Chongqing International Construction Corporation

Last updated
China Chongqing International Construction Corporation
Native name
重庆对外建设集团
Type State-owned enterprise
IndustryEngineering and construction
Founded1985
Headquarters,
Website cqcico.com

China Chongqing International Construction Corporation (also known as CICO) is a Chinese construction and engineering company and subsidiary of Chongqing Foreign Trade and Economic Cooperation Group Co., Ltd. (CFTEC) It is known as a project contractor for road building in Africa.[ citation needed ]

The company has taken on several road projects in Uganda, including the following: (a) It is the contractor for the Export Import Bank of China funded $350 million Entebbe–Kampala Expressway. [1] (b) Another road built by CICO, between 2010 and 2014 is the Fort Portal–Bundibugyo–Lamia Road. [1] (c) In another project, partially funded by the Nordic Development Fund, it built from 2009 until 2010, the 42 kilometres (26 mi) Matugga–Kapeeka Road. [2] [3]

The government of Liberia signed a contract in 2012 with CICO to rehabilitate the Monrovia-Gbarnga-Ganta highway, one of West Africa's key roads, which had decayed following the Second Liberian Civil War. [4] The $166-m project, funded by the World Bank and European Union, involves the paving of 180 km of road through 12 counties of the country, and the project contract contained provisions for the participation of Liberian-owned subcontractors. [4] The government's goal in the project is to upgrade road connections to neighbouring countries that form the Mano River Union. [4] In another World Bank funded project in Liberia, CICO was contracted in 2008 after the International Competitive Bidding process to build a $16-m Vai Town Bridge, which had earlier collapsed in 2007. [5] The completed bridge was dedicated at the end of 2011. [5]

Related Research Articles

Semuto is a town in the Central Region of Uganda. It is one of the urban centers in Nakaseke District.

Kapeeka is a town in Nakaseke District of the Central Region of Uganda.

Matugga–Kapeeka Road is a road in central Uganda, connecting the towns of Matugga in Wakiso District and Kapeeka in Nakaseke District.

Gulu–Nimule Road is a road in the Northern Region of Uganda, connecting the city of Gulu in Gulu District and the town of Nimule in Eastern Equatoria State in South Sudan, just north of the international border between the two countries. The road, known as Highway A104 in Uganda, continues into South Sudan as Highway A43.

The Karuma Hydroelectric Power Station is a 600 MW hydroelectric power project under construction in Uganda. When completed, it will be the largest power-generating installation in the country.

Isimba Hydroelectric Power Station is a 183.2 megawatts (245,700 hp) hydroelectric power station commissioned on 21 March 2019 in Uganda. Construction of this dam began in April 2015 and was completed in January 2019. Commercial operations began on 21 March 2019.

Chongqing Road Engineering Group is one of the largest individually owned construction groups in the western China region. The company's headquarters is in Yubei District of Chongqing, a provincial-level municipality of the People's Republic of China.

China Henan International Cooperation Group is a Chinese state owned construction and engineering company held by the provincial government of Henan. The construction company is known for being part of the "vanguard of the country's Africa drive".

Jiangxi Zhongmei Engineering Construction is a Chinese construction and engineering firm in the construction fields of roads, housing, public works, urban rail, mines, and hydropower as well as the installation of mechanical and electrical equipment and geological exploration. In overseas projects it is active in Kenya, Ethiopia, Ghana, Liberia, Togo, Namibia and Zambia. With 2012 revenue of $367 million from international projects, it was listed in 2013 by Engineering News-Record as the 164th largest international project contractor.

The Kampala–Jinja Expressway, also known as the Jinja–Kampala Expressway, is a proposed four-lane toll highway in Uganda, linking Kampala, the capital and largest city of Uganda, with the city of Jinja in the Eastern Region of Uganda.

The Masaka–Bukakata Road is a road in the Central Region of Uganda, connecting the city of Masaka to the lakeside town of Bukakata in Masaka District. As of September 2020, the road surface was gravel, which washed away when it rained, stranding motorists, traders and their merchandise.

The Mukono–Kyetume–Katosi–Nyenga Road is a road in the Central Region of Uganda, connecting the towns of Mukono, Kyetume and Katosi in Mukono District to Nkokonjeru and Nyenga in Buikwe District.

Rukungiri–Kihihi–Ishasha–Kanungu Road is a road in southwestern Uganda, connecting the town of Rukungiri in Rukungiri District and the town of Ishasha in Kanungu District, at the International border between Uganda and the Democratic Republic of the Congo. A spur of the road runs south from Kihihi to Kanungu.

Bumbobi–Bubulo–Lwakhakha Road is a road in the Eastern Region of Uganda, connecting the city of Mbale to the town of Lwakhakha at the International border with Kenya.

The Kampala–Mpigi Expressway, also Busega–Mpigi Expressway, is a four-lane, dual carriage highway under construction in the Central Region of Uganda, connecting, Kampala, the capital city, and Mpigi, the headquarters of Mpigi District.

The Tirinyi–Pallisa–Kamonkoli–Kumi Road is a road in the Eastern Region of Uganda, connecting the towns of Tirinyi in Kibuku District, Pallisa in Pallisa District, Kamonkoli in Budaka District, and Kumi in Kumi District.

The Kampala–Gulu Highway, also Kampala–Gulu Road, is a road connecting the capital city of Kampala, in the Central Region, with the city of Gulu, the largest urban centre in the Northern Region of Uganda.

Kayunga–Busaana–Nabuganyi Road is a road in the Central Region of Uganda, connecting the town of Kayunga to the town of Nabuganyi, on the western bank of the Victoria Nile, adjacent to the Isimba Hydroelectric Power Station.

The Kyaliwajjala–Kira–Kasangati–Matugga Road, also Kyaliwajjala–Matugga Road or Kira–Matugga Road, is a road in the Central Region of Uganda, connecting the neighborhood of Kyaliwajjala, in Kira Municipality in Wakiso District, to the town of Matugga, also in Wakiso District. This road is part of the 101 kilometres (63 mi) Kampala Outer Beltway Project.

The Kashenyi–Mitooma Road is a road in the Western Region of Uganda, connecting the town of Kashenyi in Bushenyi District with the town of Mitooma in Mitooma District. The road measures approximately 12 kilometres (7.5 mi), from end to end.

References

  1. 1 2 "China Helps Unlock Uganda's Economic Potential through Infrastructure Debt". China Radio International. 2013-11-05. Archived from the original on January 11, 2014.
  2. "Matugga-Kapeeka Road Works On Course". New Vision . 6 October 2010. Archived from the original on 11 January 2014. Retrieved 11 January 2014.
  3. "Chinese Firm to Construct 41 Kilometres Semuto-Matugga Road". New Vision. 9 December 2008.
  4. 1 2 3 "New Liberia government strikes first major road works deal". Africa Review. January 26, 2012. Archived from the original on November 7, 2017. Retrieved January 12, 2014.
  5. 1 2 "Vai Town Bridge Dedication Sets For 30 December". Public Agenda Online. Archived from the original on 2014-01-12. Retrieved 2014-01-12.