Prospect Avenue station (BMT Fourth Avenue Line)

Last updated

 Prospect Avenue
  NYCS-bull-trans-R-Std.svg
MTA NYC logo.svg New York City Subway station (rapid transit)
NYCT 8692 (38090305082).jpg
Southbound platform
Station statistics
AddressProspect Avenue & Fourth Avenue
Brooklyn, New York
Borough Brooklyn
Locale Gowanus, Greenwood Heights, Park Slope, South Park Slope
Coordinates 40°39′55″N73°59′35″W / 40.66528°N 73.99306°W / 40.66528; -73.99306
Division B (BMT) [1]
Line BMT Fourth Avenue Line
Services    D   NYCS-SSI-nightsonly.svg (late nights)
   N   NYCS-SSI-nightsonly.svg (late nights, and limited rush hour service in the reverse-peak direction)
   R   NYCS-SSI-alltimes.svg (all times)
   W   NYCS-SSI-rushonly.svg (limited rush hour service only)
TransitAiga bus trans.svg NYCT Bus: B37 (on Third Avenue); B63 (on Fifth Avenue) [2]
StructureUnderground
Platforms2 side platforms
Tracks4
Other information
OpenedJune 22, 1915;109 years ago (June 22, 1915) [3]
ClosedJune 5, 2017;7 years ago (2017-06-05) (reconstruction)
RebuiltNovember 2, 2017;7 years ago (2017-11-02)
Opposite-
direction
transfer
No
Traffic
20231,299,538 [4] Increase2.svg 10.6%
Rank237 out of 423 [4]
Services
Preceding station MTA NYC logo.svg New York City Subway Following station
Ninth Street
D   NYCS-SSI-nightsonly.svg N   NYCS-SSI-nightsonly.svg R   NYCS-SSI-alltimes.svg W   NYCS-SSI-rushonly.svg
NYCS-bull-trans-R-Std.svg
Local
25th Street
D   NYCS-SSI-nightsonly.svg N   NYCS-SSI-nightsonly.svg R   NYCS-SSI-alltimes.svg W   NYCS-SSI-rushonly.svg
Location
NYCS map blank.svg
Map pointer.svg
USA New York City location map.svg
Map pointer.svg
USA New York location map.svg
Map pointer.svg
Track layout

Contents

BSicon MFADEg.svg
BSicon uvSTR.svg
BSicon MFADEg.svg
BSicon uvSTR.svg
BSicon udSTRf.svg
BSicon uvSTRfg.svg
BSicon udSTRg.svg
BSicon numN330.svg
BSicon cBS.svg
BSicon uvSTR.svg
BSicon uvSTR.svg
BSicon cBS.svg
BSicon cBS.svg
BSicon uvSTR.svg
BSicon uvSTR.svg
BSicon cBS.svg
BSicon cBS.svg
BSicon uvSTR.svg
BSicon uvSTR.svg
BSicon cBS.svg
BSicon cBS.svg
BSicon uvSTR.svg
BSicon uvSTR.svg
BSicon cBS.svg
BSicon udSTRf.svg
BSicon uvSTRfg.svg
BSicon udSTRg.svg
BSicon MFADEf.svg
BSicon uvSTR.svg
BSicon MFADEf.svg
BSicon uvSTR.svg
Street map

Prospect Avenue station (BMT Fourth Avenue Line)

Station service legend
SymbolDescription
NYCS-SSI-allexceptnights.svg Stops all times except late nights
NYCS-SSI-nightsonly.svg Stops late nights only
NYCS-SSI-rushonly.svg Stops rush hours only
NYCS-SSI-rushpeak.svg Stops rush hours in the peak direction only

The Prospect Avenue station is a local New York City Subway station on the BMT Fourth Avenue Line in Brooklyn. It is located at Prospect Avenue and Fourth Avenue near the convergence of the Gowanus, Greenwood Heights, Park Slope, and South Park Slope neighborhoods. It is served by the R train at all times. The D and N trains also stop here during late nights, and some rush-hour W trains stop here in the peak direction.

The Prospect Avenue station was constructed as part of the Fourth Avenue Line, which was approved in 1905. Construction on the segment of the line that includes Prospect Avenue started on December 20, 1909, and was completed in May 1912. The station opened on June 22, 1915, as part of the initial portion of the BMT Fourth Avenue Line to 59th Street. The station's platforms were lengthened in 19261927, [5] and again during a renovation in 1968–1970. [6] The station was also renovated in 1970 and 2017.

History

The station prior to renovation Prospect Av station before renewal (38060731396).jpg
The station prior to renovation

Construction

The Prospect Avenue station was constructed as part of the Fourth Avenue Line, the plan for which was initially adopted on June 1, 1905. [7] The Rapid Transit Commission was succeeded on July 1, 1907, by the New York State Public Service Commission (PSC), which approved the plan for the line in late 1907. [8] [9] The contract for the section of the line that included the Prospect Avenue station, Route 11A3, which extended from 10th Street to 27th Street, was awarded on May 22, 1908, to the Tidewater Building Company and Thomas B. Bryson for $2,043,162.31 (equivalent to $69,286,000in 2023). The New York City Board of Estimate approved the contract on October 29, 1909. [8] [10] Construction on the segment started on December 20, 1909, and was completed in May 1912. [7]

As part of negotiations between New York City, the Brooklyn Rapid Transit Company (BRT), and the Interborough Rapid Transit Company for the expansion of the city's transit network, the line was leased to a subsidiary of the BRT. The agreement, known as Contract 4 of the Dual Contracts, was signed on March 19, 1913. [8] Prospect Avenue opened on June 22, 1915, as part of an extension of the subway to Coney Island, which included the Fourth Avenue Line north of 59th Street as well as the entire Sea Beach Line. [11] [3] The station's opening was marked with a competition between two trains heading from Chambers Street station in Manhattan to the Coney Island station, one heading via the West End Line and the other via the Sea Beach Line; the latter got to Coney Island first. [3]

Renovations

1920s

On June 27, 1922, the New York State Transit Commission commissioned its engineers to examine platform-lengthening plans for 23 stations on the lines of the Brooklyn–Manhattan Transit Corporation (BMT), the successor to the BRT, to accommodate eight-car trains. As part of the project, Prospect Avenue's platforms would have been lengthened from 435 feet (133 m) to 530 feet (160 m). [12] [13] Though the Transit Commission ordered the BMT to lengthen these platforms in September 1923, no further progress was made until February 16, 1925, when the New York City Board of Transportation (NYCBOT) commissioned its engineers to examine platform-lengthening plans for this and eleven other stations along the Fourth Avenue Line. It estimated the project would cost $633,000 (equivalent to $10,998,000in 2023). [14] The NYCBOT received bids for the project on February 25, 1926. [15] The contract was awarded to the Corson Construction Company for $345,021 (equivalent to $5,938,000in 2023). [16] The extensions opened on August 1, 1927. [5]

1950s and 1960s

The city government took over the BMT's operations on June 1, 1940. [17] [18] In July 1959, the New York City Transit Authority (NYCTA) announced that it would install fluorescent lighting at the Prospect Avenue station and five other stations along the Fourth Avenue Line for between $175,000 and $200,000. Bids on the project were to be advertised on August 7, 1959 and completed by fall 1960. [19]

In the 1960s, the NYCTA started a project to lengthen station platforms on its lines in Southern Brooklyn to 615 feet (187 m) to accommodate 10-car trains. [6] On July 14, 1967, the NYCTA awarded a contract to conduct test borings at eleven stations on the Fourth Avenue Line, including Prospect Avenue, to the W. M. Walsh Corporation for $6,585 (equivalent to $60,172in 2023) in preparation of the construction of platform extensions. [20] The NYCTA issued an invitation for bids on the project to extend the platforms at stations along the Fourth Avenue Line between Pacific Street and 36th Street, including those at Prospect Avenue, on March 28, 1969. [21] Funding for the renovation projects came out of the NYCTA's 1969–1970 Capital Budget, costing $8,177,890 (equivalent to $67,946,000in 2023) in total. [22]

As part of the renovation project, the station's platforms were extended, [6] and the station's elaborate mosaic tile walls were covered over with 8-by-16-inch (20 by 41 cm) white cinderblock tiles. The latter change, which was also made to 15 other stations on the BMT Broadway and Fourth Avenue Lines, was criticized for being dehumanizing. The NYCTA spokesman stated that the old tiles were in poor condition and that the change was made to improve the appearance of stations and provide uniformity. Furthermore, it did not consider the old mosaics to have "any great artistic merit". [23]

2017

Under the Metropolitan Transportation Authority's 2015–2019 Capital Program, the station, along with thirty other New York City Subway stations, were scheduled to undergo a complete overhaul as part of the Enhanced Station Initiative. Upgrades were to include cellular service, Wi-Fi, USB charging stations, interactive service advisories and maps. [24] [25] From January to May 2016, Grimshaw Architects worked on a design for the station's renovation, with Arup Group acting as a consultant. [26] The contract for Package 1 of the renovations, which covers renovations at the Prospect Avenue, 53rd Street, and Bay Ridge Avenue stations on the BMT Fourth Avenue Line, was awarded on November 30, 2016 [26] to Citnalta-Forte Joint Venture for $72 million, the first design–build contract in the subway system's history. [27] The station closed on June 5, 2017 for these renovations, [28] [29] [30] and reopened on November 2, 2017, a month ahead of schedule. [31]

Station layout

GroundStreet levelExit/entrance
Platform level Side platform
Northbound local NYCS-bull-trans-R-Std.svg toward Forest Hills–71st Avenue (Whitehall Street–South Ferry late nights) (Ninth Street)
NYCS-bull-trans-D-Std.svg toward Norwood–205th Street late nights (Ninth Street)
NYCS-bull-trans-N-Std.svg toward Astoria–Ditmars Boulevard late nights (Ninth Street)
NYCS-bull-trans-W-Std.svg toward Astoria–Ditmars Boulevard (select weekday trips) (Ninth Street)
Northbound express NYCS-bull-trans-D-Std.svg NYCS-bull-trans-N-Std.svg do not stop here
Southbound express NYCS-bull-trans-D-Std.svg NYCS-bull-trans-N-Std.svg do not stop here →
Southbound local NYCS-bull-trans-R-Std.svg toward Bay Ridge–95th Street (25th Street)
NYCS-bull-trans-D-Std.svg NYCS-bull-trans-N-Std.svg toward Coney Island–Stillwell Avenue late nights (25th Street)
NYCS-bull-trans-W-Std.svg toward 86th Street (select weekday trips) (25th Street)
Side platform
Entrance to the southbound platform on the west side of Fourth Avenue NYCT 8787 (38121751271).jpg
Entrance to the southbound platform on the west side of Fourth Avenue

This underground station is a local station with four tracks and two side platforms. [32] The R stops here at all times; [33] some rush-hour W trains stop here in the peak direction; [34] and the D and N stop here during late nights but use the center express tracks during daytime hours. [35] [36] The station is between Ninth Street to the north and 25th Street to the south. [37] The station has a full curtain wall separating the local and express tracks, which have several openings that allow a view of the tracks from the platforms. [38] [8] :854 The walls were intended to improve ventilation, as passing trains would push air forward, rather than to the sides of the tunnel. [8] :854

The platforms have no columns except on the north ends, where the platforms were extended in 1970. These I-beam columns are cream colored. The ceiling in this area is lower. [39] [40]

Prior to the station's 1970 renovation, it was finished all in white and marble tile, and it had its own color scheme to allow regular passengers to identify the station based only on the color of the marble trimmings. [8] Since that renovation, the station walls have consisted of white cinderblock tiles, except for small recesses in the walls, which contain blue-painted cinderblock tiles. The blue cinderblock field contains the station-name signs and white text pointing to the exits. During the 2017 renovation, the cinder block tiles installed in the 1970s were restored, and new black floor tiles and yellow platform treads were installed. The blue cinder block recessions installed in the 1970s were covered with small black mosaic tiles. [41]

The 2017 artwork at this station consists of mosaics by Monika Bravo. [42] They signify local landmarks such as the Brooklyn Army Terminal. [43]

Exits

The station's only fare controls are near the center of each platform, at the platform level. [44] Until the 2017 renovations, [45] they had their original trim line, colored brown with "P" at regular intervals, a bank of turnstiles, and token booth. [46] The Manhattan-bound side has two street stairs to the east sidewalk of Fourth Avenue, with one going to the southeastern corner of Prospect Avenue and Fourth Avenue, and the other going to the northeastern corner of 17th Street and Fourth Avenue. Meanwhile, the Bay Ridge-bound side has one to the northwestern corner of 17th Street and Fourth Avenue. [47] [48] There are no crossovers or crossunders to allow free transfer between directions. [49] [50]

Related Research Articles

<span class="mw-page-title-main">103rd Street–Corona Plaza station</span> New York City Subway station in Queens

The 103rd Street–Corona Plaza station is a local station on the IRT Flushing Line of the New York City Subway, located at the intersection of 103rd Street and Roosevelt Avenue. It is served by the 7 train at all times.

<span class="mw-page-title-main">90th Street–Elmhurst Avenue station</span> New York City Subway station in Queens

The 90th Street–Elmhurst Avenue station is a local station on the IRT Flushing Line of the New York City Subway, located at 90th Street and Elmhurst Avenue in Elmhurst, Queens. It is served by the 7 train at all times.

<span class="mw-page-title-main">82nd Street–Jackson Heights station</span> New York City Subway station in Queens

The 82nd Street–Jackson Heights station is a local station on the IRT Flushing Line of the New York City Subway, located at the intersection of 82nd Street and Roosevelt Avenue in Jackson Heights, Queens. It is served by the 7 train at all times.

<span class="mw-page-title-main">Borough Hall/Court Street station</span> New York City Subway station in Brooklyn

The Borough Hall/Court Street station is an underground New York City Subway station complex in Brooklyn shared by the BMT Fourth Avenue Line, the IRT Broadway–Seventh Avenue Line and the IRT Eastern Parkway Line. The complex comprises three stations: Borough Hall on the IRT lines and Court Street on the BMT line. The stations are located under Court, Joralemon, and Montague Streets, next to Brooklyn Borough Hall, in the Downtown Brooklyn and Brooklyn Heights neighborhoods of Brooklyn. It is served by the 2, 4, and R trains at all times; the 3 train all times except late nights; the 5 train on weekdays; the N train during late nights; and limited rush-hour W trains.

<span class="mw-page-title-main">Union Street station (BMT Fourth Avenue Line)</span> New York City Subway station in Brooklyn

The Union Street station is a local station on the BMT Fourth Avenue Line of the New York City Subway. It is located at the corner of Fourth Avenue and Union Street in Brooklyn, New York City, serving the communities of Park Slope, Gowanus and Carroll Gardens. It is served by the R train at all times. The D and N trains also stop here during late nights, and some rush-hour W trains stop here in the peak direction.

<span class="mw-page-title-main">86th Street station (BMT Fourth Avenue Line)</span> New York City Subway station in Brooklyn

The 86th Street station is a station on the BMT Fourth Avenue Line of the New York City Subway, located at 86th Street and Fourth Avenue in Bay Ridge, Brooklyn. It is served by the R train at all times.

<span class="mw-page-title-main">59th Street station (BMT Fourth Avenue Line)</span> New York City Subway station in Brooklyn

The 59th Street station is an express station on the BMT Fourth Avenue Line of the New York City Subway. Located at 59th Street and Fourth Avenue in Sunset Park, Brooklyn, it is served by the N and R trains at all times. During rush hours, several W trains also serve the station.

<span class="mw-page-title-main">36th Street station (BMT Fourth Avenue Line)</span> New York City Subway station in Brooklyn

The 36th Street station is an express station on the BMT Fourth Avenue Line of the New York City Subway, located at 36th Street and Fourth Avenue in Sunset Park, Brooklyn. It is served by the D, N, and R trains at all times. During rush hours, a limited amount of W trains also serve this station.

<span class="mw-page-title-main">Bay Ridge Avenue station</span> New York City Subway station in Brooklyn

The Bay Ridge Avenue station is a station on the BMT Fourth Avenue Line of the New York City Subway, located at the intersection of Bay Ridge Avenue and Fourth Avenue in Bay Ridge, Brooklyn. It is served by the R train at all times.

<span class="mw-page-title-main">45th Street station (BMT Fourth Avenue Line)</span> New York City Subway station in Brooklyn

The 45th Street station is a local station on the BMT Fourth Avenue Line of the New York City Subway. Located at 45th Street and Fourth Avenue in Sunset Park, Brooklyn, it is served by the R train at all times. The N train also stops here during late nights, and some rush-hour W trains stop here in the peak direction.

<span class="mw-page-title-main">77th Street station (BMT Fourth Avenue Line)</span> New York City Subway station in Brooklyn

The 77th Street station is a station on the BMT Fourth Avenue Line of the New York City Subway. Located at 77th Street and Fourth Avenue in Bay Ridge, Brooklyn, it is served by the R train at all times.

<span class="mw-page-title-main">Bay Ridge–95th Street station</span> New York City Subway station in Brooklyn

The Bay Ridge–95th Street station is the southern terminal station on the BMT Fourth Avenue Line of the New York City Subway. Despite the name, the station is located in the neighborhood of Fort Hamilton at the intersection of 95th Street and Fourth Avenue in southwestern Brooklyn. It is served by the R train at all times. Geographically, this station is the westernmost New York City Subway station.

<span class="mw-page-title-main">Smith–Ninth Streets station</span> New York City Subway station in Brooklyn

The Smith–Ninth Streets station is a local station on the IND Culver Line of the New York City Subway. It is located over the Gowanus Canal near the intersection of Smith and Ninth Streets in Gowanus, Brooklyn, and is served by the F and G trains at all times. The station is 87.5 feet (26.7 m) above ground level and was the highest rapid transit station in the world when it was built.

<span class="mw-page-title-main">25th Street station (BMT Fourth Avenue Line)</span> New York City Subway station in Brooklyn

The 25th Street station is a local station on the BMT Fourth Avenue Line of the New York City Subway. Located at the intersection of 25th Street and Fourth Avenue in Greenwood Heights, Brooklyn, it is served by the R train at all times. The D and N trains also stop here during late nights, and some rush-hour W trains stop here in the peak direction.

<span class="mw-page-title-main">53rd Street station (BMT Fourth Avenue Line)</span> New York City Subway station in Brooklyn

The 53rd Street station is a local station on the BMT Fourth Avenue Line of the New York City Subway. Located at 53rd Street and Fourth Avenue in Sunset Park, Brooklyn, it is served by the R train at all times. The N train also stops here during late nights, and some rush-hour W trains stop here in the peak direction.

<span class="mw-page-title-main">Avenue I station</span> New York City Subway station in Brooklyn

The Avenue I station is a local station on the IND Culver Line of the New York City Subway. Located at the intersection of Avenue I and McDonald Avenue in Midwood, Brooklyn, it is served by the F train at all times and the <F> train during rush hours in the peak direction.

<span class="mw-page-title-main">Broadway station (BMT Astoria Line)</span> New York City Subway station in Queens

The Broadway station is a local station on the BMT Astoria Line of the New York City Subway. It is located above 31st Street at Broadway in Astoria, Queens. The station is served by the N train at all times, as well as by the W train on weekdays.

<span class="mw-page-title-main">50th Street station (BMT West End Line)</span> New York City Subway station in Brooklyn

The 50th Street station is a local station on the BMT West End Line of the New York City Subway, located at the intersection of 50th Street and New Utrecht Avenue in Borough Park, Brooklyn. It is served by the D train at all times. The station opened in 1916, and had its platforms extended in the 1960s.

<span class="mw-page-title-main">Cleveland Street station</span> New York City Subway station in Brooklyn

The Cleveland Street station is a skip-stop station on the BMT Jamaica Line of the New York City Subway in Brooklyn. It is served by the J train at all times. The Z train skips this station when it operates.

<span class="mw-page-title-main">Fourth Avenue/Ninth Street station</span> New York City Subway station in Brooklyn

The Fourth Avenue/Ninth Street station is a New York City Subway station complex shared by the elevated IND Culver Line and the underground BMT Fourth Avenue Line. It is located at the intersection of Ninth Street and Fourth Avenue in Park Slope, Brooklyn and served by the:

References

  1. "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
  2. "Brooklyn Bus Map" (PDF). Metropolitan Transportation Authority. October 2020. Retrieved December 1, 2020.
  3. 1 2 3 "Through Tube to Coney, 48 Minutes: First Train on Fourth Avenue Route Beats West End Line Eleven Minutes". Brooklyn Daily Eagle. June 22, 1915. Retrieved June 29, 2015 via newspapers.com Open Access logo PLoS transparent.svg .
  4. 1 2 "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.
  5. 1 2 "B.M.T. Stations Ready For Eight-Car Trains". Brooklyn Standard Union. August 1, 1927. p. 1. Retrieved April 9, 2020 via newspapers.com Open Access logo PLoS transparent.svg .
  6. 1 2 3 New York City Transit Authority Annual Report For The Year June 30, 1960. New York City Transit Authority. 1960. pp. 16–17.
  7. 1 2 Rogoff, David (May 1961). "The Fourth Ave. Subway". New York Division Bulletin. Electric Railroaders' Association: 2–10. Retrieved May 8, 2017.
  8. 1 2 3 4 5 6 Fourth Avenue Subway, Brooklyn's New Transportation Line: A Part of the Dual System of Rapid Transit of the City of New York. New York City: Public Service Commission. June 19, 1915. p. 18. hdl:2027/uiug.30112067596715 via HathiTrust.
  9. "Fourth Avenue Subway Is Sent To A Committee". The Brooklyn Daily Eagle. March 20, 1908. pp. 1–2. Retrieved May 4, 2017 via newspapers.com Open Access logo PLoS transparent.svg .
  10. "Fourth Avenue Subway To Be Political Issue". The Brooklyn Daily Eagle. December 11, 1908. p. 1. Retrieved May 4, 2017.
  11. Cudahy, Brian J. (2009). How We Got to Coney Island: The Development of Mass Transportation in Brooklyn and Kings County. Fordham University Press. pp. 217–218. ISBN   978-0-8232-2211-7 . Retrieved April 24, 2020.
  12. Legislature, New York (State) (1923). Second Annual Report of the Transit Commission (For the Calendar Year 1922). New York State Transit Commission. p. 100.
  13. Proceedings of the Transit Commission, State of New York Volume III From January 1 to December 31, 1923. New York State Transit Commission. 1923. p. 1277.
  14. "12 B-M. T. Stations To Be Lengthened". The New York Times . February 17, 1925. ISSN   0362-4331 . Retrieved May 4, 2017.
  15. "Board Receives Platform Bids For B.M.T. Lines. Six Companies Submit Prices for Extending Subway Stations". The Brooklyn Citizen. February 26, 1926. p. 5. Retrieved April 7, 2020 via newspapers.com Open Access logo PLoS transparent.svg .
  16. "Brooklyn Wins Big Improvement Fund". Brooklyn Standard Union. March 18, 1926. p. 20. Retrieved April 7, 2020 via newspapers.com Open Access logo PLoS transparent.svg .
  17. "B.M.T. Lines Pass to City Ownership; $175,000,000 Deal Completed at City Hall Ceremony-- Mayor 'Motorman No. 1'". The New York Times. June 2, 1940. ISSN   0362-4331. Archived from the original on July 19, 2021. Retrieved May 14, 2022.
  18. "City Takes Over B. M. T. System; Mayor Skippers Midnight Train". New York Herald Tribune. June 2, 1940. p. 1. ProQuest   1243059209.
  19. "Our Subway Stations To Be Brighter". Bay Ridge Home Reporter. July 10, 1959. p. 2. Retrieved April 7, 2020 via newspapers.com Open Access logo PLoS transparent.svg .
  20. Minutes and Proceedings. New York City Transit Authority. 1967. pp. 379–380.
  21. Engineering News-record. McGraw-Hill. 1969. p. 63.
  22. Proceedings of the New York City Transit Authority Relating to Matters Other Than Operation. New York City Transit Authority. 1969. pp. 280, 435, 487.
  23. Burks, Edward C. (February 21, 1970). "Subways' Colored Tile Gets Cover-Up Job". The New York Times. ISSN   0362-4331 . Retrieved April 7, 2020.
  24. Whitford, Emma (January 8, 2016). "MTA Will Completely Close 30 Subway Stations For Months-Long "Revamp"". Gothamist. Archived from the original on August 1, 2016. Retrieved July 18, 2016.
  25. "MTAStations" (PDF). governor.ny.gov. Government of the State of New York. Retrieved July 18, 2016.
  26. 1 2 "Capital Program Oversight Committee Meeting" (PDF). mta.info. Metropolitan Transportation Authority. November 2016. p. 54. Retrieved November 27, 2016.
  27. "Three Brooklyn R Stations are First in Major Subway Station Modernization Project". Metropolitan Transportation Authority. March 22, 2017. Archived from the original on August 21, 2019. Retrieved August 31, 2017.
  28. Spivack, Caroline (January 16, 2017). "Shuttle scuttle: Riders demand extra buses during three subway stations' closure". Brooklyn Paper. Retrieved January 27, 2017.
  29. "MTA will close these Brooklyn subway stops to facilitate upgrades". Curbed NY. March 22, 2017. Retrieved March 24, 2017.
  30. "Prospect Av R Station to Close for Major Renovation". www.mta.info. Metropolitan Transportation Authority. May 25, 2017. Archived from the original on August 16, 2017. Retrieved May 26, 2017.
  31. Barone, Vincent (November 2, 2017). "Prospect Avenue subway station reopens with modern amenities". am New York. Retrieved November 3, 2017.
  32. Dougherty, Peter (2020). Tracks of the New York City Subway 2020 (16th ed.). Dougherty. OCLC   1056711733.
  33. "RSubway Timetable, Effective June 30, 2024". Metropolitan Transportation Authority . Retrieved June 28, 2024.
  34. "WSubway Timetable, Effective December 17, 2023". Metropolitan Transportation Authority . Retrieved June 28, 2024.
  35. "DSubway Timetable, Effective June 30, 2024". Metropolitan Transportation Authority . Retrieved June 28, 2024.
  36. "NSubway Timetable, Effective December 17, 2023". Metropolitan Transportation Authority . Retrieved June 28, 2024.
  37. "Subway Map" (PDF). Metropolitan Transportation Authority. September 2021. Retrieved September 17, 2021.
  38. Cox, Jeremiah (October 1, 2012). "The low ceiling of the extension at the northern end of the Bay Ridge-bound platform". subwaynut.com. Archived from the original on June 2, 2015. Retrieved December 18, 2018.
  39. Cox, Jeremiah (October 1, 2012). "The low ceiling of the extension at the northern end of the Bay Ridge-bound platform". subwaynut.com. Archived from the original on June 2, 2015. Retrieved December 18, 2018.
  40. Cox, Jeremiah (June 5, 2009). "Looking down the simple Bay Ridge/Bensonhurst-bound platform at Prospect Ave, by its innocuous advertising panels". subwaynut.com. Retrieved April 19, 2020.
  41. Cashin, Patrick (November 2, 2017). "Reopening of the Prospect Av R Station". Flickr. Metropolitan Transportation Authority. Retrieved December 18, 2018.
  42. Plitt, Amy (November 3, 2017). "Brooklyn's Prospect Ave subway station reopens after six-month revamp". Curbed NY. Retrieved November 4, 2017.
  43. Mixson, Colin (November 3, 2017). "Back on tracks: Refurbished Prospect Avenue station reopens, delighting local straphangers". Brooklyn Paper. Retrieved November 4, 2017.
  44. Cox, Jeremiah (October 1, 2012). "Approaching the turnstiles to leave the station from the Bay Ridge-bound platform, the waiting area doesn't allow the token clerk to provide a mindful eye anymore, the only token clerk is now on the Manhattan-bound platform". subwaynut.com. Archived from the original on March 11, 2016. Retrieved December 18, 2018.
  45. Hermann, Marc A. (November 2, 2017). "Prospect Av Station Reopens". Flickr. Metropolitan Transportation Authority. Retrieved December 18, 2018.
  46. Cox, Jeremiah (June 5, 2009). "Looking through the fence to the area outside of fare control at a P in the station's trim at Prospect Avenue". subwaynut.com. Archived from the original on March 11, 2016. Retrieved December 18, 2018.
  47. Cox, Jeremiah (October 1, 2012). "The one streetstair from the Bay Ridge-bound platform". subwaynut.com. Archived from the original on August 21, 2019. Retrieved December 18, 2018.
  48. "MTA Neighborhood Maps: Park Slope" (PDF). mta.info . Metropolitan Transportation Authority. 2015. Retrieved August 2, 2015.
  49. Cox, Jeremiah (June 29, 2009). "The other entrance the Manhattan-bound platform at Prospect Av, with the Expressway as the backdrop". subwaynut.com. Archived from the original on March 11, 2016. Retrieved December 18, 2018.
  50. Cox, Jeremiah (June 29, 2009). "Looking out from the Prospect Expressway's overpass at the single staircase down to the Bensonhurst & Bay Ridge side at Prospect Ave". subwaynut.com. Archived from the original on October 15, 2012. Retrieved December 18, 2018.