Conesville Power Plant

Last updated

Conesville Power Plant
Conesville Power Plant March 2020.jpg
Conesville Power Plant in 2020
Conesville Power Plant
CountryUnited States
Location Franklin Township, Coshocton County, near Conesville, Ohio
Coordinates 40°11′10″N81°52′43″W / 40.18611°N 81.87861°W / 40.18611; -81.87861 Coordinates: 40°11′10″N81°52′43″W / 40.18611°N 81.87861°W / 40.18611; -81.87861
StatusDecommissioned
Commission date Unit 1: 1957
Unit 2: 1959
Unit 3: 1962
Unit 4: 1973
Unit 5: 1976
Unit 6: 1978
Decommission dateUnit 1–2: 2005
Unit 3: 2012
Units 5–6: May 31, 2019
Unit 4: April 29, 2020
Owner(s) AEP Generation Resources
AES Ohio Generation
Operator(s)American Electric Power (AEP)
Thermal power station
Primary fuel Coal
Cooling source Muskingum River
Power generation
Nameplate capacity 2,005 MW
External links
Commons Related media on Commons

Conesville Power Plant was a 2-gigwatt (2,005 MW), coal power plant located east of Conesville, Ohio in Coshocton County, Ohio. Its units were co-owned at the time of its closing by American Electric Power (AEP) and AES Ohio Generation. All plant operations were handled by AEP. Conesville began operations in 1957 and ceased generation in April 2020. [1]

Contents

History

Construction of Unit 1 began in 1955 and was commissioned by Columbus & Southern Ohio Electric (a forerunner of AEP). [2] Unit 1 began commercial generation in 1957 while Unit 2 began operations two years later in 1959. [3] Both units cost $36 million to construct and generated 125 MW each. [4] [5] Unit 3 began operations in 1962 with a generation capacity of 165 MW. [6] Unit 4 began operations in 1973 with a generation capacity of 780 MW. [7] At the time of its conception, the unit would be jointly owned by Cincinnati Gas and Electric (CG&E) (a forerunner of Duke Energy), Columbus & Southern Ohio Electric, and DP&L. [8] Units 5 and 6 began operations in 1976 and 1978 respectively. [9] [10] Over the years, Units 5 and 6 have increased electrical generation from 375 MW to 405 MW. [9] [11] In 2014, Duke Energy sold its stake in Conesville to Dynegy. [12] Three years later in 2017, Dynegy sold its stake in Conesville in a swap with AEP for a stake of William H. Zimmer Power Station. [13] At the time of its closure in 2020, DP&L held a minority ownership of Unit 4 with AEP. [14]

Environmental mitigation

With the installation of Unit 4, electrostatic precipitators (ESPs) were installed to prevent fly ash from going into the atmosphere. ESPs were later installed to Units 13 in the mid-1970s. Unit 4 also had cooling towers constructed which resulted in zero discharge into the Muskingum River. [15] In 2009, Unit 4 would receive the installation of flue-gas desulfurization (FGD) equipment along with a selective catalytic reduction (SCR) system to meet the requirements of the Environmental Protection Agency's (EPA) Clean Air Interstate Rule (CAIR) and Clean Air Mercury Rule (CAMR). [16] [17] The $450 million project for Unit 4, saw the construction of an 800 ft (240 m) smokestack for the FGD equipment. [18] After it was installed, inspectors found corrosion. AEP settled with Black & Veatch, the contractor who installed the FGD equipment, to address the corrosion. [19] When Units 5 and 6 went into operation, $52 million in scrubber technology were installed to reduce sulfur dioxide (SO2) emissions, but it operated inefficiently. [20] [21] The scrubber was eventually upgraded in 2008. [17] In the summer of 2001, Unit 6 was the test site for Thermal Energy International's THERMALONOx. [22] [23] The THERMALONOx was intended to show that nitrogen oxide (NOx) emissions would be reduced by 70%. [22] Unfortunately, the demonstration was halted in September 2001 after the "system did not appreciably reduce nitrogen oxide (NOx) emission levels." [23]

Operations

When the first unit went into operation, it was projected that Conesville would use between 300,000 and 400,000 short tons of coal each year. [2] According to the Energy Information Administration (EIA), the plant received 1,716,286 short tons of coal in 2017. All of the coal was shipped from mines within Ohio. [24] Conesville used to employ 600 workers. In 2018, only 165 were employed at the plant. [25]

Retirement

Units 1 and 2 were retired in 2005 after Unit 1's tubing to its boiler failed. Inspections on Unit 2 revealed severe corrosion in a pattern that was similar to Unit 1. The reported cost of $35 million to repair both units was not worth the benefit of returning to service. [4] Unit 3 was retired in December 2012 in order to comply with the Environmental Protect Agency (EPA) rules regarding mercury, lead, and other toxic emissions. [26] [27] AEP announced in October 2018 they will shut down Conesville by May 2020. Units 5 and 6 retired on May 31, 2019, while Unit 4 remained in operation until April 2020. [28] [1] The decision to close the plant was due to operational costs, not clearing PJM Interconnection's capacity auction, and AEP unable to find a buyer. [25] [14] The facility was imploded on December 19, 2021. [29]

Incidents

In February 1982, two protestors from Greenpeace climbed up one of Conesville Power Plant's smokestacks to protest against acid rain. [30] The protestors spent three days on top of the smokestack. They were charged with criminal trespass. The judge fined both protestors $250 and were sentenced to three days in jail. [31]

In July 2004, a tank exploded burning two workers. They would later die from their injuries. [32] AEP determined the cause was due to a sudden release of molten slag that overpressured the tank. [33]

See also

Related Research Articles

<span class="mw-page-title-main">Conesville, Ohio</span> Village in Ohio, United States

Conesville is a village in Coshocton County, Ohio, United States, along the Muskingum River. The population was 328 at the 2020 census.

<span class="mw-page-title-main">American Electric Power</span> United States utility company

American Electric Power Company, Inc. (AEP), is a major investor-owned electric utility in the United States, delivering electricity to more than five million customers in 11 states.

<span class="mw-page-title-main">William H. Zimmer Power Station</span>

The William H. Zimmer Power Station, located near Moscow, Ohio, was a 1.35-gigawatt coal power plant. Planned by Cincinnati Gas and Electric (CG&E), with Columbus & Southern Ohio Electric and Dayton Power & Light (DP&L) as its partners, it was originally intended to be a nuclear power plant. Although once estimated to be 97% complete, poor construction and quality assurance (QA) led to the plant being converted to coal-fired generation. The plant began operations in 1991. Today, the plant is owned and operated by Vistra Corp.

<span class="mw-page-title-main">Rockport Generating Station</span> American coal-fired power station Indiana

Rockport Generating Station is a coal-fired power plant, located along the Ohio River in Ohio Township, Spencer County, Indiana, in the United States, near Rockport. The power plant is located along U.S. Route 231, approximately one mile north of the William H. Natcher Bridge, spanning the Ohio River. It is operated by Indiana Michigan Power, a subsidiary of American Electric Power.

<span class="mw-page-title-main">Kyger Creek Power Plant</span>

Kyger Creek Power Plant is a 1.08-gigawatt, 1,086 (MW) coal-fired power station located south of Cheshire, Ohio in Gallia County, Ohio. It is operated by the Ohio Valley Electric Corporation (OVEC).

<span class="mw-page-title-main">W. H. Sammis Power Plant</span> Coal-fired power station in Jefferson County, Ohio

The W. H. Sammis Power Plant is a 2.2-gigawatt coal power plant in Stratton, Jefferson County, Ohio. The plant is operated by Energy Harbor. It began operations in 1960.

<span class="mw-page-title-main">Clifty Creek Power Plant</span>

Clifty Creek Power Plant is a 1,300-MW coal-fired power station located in Madison, Indiana. Clifty Creek is operated by the Indiana Kentucky Electric Corporation. It is named after Clifty Creek, which enters the Ohio River nearby.

<span class="mw-page-title-main">John E. Amos Power Plant</span>

John E. Amos Power Plant is a three-unit coal-fired power plant owned and operated by Appalachian Power, a subsidiary of American Electric Power (AEP). With a nameplate rating of 2,933 MW, it is the largest generating plant in the AEP system. It was named after John E. Amos, a prominent state senator, Democratic National Committee member from West Virginia, and member of the AEP board of directors.

<span class="mw-page-title-main">Gavin Power Plant</span> Coal-fired power plant in Cheshire, Ohio

General James M. Gavin Power Plant is a 2,600-megawatt supercritical coal-fired power station in the village of Cheshire, Ohio, United States. It is owned by Lightstone Generation LLC, a 50–50 joint venture of The Blackstone Group L.P. and ArcLight Capital Partners. Gavin is the largest coal-fired power facility in Ohio, and one of the largest in the US, capable of powering two million homes. In February 2017, the plant represented slightly more than 11% of the total electric generation capacity in Ohio according to the Energy Information Administration (EIA). The plant was named in honor of James Maurice "Jumpin' Jim" Gavin, the third Commanding General (CG) of the 82nd Airborne Division during World War II.

<span class="mw-page-title-main">Muskingum River Power Plant</span>

Muskingum River Power Plant was a 1.5-gigawatt coal power plant, owned and operated by American Electric Power (AEP). It was located on the west bank of Muskingum River, about 4 miles (6 km) northwest of the town of Beverly, Ohio in Washington County, Ohio. At its peak, the plant powered three million households. The plant operated from 1953 until ceasing generation in 2015.

<span class="mw-page-title-main">Killen Station</span> Archaeological site in Ohio, United States

Killen Station was a 618 megawatt (MW) dual-fuel power generating facility located east of Wrightsville, Ohio in Adams County, Ohio. The power plant had two units: one coal-fired and one oil-fired. At the time of its closure, it was operated by AES Ohio Generation, a subsidiary of the AES Corporation. The plant began operations in 1982 and ceased generation on May 31, 2018.

<span class="mw-page-title-main">J.M. Stuart Station</span>

J.M. Stuart Station was a 2.3-gigawatt coal power plant located east of Aberdeen, Ohio in Adams County, Ohio. The power plant had four units and was operated by AES Ohio Generation, a subsidiary of the AES Corporation. It began operations in 1970 and ceased on May 24, 2018.

R.E. Burger Power Station was a 568 megawatt (MW), coal power plant located south of Shadyside, Ohio in Belmont County, Ohio. The plant closed in 2011. It was operated by FirstEnergy.

<span class="mw-page-title-main">Cardinal Power Plant</span>

Cardinal Power Plant is a 1.8-gigawatt coal power plant located south of Brilliant, Ohio in Jefferson County, Ohio. The power plant has three units. Cardinal is co-owned with Unit 1 owned by American Electric Power's (AEP) subsidiary, AEP Generation Resources. Units 2–3 are owned by Buckeye Power, a utility cooperative. It began operations in 1967.

Picway Power Plant was a 220 megawatt (MW) coal power plant located west of Lockbourne in Pickaway County, Ohio. The plant generated electricity from 1926 until its closure in 2015. It was operated by American Electric Power (AEP).

<span class="mw-page-title-main">Hanging Rock Energy Facility</span>

The Hanging Rock Energy Facility is a 1.43-gigawatt, natural gas power plant located west of Hanging Rock, Ohio in Lawrence County, Ohio. The plant began operations in 2003 and is currently owned by Vistra Energy.

Philo Power Plant was a 510 megawatt (MW), coal power plant located in Philo in Muskingum County, Ohio. It was the first power plant in the United States to apply steam reheat and supercritical steam generator technologies for its turbines. The plant had six units and its operations were handled by Ohio Power, a forerunner of American Electric Power (AEP). It operated from 1924 until ceasing in 1975.

<span class="mw-page-title-main">Dresden Plant</span>

The Dresden Plant is a 580 megawatt (MW), natural gas power plant located south of Dresden, Ohio in Muskingum County, Ohio. The plant began operations in 2012 and is currently owned by American Electric Power (AEP).

<span class="mw-page-title-main">Darby Generating Station</span>

Darby Generating Station is a 480 megawatt (MW), natural gas peaker plant located in Darby Township, Pickaway County near Mount Sterling, Ohio. The plant is currently owned by Lightstone Generation LLC, a 50-50 joint venture of The Blackstone Group and ArcLight Capital Partners. The plant has six units and began operations in 2001.

References

  1. 1 2 Hayhurst, Leonard L. (April 30, 2020). "AEP Conesville reaches end of era". Coshocton Tribune. Retrieved April 30, 2020.
  2. 1 2 "Top Executives Tell of Conesville Power Plant". Coshocton Tribune. July 5, 1955. p. 6. Retrieved June 24, 2018 via Newspapers.com.
  3. Hayhurst, Leonard (August 24, 2017). "AEP Conesville still fired up after 60 years". Coshocton Tribune. Retrieved June 18, 2018.
  4. 1 2 "2 units at AEP Conesville plant to be shuttered". Columbus Business First. October 3, 2005. Retrieved June 20, 2018.
  5. "Conesville Power Plant Began Operating in 1958". Coshocton Tribune. August 20, 1961. p. 9. Retrieved June 26, 2018 via Newspapers.com.
  6. Waitkus, Dave (January 7, 2013). "End of an era". American Electric Power (AEP). Retrieved June 26, 2018.
  7. "Conesville Unit 4". DPL Inc. Archived from the original on June 26, 2018. Retrieved June 21, 2018.
  8. "Conesville power plant constructed". The Times Reporter. January 27, 1971. p. D-3. Retrieved June 24, 2018 via Newspapers.com.
  9. 1 2 "C&SOE Initiates Newest Electric Generating Unit". Coshocton Tribune. April 24, 1977. p. 8C. Retrieved June 26, 2018 via Newspapers.com.
  10. "C&SOE's Leppla Met Challenge Of Past Winter". Coshocton Tribune. April 30, 1978. p. 2B. Retrieved June 26, 2018 via Newspapers.com.
  11. Interconnection Service Agreement (PJM Queue #Y1-018) (PDF) (Report). PJM Interconnection. October 1, 2013. Retrieved June 26, 2018.
  12. Savenije, Davide (August 22, 2014). "Dynegy to buy 12,500 MW for $6.25B". Utility Drive. Retrieved June 21, 2018.
  13. Knox, Tom (February 24, 2017). "AEP, Dynegy swap Ohio power plant ownership". Columbus Business First. Retrieved June 21, 2018.
  14. 1 2 Sweeney, Darren (October 8, 2018). "AEP plans to shut down Conesville coal plant in Ohio by 2020". S&P Global Market Intelligence. Retrieved October 8, 2018.
  15. "Conesville Unit 4 Contributing To CSOE Operation". Coshocton Tribune. April 28, 1974. p. 18-A. Retrieved June 24, 2018 via Newspapers.com.
  16. McHenry, Melissa (June 17, 2005). "AEP announces additional environmental investments at five plants in four states". AEP. Retrieved June 24, 2018.
  17. 1 2 McHenry, Melissa (January 17, 2008). "News Releases". AEP. Retrieved June 24, 2018.
  18. Dickerson, Kathie (May 14, 2009). "New unit ready to go online". Coshocton Tribune. p. 1-A. Retrieved June 25, 2018 via Newspapers.com.
  19. Hunt, Spencer (July 11, 2011). "Failing Pollution Scrubbers – 'Aggressive' decay eats at power plants". The Columbus Dispatch. p. 1A. Retrieved June 26, 2018 via Newsbank.com.
  20. "Firm Awards Contract". The Times Recorder. October 15, 1975. p. 10-B. Retrieved June 24, 2018 via Newspapers.com.
  21. "Governor Blasts Federal EPA". The Circleville Herald. Associated Press. June 5, 1978. p. 11. Retrieved June 24, 2018 via Newspapers.com.
  22. 1 2 "AEP to test nitrogen oxide control technology". Power Engineering. March 8, 2001. Retrieved June 25, 2018.
  23. 1 2 "THERMALONOx demonstration project at AEP's Conesville Plant suggests need for additional laboratory research". Power Engineering. September 28, 2001. Retrieved June 25, 2018.
  24. "Coal Data Browser – Shipments to Conesville". Energy Information Administration (EIA). Retrieved June 18, 2018.
  25. 1 2 Hayhurst, Leonard (October 5, 2018). "AEP Conesville Plant to close by May 2020". Coshocton Tribune. Retrieved October 5, 2018.
  26. Dickerson, Kathie; Whiteman, Doug (June 10, 2011). "AEP may close six sites". Coshocton Tribune. p. 1A. Retrieved June 20, 2018 via Newspapers.com.
  27. Dickerson, Kathie (January 13, 2013). "Conesville plant labeled as a top-5 metal polluter". Coshocton Tribune. p. 3A. Retrieved June 20, 2018 via Newspapers.com.
  28. Sweeney, Darren (May 13, 2019). "AEP to retire 750 MW of coal capacity at Conesville plant". S&P Global Market Intelligence. Retrieved May 31, 2019.
  29. "Towers at Former AEP Plant Come Down". December 19, 2021.
  30. "Smokestack sitters extend vigil without any regrets". The Plain Dealer. The Associated Press. February 11, 1982. p. 17-A. Retrieved June 26, 2018 via Newsbank.com.
  31. Weidner, Nolan (February 12, 1982). "Protestors Sentenced To Jail". Coshocton Tribune. p. 1. Retrieved June 26, 2018 via Newspapers.com.
  32. "AEP Employee Dies 2 Weeks After Conesville Explosion". The Columbus Dispatch. July 29, 2004. p. 8C. Retrieved June 26, 2018 via Newsbank.com.
  33. Douglas, Kristy (August 12, 2004). "AEP officials determine cause of fatal accident". The Times Reporter. Retrieved June 26, 2018 via Newsbank.com.