Eighth Avenue station (BMT Sea Beach Line)

Last updated

 8 Avenue
  NYCS-bull-trans-N-Std.svg
MTA NYC logo.svg New York City Subway station (rapid transit)
8th Avenue Northbound BMT Sea Beach Line Platform, May 2024.jpg
R46 N train arriving at the northbound platform
Station statistics
AddressEighth Avenue & 62nd Street
Brooklyn, New York
Borough Brooklyn
Locale Sunset Park
Coordinates 40°38′4.41″N74°0′38.5″W / 40.6345583°N 74.010694°W / 40.6345583; -74.010694
Division B (BMT) [1]
Line BMT Sea Beach Line
Services    N   NYCS-SSI-alltimes.svg (all times)
   W   NYCS-SSI-rushonly.svg (selected rush-hour trips)
TransitAiga bus trans.svg NYCT Bus: B9 (on 60th Street), B70
Structure Open-cut / at-grade
Platforms2 side platforms
Tracks4 (2 in regular service)
Other information
OpenedJune 22, 1915;109 years ago (1915-06-22) [2]
Accessible Wheelchair symbol.svg ADA-accessible
Opposite-
direction
transfer
Yes
Traffic
20232,561,457 [3] Increase2.svg 10.7%
Rank138 out of 423 [3]
Services
Preceding station MTA NYC logo.svg New York City Subway Following station
59th Street
N   NYCS-SSI-alltimes.svg W   NYCS-SSI-rushonly.svg
NYCS-bull-trans-N-Std.svg
Local
Fort Hamilton Parkway
N   NYCS-SSI-alltimes.svg W   NYCS-SSI-rushonly.svg
Location
NYCS map blank.svg
Map pointer.svg
USA New York City location map.svg
Map pointer.svg
USA New York location map.svg
Map pointer.svg
Track layout

Contents

BSicon MFADEg.svg
BSicon uvSTR.svg
BSicon vCONTg.svg
BSicon vCONTg-.svg
BSicon uvSTRfg.svg
BSicon numN075.svg
BSicon vSTR.svg
BSicon dSTR.svg
BSicon uv-SPLa.svg
BSicon uvSPLa-.svg
BSicon vSTR.svg
BSicon dSTR.svg
BSicon uvUSTr.svg
BSicon udSTR.svg
BSicon vSTR.svg
BSicon dSTR.svg
BSicon uSHI1c1.svg
BSicon uSHI1r.svg
BSicon uvSHI1+r.svg
BSicon dSHI2l.svg
BSicon dSHI2g+lr.svg
BSicon dSHI2r.svg
BSicon udSTR.svg
BSicon uexdENDEa.svg
BSicon uvSTR.svg
BSicon PLTl.svg
BSicon v-STR2~R.svg
BSicon uxvSTR.svg
BSicon uvSTR.svg
BSicon PLTr.svg
BSicon PLTl.svg
BSicon STRc1~R.svg
BSicon uxvSTR.svg
BSicon uvSTR.svg
BSicon PLTr.svg
BSicon PLTl.svg
BSicon uxvSTR.svg
BSicon uvSTR.svg
BSicon PLTr.svg
BSicon PLTl.svg
BSicon uxvSTR.svg
BSicon uvSTR.svg
BSicon PLTr.svg
BSicon v-STR+4.svg
BSicon udSTRf.svg
BSicon uevSTR.svg
BSicon udSTRg.svg
BSicon v-STR.svg
BSicon MFADEf.svg
BSicon uxvSTR.svg
BSicon MFADEf.svg
BSicon uvSTR.svg
BSicon v-STR.svg
BSicon v-CONTf.svg
Bay Ridge Branch
to Fresh Pond Junction
Street map

Eighth Avenue station (BMT Sea Beach Line)

Station service legend
SymbolDescription
NYCS-SSI-alltimes.svg Stops all times
NYCS-SSI-rushonly.svg Stops rush hours only
NYCS-SSI-rushpeak.svg Stops rush hours in the peak direction only

The Eighth Avenue station is a local station on the BMT Sea Beach Line of the New York City Subway. It is located in Sunset Park, Brooklyn, at the intersection of Eighth Avenue and 62nd Street. It is served by the N train at all times. During rush hours, several W trains also serve this station.

Eighth Avenue is the northernmost stop on the Sea Beach Line. West of this station, the tracks curve northward, enter a tunnel, and become the express tracks of the BMT Fourth Avenue Line.

The station serves the Sunset Park Chinatown, the oldest Chinatown in Brooklyn, which is centered around Eighth Avenue. [4]

History

This station opened on June 22, 1915. [2]

This station, along with eight others along the Sea Beach Line, was renovated from 2016 to 2019, which initially included installation of two ADA-accessible elevators (original plans were to construct two wheelchair ramps to each platform). [5] The Manhattan-bound platform was closed from January 18, 2016 to May 22, 2017 and a temporary platform was set up on the Coney Island express track for Manhattan-bound service. [6] [7] The Coney Island-bound platform was closed from July 31, 2017 [8] [9] to July 1, 2019. During this time, southbound trains used the northbound express track and the temporary platform. [10]

A project to make the station ADA-accessible was originally expected to be completed in December 2018, [11] but was repeatedly delayed. An elevator to the northbound platform opened on November 4, 2019. [12] Another elevator to the southbound platform was planned to be opened in May 2020. [13] The southbound elevator was not completed, but funding had been committed to completing the elevator. [14] In December 2021, the MTA awarded a contract for the installation of elevators at eight stations, including the Eighth Avenue station's southbound platform. [15] [16] The elevator to the southbound platform finally opened on July 20, 2023. [17]

Plans for the Interborough Express, a light rail line using the Bay Ridge Branch right of way, were announced in 2023. [18] As part of the project, a light rail station at Eighth Avenue has been proposed next to the existing subway station. [19] [20]

Station layout

GroundStreet levelStation building, entrance/exit, station agent, MetroCard and OMNY vending machines
Wheelchair symbol.svg Elevators inside station house at northwest corner of Eighth Avenue and 62nd Street.
Platform level Side platform
Northbound local NYCS-bull-trans-N-Std.svg toward Astoria–Ditmars Boulevard or 96th Street (select weekday trips) (59th Street)
NYCS-bull-trans-W-Std.svg toward Astoria–Ditmars Boulevard (select weekday trips) (59th Street)
Northbound express No regular service
Southbound express Trackbed
Southbound local NYCS-bull-trans-N-Std.svg toward Coney Island–Stillwell Avenue (Fort Hamilton Parkway)
NYCS-bull-trans-W-Std.svg toward 86th Street (select weekday trips) (Fort Hamilton Parkway)
Side platform

This open-cut station has four tracks and two side platforms, but the two center express tracks are not normally used. The Coney Island-bound track has been disconnected from the line and the Manhattan-bound track is signaled for trains in both directions. [21] The platforms have windscreens with beige panels. [22] The platforms have brown canopies with green support columns and frames. The station signs are at the standard black name plate in white Helvetica lettering. [23]

The LIRR Bay Ridge Branch crosses underneath and is visible from the north end of the station. [21]

Station house prior to renovation 8th Av N sta jeh.JPG
Station house prior to renovation

This is the northernmost station on the Sea Beach Line. North of here, the Coney Island-bound express track dead ends while the Manhattan-bound express track merges with the local tracks as the line curves north and enters the tunnel into the BMT Fourth Avenue Line. [21]

Exits

Seventh Avenue station house following renovation, 2019 8 Av (N) Station Control House Reopening - 48804000703.jpg
Seventh Avenue station house following renovation, 2019

The station has an entrance at the extreme east (railroad south) end, which is a beige street-level station house on the Eighth Avenue overpass at 62nd Street above the platforms and tracks. A single staircase from each platform goes up to a crossover, where a set of doors lead to the waiting area above the station house. A turnstile bank leads to the token booth and exit doors. [24]

The station also has an entrance at the extreme west (railroad north) end, with two staircases from each platform leading up to Seventh Avenue and 62nd Street. In the past, it was closed due to high crime and repurposed into a maintenance shop. [25] The staircases and overpass above the tracks remained intact, and the entrances were reopened in February 2019 as part of the reconstruction of this station. [26] [27] :129

Notes

    References

    1. "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
    2. 1 2 "Through Tube to Coney, 48 Minutes: First Train on Fourth Avenue Route Beats West End Line Eleven Minutes". Brooklyn Daily Eagle . June 22, 1915. Retrieved June 29, 2015 via Newspapers.com. Open Access logo PLoS transparent.svg
    3. 1 2 "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.
    4. "Live lobsters, longan fruit and a small-town feel: Sunset Park's Chinatown". Brooklyn Eagle. August 9, 2019. Retrieved March 13, 2020.
    5. "New York City Transit and Bus Committee Meeting" (PDF). Metropolitan Transportation Authority. December 13, 2017. p. 150. Archived from the original (PDF) on December 28, 2017. Retrieved November 9, 2017.
    6. Romano, Denise (October 4, 2013). "Two elevators coming to the N line during massive rehabilitation". The Brooklyn Reporter. Archived from the original on January 10, 2019. Retrieved July 27, 2020.
    7. DeJesus, Jaime (May 17, 2017). "Manhattan-bound service to return to N stations on Sea Beach Line". The Brooklyn Reporter. Archived from the original on October 27, 2018. Retrieved May 18, 2017.
    8. "Manhattan-Bound Service Returns to N Stations on Sea Beach Line". www.mta.info (Press release). New York City, NY: Metropolitan Transportation Authority. May 17, 2017. Archived from the original on July 30, 2017. Retrieved May 26, 2017.
    9. "Planned Service Changes for: Monday, July 1, 2019". travel.mtanyct.info. Metropolitan Transportation Authority. July 1, 2019. Archived from the original on July 1, 2019. Retrieved July 1, 2019.
    10. "T6041318 ADA Accessibility at 8th Avenue Station on the Sea Beach Line". web.mta.info. Metropolitan Transportation Authority. Retrieved September 3, 2017.
    11. "MTA | Press Release | NYC Transit | MTA Opens New Elevator at 8 av for Northbound Access to Improve Accessibility in Southern Brooklyn". Archived from the original on November 6, 2019. Retrieved November 6, 2019.
    12. "Capital Program Oversight Committee Meeting November 2018" (PDF). Metropolitan Transportation Authority. November 13, 2018. p. 92. Retrieved November 10, 2018.
    13. "2021 Commitment & Completion Goals". MTA Construction and Development. February 18, 2021. p. 12. Retrieved March 28, 2021.
    14. Duggan, Kevin (December 12, 2021). "Advocates raise oversight concerns as MTA eyes more private subway elevator maintenance". amNewYork. Retrieved July 26, 2022.
    15. "MTA announces historic investment in accessibility projects". Mass Transit Magazine. December 13, 2021. Retrieved July 26, 2022.
    16. "MTA Announces Manhattan Dyckman St 1 Station and Brooklyn 8 Av N Station Fully Accessible With Opening of Elevators". MTA. July 20, 2023. Retrieved July 20, 2023.
    17. Brachfeld, Ben (January 10, 2024). "Interborough Express light rail project, which will connect Bay Ridge and Jackson Heights, inches forward". Brooklyn Paper. Retrieved January 26, 2024.
    18. Gannon, Michael (August 24, 2023). "MTA says progress on IBX plan is A-OK". Queens Chronicle. Retrieved January 31, 2025.
    19. "The Interborough Express: Planning & Environmental Linkages Study". MTA. January 2023.
    20. 1 2 3 Dougherty, Peter (2020). Tracks of the New York City Subway 2020 (16th ed.). Dougherty. OCLC   1056711733.
    21. See, for example: Dooley, John (May 12, 2017). "Showing Image 148091". nycsubway.org. Retrieved September 17, 2024.
    22. See, for example: Hodurski, Michael (July 18, 2017). "Showing Image 147373". nycsubway.org. Retrieved September 17, 2024.
    23. "MTA Neighborhood Maps: Sunset Park" (PDF). mta.info . Metropolitan Transportation Authority. 2015. Retrieved August 2, 2015.
    24. "Reopening closed subway entrances using high entry/exit turnstiles" (PDF). Permanent Citizens Advisory Committee to the MTA. November 2001. Archived from the original (PDF) on December 22, 2015. Retrieved February 12, 2019.
    25. Jaeger, Max (July 1, 2014). "Crowded Sunset Park subway station to get second exit". Brooklyn Daily. Archived from the original on April 28, 2017. Retrieved April 27, 2017.
    26. "Capital Program Oversight Committee Meeting April 2017" (PDF). mta.info. Metropolitan Transportation Authority. April 24, 2017. Retrieved April 27, 2017.
    Construction work Weekend work 2011-12-12 09 (6499240853).jpg
    Construction work