The electricity sectors of the Republic of Ireland and Northern Ireland are integrated and supply 2.5 million customers from a combination of coal, peat, natural gas, wind and hydropower. In 2022, 34 TWh were generated. [1] In 2018 natural gas produced 51.8%, while wind turbines generated 28.1%, coal 7%, and peat 6.8% of Ireland's average electricity demand. [2] In 2020 wind turbines generated 36.3% of Ireland's electrical demand, one of the highest wind power proportions in the world. [3] While the United Kingdom was one of the first countries in the world to deploy commercial nuclear power plants, the island of Ireland has never had a nuclear power plant built on either side of the Irish border. Nuclear power in Ireland was discussed in the 1960s and 1970s but ultimately never phased in, with legislation now in place explicitly forbidding its introduction.
The grid runs as a synchronous electrical grid and in terms of interconnections has undersea DC-only connections to the UK National Grid, alongside plans in the advanced stage for a higher power, planned Celtic Interconnector to France. In the 2019 UK General Election 2019, the Democratic Unionist Party included in their manifesto a proposal to link Iceland to Northern Ireland (a variant on Icelink). [4]
External image | |
---|---|
Today's demand and production |
The electricity sector in Ireland previously operated as two separate markets: Northern Ireland operated as part of the UK, and the Republic of Ireland operated its own separate market. On 1 November 2007 the two Transmission System Operators (System Operator Northern Ireland and EirGrid) established the Single Electricity Market for the island of Ireland. This market has created "a gross mandatory pool market, into which all electricity generated on or imported onto the island of Ireland must be sold, and from which all wholesale electricity for consumption on or export from the island of Ireland must be purchased". According to the Electricity Association of Ireland, in 2013 the Single Electricity Market had approximately 2.5 million customers; 1.8 million in the Republic and 0.7 million in Northern Ireland. [5] The effect of Brexit on the Single Electricity Market has yet to be defined.
Ireland and Northern Ireland form a regional group of the Europe-wide ENTSO-E organisation. The networks are not yet interconnected with the Continental Europe grid, but have interconnection with the British network through the Moyle Interconnector and the East–West Interconnector. In 2014, the island had an electricity interconnection level (international transmission capacity relative to production capacity) of 9%, below the recommended 10% level. [6]
Electricity generators in the Republic of Ireland are ESB, SSE, Synergen (70% ESB), Edenderry Power, Endesa-Ireland and Huntstown (Viridian). ESB owns the transmission and distribution networks.
The transmission system operator is EirGrid plc, which assumed the role from ESB Networks on 1 July 2006. EirGrid ensures the safe, secure and economic operation of the high voltage electricity grid. EirGrid is owned by the Irish State and is established as a result of a government decision to create an independent organisation to carry out the transmission system operator function, in order to assist the liberalisation of Ireland's electricity industry and the development of a competitive market.
The electricity industry is regulated by the Commission for Regulation of Utilities which also regulates the natural gas market. The functions and duties of the commission have been altered and expanded significantly by legislation transposing EU directives into Irish law.
Under the original 2009 Renewable Energy Directive Ireland had set a target of producing 16% of all its energy needs from renewable energy sources by 2020 but that has been updated by a second Renewable Energy Directive whose targets are 32% by 2030. Between 2005 and 2014 the percentage of energy from renewable energy sources grew from just 3.1% to 8.6% of total final consumption. By 2020 the overall renewable energy share was 13.5%, short of its Renewable Energy Drive target of 16%. [7] Renewable electricity accounted for 69% of all renewable energy used in 2020, up from two thirds (66.8%) in 2019. [7]
The country has a large and growing installed wind power capacity at 4,405 MW by the end of 2021 producing 31% of all its electricity needs in that year. [8] By February 2024, there was 1GW of solar PV capacity connected to the grid. [9] By April 2024, the grid had 1GW of storage capacity with almost 750MW of that capacity in the form of battery storage [10] the rest supplied by Turlough Hill.The high-voltage Irish electricity transmission grid comprises 6,800 km of power lines and operates at 400 kV, 220 kV and 110 kV. [14] Substations provide entry points to, and exits from, the transmission grid. Entry points include thermal and hydro-electric power stations, major wind farms, and inter-connectors from other countries and regions. Exit points are to lower voltage (220 kV, 110 kV, and 38 kV) transmission and distribution substations.
EirGrid is the Transmission System Operator (TSO), and ESB Networks is the Transmission Asset Owner (TAO). [14]
There are two 400 kV lines. One is from Moneypoint power station to Woodland substation where there is a connection to the 400 kV DC East-West Interconnector. The Oldstreet 400 kV substation is an intermediate substation on this line. The second line is from Moneypoint power station to Dunstown 400 kV substation. [15]
There are 220 kV substations at:
Aghada power station, Arklow, Arva, Ballyvouskill, Ballynahulla, Belcamp, Carrickmines, Cashla, Clashavoon, Clonee, Corduff, Cowcross, Cullenagh, Dunstown, Finglas, Flagford, Glanagow power station, Gorman, Great Island power station, Huntstown power station, Kellistown, Kilpaddoge, Killonan, Knockraha, Killonan, Lodgewood, Louth (and a connection to the 275 kV Northern Ireland grid), Maynooth, Moneypoint power station, Prospect, Raffee, Shannonbridge, Srananagh, Tarbert power station, Turlough Hill, and West Dublin. [15]
Ireland has several grid energy storage facilities with a combined 1.1 GW power, [16] [17] of which some are bidding into Ireland's DS3 grid services market for frequency control. [18] [19]
Name | Commissioning date | Energy (MWh) | Power (MW) | Duration (hours) | Type | County | Refs |
---|---|---|---|---|---|---|---|
Turlough Hill | 1974 | 1500 | 292 | 5 | Pumped-storage hydroelectricity | Wicklow | [20] [21] |
Aghada | 2024 | 338 | 170 | 2 | batteries | Cork | [17] |
Lumcloon | 2021 | 100 | Battery | Offaly | [22] | ||
Poolbeg | 2024 | 150 | 75 | 2 | Lithium-ion | Dublin | [23] |
Lisdrumdoagh | June 2022 | 60 | Battery | Monaghan | [24] | ||
Tullahennel | April 2021 | 26 | Lithium-ion | Kerry | [25] [26] | ||
Kilathmoy | January 2020 | 11 | Lithium-ion | Limerick/Kerry | [27] | ||
Stephenstown | April 2021 | 8.5 | Lithium-ion | Dublin | [28] |
Approved projects:
Name | Commissioning date | Energy (MWh) | Power (MW) | Duration (hours) | Type | County | Refs |
---|---|---|---|---|---|---|---|
Inchicore | 2022 | 60 | battery | Dublin | [29] | ||
South Wall | 2023 | 60 | 30 | 2 | Lithium-ion | Dublin | [29] |
Thornsberry | 2025 | 240 | 120 | 2 | Lithium-ion | Offaly | [30] |
Derrymeen | 2026 | 200 | 100 | 2 | Lithium-ion | Tyrone | [31] |
Shannonbridge | 2024 | 160 | Lithium-ion | +400 MW syncon [32] | |||
2025 | mwh | mw | 2 | Lithium-ion | Dublin | ||
There are three power stations in Northern Ireland: Ballylumford power station, Coolkeeragh power station and Kilroot power station. Northern Ireland Electricity (a subsidiary of ESB Group) owns the transmission and distribution networks.
The single electricity market means that Northern Ireland Electricity carries electricity on its network in exchange for a regulated charge to the electricity supply company. As of September 2011, domestic customers in Northern Ireland are able to buy electricity from Electric Ireland, Power NI, Airtricity, Click Energy or Budget Energy. Industrial and commercial customers are able to choose from several other electricity suppliers.
The transmission system operator is System Operator Northern Ireland, which ensures the safe, secure and economic operation of the high voltage electricity grid. Its counterpart in the Republic of Ireland is EirGrid. Both of these are owned by EirGrid plc which also (through a joint partnership) acts as the single energy market operator, i.e., runs the new all-island wholesale market for electricity. [33]
The electricity industry in Northern Ireland is regulated by the Northern Ireland Authority for Utility Regulation. [34] The authority is an independent public body established to oversee and regulate the electricity, gas, water and sewerage industries in Northern Ireland. The Authority is a non-ministerial government department responsible for promoting the short and long term interests of consumers. It does not make policy, but ensures that the energy and water utility industries are regulated and developed within ministerial policies. It is governed by a board of directors and is accountable to the Northern Ireland Assembly. [34]
The office of Director General of Electricity Supply for Northern Ireland was established in 1992 in association with the privatisation of electricity supplies in Northern Ireland. [35] The Director General was appointed by the Department of Economic Development to regulate the electricity industry. [36] Statutory duties included ensuring that all reasonable demands for electricity were satisfied; that licence holders were able to finance their activities; to promote competition in the generation and supply of electricity; to protect the interests of consumers of electricity in terms of price and continuity of supply; to promote efficiency and economy; to promote research and development; to protect the public from danger; and to secure the health and safety of persons employed in the generation, transmission or supply of electricity. [37]
The regulatory system was reformed in 2003 to combine the regulation of electricity and natural gas into a single energy regulator. The Northern Ireland Authority for Energy Regulation was established and the offices of Director General of Gas for Northern Ireland and Director General of Electricity Supply for Northern Ireland were abolished. [38] The posts of Chief Executive and Chair of the Energy Regulator were split in 2006.
In April 2007 the regulatory system for utilities was further reformed to encompass the water supply and sewage industries. [39] The Northern Ireland Authority for Energy Regulation became the Northern Ireland Authority for Utility Regulation. The board of directors is responsible for the overall strategic direction of the organisation. The board comprises a non-executive chairman, four non-executive members and the chief executive. The key functional areas in the organisation are Network Operations, Wholesale, Retail and Consumer Protection, and Corporate Affairs. [40]
Director General of Electricity Supply
Chair and Chief Executive of Energy Regulation
Chief Executive of Energy Regulation
Chief Executive of Northern Ireland Authority for Utility Regulation
Chair of Northern Ireland Authority for Utility Regulation
Distributed generation, also distributed energy, on-site generation (OSG), or district/decentralized energy, is electrical generation and storage performed by a variety of small, grid-connected or distribution system-connected devices referred to as distributed energy resources (DER).
The Electricity Supply Board is a state owned electricity company based in Ireland with operations worldwide. While historically a monopoly, the ESB now operates as a commercial semi-state concern in a "liberalised" and competitive market. It is a statutory corporation whose members are appointed by the government of Ireland.
The National Grid is the high-voltage electric power transmission network serving Great Britain, connecting power stations and major substations, and ensuring that electricity generated anywhere on the grid can be used to satisfy demand elsewhere. The network serves the majority of Great Britain and some of the surrounding islands. It does not cover Northern Ireland, which is part of the Irish single electricity market.
Northern Ireland Electricity Networks Limited (NIE Networks) is the electricity asset owner of the transmission and distribution infrastructure in Northern Ireland, established in 1993 when the business was privatised. NIE Networks does not generate or supply electricity. Since 2010 it has been a subsidiary of ESB Group.
The East–West Interconnector is a 500 MW high-voltage direct current submarine and subsoil power cable from 2012 which connects the Irish and British electricity markets, between Dublin and the Wales/England border. The project was developed by the Irish national grid operator EirGrid.
A virtual power plant (VPP) is a system that integrates multiple, possibly heterogeneous, power resources to provide grid power. A VPP typically sells its output to an electric utility. VPPs allow energy resources that are individually too small to be of interest to a utility to aggregate and market their power. As of 2024, VPPs operated in the United States, Europe, and Australia.
EirGrid plc is the state-owned electric power transmission operator in Ireland. It is a public limited company registered under the Companies Acts; its shares are held by the Minister for the Environment, Climate and Communications. It is one of a number of Irish state-sponsored bodies and is regulated by the Commission for Regulation of Utilities.
A grid-tied electrical system, also called tied to grid or grid tie system, is a semi-autonomous electrical generation or grid energy storage system which links to the mains to feed excess capacity back to the local mains electrical grid. When insufficient electricity is available, electricity drawn from the mains grid can make up the shortfall. Conversely when excess electricity is available, it is sent to the main grid. When the Utility or network operator restricts the amount of energy that goes into the grid, it is possible to prevent any input into the grid by installing Export Limiting devices.
An electrical grid is an interconnected network for electricity delivery from producers to consumers. Electrical grids consist of power stations, electrical substations to step voltage up or down, electric power transmission to carry power over long distances, and finally electric power distribution to customers. In that last step, voltage is stepped down again to the required service voltage. Power stations are typically built close to energy sources and far from densely populated areas. Electrical grids vary in size and can cover whole countries or continents. From small to large there are microgrids, wide area synchronous grids, and super grids. The combined transmission and distribution network is part of electricity delivery, known as the power grid.
The energy sector in Hawaii has rapidly adopted solar power due to the high costs of electricity, and good solar resources, and has one of the highest per capita rates of solar power in the United States. Hawaii's imported energy costs, mostly for imported petroleum and coal, are three to four times higher than the mainland, so Hawaii has motivation to become one of the highest users of solar energy. Hawaii was the first state in the United States to reach grid parity for photovoltaics. Its tropical location provides abundant ambient energy.
The National Grid covers most of mainland Great Britain and several of the surrounding islands, and there are interconnectors to Northern Ireland and to other European countries. Power is supplied to consumers at 230 volts AC with a frequency of 50 Hz. In 2023 about a third of electricity used in Britain was generated from fossil gas and two-thirds was low-carbon power. Wind generates the most low-carbon power, followed by nuclear some of which is imported from France. The government is aiming for greenhouse gas emissions from electricity in Britain to be net zero by 2035.
South Australia is a leader in utility-scale renewable energy generation, and also produces gas and uranium for electricity generation. Gas production is mostly concentrated in the Cooper Basin in the state's north-east. Gas is delivered from these fields by pipeline to users interstate and to Port Adelaide where it fuels three separate gas-fired power plants. Uranium is also mined in South Australia, though nuclear power generation is prohibited nationally. The Olympic Dam mine is the world's single largest known deposit of uranium and represents 30% of the world's total uranium resource. Many utility-scale wind farms and solar farms have been commissioned during the 21st century and geology with potential for geothermal energy has also been identified but is yet to be developed.
Ireland is a net energy importer. Ireland's import dependency decreased to 85% in 2014. The cost of all energy imports to Ireland was approximately €5.7 billion, down from €6.5 billion (revised) in 2013 due mainly to falling oil and, to a lesser extent, gas import prices. Consumption of all fuels fell in 2014 with the exception of peat, renewables and non-renewable wastes.
Variable renewable energy (VRE) or intermittent renewable energy sources (IRES) are renewable energy sources that are not dispatchable due to their fluctuating nature, such as wind power and solar power, as opposed to controllable renewable energy sources, such as dammed hydroelectricity or bioenergy, or relatively constant sources, such as geothermal power.
Energy is a major area of the economy of California. California is the state with the largest population and the largest economy in the United States. It is second in energy consumption after Texas. As of 2018, per capita consumption was the fourth-lowest in the United States partially because of the mild climate and energy efficiency programs.
The electricity sector in Australia has been historically dominated by coal-fired power stations, but renewables are forming a rapidly growing fraction of supply. In 2021, Australia's electricity production reached 265 TWh, with coal accounting for 52.9% and natural gas for 18.8%. Renewable sources, comprising solar, wind, hydro, and bioenergy with waste, collectively made up 26.7% of the total electricity generation mix.
Under the original 2009 Renewable Energy Directive Ireland had set a target of producing 16% of all its energy needs from renewable energy sources by 2020 but that has been updated by a second Renewable Energy Directive whose targets are 32% by 2030. Between 2005 and 2014 the percentage of energy from renewable energy sources grew from just 3.1% to 8.6% of total final consumption. By 2020 the overall renewable energy share was 13.5%, short of its Renewable Energy Drive target of 16%. Renewable electricity accounted for 69% of all renewable energy used in 2020, up from two thirds (66.8%) in 2019.
The Commission for Regulation of Utilities, formerly known as the Commission for Energy Regulation, is Ireland's energy and water economic utility regulator.
The Tehachapi Energy Storage Project (TSP) is a 8MW/32MWh lithium-ion battery-based grid energy storage system at the Monolith Substation of Southern California Edison (SCE) in Tehachapi, California, sufficient to power between 1,600 and 2,400 homes for four hours. At the time of commissioning in 2014, it was the largest lithium-ion battery system operating in North America and one of the largest in the world. TSP is considered to be a modern-day energy storage pioneer with significant accomplishments that have proven the viability of utility-scale energy storage using lithium-ion technology. While originally envisioned as a research and development project, TSP operated as a distribution-level resource for SCE and for calendar year 2020, SCE reported that TSP operated in the wholesale energy market with revenue exceeding operating and maintenance costs. In 2021, SCE began the decommissioning of TSP, which was followed by formal decommissioning by state regulators in 2022. The physical dismantlement of TSP is expected to be completed by the end of 2022.