CSS Florida (cruiser)

Last updated

CSSFloridacruiser.jpg
CSS Florida
History
Naval ensign of the Confederate States of America (1863-1865).svgConfederate States
NameCSS Florida
BuilderWilliam C. Miller & Sons, Liverpool
LaunchedDecember 1861
CommissionedAugust 17, 1862
DecommissionedOctober 7, 1864
FateCaptured by US Navy; sunk in collision November 28, 1864
General characteristics
Length191 ft 0 in (58.2 m)
Beam27 ft 2 in (8.3 m)
Draft13 ft 0 in (4.0 m)
PropulsionSails and steam engine
Speed
  • 9.5 knots (17.6 km/h; 10.9 mph) under steam
  • 12 knots (22 km/h; 14 mph) under sail
Complement146
Armament
  • 6 × 6 in (152 mm) rifled cannon
  • 2 × 7 in (180 mm) rifled cannon
  • 1 × 12-pounder (5.4 kg) cannon
Illustration from Harper's Weekly in 1863 of CSS Florida (left) burning the clipper Jacob Bell (right) off the West Indies on 13 February 1863. She had captured Jacob Bell the previous day. CSS Florida sinking clipper Jacob Bell.JPG
Illustration from Harper's Weekly in 1863 of CSS Florida (left) burning the clipper Jacob Bell (right) off the West Indies on 13 February 1863. She had captured Jacob Bell the previous day.

CSS Florida was a sloop-of-war in the service of the Confederate States Navy. She served as a commerce raider during the American Civil War before being sunk in 1864.

Contents

Service history

Florida was built by the British firm William C. Miller & Sons of Toxteth, Liverpool. Launched in December 1861, [1] she was purchased by the Confederacy from Fawcett, Preston & Co., also of Liverpool, who provided her engines. Known in the shipyard as Oreto and initially called CSS Manassas by the Confederates, the ship was the first of several foreign-built commerce raiders commissioned as into the Confederate States Navy as CSS Florida. Union naval records often referred to her as Oreto or confused her with CSS Alabama, another Confederate vessel.

Florida departed England on 22 March 1862, bound for Nassau in the Bahamas. To avoid suspicions that she was destined for Confederate service, the ship was only loaded with enough coal to reach Nassau. However, once in Nassau she planned to meet with a Confederate ship, take on a portion of that ship's coal, and use the additional fuel to steam to the nearest Confederate port. However, having been built under foreign licence, she was the subject of much diplomatic and intelligence correspondence. [2] The governor of Nassau prevented Florida from attempting a rendezvous with her planned tender in Nassau harbor, so the two ships met instead near the more isolated Green Cay. There, stores, armaments, and coal were taken aboard the ship. While anchored off Green Cay, she was officially commissioned into the Confederate States Navy as CSS Florida on August 17, with Lieutenant John Newland Maffitt in command.

During her outfitting, yellow fever raged among her crew, in five days reducing her effective force to one fireman and four deckhands. In desperate plight she ran across to the Spanish colony of Cuba. In Cárdenas, Lieutenant Maffitt too was stricken with the disease.

In this condition, against all probability, Maffitt sailed her from Cárdenas to Mobile, Alabama. In an audacious dash, the "Prince of Privateers" braved a hail of projectiles from the Union blockaders and raced through them to anchor beneath the guns of Fort Morgan in Mobile Bay, where she was received with a hero's welcome by the war-weary citizens of Mobile. Florida had been unable to fight back not only because of sickness but because rammers, sights, beds, locks and quoins - necessary to use her guns - had, inadvertently, not been loaded in the Bahamas. Having resupplied her stores armed with the gun accessories she lacked, along with added crew members, Florida escaped to sea on January 16, 1863 under (now) Captain John Newland Maffitt. [3]

After coaling at Nassau, she spent six months off the coasts of North and South America and in the West Indies, with calls at neutral ports, all the while making captures and eluding the large Federal squadron pursuing her.

Florida sailed on July 27, 1863 from Bermuda for Brest, France, where she lay in the French naval dock from August 23, 1863, to February 12, 1864. There, broken in health, Maffitt relinquished command to Commander Joseph Nicholson Barney, whose ill health prompted an additional handover to Lieutenant Charles Manigault Morris. Departing for the West Indies, Florida bunkered (reloaded her coal bunkers) at Barbados, although the three months specified by British law had not elapsed since her last coaling at a British Empire port. She then skirted the U.S. coast, sailed east across the Atlantic Ocean to Tenerife in the Canary Islands and thence back southwest to Bahia, Brazil, arriving on October 4, 1864.

Anchored at Bahia on October 7, Florida, while her captain was ashore with half his crew, was caught defenseless in an illegal night attack by Commander Napoleon Collins, of the U.S. Navy steam sloop-of-war USS Wachusett. Towed to sea, she was sent to the United States as a prize, despite the Empire of Brazil's protests at the violation of its sovereignty. Commander Collins was court-martialed and was convicted of violating Brazilian territorial rights, but the verdict was set aside by United States Secretary of the Navy Gideon Welles. Collins won fame and eventual promotion for his daring capture of the raider.

At Newport News, Virginia, on November 28, 1864, Florida reached the end of her career when she sank under dubious circumstances after a collision with the United States Army Transport USAT Alliance, a troop ferry. Florida could therefore not be delivered to Brazil in satisfaction of the final court order, and could not rejoin the Confederate States Navy.

Florida captured 37 prizes in her impressive career. Two of her prizes were absorbed into the Confederate States Navy as CSS Tacony and CSS Clarence and in turn took 23 more prizes.

Today, many of the artifacts from CSS Florida are at the Hampton Roads Naval Museum.

The pirate Florida burning the barque Golconda, off Cape Henry, July 8, 1864 The pirate Florida burning the barque Golconda, off Cape Henry, July 8 - FL 1864.jpg
The pirate Florida burning the barque Golconda, off Cape Henry, July 8, 1864
The Florida intercepting the U.S. Mail steamer Electric Spark, from New York to New Orleans, July 10, 1864 The pirate Florida intercepting the U.S. Mail steamer Electric Spark, from New York to New Orleans, July 10 - FL 1864.jpg
The Florida intercepting the U.S. Mail steamer Electric Spark, from New York to New Orleans, July 10, 1864

Related Research Articles

CSS <i>Alabama</i> Confederate States Navy ship

CSS Alabama, a screw sloop-of-war built in 1862 for the Confederate States Navy. The vessel was built in Birkenhead on the River Mersey opposite Liverpool, England, by John Laird Sons and Company. Launched as Enrica, she was fitted out as a cruiser and commissioned as CSS Alabama on August 24, 1862. Under Captain Raphael Semmes, Alabama served as a successful commerce raider, attacking, capturing, and burning Union merchant and naval ships in the North Atlantic, as well as intercepting American grain ships bound for Europe. The Alabama continued its wrath through the West Indies and further into the East Indies, destroying over seven ships before returning to Europe. On June 11, 1864, the Alabama arrived at Cherbourg, France, where she was overhauled. Shortly after. A Union sloop-of-war, USS Kearsarge, arrived; and on June 19, the Battle of Cherbourg commenced outside the port of Cherbourg, France, whereby the Kearsarge sank the Alabama in approximately one hour after the Alabama's opening shot.

CSS <i>Shenandoah</i> Confederate Navy warship

CSS Shenandoah, formerly Sea King and later El Majidi, was an iron-framed, teak-planked, full-rigged sailing ship with auxiliary steam power chiefly known for her actions under Lieutenant Commander James Waddell as part of the Confederate States Navy during the American Civil War.

<span class="mw-page-title-main">John Newland Maffitt (privateer)</span> Officer in the Confederate States Navy

John Newland Maffitt was an officer in the Confederate States Navy who was nicknamed the "Prince of Privateers" due to his success as a blockade runner and commerce raider in the U.S. Civil War.

CSS <i>Owl</i>

CSSOwl was a blockade runner in the Confederate States Navy during the American Civil War. It was built by Jones Quiggen, a ship builder in Liverpool, England and launched on June 21, 1864.

CSS <i>Georgia</i> (1862)

CSSGeorgia was a screw steamer of the Confederate States Navy, acquired in 1863, and captured by the Union Navy in 1864.

CSS <i>Chickamauga</i> Warship

CSS Chickamauga, originally the blockade runner Edith, was purchased by the Confederate States Navy at Wilmington, North Carolina, in September 1864. In September, when she was nearly ready for sea, the Confederate Army sought unsuccessfully to retain her at that place for use as a troop and supply transport. On October 28, 1864, she put to sea under Lieutenant John Wilkinson (CSN) for a cruise north to the entrance of Long Island Sound, thence to St. George, Bermuda, for repairs and coal. She took several prizes before returning to Wilmington on November 19.

CSS <i>Sumter</i> Steam cruiser of the Confederate States Navy

CSS Sumter, converted from the 1859-built merchant steamer Habana, was the first steam cruiser of the Confederate States Navy during the American Civil War. She operated as a commerce raider in the Caribbean and in the Atlantic Ocean against Union merchant shipping between July and December 1861, taking eighteen prizes, but was trapped in Gibraltar by Union Navy warships. Decommissioned, she was sold in 1862 to the British office of a Confederate merchant and renamed Gibraltar, successfully running the Union blockade in 1863 and surviving the war.

CSS Savannah, later called Old Savannah and Oconee, was a gunboat in the Confederate States Navy during the American Civil War.

<span class="mw-page-title-main">Joseph Nicholson Barney</span>

Joseph Nicholson Barney was a career United States Navy officer (1835–1861) who served in the Confederate States Navy in the American Civil War (1861–1865).

USS <i>Wachusett</i> (1861) Gunboat of the United States Navy

USS Wachusett – the first U.S. Navy ship to be so named – was a large (1,032-ton), Mohican-class steam sloop-of-war that served the United States Navy during the American Civil War. She was outfitted as a gunboat and used by the Navy as part of the Union blockade of the Confederate States of America.

USS <i>Vanderbilt</i> Gunboat of the United States Navy

USS Vanderbilt was a heavy (3,360-ton) passenger steamship obtained by the Union Navy during the second year of the American Civil War and utilized as a cruiser.

USS <i>Adela</i> Gunboat of the United States Navy

USS Adela was a steamer captured by the Union Navy during the American Civil War. She was used by the Union Navy as a gunboat in support of the Union Navy blockade of Confederate waterways.

The first USS Adirondack was a large and powerful screw-assisted sloop of war with heavy guns, contracted by the Union Navy early in the American Civil War. She was intended for use by the Union Navy as a warship in support of the Union Navy blockade of Confederate waterways. Her career with the Navy proved to be short, yet active and historically important. USS Adirondack was one of four sister ships which included the Housatonic, Ossipee and Juniata.

<span class="mw-page-title-main">Bahia incident</span> 1864 naval skirmish in the American Civil War

The Bahia incident was a naval skirmish fought in late 1864 during the American Civil War. A Confederate navy warship was captured by a Union warship in the Port of Salvador, Bahia, Brazil. The engagement resulted in a United States victory, but also sparked an incident between the United States and Brazil, over the American violation of Brazil's neutrality by illegally attacking a vessel in a Brazilian harbor.

<span class="mw-page-title-main">Blockade runners of the American Civil War</span> Seagoing steam ships

During the American Civil War, blockade runners were used to get supplies through the Union blockade of the Confederate States of America that extended some 3,500 miles (5,600 km) along the Atlantic and Gulf of Mexico coastlines and the lower Mississippi River. The Confederacy had little industrial capability and could not indigenously produce the quantity of arms and other supplies needed to fight against the Union. To meet this need, numerous blockade runners were constructed in the British Isles and were used to import the guns, ordnance and other supplies that the Confederacy desperately needed, in exchange for cotton that the British textile industry needed greatly. To penetrate the blockade, these relatively lightweight shallow draft ships, mostly built in British shipyards and specially designed for speed, but not suited for transporting large quantities of cotton, had to cruise undetected, usually at night, through the Union blockade. The typical blockade runners were privately owned vessels often operating with a letter of marque issued by the Confederate government. If spotted, the blockade runners would attempt to outmaneuver or simply outrun any Union Navy warships on blockade patrol, often successfully.

<span class="mw-page-title-main">CSS Colonel Lamb</span>

The CSS Colonel Lamb was a twin Confederate blockade runner of the CSS Hope who participated in the American Civil War.

CSS Lapwing was a barque of the Confederate States of America of the American Civil War.

References

  1. "Launch of a Clipper Screw Steamer". Liverpool Mercury. No. 4314. Liverpool. 9 December 1861.
  2. Appletons' annual cyclopaedia and register of important events of the year: 1862. New York: D. Appleton & Company. 1863. p. 381.
  3. Appletons' annual cyclopaedia and register of important events of the year: 1862. New York: D. Appleton & Company. 1863. p. 600.

PD-icon.svg This article incorporates text from the public domain Dictionary of American Naval Fighting Ships .

37°04′24″N76°32′35″W / 37.0732°N 76.5431°W / 37.0732; -76.5431