnergy. It began operations in 1976 and was shut down in November 2019. [1]
Construction of Bruce Mansfield commenced in 1970. The plant was operated by Pennsylvania Power (a subsidiary of Ohio Edison). Its ownership was a consortium of Pennsylvania Power, Ohio Edison, Cleveland Electric Illuminating, Toledo Edison, and Duquesne Light to form the Central Area Power Coordination (CAPCO). [2] Bruce Mansfield began commercial operations of Unit 1 in 1976 with Units 2 and 3 following suit in 1977 and 1980 respectively. All three of the units generated 830 MW each with a nameplate capacity of 2490 MW. [3] The plant was named after D. Bruce Mansfield, a former chairman of Pennsylvania Power. [2] Murray Energy was the primary supplier of coal for Bruce Mansfield. The coal was shipped from West Virginia. [4]
FirstEnergy Solutions announced in August 2018 that they were closing Bruce Mansfield by June 2021. FirstEnergy Solutions blamed the wholesale market system, which PJM Interconnection operates on, for not relying on coal and nuclear plants. [5] PJM Interconnection conducted an analysis and concluded the plant's closure would not affect grid reliability. [6] The closure was moved back to November 2019 due to, "a lack of economic viability." [7]
Units 1 and 2 were installed with a flue-gas desulfurization (FGD) system to prevent sulfur dioxide (SO2) from being emitted into the atmosphere. [3] [8] Its chimney is 950 feet (290 m) tall. [3] The sludge was then transported 7 miles (11 km) by pipe to Little Blue Run Lake between Beaver County, Pennsylvania and Hancock County, West Virginia. [3] [8] When Unit 3 was constructed in 1980, an electrostatic precipitator (ESP) system, designed by the Weir Group, was installed instead for the unit to curb particulate emissions. [9] Its chimney is 600 feet (180 m) tall. [3] To reduce waste disposal from scrubbers at Bruce Mansfield, National Gypsum constructed a nearby plant in 1998 to process synthetic gypsum from the plant to produce drywall. [10] To deliver the gypsum for the nearby manufacturer, a forced-oxidation gypsum (FOG) system was built. [11] A $200 million dewatering facility was completed in 2016 in response to a 2012 settlement that prohibits the further disposal of byproduct at Little Blue Run Lake. The facility would separate byproduct from water and then be properly disposed of in a lined impoundment at Murray Energy's mine in Marshall County, West Virginia. [12] [13] The dewatering facility began operations in January 2017, but problems at the new facility forced the plant to go offline the following month. [14] The plant restarted two weeks later. [15]
A release of hydrogen sulfide (H2S) during repair work on a pipe killed two and injured four workers in August 2017. [16] The workers' families who experienced casualties in the accident filed lawsuits against FirstEnergy in November 2017 seeking damages. [17] Occupational Safety and Health Administration (OSHA) fined FirstEnergy $77,605 for workplace hazards and also fined subcontractor Enerfab $129,340 for failing to provide "appropriate respiratory protection". [18] FirstEnergy ultimately settled by paying a fine of $65,963. [19]
On January 10, 2018, Bruce Mansfield caught on fire causing damage to its roof and duct work. [20] In a filing later that month, FirstEnergy revealed that the fire caused significant damage to the equipment for Units 1 and 2. [21] The damage was severe enough that deactivation of both units were accelerated from June 2021 to February 5, 2019. [22]
Ethel Cain cites Bruce Mansfield Power Plant as inspiration for her album Perverts .
Drax power station is a large biomass power station in Drax, North Yorkshire, England. It has a 2.6 GW capacity for biomass and had a 1.29 GW capacity for coal that was retired in 2021. Its name comes from the nearby village of Drax. It is situated on the River Ouse between Selby and Goole. Its generating capacity of 3,906 megawatts (MW), which includes the shut down coal units, is the highest of any power station in the United Kingdom, providing about 6% of the United Kingdom's electricity supply.
FirstEnergy Corp. is a privately owned electric utility headquartered in Akron, Ohio. It was established when Ohio Edison merged with Centerior Energy in 1997. Its subsidiaries and affiliates are involved in the distribution, transmission, and generation of electricity, as well as energy management and other energy-related services. Its ten electric utility operating companies comprise one of the United States' largest investor-owned utilities, based on serving 6 million customers within a 65,000-square-mile (170,000 km2) area of Ohio, Pennsylvania, West Virginia, Virginia, Maryland, New Jersey, and New York. Its generation subsidiaries control more than 16,000 megawatts of capacity, and its distribution lines span over 194,000 miles. In 2018, FirstEnergy ranked 219 on the Fortune 500 list of the largest public corporations in the United States by revenue.
Homer City Generating Station is a decommissioned 2-GW coal-burning power station near Homer City, in Indiana County, Pennsylvania, USA. It is owned by hedge funds and private equity firms and is operated by NRG Energy. Units 1 and 2, rated at 660 MWe, began operation in 1969. Unit 3, rated at 692 MWe nameplate capacity, was launched in 1977. It employed about 124 people.
The Nanticoke Generating Station was a coal-fired power station in Nanticoke, Ontario in operation from 1972 to 2013. It was the largest coal power station in North America and, at full capacity, it could provide 3,964 MW of power into the southern Ontario power grid from its base in Nanticoke, Ontario, Canada, and provided as much as 15% of Ontario's electricity.
The William H. Zimmer Power Station, located near Moscow, Ohio, was a 1.35-gigawatt coal power plant. Planned by Cincinnati Gas and Electric (CG&E), with Columbus & Southern Ohio Electric and Dayton Power & Light (DP&L) as its partners, it was originally intended to be a nuclear power plant. Although once estimated to be 97% complete, poor construction and quality assurance (QA) led to the plant being converted to coal-fired generation. The plant began operations in 1991. Vistra Corp. acquired ownership in 2018 and operated the plant until its closure on May 31, 2022.
The W. H. Sammis Power Plant was a 2.23-gigawatt coal power plant in Stratton, Jefferson County, Ohio. The plant was operated by Energy Harbor. It began operations in 1960.
Coal generated about 19.5% of the electricity at utility-scale facilities in the United States in 2022, down from 38.6% in 2014 and 51% in 2001. In 2021, coal supplied 9.5 quadrillion British thermal units (2,800 TWh) of primary energy to electric power plants, which made up 90% of coal's contribution to U.S. energy supply. Utilities buy more than 90% of the coal consumed in the United States. There were over 200 coal powered units across the United States in 2024. Coal plants have been closing since the 2010s due to cheaper and cleaner natural gas and renewables. Due to measures such as scrubbers air pollution from the plants kills far fewer people nowadays, but deaths in 2020 from PM25 have been estimated at 1600. Environmentalists say that political action is needed to close them faster, to also reduce greenhouse gas emissions by the United States and better limit climate change.
The Dickerson Generating Station is an 853 MW electric generating plant owned by NRG Energy, located approximately two miles west of Dickerson, Maryland, on the eastern banks of the Potomac River.
The Wilton power station refers to a series of coal, oil, gas and biomass fired CHP power stations which provide electricity and heat for the Wilton International Complex, with excess electricity being sold to the National Grid. It is located on the Wilton site in Redcar and Cleveland, south of the town of Middlesbrough in North East England. The station has provided for the site since opening in 1952, when it was operated by ICI. The station is currently owned and operated by SembCorp Industries.
The Charles P. Crane Generating Station was a 400 megawatt (MW) coal power plant located on the Carroll Island Road in Bowleys Quarters, Maryland, 14 miles (23 km) east of Baltimore. The power plant was operated by C.P. Crane, LLC, a subsidiary of Avenue Capital Group. The station had two coal-fired generating units, rated at 190 and 209 MW nominal capacity, and powered by cyclone steam boilers. It also had a 16 MW oil-fired combustion turbine. The Crane station occupies 157 acres (64 ha) on the Middle River Neck Peninsula adjacent to the Seneca Creek tributary of the Gunpowder River, and is on the rural side of the Baltimore County Urban Rural Demarcation Line. The plant was closed in June 2018 and demolished via building implosion in August 2022.
Brunner Island Steam Electric Station is a coal-fired, alternatively natural gas-powered electrical generation facility in York County, Pennsylvania. It occupies most of the area of the eponymous island on Susquehanna River. The power plant has three major units, which came online in 1961, 1965, and 1969, with respective generating capacities of 334 MW, 390 MW, and 759 MW. In addition, three internal combustion generators were installed in 1967. Talen Energy will stop coal use at the plant in 2028.
Pleasants Power Station is a 1.3-gigawatt coal power plant located near Belmont, West Virginia in Pleasants County, West Virginia. The plant is owned by Energy Harbor and began operations in 1979. The power plant was the site of the Willow Island disaster in 1978.
Armstrong Power Station was a 356 megawatt (MW), coal power plant in Washington Township, Armstrong County along the Allegheny River across from Mahoning Creek and Templeton, Pennsylvania, about 10 miles (16 km) north of Kittanning, Pennsylvania. The plant operated from 1958 to 2012.
The Paradise Combined Cycle Plant is a natural gas power plant operated by the Tennessee Valley Authority (TVA). Located just east of Drakesboro, Kentucky, it was the highest power capacity power plant in Kentucky. The plant originally consisted of three coal units, with a combined capacity of 2,632 MW. Units 1 and 2 were retired in 2017, and replaced with the natural gas units, and Unit 3 was retired in 2020. The combined cycle natural gas plant had a capacity of 1.02-gigawatts as of 2017.
The George F. Weaton Power Station was a coal-fired power plant located in Potter Township, Beaver County, Pennsylvania, along the Ohio River. It was formerly owned by Horsehead Corporation and was completed in 1958 by Kaiser Engineers, later ICF International, at a cost of $30 million. Although the primary purpose of the plant was to supply power to the company's nearby zinc smelting operation, excess electricity could be sold to the local grid market via the site's 138,000 and 69,000 volt transmission lines, owned and operated by Duquesne Light. The power plant itself consisted of two 375,000 lb/h Combustion Engineering steam generators, two 55 megawatt Westinghouse tandem compound double flow steam turbines, and two 65 megawatt Westinghouse generators. The plant was idled in September 2011 and officially closed in July 2012, after more than 50 years of service.
Little Blue Run Lake or Little Blue Run is the largest coal ash impound in the United States. FirstEnergy owns the site, located in Western Pennsylvania and parts of the Northern Panhandle of West Virginia, and has disposed of billions of gallons of coal waste into the body of water. Several court cases have been brought against the company as a result of the damage caused by the company's practices at the site.
Longview Power Plant is a coal-fired power plant located near Maidsville, West Virginia. The plant's single unit generates 700 megawatt (MW) of electricity from run-of-mine coal and natural gas.
The Shell Pennsylvania Petrochemicals Complex, formally known as Shell Polymers Monaca, is an ethylene cracker plant located in Potter Township, Pennsylvania, United States, owned and operated by Shell Oil Company, the American subsidiary of supermajor oil company Royal Dutch Shell. The plant is near the interchange of Interstate 376 and Pennsylvania Route 18, about 25 miles (40 km) from Pittsburgh. Operations began in November, 2022 and will produce over a million tons per year of plastic pellets.
Hatfield's Ferry Power Station was a 1.7-gigawatt, coal power plant located in Greene County, Pennsylvania. The plant was operated by FirstEnergy. It began operations in 1969 and was shut down in 2013. The three emission stacks were imploded March 4, 2023 at 11:00 AM, and the remaining structure, the boiler house, was imploded on November 17, 2023 at 11:00 AM.
Nuclear power has been widely established in Pennsylvania since the 1950s and has grown to provide almost 25% of the energy produced in PA. This is achieved through the four active reactors currently operating. There are five inactive reactors in PA, including Three Mile Island, which had a partial meltdown and caused a reevaluation of nuclear reactor safety practices.