As of 2021 [update] , the island of Ireland had 5,585 MW of installed wind power capacity, with 4,309 MW in the Republic of Ireland. In 2020, wind provided over 86% of Ireland's renewable electricity and generated 36.3% of Ireland's electricity demand, one of the highest percentages globally. [1] [2] In 2023, Wind Energy Ireland confirmed that wind farms provided 35 per cent of Ireland and Northern Ireland’s electricity in 2023, totalling a record breaking 13,725 gigawatt-hours (GWh). [3] Ireland has over 300 wind farms, mostly onshore. A Public Service Obligation subsidy supports renewable energy and wind power development, driven by concerns over energy, security, and climate change mitigation. [ citation needed ]
Eddie O'Connor, then CEO of the semi-state owned peat harvesting company, Bord na Móna, commissioned the country's first "commercial wind farm" in a cutaway peat bog in County Mayo in 1992. [4] Wind power deployment in the Republic of Ireland began slowly during the 1990's but has accelerated in the 2000's. Whilst annual wind capacity growth has been variable, it has shown an increasing trend (Figure 1). [5] Wind power has provided a steadily increasing share of electricity, from 4% (1,874 GWh) in 2005, to 28% in 2018 (10,195 GWh) (Figure 2). [5] In the first two months of 2020, wind provided 49% of electricity demand, [6] and a peak recorded output from wind power of 4,471 MW was delivered on 12 February 2021. [1] Wind is now the second largest source of electricity generation after natural gas, which accounted for 52% of electricity generated in 2018. [5]
Concerns over energy security (Ireland has an estimated 15.4m tonnes of coal reserves, peat bogs, offshore oil and gas fields, and has extensive wind resources), climate change mitigation policies, and compliance with EU Directives for market liberalization, have all shaped wind power development in Ireland. [7]
In the Directive [8] 2001/77/EC, otherwise known as the RES-E Directive, the European Union stated a goal to have 22% of the total energy consumed by member states to be produced from renewable energy resources by 2010. As a result, Ireland, in a report titled "Policy Consideration for Renewable Electricity to 2010", made the commitment to have 4% of its total energy consumption come from renewable energy resources by 2002 and 13.2% by 2010. The Department of Communications Marine and Natural Resources (DCMNR) founded the Renewable Energy Group (REG) which established the short-term analysis group (STAG) to investigate a means of accomplishing this goal. To meet the 2010 target of 13.2%, 1,432 MW of electricity will need to be generated from renewable resources with 1,100 MW being generated from wind resources both onshore and offshore. [ citation needed ]
State financial support for the national electricity sector, and particular technologies, has been influenced by a slow move towards liberalization, and concerns for energy security and climate change mitigation. [7] Ireland uses an industry subsidy known as the Public Service Obligation (PSO) to support the generation of electricity from sustainable, renewable and indigenous sources, including wind. [9] The PSO levy is charged to all electricity customers. As of April 2020, for residential consumers, the current PSO levy is €38.68 per year inclusive of value-added tax (VAT), and is displayed on the typical two-monthly electricity bill as €5.68 (€2.84 × 2) + 13.5% VAT.[ citation needed ]
The PSO levy funds the government's main mechanisms to support the generation of electricity from sustainable, renewable and indigenous sources. These mechanisms have shifted from the initial use of competitive auctions in the late 1990s, to a renewable energy feed-in tariff (REFiT) from 2006 to 2015, and back to a new renewable energy auction scheme as of 2020. Ireland's initial use of competitive auction from 1996 failed to support the intended growth in wind development. Between 2006 and 2015, the government supported a REFiT, secured for 15 years. The 2020 REFiT reference price for large wind (>5MW) is €70.98 /MWh and for small wind (<5MW) is €73.47/MWh. In June 2020, Ireland will run its first competitive renewable energy auction under the government's new Renewable Energy Support Scheme (RESS-1). [10] RESS-1 support is structured as a two-way floating feed-in premium (FIP), roughly the difference between the 'strike price' set in the successful auction bid and the 'market reference price'. When costs of electricity suppliers exceed market revenues a Support Payment will be due to the supplier, and when market revenues exceed costs a Difference Payment will be due from the supplier. An economic analysis of the financial cost of different RESS options, estimated that a least cost auction with floating FIP mechanism would cost a domestic consumer €0.79 per month by 2030 (at 2017 prices). [11] This is significantly less than the current PSO levy rate to fund REFiT costs.
The Arklow Bank Wind Park, located 10 km off the coast of Arklow on the Arklow Bank in the Irish Sea, is Ireland's only offshore wind farm. The wind farm is owned and built by GE Energy and was co-developed by Airtricity and GE Energy. The site has 7 GE Energy 3.6 MW turbines that generate a total of 25 MW. The development of the site was originally divided into two phases with the first phase being the current installation of 7 turbines. The second phase was a partnership between Airtricity and Acciona Energy. Acciona Energy had an option to buy the project after the facility is completed. The wind farm was planned to expand to 520 MW of power. However, Phase 2 was cancelled in 2007. [12]
Although the waters off the Atlantic coast of Ireland have higher winds, sites along the eastern coast, such as Arklow, have been chosen for their shallower waters, with depths of 20m or less.
In Belfast, the harbor industry is being redeveloped as a hub for offshore wind farm construction, at a cost of about £50m. The work will create 150 jobs in construction, as well as requiring about 1 million tonnes of stone from local quarries, which will create hundreds more jobs. "It is the first dedicated harbor upgrade for offshore wind". [13]
In 2023, an offshore wind auction approved four projects totaling 3 GW. [14] The Codling project won first approval for a power price around €90/MWh by 2027. [15]
Grid connections are currently allocated on a 'first come, first served' basis through the Gate 3 procedures. Upon reviewing the Gate 3 queue, it was noted that several large onshore and offshore wind projects are positioned lower in the queue, meaning they will likely be offered grid connections towards the end of the anticipated 18-month processing period, which began in December 2009. [16]
Under normal circumstances, planning permission expires after 5 years. However, Section 41 of the Planning and Development Act 2000 allows for an extended period. It is currently common to apply for and obtain a 10-year permission for wind energy developments. Section 42 of the same Act initially permitted a 5-year extension of the "appropriate period," provided that substantial works were carried out. This led to issues, as the term "substantial works" was not clearly defined, resulting in varied interpretations among planning authorities. This problem was addressed by the Planning and Development (Amendment) Act 2010, which introduced Section 28, allowing a one-off extension of up to 5 years if "there were considerations of a commercial, economic, or technical nature beyond the control of the applicant, which substantially militated against either the commencement of development or the carrying out of substantial works pursuant to the planning permission." [ citation needed ]
The fourth issue regarding the generation of wind power is the Renewable Energy Feed-in Tariff, or REFIT. [17] REFIT's goal is to promote the development of renewable energy sources. For wind power production, the current limit to the tariff is 1,450 MW. However, applications currently being processed for grid connections exceed the limit by almost 1,500 MW for a total for nearly 3,000 MW. Since the limit is 1,450 MW, many of the applications for grid connections are most likely not eligible for the tariff. [18] [ failed verification ]
Wind Farm | Capacity (MW) | No. | Turbine Vendor | Model | Size (MW) | Operator | Completed | County |
---|---|---|---|---|---|---|---|---|
Oweninny | 192 | 60 | Siemens Gamesa Enercon | SWT-3.2-113 N117/3600 | 3.2 3.6 | ESB Bord na Móna | 2023 | Mayo |
Galway Wind Park [19] | 174 | 58 | Siemens Gamesa | SWT-3.0-101 | 3.0 | SSE Renewables & Coillte | 2017 | Galway |
Grousemount [20] | 114 | 38 | Siemens Gamesa | SWT-3.2-108 SWT-2.3-93 | 3.2 2.3 | ESB | 2020 | Kerry |
Ardderroo [21] [22] | 101 | 22 | Nordex | N149 | 4.0 5.0 | 2023 | Galway | |
Knockacummer [23] | 100 | 40 | Nordex | N90 | 2.5 | Greencoat Renewables | 2013 | Cork |
In 2011, the 120-member Irish Academy of Engineering described wind as "an extremely expensive way of reducing greenhouse gas emissions when compared to other alternatives" like conservation, nuclear energy or the Corrib gas project and Liquified Gas tanker imports at Shannon, concluding that the suggestion of 40% grid penetration by wind, is "unrealistic". [24] In 2020, grid penetration had hit 36.3% [2] and was still increasing but slowly. [25] By contrast, the Sustainable Energy Authority of Ireland said in 2014 that wind power cost the same as gas power. [26] In 2020 the Irish Times reported that the cost of onshore wind energy had dropped over the last 20 years but that regulation on noise and height of turbines made Irish wind energy more expensive than elsewhere. [27]
Building wind turbines and access roads on top of peatland results in the drainage and then eventual oxidation of some of the peat. The turbines represent a minor impact, [28] provided that the entire wind farm area is not drained, potentially emitting more carbon dioxide (CO2) than the turbines would save. [29] Biochemist Mike Hall said in 2009; "wind farms (built on peat bogs) may eventually emit more carbon than an equivalent coal-fired power station" if drained. [30]
A 2014 report for the Northern Ireland Environment Agency, which has similar peatland, notes that building wind turbines on peatland could release considerable carbon dioxide from the peat, weaken flood control, and spoil water quality: "The potential knock-on effects of using the peatland resource for wind turbines are considerable and it is arguable that the impacts on this facet of biodiversity will have the most noticeable and greatest financial implications for Northern Ireland." [31]
The Irish Peatland Conservation Council maintains a database on incidents where building wind turbines (and wind farms) on or near peatland caused devastating landslides, called "bog bursts"/"peat flows". These accelerate the release of carbon dioxide into the atmosphere. [32]
In October 2003, the building of a wind farm in County Galway caused the Derrybrien landslide, an almost 2.5 km long, 450,000 m3 bog landslide, polluting a nearby lake and killing 50,000 fish. [33] The lake was also the source of the town of Gort's drinking water. [34] If all carbon in the slide is being released, it represents 7–15 months of production from the wind farm in avoided carbon dioxide from fossil power. [29] In 2004, engineering companies were convicted of being responsible for the pollution, [35] while the wind farm company was acquitted. [36] The Irish government was convicted in 2008 of poor oversight. [37]
Following the Corrie Mountain bog burst of 2008, Ireland was fined by a European Court over its mishandling of wind farms on peatland. [32] [38] By 2010, there had been at least three major bog landslides related to wind farms in Ireland. [28]
In 2020, there was another large bog landslide at a wind farm construction site at Meenbog, County Donegal. This polluted rivers that are protected Atlantic salmon habitats, and was predicted to have caused a "complete fish kill". Drinking water supplies linked to the rivers had to be suspended. [39] [40]
The body representing industrial peat harvesting in Ireland, Bord na Móna, announced in 2015 the "biggest change of land use in modern Irish history": harvesting peat is being phased out by 2030, due to the long-expected depletion of profitable lowland peat, [41] at which point the company would complete its transition to becoming a "sustainable biomass, wind and solar power" organization. [42]
Some on-land wind farms in Ireland have been opposed by local residents, county councils, the Heritage Council and An Taisce (The National Trust) for their potential to blight the landscape, and having a harmful impact on protected scenic areas, archaeological landscapes, tourism and cultural heritage. In 2014, more than 100 protest groups united against government plans to build thousands of wind turbines in the Midlands to export energy to Britain. Among other things, they argued the wind farms would ruin the landscape and mainly benefit "multinational corporations who are sucking subsidies from the UK taxpayers". The Irish government shelved the plans. [43] [44] [45]
In 2021, a proposed wind farm at Kilranelagh in the Wicklow Mountains was refused as it would have harmed the area's archaeological landscape, which includes the Baltinglass hillfort complex. [46]
An application to build a wind farm overlooking the scenic valley of Gougane Barra was refused by Cork County Council, who voted unanimously against it. The company appealed to An Bord Pleanála, whose inspector also rejected it, stating it "would have significant adverse environmental and visual impacts and is not sustainable at this highly sensitive location". Despite this, An Bord Pleanála granted permission, on the grounds that the wind farm would contribute "to the implementation of Ireland's national strategic policy on renewable energy". The spokesman of the campaigners against the wind farm said the decision was undemocratic, as the local people and council opposed it. [47]
In a typical study of a wind farms Life cycle assessment (LCA), in isolation, it usually results in similar findings as the following 2006 analysis of 3 installations in the US Midwest, were the carbon dioxide (CO2) emissions of wind power ranged from 14 to 33 metric ton per GWh (14 - 33 g CO2/kWh) of energy produced, with most of the CO2 emissions coming from the production of concrete for wind-turbine foundations. [52]
However, when approached from the effects on the grid as a whole, that assess wind turbines' ability to reduce a country's total electric grid emission intensity, a study by the Irish national grid, a grid that is predominately (~70%) powered by fossil gas, (and if it was 100% gas, would result in emissions of 410 - 650 g CO2/kWh. [53] [54] ) found that "Producing electricity from wind reduces the consumption of fossil fuels and therefore leads to [electric grid] emissions savings", with findings in reductions of the grid-wide CO2 emissions to 0.33-0.59 metric ton of CO2 per MWh (330 - 590 g CO2/kWh). [55]
These findings were of relatively "low [emission] savings", as presented in the Journal of Energy Policy , and were largely due to an over-reliance on the results from the analysis of wind farms LCAs in isolation. [50] [51] As high electric grid penetration by intermittent power sources e.g. wind power, sources which have low capacity factors due to the weather, either requires the construction of transmission to neighbouring areas, energy storage projects like the 292 MW Turlough Hill Power Station, that have their own additional emission intensity which must be accounted for, [56] [57] or the more common practice of requiring a higher reliance on fossil fuels than the spinning reserve requirements necessary to back-up the more dependable/baseload power sources, such as hydropower and nuclear energy. [50]
This higher dependence on back-up/Load following power plants to ensure a steady power grid output has the knock-on-effect of more frequent inefficient (in CO2e g/kW·h) throttling up and down of these other power sources in the grid to accommodate the intermittent power source's variable output. When one includes the intermittent sources total effect it has on other power sources in the grid system, that is, including these inefficient start up emissions of backup power sources to cater for wind energy, into wind energy's total system wide life cycle, this results in a higher real-world emission intensity related to wind energy than the in-isolation g/kW·h value, a statistic that is determined by looking at the power source in isolation and thus ignores all down-stream detrimental/inefficiency effects it has on the grid. [50] In a 2012 paper that appeared in the Journal of Industrial Ecology it states. [49]
The thermal efficiency of fossil-based power plants is reduced when operated at fluctuating and suboptimal loads to supplement wind power, which may degrade, to a certain extent, the GHG (Greenhouse gas) benefits resulting from the addition of wind to the grid. A study conducted by Pehnt and colleagues (2008) reports that a moderate level of [grid] wind penetration (12%) would result in efficiency penalties of 3% to 8%, depending on the type of conventional power plant considered. Gross and colleagues (2006) report similar results, with efficiency penalties ranging from nearly 0% to 7% for up to 20% [of grid] wind penetration. Pehnt and colleagues (2008) conclude that the results of adding offshore wind power in Germany on the background power systems maintaining a level supply to the grid and providing enough reserve capacity amount to adding between 20 and 80 g CO2-eq/kWh to the life cycle GHG emissions profile of wind power.
According to the IPCC, wind turbines when assessed in isolation, have a median life cycle emission value of between 12 and 11 (g CO2 eq/kWh). While the more dependable alpine Hydro power and nuclear stations have median total life cycle emission values of 24 and 12 g CO2-eq/kWh respectively. [53] [54]
Regarding interconnections, Ireland is connected to adjacent UK National Grid at an electricity interconnection level (transmission capacity relative to production capacity) of 9%. [58] The two grids have a high wind correlation of 0.61, whereas the wind correlation between the Irish grid and the Danish grid is low at 0.09. [59]
A significant feature of wind farms in Ireland is their ability to attract both local and tourists.. The Bord na Mona wind farm in Mount Lucas, Daingean, Co.Offaly has provided a local walk way through the newly established wind farm that attracts people of all ages. The walk way provides a safe environment off-road for walking, running and cycling. The walk way is approximately nine kilometres in distance with numerous stop off points for breaks. Maps can also be located in a variety of locations on the walk for guidance around the wind farm and back to allocated car parks. The walk way also provides aesthetic scenery on a relatively flat landscape. Such a walk attracts many people year round and circulates money back into the local community as tourists stop off in local shops. [60]
A 2008 Irish study of the grid indicates that it would be feasible to accommodate 42% (of demand) renewables in the electricity mix. [61] This acceptable level of renewable penetration was found in what the study called Scenario 5, provided 47% of electrical capacity (different from demand) with the following mix of renewable energies:
The study cautions that various assumptions were made that "may have understated dispatch restrictions, resulting in an underestimation of operational costs, required wind curtailment, and CO2 emissions" and that "The limitations of the study may overstate the technical feasibility of the portfolios analyzed..."
Scenario 6, which proposed renewables providing 59% of electrical capacity and 54% of demand had problems. Scenario 6 proposed the following mix of renewable energies:
The study found that, for Scenario 6, "a significant number of hours characterized by extreme system situations occurred, where load and reserve requirements could not be met." The results of the network study suggested that, for scenarios with extreme renewable penetration, a system redesign would be necessary, rather than merely reinforcing the existing system. The study chose not to analyze the cost-effectiveness of the required changes, stating that "determination of costs and benefits had become extremely dependent on the assumptions made," and that this uncertainty could have impacted the robustness of the results. [62]
SSE Airtricity is an energy company founded in Ireland in 1997, and now a subsidiary SSE plc. SSE Airtricity supplies and distributes electricity and gas to Northern Ireland and the Republic of Ireland.
The United Kingdom is the best location for wind power in Europe and one of the best in the world. The combination of long coastline, shallow water and strong winds make offshore wind unusually effective.
Arklow Bank Wind Park is a 25 megawatt offshore wind farm generating electrical power for the Wicklow region in Ireland. It is the first offshore wind farm in Ireland, and the world's first erection of wind turbines rated over 3 MW. It is located on the Arklow Bank, a shallow water sandbank in the Irish Sea, around 10 kilometers (6.2 mi) off the coast of Arklow with an area of 27 by 2.5 kilometres.
Wind power is a type of power using wind turbines allowing for electricity to be made and stored without the use of fossil fuels, including the green power in Australia’s energy sectors. As of October 2023, the nation has an installed wind capacity of around 9,100 megawatts (MW). It accounts for approximately 5% of the country's total primary energy supply and 35% of its renewable energy supply. Australia's geographical features, including its southern regions and the eastern slopes of the Great Dividing Range, are particularly conducive to wind energy development. Most of Australia's wind farms are situated in coastal areas.
The production of renewable energy in Scotland is a topic that came to the fore in technical, economic, and political terms during the opening years of the 21st century. The natural resource base for renewable energy is high by European, and even global standards, with the most important potential sources being wind, wave, and tide. Renewables generate almost all of Scotland's electricity, mostly from the country's wind power.
As of 2023, Europe had a total installed wind capacity of 255 gigawatts (GW). In 2017, a total of 15,680 MW of wind power was installed, representing 55% of all new power capacity, and the wind power generated 336 TWh of electricity, enough to supply 11.6% of the EU's electricity consumption.
Wind power is the fastest-growing renewable energy technology in Scotland, with 11,482 megawatts (MW) of installed wind power capacity by Q1 2023. This included 9,316 MW from onshore wind in Scotland and 2,166 MW of offshore wind generators.
Wind power' is a major source of energy in Portugal. At the end of 2020, wind power capacity in Continental Portugal was 5,456 MW. In 2020, wind power represented 23.7% of total electricity generation.
Renewable energy in the United Kingdom contributes to production for electricity, heat, and transport.
The environmental impact of electricity generation from wind power is minor when compared to that of fossil fuel power. Wind turbines have some of the lowest global warming potential per unit of electricity generated: far less greenhouse gas is emitted than for the average unit of electricity, so wind power helps limit climate change. Wind power consumes no fuel, and emits no air pollution, unlike fossil fuel power sources. The energy consumed to manufacture and transport the materials used to build a wind power plant is equal to the new energy produced by the plant within a few months.
The electricity sectors of the Republic of Ireland and Northern Ireland are integrated and supply 2.5 million customers from a combination of coal, peat, natural gas, wind and hydropower. In 2022, 34 TWh were generated. In 2018 natural gas produced 51.8%, while wind turbines generated 28.1%, coal 7%, and peat 6.8% of Ireland's average electricity demand. In 2020 wind turbines generated 36.3% of Ireland's electrical demand, one of the highest wind power proportions in the world. While the United Kingdom was one of the first countries in the world to deploy commercial nuclear power plants, the island of Ireland has never had a nuclear power plant built on either side of the Irish border. Nuclear power in Ireland was discussed in the 1960s and 1970s but ultimately never phased in, with legislation now in place explicitly forbidding its introduction.
Wind power in Indiana was limited to a few small water-pumping windmills on farms until 2008 with construction of Indiana's first utility-scale wind power facility, Goodland with a nameplate capacity of 130 MW. As of March of 2024, Indiana had a total of 2,743 MW of wind power capacity installed, ranking it 12th among U.S. states. Wind power was responsible for 4.8% of in-state electricity production in 2016.
GE Wind is a division of GE Vernova. The company manufactures and sells wind turbines to the international market. In 2018, GE Wind was the fourth largest wind turbine manufacturer in the world. Vic Abate is the CEO of GE Vernova’s Wind businesses.
Meadow Lake Wind Farm is an 801.25 megawatt (MW) wind farm near Brookston and Chalmers, Indiana, spreading over portions of White, Jasper, and Benton Counties. It is owned and operated by EDP Renewables North America. The facility currently has six operational phases, with 414 turbines, and is a prominent feature on both sides of Interstate 65 in western Indiana.
Bellacorick or Bellacoric is a townland in County Mayo in Ireland. It is in the Electoral Division of Glenco, in Civil Parish of Kilcommon, in the Barony of Erris, in the County of Mayo. Bellacorick has an area of: 2,789,440 m2 / 278.94 hectares / 2.7894 km2. Bellacorick borders the following other townlands: Killsallagh to the west; Moneynierin to the east; Muingaghel to the south; Srahnakilly to the north.
In 2016, Arizona had 268 megawatts (MW) of wind powered electricity generating capacity, producing 0.5% of in-state generated electricity.
Energy in Portugal describes energy and electricity production, consumption and import in Portugal. Energy policy of Portugal will describe the politics of Portugal related to energy more in detail. Electricity sector in Portugal is the main article of electricity in Portugal.
Ireland is a net energy importer. Ireland's import dependency decreased to 85% in 2014. The cost of all energy imports to Ireland was approximately €5.7 billion, down from €6.5 billion (revised) in 2013 due mainly to falling oil and, to a lesser extent, gas import prices. Consumption of all fuels fell in 2014 with the exception of peat, renewables and non-renewable wastes.
Renewable energy in Bhutan is the use of renewable energy for electricity generation in Bhutan. The renewable energy sources include hydropower.
Under the original 2009 Renewable Energy Directive Ireland had set a target of producing 16% of all its energy needs from renewable energy sources by 2020 but that has been updated by a second Renewable Energy Directive whose targets are 32% by 2030. Between 2005 and 2014 the percentage of energy from renewable energy sources grew from just 3.1% to 8.6% of total final consumption. By 2020 the overall renewable energy share was 13.5%, short of its Renewable Energy Drive target of 16%. Renewable electricity accounted for 69% of all renewable energy used in 2020, up from two thirds (66.8%) in 2019.
{{cite web}}
: CS1 maint: archived copy as title (link){{cite web}}
: CS1 maint: archived copy as title (link){{cite web}}
: CS1 maint: archived copy as title (link){{cite web}}
: CS1 maint: archived copy as title (link)