Coleridge Power Station

Last updated

Coleridge Power Station
Horizontal turbine (BTH) at Lake Coleridge power station - panoramio.jpg
Horizontal turbine (BTH) at Lake Coleridge power station
CountryNew Zealand
Location Canterbury
Coordinates 43°21′51″S171°31′37″E / 43.36417°S 171.52694°E / -43.36417; 171.52694
StatusOperational
Construction began1911
Owner(s) Manawa Energy [1]
Reservoir
Creates Lake Coleridge
Power Station
Commission date1914
Type Conventional
Turbines 3 (1914), 9 (1930), [2] 5 (today)
Installed capacity 39.5 MW (53,000 hp) [1]
4.5 MW (6,000 hp) (1914)
34.5 MW (46,300 hp) (1930) [3]
Annual generation 270 gigawatt-hours (970 TJ) [3]

The Coleridge Power Station is a hydroelectric facility at Lake Coleridge on the Rakaia River in Canterbury, New Zealand. The power station is owned and operated by Manawa Energy (formerly Trustpower). [1]

Contents

History

Coleridge was New Zealand's first major power station in which the state was involved. It was constructed mainly to supply electricity to Christchurch, with construction beginning in 1911 and completed with three generating units in 1914. [4] :361 For the most part it was built by hand, with some heavier work done by steam shovels. [5] Following its initial construction, the twin 66 kV transmission lines connecting the power station with Christchurch's Addington substation were the highest voltage in New Zealand, and the longest at over 100 kilometres (62 mi) long. [3] [6]

In the early years of the station, demand for electricity in Christchurch grew rapidly [4] :125–145 and the transmission system extended to reach Rangiora in the north and Oamaru in the south. The limited capacity at Coleridge resulted in regular interruptions to supply. To remedy this the fourth generator was connected in April 1917, with two more connected in November 1921 and March 1922. [4] :142 The turbine hall was extended in 1924 to make room for additional larger turbines. [4] :145–158 [2] By the early 1930s, Coleridge had reached capacity, and was supplemented in 1934 by the commissioning of the Waitaki Dam and in 1935 by extending transmission lines south to join Coleridge/Waitaki to Dunedin's Waipori scheme. [3]

Water supply was a challenge, and so three river diversions were made to increase the amount of water available in the lake: the Harper River in 1922, the Acheron River in 1930, and later the Wilberforce River in 1977. [4] :361

The station was built and initially owned by the New Zealand Government through the Hydro Electric Branch of the Public Works Department, which this branch later became the State Hydro Electric Department in 1946, which in turn became the New Zealand Electricity Department (NZED) in 1958, which then became the Electricity Division of the Ministry of Energy in 1978. [4] :191 In 1987, the government dissolved its responsibility for electricity to create a state-owned enterprise called the Electricity Corporation of New Zealand (Electricorp). [4] :195 Electricorp began downsizing staff and upgrading systems at the facility, and in 1994 it restructured into two subsidiaries. One subsidiary, Transpower, adopted responsibility for the outdoor switching yard, with the parent company planning to sell the facility at Coleridge. After Ngāi Tahu waived their right of first refusal to the facility, in 1998 the facility was purchased for $90.6 million by both Alpine Energy and Trustpower. Alpine Energy was only involved in the deal to circumvent a rule that the station could only be sold to a South Island company, with Alpine withdrawing from the scheme in 1998. [4] :207 The facility has been owned by Trustpower (now Manawa Energy) since.

Technical details

Aerial view of the facility, showing the distinctive penstock pipes running down the hill between the surge chambers and the turbine hall. Colderidge Hydroelectric Plant Aerial View.png
Aerial view of the facility, showing the distinctive penstock pipes running down the hill between the surge chambers and the turbine hall.

As of 2020, the station has a generation capacity of 39 megawatts (52,000 hp) of electricity, and annual generation averages 270 gigawatt-hours (970 TJ). [1]

Coleridge is unusual in that it does not use a dam like most other hydroelectric facilities. Lake Coleridge is a natural lake that runs alongside a natural river, but at a much higher elevation. Water is fed to the station from two inlets at the lake, which is elevated 165 metres (541 ft) above the station's turbine hall. [5] The newer No. 1 inlet is visible up at the lake as a whirlpool on calm days, [4] :146 with some of the older No. 2 inlet visible on the shore near to it. [4] :116 These inlets supply water to two horseshoe-shaped [2] tunnels which run almost horizontally (grade of 1:1000) [4] :111 through approximately 2.2 kilometres (1.4 mi) of the hill between the lake and the power station. These tunnels terminate in large concrete surge chambers above the power station, which in turn connect to the distinctive steel penstock pipes that run down the hill above-ground to the turbine hall. [5] The older No. 2 surge chamber is 12 metres (39 ft) [4] :361 in diameter and connects to the original set of 1.32 metres (4 ft 4 in) [4] :361 diameter penstock pipes. Originally there were four of these pipes, however only two remain in use, with the other two disconnected half way up the hill. The newer No.1 surge chamber is 19 metres (62 ft) [4] :361 in diameter and connects to an additional set of three penstock pipes that taper from 2.14 metres (7 ft 0 in) at the top of the run to 1.5 metres (4 ft 11 in) [4] :361 at the bottom, which are used to power the newer and larger set of turbines. [5] The water is discharged to the Rakaia River.

While it initially started with 3 turbines, this was increased to 9 [2] by 1930 with a total power output of 34.5 megawatts (46,300 hp). Currently only 5 turbines are operational, but despite having four fewer turbines than in 1930 they produce 75 gigawatt-hours (270 TJ) more energy [5] due to modern redesign and refurbishment using computational fluid dynamics modelling, completed in 2008. [1]

Coleridge was the first station in the world to use aerated draft tubes on the turbines, invented on-site by Silston Cory-Wright to solve an issue with heavy thumping when under load. [4] :125 It was also the first to be built on glacial morraine, [4] :117 which caused significant issues with stability of the turbine hall.

The open-air switching yard supplies 66kV lines that run both east (connecting to the Transpower switch yard at Hororata and from there on to Christchurch) and west (across the Southern Alps via Arthur's Pass to supply the West Coast). [7]

Turbines

All turbines are of the horizontal Francis type. [4] :361

Turbines Commissioned at Coleridge [2] [4] :153,361
NumberDate CommissionedWattageStatus
119307,500 kilowatts (10,100 hp)Active
219277,500 kilowatts (10,100 hp)Active
319267,500 kilowatts (10,100 hp)Active
419141,500 kilowatts (2,000 hp)Decommissioned
519141,500 kilowatts (2,000 hp)Decommissioned
619141,500 kilowatts (2,000 hp)Decommissioned
719171,500 kilowatts (2,000 hp)Decommissioned
819213,000 kilowatts (4,000 hp)Active
919233,000 kilowatts (4,000 hp)Active

See also

Related Research Articles

<span class="mw-page-title-main">Benmore Dam</span> Dam in Canterbury Region, New Zealand

Benmore Dam is the largest dam within the Waitaki power scheme, located in the Canterbury Region of New Zealand's South Island. There are eight other power stations in the Waitaki Power Scheme.

<span class="mw-page-title-main">Manawa Energy</span> New Zealand electricity generation and retailing company

Manawa Energy limited is a New Zealand electricity generation company that offers bespoke electricity products to commercial and industrial customers across New Zealand. Manawa energy currently operate 26 power schemes from the Bay of Plenty in the north, to Otago in the south.

The Lake Echo Power Station is a conventional hydroelectric power station located in the Central Highlands region of Tasmania, Australia. The power station is situated on the Upper River Derwent catchment and is owned and operated by Hydro Tasmania.

<span class="mw-page-title-main">Trevallyn Power Station</span> Dam in Northern Midlands Tasmania

The Trevallyn Power Station is a run-of-the-river hydroelectric power station located in the northern Midlands region of Tasmania, Australia. The power station is situated on the Great Lake and South Esk catchment and is owned and operated by Hydro Tasmania.

<span class="mw-page-title-main">Aviemore Dam</span> Dam in Canterbury/Otago, New Zealand

The Aviemore Dam is a dam on the Waitaki River in New Zealand. The dam is a composite dam, with an embankment section, and a concrete section. Built in the 1960s it impounds Lake Aviemore.

The electricity sector in New Zealand uses mainly renewable energy, such as hydropower, geothermal power and increasingly wind energy. As of 2019, 82% of electricity is generated from renewable sources, making New Zealand one of the countries with the lowest carbon dioxide emissions from electricity generation. Electricity demand grew by an average of 2.1% per year from 1974 to 2010 but decreased by 1.2% from 2010 to 2013.

<span class="mw-page-title-main">Monowai Power Station</span> Hydroelectric power station in New Zealand

The Monowai Power Station, fed by the Monowai River from Lake Monowai in Southland, New Zealand, was one of the earliest hydroelectric power stations in the country. Originally commissioned in 1925, it was refurbished between 2005 and 2007 and now contains modern turbines and plant, though the original buildings are still in use.

<span class="mw-page-title-main">Arnold Power Station</span>

The Arnold Power Station is a hydroelectric facility fed from Lake Brunner on the Arnold River in West Coast, New Zealand, owned and operated by TrustPower. Commissioned in 1932, the plant is rated at 3 megawatts (4,000 hp) and has an average annual output of 25 gigawatt-hours (90 TJ).

<span class="mw-page-title-main">Cobb Power Station</span> Hydroelectric power station in New Zealand

The Cobb Power Station is a hydroelectric facility on the Cobb River, in the Tasman District of New Zealand. The power station is located in Upper Tākaka, 112 km (70 mi) northwest of Nelson. Annual generation is approximately 190 gigawatt-hours (680 TJ). The initial stages of the construction of the station began as a privately-funded scheme in 1935, but the investor failed to raise the necessary capital. The national government took over building the station and the first power was produced in 1944, operating as a run-of-river station. A storage dam was completed in 1954. The resulting hydro lake is the highest in the country and at 596 m (1,955 ft), the station has New Zealand's highest hydraulic head of any power station.

<span class="mw-page-title-main">Atiamuri Power Station</span> Hydroelectric power station on the Waikato River in New Zealand

Ātiamuri Power Station is a hydroelectric power station on the Waikato River, in the North Island of New Zealand. It is the third of eight hydroelectric power stations on the Waikato River. The station can easily be seen from State Highway 1 between Taupō and Tokoroa.

Maraetai Power Station is a hydroelectric power station on the Waikato River, in the North Island of New Zealand. It is the fifth of the eight hydroelectric power stations on the Waikato River, and at 360 MW, is the largest hydroelectric station on the Waikato.

<span class="mw-page-title-main">Whakamaru Dam</span> Dam in Lake Whakamaru

Whakamaru Power Station is a hydroelectric power station on the Waikato River, in the North Island of New Zealand. It is the fourth hydroelectric power station on the Waikato River.

<span class="mw-page-title-main">National Grid (New Zealand)</span> Overview of the electrical grid in New Zealand

The National Grid is the nationwide system of electric power transmission in New Zealand. The grid is owned, operated and maintained by Transpower New Zealand, a state-owned enterprise, although some lines are owned by local distribution companies and leased to Transpower. In total, the national grid contains 11,803 kilometres (7,334 mi) of high-voltage lines and 178 substations.

The Omanawa Falls Power Station is a run of the river hydroelectric facility on the Omanawa River, in the Bay of Plenty in New Zealand. Built in 1915 to supply electricity to the town of Tauranga, it was the Southern Hemisphere's first underground power station.

The Motukawa Power Station is a hydroelectric power facility in Taranaki in New Zealand which makes use of water from the Manganui River. Water is drawn from behind a weir on the Manganui River near Tariki and diverts this water through a race to Lake Ratapiko and then through penstocks to the Motukawa Power Station. The power station discharges into the Mākara Stream, a tributary of the Waitara River.

The Mangorei Power Station is a hydroelectric power facility near Mangorei in Taranaki in New Zealand which makes use of water from the Waiwhakaiho River and the Mangamahoe Stream catchments.

The Kuratau power station is a hydroelectric power facility in Kuratau on the western side of Lake Taupō in New Zealand which makes use of water from the Kuratau River. The river is impounded behind a dam to form Lake Kuratau before discharging through the power station back into the river. The scheme is operated by Trustpower on behalf of its owner King Country Energy.

The Piriaka power station is a hydroelectric power facility in Manawatū-Whanganui in New Zealand which draws water from behind a weir on the Whanganui River near Piriaka and diverts it through a canal and penstock to the Piriaka Power Station, which is located approximately 9 km southeast of the town of Taumarunui, via SH4. The power station discharges back into the Whanganui River.

The Wairere Power Station is a hydroelectric power facility in the Waikato region in New Zealand which makes use of water from the Mokau River. Water is drawn from behind a dam above the Wairere Falls, which diverts the water through two penstocks to the Wairere Power Station, before being discharged back into the Mokau River. The station was commissioned in 1925 with the first generating unit. Three more generating units were added between 1938 and 1981 before a major refurbishment resulted in three of the units being replaced by a single generating unit in 2013-2014.

<span class="mw-page-title-main">Matahina Power Station</span> Dam in Bay of Plenty

The Matahina power station is a hydroelectric power facility in Bay of Plenty in New Zealand on the Rangitaiki River downstream of the Aniwhenua Power Station. The river was dammed to form Lake Matahina from which water is drawn and diverted through the power station before being discharged back into the river. The Matahina dam is the largest earth embankment dam in the North Island of New Zealand.

References

  1. 1 2 3 4 5 "Coleridge Power Station", Manawa Energy , archived from the original on 11 November 2023, retrieved 29 January 2024
  2. 1 2 3 4 5 Shearer, A. R. (1973). "Pamphlet 18787A-73 A: Lake Coleridge Power Station" (Press release). Government of New Zealand. New Zealand Electricity. Retrieved 31 December 2020.
  3. 1 2 3 4 "Lake Coleridge Power Station". Engineering NZ. Retrieved 31 December 2020.
  4. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Britten, Rosemary (2000). Lake Coleridge: The Power, the People, the Land. Christchurch, New Zealand: Hazard Press. pp. 382 pages. ISBN   1877161888.
  5. 1 2 3 4 5 Ian Lees (15 November 2016). Building the Lake Coleridge Power Station and operating it today. Coleridge, New Zealand: Coleridge Community. Retrieved 31 December 2020.
  6. "Lake Coleridge Power Station". IPENZ Engineering Heritage. Archived from the original on 9 February 2013. Retrieved 9 March 2009.
  7. "Transpower Transmission Network: South Island" (PDF). July 2020. Retrieved 31 December 2020.

Further reading