TE3x CR1 | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Future Mass Rapid Transit (MRT) interchange and terminus | ||||||||||||||||
![]() Artist's impression of the future station's platform level [1] | ||||||||||||||||
General information | ||||||||||||||||
Coordinates | 1°20′23″N104°00′36″E / 1.3397141°N 104.0099672°E | |||||||||||||||
Owned by | Land Transport Authority | |||||||||||||||
Line(s) | ||||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
History | ||||||||||||||||
Opening | ~2040 | |||||||||||||||
Electrified | Yes | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
Changi Airport Terminal 5 MRT station is a future underground Mass Rapid Transit (MRT) interchange and terminal station on the Cross Island Line (CRL) and Thomson-East Coast Line (TEL). It will serve the future Changi Airport Terminal 5.
In July 2016, during the groundbreaking ceremony for the eastern stretch of the Thomson–East Coast line (TEL), then Transport Minister Khaw Boon Wan announced the possibility of extending the TEL to Changi Airport, to provide a more direct connection from the airport to the city. The extension will open along with the future Terminal 5 of the airport. [2] In March 2017, the Straits Times published an article mentioning the likelihood of the MRT station at Terminal 5 to interchange with the Cross Island line (CRL), though plans for that were yet to be final. [3] This was later confirmed by LTA in January 2019, during the announcement of Phase 1 of the CRL, stating that the station code "CR1" will be reserved for a station in Terminal 5. [4] Later that year on 25 May, LTA published the Land Transport Masterplan 2040, which confirmed the extension of both lines to the Terminal 5, with plans for the TEL to further extend to the existing Changi Airport MRT station on the East–West line and absorb the Changi Airport branch of that line, which includes Expo and Tanah Merah stations. [5] [6] [7]
In 2019, contract T316 for the construction of twin bored tunnels from Changi Airport station to Terminal 5 was awarded to Shanghai Tunnel Engineering Co (Singapore) Pte Ltd for S$321.7 million (US$240.07 million). [8] [9]
External image | |
---|---|
![]() |
On 14 May 2025, during the groundbreaking of Terminal 5, [10] the airport operator Changi Airport Group gave further confirmation of plans to extend the TEL and CRL to the terminal, and the first render of the station design was unveiled. [11] [12] [13]
The station will be built in the Terminal 5 ground transport centre. [14] The sculpted columns and ceilings of the future station are designed to evoke rain trees, creating a sense of connection to nature. [1]