Wind power in Ireland

Last updated

Ireland relief location map.png
Dark Green 004040 pog.svg
Arklow Bank
Green 00ff00 pog.svg
Altagowlan
Green 00ff00 pog.svg
Anarget
Green 00ff00 pog.svg
Astellas
Green 00ff00 pog.svg
Ballincollig Hill
Green 00ff00 pog.svg
Ballinlough/Ikerrin
Green 00ff00 pog.svg
Ballinveny
Green 00ff00 pog.svg
Ballybane
Green 00ff00 pog.svg
Ballymartin
Green 00ff00 pog.svg
Ballywater
Green 00ff00 pog.svg
Bawnmore
Green 00ff00 pog.svg
Barnesmore
Green 00ff00 pog.svg
Beal Hill
Green 00ff00 pog.svg
Beallough
Green 00ff00 pog.svg
Beam Hill
Green 00ff00 pog.svg
Beenageeha
Green 00ff00 pog.svg
Bellacorick
Green 00ff00 pog.svg
Bindoo
Green 00ff00 pog.svg
Black Banks
Green 00ff00 pog.svg
Boggeragh
Green 00ff00 pog.svg
Booltiagh
Green 00ff00 pog.svg
Burtonport
Green 00ff00 pog.svg
Caherdowney
Green 00ff00 pog.svg
Caranne Hill
Green 00ff00 pog.svg
\Cark
Green 00ff00 pog.svg
Carnsore
Green 00ff00 pog.svg
Carrigcannon
Green 00ff00 pog.svg
Carrig
Green 00ff00 pog.svg
Carrons
Green 00ff00 pog.svg
Castledockrell
Green 00ff00 pog.svg
Clydaghroe
Green 00ff00 pog.svg
Coomacheo 1
Green 00ff00 pog.svg
Coomacheo 2
Green 00ff00 pog.svg
Coomatallin
Green 00ff00 pog.svg
Cornacahan
Green 00ff00 pog.svg
Corneen
Green 00ff00 pog.svg
Corry Mountain
Green 00ff00 pog.svg
Crocane
Green 00ff00 pog.svg
Crockahenny
Green 00ff00 pog.svg
Cronalaght
Green 00ff00 pog.svg
Cronelea
Green 00ff00 pog.svg
Cronelea Upper
Green 00ff00 pog.svg
Cuillalea
Green 00ff00 pog.svg
Culliagh
Green 00ff00 pog.svg
Curragh, Co Cork
Green 00ff00 pog.svg
Curraghgraigue
Green 00ff00 pog.svg
Derrybrien
Green 00ff00 pog.svg
Derrynadivva
Green 00ff00 pog.svg
Dromada
Green 00ff00 pog.svg
Drumlough
Green 00ff00 pog.svg
Drybridge/Dunmore
Green 00ff00 pog.svg
Dundalk
Green 00ff00 pog.svg
Dunmore
Green 00ff00 pog.svg
Flughland
Green 00ff00 pog.svg
Gartnaneane
Green 00ff00 pog.svg
Geevagh
Green 00ff00 pog.svg
Glackmore
Green 00ff00 pog.svg
Glenough
Green 00ff00 pog.svg
Gortahaile
Green 00ff00 pog.svg
Grouse Lodge
Green 00ff00 pog.svg
Garracummer
Green 00ff00 pog.svg
Gneeves
Green 00ff00 pog.svg
Greenoge
Green 00ff00 pog.svg
Inverin
Green 00ff00 pog.svg
Kealkill
Green 00ff00 pog.svg
Kilgarvan
Green 00ff00 pog.svg
Kilgarvan Extension
Green 00ff00 pog.svg
Killybegs
Green 00ff00 pog.svg
Kilronan
Green 00ff00 pog.svg
Kilvinane
Green 00ff00 pog.svg
Kingsmountain
Green 00ff00 pog.svg
Knockastanna
Green 00ff00 pog.svg
Knockawarriga
Green 00ff00 pog.svg
Lacka Cross
Green 00ff00 pog.svg
Lackan
Green 00ff00 pog.svg
Lahanaght Hill
Green 00ff00 pog.svg
Largan Hill
Green 00ff00 pog.svg
Lenanavea
Green 00ff00 pog.svg
Lisheen
Green 00ff00 pog.svg
Loughderryduff
Green 00ff00 pog.svg
Lurganboy
Green 00ff00 pog.svg
Mace Upper
Green 00ff00 pog.svg
Meenachullalan
Green 00ff00 pog.svg
Meenadreen and Meentycat
Green 00ff00 pog.svg
Meenanilta
Green 00ff00 pog.svg
Glanlee Midas
Green 00ff00 pog.svg
Mienvee
Green 00ff00 pog.svg
Milane Hill
Green 00ff00 pog.svg
Moanmore
Green 00ff00 pog.svg
Moneenatieve
Green 00ff00 pog.svg
Mount Eagle
Green 00ff00 pog.svg
Mount Lucas
Green 00ff00 pog.svg
Mountain Lodge
Green 00ff00 pog.svg
Mullananalt
Green 00ff00 pog.svg
Muingnaminnane
Green 00ff00 pog.svg
Pallas
Green 00ff00 pog.svg
Raheen Barr
Green 00ff00 pog.svg
Rahora
Green 00ff00 pog.svg
Rathmooney
Green 00ff00 pog.svg
Reenascreena
Green 00ff00 pog.svg
Richfield
Green 00ff00 pog.svg
Seltanaveeny
Green 00ff00 pog.svg
Shannagh
Green 00ff00 pog.svg
Sheeragh
Green 00ff00 pog.svg
Skehanagh
Green 00ff00 pog.svg
Skrine
Green 00ff00 pog.svg
Snugborough
Green 00ff00 pog.svg
Sonnagh Old
Green 00ff00 pog.svg
Sorne Hill
Green 00ff00 pog.svg
Spion Kop
Green 00ff00 pog.svg
Slieveragh
Green 00ff00 pog.svg
Taurbeg
Green 00ff00 pog.svg
Tournafulla
Green 00ff00 pog.svg
Tullynamoyle
Green 00ff00 pog.svg
Tursillagh
Pink pog.svg
Slieve Rushen
Pink pog.svg
Lendrum's Bridge
Pink pog.svg
Callagheen
Pink pog.svg
Hunter's Hill
Pink pog.svg
Slieve Divena
Pink pog.svg
Tappaghan Mountain
Pink pog.svg
Lough Hill
Pink pog.svg
Balloo Wood
Pink pog.svg
Brett Martin
Pink pog.svg
Bessy Bell
Pink pog.svg
Bin Mountain
Pink pog.svg
Bessy Bell
Pink pog.svg
Wolf Bog
Pink pog.svg
Owenreagh
Pink pog.svg
Elliot's Hill
Pink pog.svg
Altahullion
Pink pog.svg
Rigged Hill
Pink pog.svg
Corkey
Pink pog.svg
Gruig
Pink pog.svg
Garves Mountain
Pink pog.svg
Ulster University
Locations of wind farms on and around the island of Ireland

As of 2021 the island of Ireland has 5,585 megawatt and the Republic of Ireland has 4,309 MW of installed wind power nameplate capacity, the third highest per capita in the world. [1] In 2020, wind turbines generated 36.3% of Ireland's electrical demand, one of the highest wind power penetrations in the world. [2] [3]

Contents

Ireland has over 300 wind farms (nearly 400 all-island); [1] [4] mostly onshore, with only the 25 MW Arklow Bank Wind Park situated offshore as of 2020. This is unlike Germany and Great Britain two other European countries with high wind power penetration whose territorial waters (particularly the German Bight and waters off the coast of Scotland) are in extensive and growing use for offshore wind power.

Ireland's instantaneous wind power generation fluctuates between near zero and almost 4,500 MW [1] due to weather, [5] with an average capacity factor of 32.3% in 2015. [6] Irish wind power generation is higher during winter and lower in the summer. [7] The overall capacity factor of Irish wind farms is high compared to the global average of onshore wind farms which usually ranges around 20% but significantly lower than that of offshore wind farms which often achieve capacity factors around 50%.

Ireland uses an EU industry subsidy known as the Public Service Obligation to support development of wind and other domestic power generation, [8] currently levied at €72 per year per household. [9] In the 2016/17 period, €308 million raised through this levy was planned to be granted to supporting domestic renewable energy schemes. For comparison €120.90 million was planned to be granted to (non renewable)peat generation. [10]

Concerns over energy security (Ireland lacks significant onshore fossil fuel resources other than peat, and has extensive wind resources), climate change mitigation policies, and compliance with EU Directives for market liberalisation, have all shaped wind power development in Ireland

Capacity Growth

Figure 1: A graph of the wind power generation capacity of the Republic of Ireland from 2000 - 2018, Graph source: SEAI Electricity in Ireland Report, 2019, Data source: Eirgrid Sustainable Energy Authority of Ireland SEAI 2019 Ireland wind power generating capacity 2000-2018.png
Figure 1: A graph of the wind power generation capacity of the Republic of Ireland from 2000 - 2018, Graph source: SEAI Electricity in Ireland Report, 2019, Data source: Eirgrid

Eddie O'Connor, then CEO of the semi-state owned peat harvesting company, Bord na Móna, commissioned the country's first "commercial wind farm" in a cutaway peat bog in County Mayo in 1992. [11] Following the first commercial wind farm, wind power deployment in the Republic of Ireland started slowly in the 1990s, but increased more rapidly from the 2000s onwards. Whilst annual wind capacity growth has been variable, it has shown an increasing trend (Figure 1). [12] Wind power has provided a steadily increasing share of electricity, from 4% (1,874 GWh) in 2005, to 28% in 2018 (10,195 GWh) (Figure 2). [12] In the first two months of 2020, wind provided 49% of electricity demand, [13] and a peak recorded output from wind power of 4,471 MW was delivered on 12 February 2021. [1] Wind is now the second largest source of electricity generation after natural gas, which accounted for 52% of electricity generated in 2018. [12]

Figure 2: Electricity generated by fuel type in the Republic of Ireland in million tonnes of oil equivalent (Mtoe), Graph source:SEAI Electricity in Ireland Report, 2019 Datasource: Eirgrid Sustainable energy authority of Ireland electricity generated by fuel type 2005-2018.png
Figure 2: Electricity generated by fuel type in the Republic of Ireland in million tonnes of oil equivalent (Mtoe), Graph source:SEAI Electricity in Ireland Report, 2019 Datasource: Eirgrid

Drivers of wind power expansion

Concerns over energy security (Ireland has an estimated 15.4m tonnes of coal reserves, peat bogs, offshore oil and gas fields, and has extensive wind resources), climate change mitigation policies, and compliance with EU Directives for market liberalisation, have all shaped wind power development in Ireland. [14]

In the Directive [15] 2001/77/EC, otherwise known as the RES-E Directive, the European Union stated a goal to have 22% of the total energy consumed by member states to be produced from renewable energy resources by 2010. As a result, Ireland, in a report titled "Policy Consideration for Renewable Electricity to 2010", made the commitment to have 4% of its total energy consumption come from renewable energy resources by 2002 and 13.2% by 2010. The Department of Communications Marine and Natural Resources (DCMNR) founded the Renewable Energy Group (REG) which established the short term analysis group (STAG) to investigate a means of accomplishing this goal. To meet the 2010 target of 13.2%, 1,432 MW of electricity will need to be generated from renewable resources with 1,100 MW being generated from wind resources both onshore and offshore.

State financial support

State financial support for the national electricity sector, and particular technologies, has been influenced by a slow move towards liberalisation, and concerns for energy security and climate change mitigation. [14] Ireland uses an industry subsidy known as the Public Service Obligation (PSO) to support the generation of electricity from sustainable, renewable and indigenous sources, including wind. [16] The PSO levy is charged to all electricity customers. As of April 2020, for residential consumers, the current PSO levy is €38.68 per year inclusive of VAT, and is displayed on the typical two-monthly electricity bill as €5.68 (€2.84 × 2) + 13.5% VAT.

The PSO levy funds the government's main mechanisms to support the generation of electricity from sustainable, renewable and indigenous sources. These mechanisms have shifted from the initial use of competitive auctions in the late 1990s, to a renewable energy feed-in tariff (REFiT) from 2006 to 2015, and back to a new renewable energy auction scheme as of 2020. Ireland's initial use of competitive auction from 1996 failed to support the intended growth in wind development. Between 2006 and 2015, the government supported a REFiT, secured for 15 years. The 2020 REFiT reference price for large wind (>5MW) is €70.98 /MWh and for small wind (<5MW) is €73.47/MWh. In June, 2020, Ireland will run its first competitive renewable energy auction under the government's new Renewable Energy Support Scheme (RESS-1). [17] RESS-1 support is structured as a two-way floating feed-in premium (FIP), roughly the difference between the 'strike price' set in the successful auction bid and the 'market reference price'. When costs of electricity suppliers exceed market revenues a Support Payment will be due to the supplier, and when market revenues exceed costs a Difference Payment will be due from the supplier. An economic analysis of the financial cost of different RESS options, estimated that a least cost auction with floating FIP mechanism would cost a domestic consumer €0.79 per month by 2030 (at 2017 prices). [18] This is significantly less than the current PSO levy rate to fund REFiT costs.

Offshore wind power

The Arklow Bank Wind Park, located 10 km off the coast of Arklow on the Arklow Bank in the Irish Sea, is Ireland's only offshore wind farm. The wind farm is owned and built by GE Energy and was co-developed by Airtricity and GE Energy. The site has 7 GE Energy 3.6 MW turbines that generate a total of 25 MW. The development of the site was originally divided into two phases with the first phase being the current installation of 7 turbines. The second phase was a partnership between Airtricity and Acciona Energy. Acciona Energy had an option to buy the project after the facility is completed. The wind farm was planned to expand to 520 MW of power. However, in 2007, Phase 2 was cancelled. [19]

Although the waters off the Atlantic coastline of Ireland have higher winds, sites along the eastern coastline such as Arklow were chosen because of the shallower waters, which are 20 m deep or less.

In Belfast, the harbour industry is being redeveloped as a hub for offshore windfarm construction, at a cost of about £50m. The work will create 150 jobs in construction, as well as requiring about 1m tonnes of stone from local quarries, which will create hundreds more jobs. "It is the first dedicated harbour upgrade for offshore wind". [20]

In 2023, an offshore wind auction approved four projects totaling 3 GW. [21] The Codling project won first approval for a power price around €90/MWh by 2027. [22]

Wind turbines on County Leitrim's Corrie Mountain, where a peat slide occurred in 2008. Corrie Mountain Windfarm 4818 edit.jpg
Wind turbines on County Leitrim's Corrie Mountain, where a peat slide occurred in 2008.

Grid connection is currently awarded on a 'first come, first connect' basis through Gate 3 procedures. On examination of the Gate 3 queue, there are a number of large onshore and offshore wind projects that are down the list and will, therefore, be offered grid connection towards the end of the anticipated 18-month processing period commencing in December 2009. [23]

While planning permission normally expires after 5 years, the Planning and Development Act 2000 section 41 allows for a longer period. At present it is common to apply and obtain a 10-year permission for a wind energy development. Section 42 of the above Act originally permitted a 5-year extension of the "appropriate period" provided that substantial works were carried out. This caused major problems as the term "substantial works" was not clearly defined which resulted in a large variety in interpretation of what constituted substantial works among the various planning authorities. This issue was rectified by the Planning and Development (Amendment) Act 2010 section 28 which inserted an additional paragraph allowing a once off extension not exceeding 5 years if "there were considerations of a commercial, economic or technical nature beyond the control of the applicant which substantially militated against either the commencement of development or the carrying out of substantial works pursuant to the planning permission"

The fourth issue regarding the generation of wind power is the Renewable Energy Feed-in Tariff, or REFIT. [24] The purpose of REFIT is to encourage development of renewable energy resources. For wind power production, the current limit to the tariff is 1,450 MW. However, applications currently being processed for grid connections exceed the limit by almost 1,500 MW for a total for nearly 3,000 MW. Since the limit is 1,450 MW, many of the applications for grid connections may not eligible for the tariff. [25] [ failed verification ]

5 largest onshore wind farms

Wind Farm Capacity (MW) No.Turbine VendorModelSize (MW)OperatorCompletedCounty
Oweninny19260 Siemens Gamesa
Enercon
SWT-3.2-113
N117/3600
3.2
3.6
ESB
Bord na Móna
2023 Mayo
Galway Wind Park [26] 17458 Siemens Gamesa SWT-3.0-1013.0 SSE Renewables & Coillte 2017 Galway
Grousemount [27] 11438 Siemens Gamesa SWT-3.2-108
SWT-2.3-93
3.2
2.3
ESB 2020 Kerry
Ardderroo [28] [29] 10122 Nordex N1494.0
5.0
2023 Galway
Knockacummer [30] 10040 Nordex N902.5 Greencoat Renewables 2013 Cork

Controversy

Economy

In 2011, the 120-member Irish Academy of Engineering described wind as "an extremely expensive way of reducing greenhouse gas emissions when compared to other alternatives" like conservation, nuclear energy or the Corrib gas project and Liquified Gas tanker imports at Shannon, concluding that the suggestion of 40% grid penetration by wind, is "unrealistic". [31] In 2020, grid penetration had hit 36.3% [2] and was still increasing but far slowly. [32] By contrast, the Sustainable Energy Authority of Ireland said in 2014 that wind power cost the same as gas power. [33] In 2020 the Irish Times reported that the cost of onshore wind energy had dropped over the last 20 years but that regulation on noise and height of turbines made Irish wind energy more expensive than elsewhere. [34]

Peatlands and bog landslides

Building wind turbines and access roads on top of peatland results in the drainage and then eventual oxidation of some of the peat. The turbines represent a minor impact, [35] provided that the entire wind farm area is not drained, potentially emitting more carbon dioxide (CO2) than the turbines would save. [36] Biochemist Mike Hall said in 2009; "wind farms (built on peat bogs) may eventually emit more carbon than an equivalent coal-fired power station" if drained. [37]

A 2014 report for the Northern Ireland Environment Agency, which has similar peatland, notes that building wind turbines on peatland could release considerable carbon dioxide from the peat, weaken flood control, and spoil water quality: "The potential knock-on effects of using the peatland resource for wind turbines are considerable and it is arguable that the impacts on this facet of biodiversity will have the most noticeable and greatest financial implications for Northern Ireland." [38]

The Irish Peatland Conservation Council maintains a database on incidences[ spelling? ] where building wind turbines (and wind farms) on or near peatland caused devastating landslides, called "bog bursts"/"peat flows". These accelerate the release of carbon dioxide into the atmosphere. [39]

In October 2003, the building of a wind farm in County Galway caused the Derrybrien landslide, an almost 2.5 km long, 450,000 m3 bog landslide, polluting a nearby lake and killing 50,000 fish. [40] The lake was also the source of the town of Gort's drinking water. [41] If all carbon in the slide is being released, it represents 7–15 months of production from the wind farm in avoided carbon dioxide from fossil power. [36] In 2004, engineering companies were convicted of being responsible for the pollution, [42] while the wind farm company was acquitted. [43] The Irish government was convicted in 2008 of poor oversight. [44]

Following the Corrie Mountain bog burst of 2008, Ireland was fined by a European Court over its mishandling of wind farms on peatland. [39] [45] By 2010, there had been at least three major bog landslides related to wind farms in Ireland. [35]

In 2020, there was another large bog landslide at a wind farm construction site at Meenbog, County Donegal. This polluted rivers that are protected Atlantic salmon habitats, and was predicted to have caused a "complete fish kill". Drinking water supplies linked to the rivers had to be suspended. [46] [47]

The body representing industrial peat harvesting in Ireland, Bord na Móna, announced in 2015 the "biggest change of land use in modern Irish history": harvesting peat is being phased out by 2030, due to the long-expected depletion of profitable lowland peat, [48] at which point the company would complete its transition to becoming a "sustainable biomass, wind and solar power" organization. [49]

Local opposition

Sinn Fein politicians protesting against the proposed Midlands wind farms in 2014 Senator Trevor O Clochartaigh, Senator Kathryn Reilly and Gerry Adams TD.jpg
Sinn Féin politicians protesting against the proposed Midlands wind farms in 2014

Some on-land wind farms in Ireland have been opposed by local residents, county councils, the Heritage Council and An Taisce (The National Trust) for their potential to blight the landscape, and having a harmful impact on protected scenic areas, archaeological landscapes, tourism and cultural heritage. In 2014, more than 100 protest groups united against government plans to build thousands of wind turbines in the Midlands to export energy to Britain. Among other things, they argued the wind farms would ruin the landscape and mainly benefit "multinational corporations who are sucking subsidies from the UK taxpayers". The Irish government shelved the plans. [50] [51] [52]

In 2021 a proposed wind farm at Kilranelagh in the Wicklow Mountains was refused as it would have harmed the area's archaeological landscape, which includes the Baltinglass hillfort complex. [53]

An application to build a wind farm overlooking the scenic valley of Gougane Barra was refused by Cork County Council, who voted unanimously against it. The company appealed to An Bord Pleanála, whose inspector also rejected it, stating it "would have significant adverse environmental and visual impacts and is not sustainable at this highly sensitive location". Despite this, An Bord Pleanála granted permission, on the grounds that the wind farm would contribute "to the implementation of Ireland's national strategic policy on renewable energy". The spokesman of the campaigners against the wind farm said the decision was undemocratic, as the local people and council opposed it. [54]

Environmental Impact & Greenhouse gases

Studies by the Vattenfall electricity company found; electricity generation by Hydroelectric, nuclear stations and wind turbines in-isolation, to all have a far smaller embodied carbon footprint than other sources represented. These studies on the total life-cycle, greenhouse gas emissions, per unit of energy generated take into account the Nordic utilities cradle-to-grave construction emissions etc. These results are largely in-line with those made in 2014 by the Intergovernmental Panel on Climate Change. However they do not assess real-world integrated grid findings and the actual pollution emitted from the addition of wind energy into an electric grid. Greenhouse emissions by electricity source.PNG
Studies by the Vattenfall electricity company found; electricity generation by Hydroelectric, nuclear stations and wind turbines in-isolation, to all have a far smaller embodied carbon footprint than other sources represented. These studies on the total life-cycle, greenhouse gas emissions, per unit of energy generated take into account the Nordic utilities cradle-to-grave construction emissions etc. These results are largely in-line with those made in 2014 by the Intergovernmental Panel on Climate Change. However they do not assess real-world integrated grid findings and the actual pollution emitted from the addition of wind energy into an electric grid.

In a typical study of a wind farms Life cycle assessment (LCA), in isolation, it usually results in similar findings as the following 2006 analysis of 3 installations in the US Midwest, were the carbon dioxide (CO2) emissions of wind power ranged from 14 to 33 metric ton per GWh (14 - 33 g CO2/kWh) of energy produced, with most of the CO2 emissions coming from the production of concrete for wind-turbine foundations. [59]

However, when approached from the effects on the grid as a whole, that assess wind turbines' ability to reduce a country's total electric grid emission intensity, a study by the Irish national grid, a grid that is predominately (~70%) powered by fossil gas, (and if it was 100% gas, would result in emissions of 410 - 650 g  CO2/kWh. [60] [61] ) found that "Producing electricity from wind reduces the consumption of fossil fuels and therefore leads to [electric grid] emissions savings", with findings in reductions of the grid-wide CO2 emissions to 0.33-0.59 metric ton of CO2 per MWh (330 - 590 g  CO2/kWh). [62]

These findings were of relatively "low [emission] savings", as presented in the Journal of Energy Policy , and were largely due to an over-reliance on the results from the analysis of wind farms LCAs in isolation. [57] [58] As high electric grid penetration by intermittent power sources e.g. wind power, sources which have low capacity factors due to the weather, either requires the construction of transmission to neighbouring areas, energy storage projects like the 292 MW Turlough Hill Power Station, that have their own additional emission intensity which must be accounted for, [63] [64] or the more common practice of requiring a higher reliance on fossil fuels than the spinning reserve requirements necessary to back-up the more dependable/baseload power sources, such as hydropower and nuclear energy. [57]

This higher dependence on back-up/Load following power plants to ensure a steady power grid output has the knock-on-effect of more frequent inefficient (in CO2e g/kW·h) throttling up and down of these other power sources in the grid to accommodate the intermittent power source's variable output. When one includes the intermittent sources total effect it has on other power sources in the grid system, that is, including these inefficient start up emissions of backup power sources to cater for wind energy, into wind energy's total system wide life cycle, this results in a higher real-world emission intensity related to wind energy than the in-isolation g/kW·h value, a statistic that is determined by looking at the power source in isolation and thus ignores all down-stream detrimental/inefficiency effects it has on the grid. [57] In a 2012 paper that appeared in the Journal of Industrial Ecology it states. [56]

The thermal efficiency of fossil-based power plants is reduced when operated at fluctuating and suboptimal loads to supplement wind power, which may degrade, to a certain extent, the GHG (Greenhouse gas) benefits resulting from the addition of wind to the grid. A study conducted by Pehnt and colleagues (2008) reports that a moderate level of [grid] wind penetration (12%) would result in efficiency penalties of 3% to 8%, depending on the type of conventional power plant considered. Gross and colleagues (2006) report similar results, with efficiency penalties ranging from nearly 0% to 7% for up to 20% [of grid] wind penetration. Pehnt and colleagues (2008) conclude that the results of adding offshore wind power in Germany on the background power systems maintaining a level supply to the grid and providing enough reserve capacity amount to adding between 20 and 80 g CO2-eq/kWh to the life cycle GHG emissions profile of wind power.

Anti Wind Farm poster in Rochfortbridge, County Westmeath in 2014 AntiWindFarmRochfortbridge.jpg
Anti Wind Farm poster in Rochfortbridge, County Westmeath in 2014

According to the IPCC, wind turbines when assessed in isolation, have a median life cycle emission value of between 12 and 11 (g CO2 eq/kWh). While the more dependable alpine Hydropower and nuclear stations have median total life cycle emission values of 24 and 12 g CO2-eq/kWh respectively. [60] [61]

Regarding interconnections, Ireland is connected to adjacent UK National Grid at an electricity interconnection level (transmission capacity relative to production capacity) of 9%. [65] The two grids have a high wind correlation of 0.61, whereas the wind correlation between the Irish grid and the Danish grid is low at 0.09. [66]

Tourism

One major aspect of wind farms in Ireland is tourist attraction and also local attraction. The Bord na Mona wind farm in Mount Lucas, Daingean, Co.Offaly has provided a local walk way through the newly established wind farm that attracts people of all ages. The walk way provides a safe environment off-road for walking, running and cycling. The walk way is approximately nine kilometres in distance with numerous stop off points for breaks. Maps can also be located in a variety of locations on the walk for guidance around the wind farm and back to allocated car parks. The walk way also provides aesthetic scenery on a relatively flat landscape. Such a walk attracts many people year round and circulates money back into the local community as tourists stop off in local shops. [67]

Grid study in Ireland

A 2008 Irish study of the grid indicates that it would be feasible to accommodate 42% (of demand) renewables in the electricity mix. [68] This acceptable level of renewable penetration was found in what the study called Scenario 5, provided 47% of electrical capacity (different from demand) with the following mix of renewable energies:

The study cautions that various assumptions were made that "may have understated dispatch restrictions, resulting in an underestimation of operational costs, required wind curtailment, and CO2 emissions" and that "The limitations of the study may overstate the technical feasibility of the portfolios analyzed..."

Scenario 6, which proposed renewables providing 59% of electrical capacity and 54% of demand had problems. Scenario 6 proposed the following mix of renewable energies:

The study found that for Scenario 6, "a significant number of hours characterized by extreme system situations occurred where load and reserve requirements could not be met. The results of the network study indicated that for such extreme renewable penetration scenarios, a system re-design is required, rather than a reinforcement exercise." The study declined to analyze the cost effectiveness of the required changes because "determination of costs and benefits had become extremely dependent on the assumptions made" and this uncertainty would have impacted the robustness of the results. [69]

See also

Related Research Articles

<span class="mw-page-title-main">Iberdrola</span> Spanish multinational electric utility company

Iberdrola, S.A. is a Spanish multinational electric utility company based in Bilbao, Spain. It has around 40,000 employees and serves around 30 million customers.

<span class="mw-page-title-main">Wind power in the United Kingdom</span>

The United Kingdom is the best location for wind power in Europe and one of the best in the world. The combination of long coastline, shallow water and strong winds make offshore wind unusually effective.

<span class="mw-page-title-main">Arklow Bank Wind Park</span>

Arklow Bank Wind Park is a 25 megawatt offshore wind farm generating electrical power for the Wicklow region in Ireland. It is the first offshore wind farm in Ireland, and the world's first erection of wind turbines rated over 3 MW. It is located on the Arklow Bank, a shallow water sandbank in the Irish Sea, around 10 kilometers (6.2 mi) off the coast of Arklow with an area of 27 by 2.5 kilometres.

<span class="mw-page-title-main">Wind power in Denmark</span>

Denmark was a pioneer in developing commercial wind power during the 1970s, and today a substantial share of the wind turbines around the world are produced by Danish manufacturers such as Vestas—the world's largest wind-turbine manufacturer—along with many component suppliers. Furthermore, Denmark has—as of 2022—the 2nd highest amount in the world of wind power generation capacity installed per capita, behind only neighboring Sweden.

<span class="mw-page-title-main">Wind power in Europe</span>

As of 2023, Europe had a total installed wind capacity of 255 gigawatts (GW). In 2017, a total of 15,680 MW of wind power was installed, representing 55% of all new power capacity, and the wind power generated 336 TWh of electricity, enough to supply 11.6% of the EU's electricity consumption.

Wind power has a history in Canada dating back many decades, particularly on prairie farms. As of December 2021, wind power generating capacity was approximately 14,304 megawatts (MW). Combined with 2,399 MW of solar power generating capacity, this provided about 6.5% of Canada's electricity demand as of 2020. The Canadian Wind Energy Association (CanWEA) has outlined a future strategy for wind energy that would reach a capacity of 55 GW by 2025, meeting 20% of the country's energy needs.

<span class="mw-page-title-main">Wind power in Scotland</span>

Wind power is the fastest-growing renewable energy technology in Scotland, with 11,482 megawatts (MW) of installed wind power capacity by Q1 2023. This included 9,316 MW from onshore wind in Scotland and 2,166 MW of offshore wind generators.

<span class="mw-page-title-main">Environmental impact of wind power</span>

The environmental impact of electricity generation from wind power is minor when compared to that of fossil fuel power. Wind turbines have some of the lowest global warming potential per unit of electricity generated: far less greenhouse gas is emitted than for the average unit of electricity, so wind power helps limit climate change. Wind power consumes no fuel, and emits no air pollution, unlike fossil fuel power sources. The energy consumed to manufacture and transport the materials used to build a wind power plant is equal to the new energy produced by the plant within a few months.

The electricity sectors of the Republic of Ireland and Northern Ireland are integrated and supply 2.5 million customers from a combination of coal, peat, natural gas, wind and hydropower. In 2022, 34 TWh were generated. In 2018 natural gas produced 51.8%, while wind turbines generated 28.1%, coal 7%, and peat 6.8% of Ireland's average electricity demand. In 2020 wind turbines generated 36.3% of Ireland's electrical demand, one of the highest wind power proportions in the world. While the United Kingdom was one of the first countries in the world to deploy commercial nuclear power plants, the island of Ireland has never had a nuclear power plant built on either side of the Irish border. Nuclear power in Ireland was discussed in the 1960s and 1970s but ultimately never phased in, with legislation now in place explicitly forbidding its introduction.

<span class="mw-page-title-main">Offshore wind power</span> Wind turbines in marine locations for electricity production

Offshore wind power or offshore wind energy is the generation of electricity through wind farms in bodies of water, usually at sea. There are higher wind speeds offshore than on land, so offshore farms generate more electricity per amount of capacity installed. Offshore wind farms are also less controversial than those on land, as they have less impact on people and the landscape.

<span class="mw-page-title-main">Wind power in Belgium</span>

Wind power in Belgium has seen significant advancements, starting with the generation of electricity from offshore wind farms in 2009. By 2020, the capacity of these offshore farms reached 2,262 megawatts (MW), matching the combined output of Belgium's largest nuclear reactors, Doel 4 and Tihange 3. Concurrently, the development of on-shore wind energy, which remained minimal until 2004, experienced significant growth, with installed capacity and production doubling annually from 96 MW in 2004 to 2,476.1 MW by 2021. The percentage of electricity demand met by wind grew to about 14.4% by 2020.

<span class="mw-page-title-main">Wind power in the Netherlands</span>

As of May 2024, wind power in the Netherlands has an installed capacity of 11,611 MW, 40.9% of which is based offshore. In 2022, the wind turbines provided the country with 18.37% of its electricity demand during the year. Windmills have historically played a major part in the Netherlands by providing an alternative to water driven mills.

Wind power in Indiana was limited to a few small water-pumping windmills on farms until 2008 with construction of Indiana's first utility-scale wind power facility, Goodland with a nameplate capacity of 130 MW. As of March of 2024, Indiana had a total of 2,743 MW of wind power capacity installed, ranking it 12th among U.S. states. Wind power was responsible for 4.8% of in-state electricity production in 2016.

<span class="mw-page-title-main">GE Wind</span> American wind turbine manufacturer

GE Wind is a division of GE Vernova. The company manufactures and sells wind turbines to the international market. In 2018, GE Wind was the fourth largest wind turbine manufacturer in the world. Vic Abate is the CEO of GE Vernova’s Wind businesses.

<span class="mw-page-title-main">Meadow Lake Wind Farm</span> Wind farm in Indiana, USA

Meadow Lake Wind Farm is an 801.25 megawatt (MW) wind farm near Brookston and Chalmers, Indiana, spreading over portions of White, Jasper, and Benton Counties. It is owned and operated by EDP Renewables North America. The facility currently has six operational phases, with 414 turbines, and is a prominent feature on both sides of Interstate 65 in western Indiana.

<span class="mw-page-title-main">Energy in Portugal</span>

Energy in Portugal describes energy and electricity production, consumption and import in Portugal. Energy policy of Portugal will describe the politics of Portugal related to energy more in detail. Electricity sector in Portugal is the main article of electricity in Portugal.

<span class="mw-page-title-main">Energy in Ireland</span>

Ireland is a net energy importer. Ireland's import dependency decreased to 85% in 2014. The cost of all energy imports to Ireland was approximately €5.7 billion, down from €6.5 billion (revised) in 2013 due mainly to falling oil and, to a lesser extent, gas import prices. Consumption of all fuels fell in 2014 with the exception of peat, renewables and non-renewable wastes.

<span class="mw-page-title-main">Wind power in the Philippines</span>

Wind power in the Philippines accounts for a total of 443MW as of 2020 according to the Department of Energy, covering about 1.6% of the country's total installed capacity for both renewable and non-renewable energy sources. When it comes to existing renewable energy sources in the country, wind power has a total share of approximately 5.4%. Despite currently being a small contributor to the country's energy mix, wind power installations have increased from 33MW in 2012-2013 to 337MW in 2014, 427MW in 2015-2018, and 443MW in 2019-2021. Moreover, the Department of Energy's National Renewable Energy Plan (NREP) 2020-2040 aims to commission 2,345MW of total wind power capacity by 2030. There has been a setback, however, as the wind power industry was moderately affected by COVID, particularly in the import of wind turbines. Due to this, several projects such as the Aklan onshore wind project got delayed. To further drive the wind energy sector in the country, an increased demand for renewable energy, greater government commitments, and reduced wind power tariff are needed.

<span class="mw-page-title-main">Renewable energy in the Republic of Ireland</span>

Under the original 2009 Renewable Energy Directive Ireland had set a target of producing 16% of all its energy needs from renewable energy sources by 2020 but that has been updated by a second Renewable Energy Directive whose targets are 32% by 2030. Between 2005 and 2014 the percentage of energy from renewable energy sources grew from just 3.1% to 8.6% of total final consumption. By 2020 the overall renewable energy share was 13.5%, short of its Renewable Energy Drive target of 16%. Renewable electricity accounted for 69% of all renewable energy used in 2020, up from two thirds (66.8%) in 2019.

<span class="mw-page-title-main">Renewable energy in Wales</span> Overview of renewable energy in Wales

In 2019, Wales generated 27% of its electricity consumption as renewable electricity, an increase from 19% in 2014. The Welsh Government set a target of 70% by 2030. In 2019, Wales was a net exporter of electricity. It produced 27.9 TWh of electricity while only consuming 14.7 TWh. The natural resource base for renewable energy is high by European standards, with the core sources being wind, wave, and tidal. Wales has a long history of renewable energy: in the 1880s, the first house in Wales with electric lighting powered from its own hydro-electric power station was in Plas Tan y Bwlch, Gwynedd. In 1963, the Ffestiniog Power Station was constructed, providing a large scale generation of hydroelectricity, and in November 1973, the Centre for Alternative Technology was opened in Machynlleth.

References

  1. 1 2 3 4 "Wind Statistics". iwea.com. 23 November 2021. Retrieved 23 November 2021.
  2. 1 2 "Wind Energy Powers Ireland to Renewable Energy Target". 28 January 2021.
  3. Eoin Burke-Kennedy (27 December 2015). "Over 23% of electricity demand now supplied through wind". The Irish Times . Retrieved 2 January 2016.
  4. "Ireland's Clean Energy Hits Record Output". Irish Wind Energy Association. 7 January 2015. Retrieved 29 January 2015.
  5. "Wind Record Broken". EirGrid. Retrieved 21 January 2017.
  6. "Fuel Mix Disclosure and CO2 Emissions 2015" (PDF). Commission for Energy Regulation. 26 August 2016. p. 10. Retrieved 21 January 2017.
  7. "All-island Wind and Fuel Mix summary, 2014" (PDF). Eirgrid. Archived from the original (PDF) on 22 July 2015.
  8. "Public Service Obligation Levy 2015/2016" (PDF). Commission for Energy Regulation.
  9. "Electricity bills to rise as regulator increases PSO charge". The Irish Times . 1 August 2016. Retrieved 10 August 2016.
  10. "Public Service Obligation Levy 2016/17 — Proposed Decision Paper" (PDF). Commission for Energy Regulation. 31 May 2016. Retrieved 6 December 2016.
  11. "SPECIAL REPORT: A look at the wind energy debate". Irish Examiner . 7 April 2014. Retrieved 15 January 2017.
  12. 1 2 3 "Energy In Ireland Report, 2019" (PDF). www.seai.ie. 2019. Retrieved 3 April 2020.
  13. "Record wind levels Feb 2020". eirgridgroup.com . Retrieved 3 April 2020.
  14. 1 2 Gaffney, F.; Deane, J. P.; Gallachóir, B. P. Ó (1 June 2017). "A 100 year review of electricity policy in Ireland (1916–2015)". Energy Policy. 105: 67–79. doi:10.1016/j.enpol.2017.02.028. hdl: 10468/5299 . ISSN   0301-4215.
  15. "Archived copy" (PDF). Archived from the original (PDF) on 13 May 2008. Retrieved 6 November 2007.{{cite web}}: CS1 maint: archived copy as title (link)
  16. "PUBLIC SERVICE OBLIGATION LEVY 2015/2016" (PDF). Cer.ie. Retrieved 15 January 2017.
  17. "Ireland Renewable Energy Support Scheme: Terms and Conditions" (PDF). Government of Ireland. February 2020. Retrieved 3 April 2020.
  18. "Economic Analysis to Underpin a New Renewable Electricity Support Scheme in Ireland" (PDF). Government of Ireland. May 2017. Retrieved 3 April 2020.
  19. "Airtricity Welcomes Support for Offshore Wind Farm Development" (PDF). Airtricity.com. Retrieved 15 January 2017.
  20. Harvey, Fiona (6 February 2012). "Offshore wind turbines set to benefit British industries". The Guardian. London.
  21. "Ireland makes history with its first offshore wind auction". WindEurope. 12 May 2023. Retrieved 22 September 2023.
  22. "Revealed: Fred Olsen and EDF power price for first Irish gigascale offshore wind farm". Recharge | Latest renewable energy news. 16 June 2023.
  23. "Archived copy" (PDF). Archived from the original (PDF) on 21 July 2011. Retrieved 15 December 2009.{{cite web}}: CS1 maint: archived copy as title (link)
  24. "Renewable Energy Feed in Tariff". Iwea.com. Retrieved 15 January 2017.
  25. "IWEA is the national association for the wind industry in Ireland". Iwea.com. Retrieved 15 January 2017.
  26. "Galway Wind Park - Ireland's largest wind farm enters commercial operation". Coillte. 24 October 2017. Retrieved 3 August 2021.
  27. Carmen (10 December 2021). "Grousemount Wind Farm, Ireland". Power Technology. Retrieved 26 September 2023.
  28. "Nordex to supply turbines for 101-MW wind project in Ireland". Renewablesnow.com. Retrieved 26 September 2023.
  29. "Amazon announces new project in Ireland as part of commitment to be 100% powered by renewable energy". EU About Amazon. 24 August 2020. Retrieved 26 September 2023.
  30. "Greencoat subsidiary acquires two Irish wind farms". The Irish Times. Retrieved 26 September 2023.
  31. Energy Policy and Economic Recovery 2010-2015 Archived 14 May 2013 at the Wayback Machine , page 5. Irish Academy of Engineering, 2011. Archive
  32. Statista. "Ireland: Installed wind power capacity 2021".
  33. SPECIAL REPORT: A look at the wind energy debate Monday, 7 April 2014, By Claire O'Sullivan Irish Examiner Archive
  34. O'Sullivan, Kevin. "Ireland can 'almost halve' the cost of renewable electricity". The Irish Times. Retrieved 15 November 2021.
  35. 1 2 Richard Lindsay. Peat bogs and carbon, page 164. University of East London , 14 June 2010
  36. 1 2 Richard Lindsay. Wind farms and blanket peat, page 70, 79-87, 111. University of East London , 2004
  37. Fred Pearce. "Greenwash: How a wind farm could emit more carbon than a coal power station | Fred Pearce | Environment". The Guardian . Retrieved 15 January 2017.
  38. David Tosh, W. Ian Montgomery & Neil Reid A review of the impacts of onshore wind energy development on biodiversity Archived 31 May 2015 at the Wayback Machine , Northern Ireland Environment Agency, Research and Development Series 14/02, 2014, p.54
  39. 1 2 "Habitat Loss of Peatlands, Wind Farms on Peatlands". Irish Peatland Conservation Council. Archived from the original on 1 March 2014.
  40. Douglas, Ed (5 July 2006). "The hidden cost of wind turbines". New Scientist . Retrieved 15 January 2017.
  41. Douglas, Ed (5 July 2006). "The hidden cost of wind turbines". New Scientist. Retrieved 16 June 2020.
  42. "Companies convicted for Galway river pollution". RTÉ.ie. 20 October 2004. Retrieved 15 January 2017.
  43. "Galway court dismisses pollution prosecution". RTÉ.ie. 19 October 2004. Retrieved 15 January 2017.
  44. "EU court rules against Ireland on Derrybrien". RTÉ.ie. 3 July 2008. Retrieved 15 January 2017.
  45. "Re: Moratorium on upland wind farm construction" (PDF). Friends of the Irish Environment. 12 May 2009.
  46. "Fears Donegal landslide has devastated EU protected salmon site". RTÉ News . 18 November 2020. Retrieved 18 January 2022.
  47. "Donegal: Peat landslide linked to wind farm raised in Dáil". BBC News . 18 November 2020. Retrieved 18 January 2022.
  48. Joanne Edgar (14 June 1987). "In The Bogs of Western Ireland". The New York Times . Ireland, Republic Of. Retrieved 15 January 2017.
  49. de Róiste, Daithí. "Bord na Móna announces biggest change of land use in modern Irish history". Bord na Móna. Bord na Móna. Retrieved 6 October 2015.
  50. "Ireland's rural protests over wind energy". BBC News . 2 February 2014.
  51. "It's official: The Government has cancelled its Midlands wind energy export plan". TheJournal.ie . 13 April 2014.
  52. "Export plan for wind energy dumped". Irish Examiner . 14 April 2014.
  53. Dodd, Eimear (27 March 2021). "Permission to build five turbine wind farm at Kilranelagh refused". Irish Independent . Retrieved 18 January 2022.
  54. "Row over planned wind farm at Cork beauty spot Gougane Barra". The Irish Times . 26 April 2022.
  55. "Archived copy" (PDF). srren.ipcc-wg3.de. Archived from the original (PDF) on 27 June 2013. Retrieved 17 January 2022.{{cite web}}: CS1 maint: archived copy as title (link)
  56. 1 2 Stacey L. Dolan; Garvin A. Heath (2012). "Life Cycle Greenhouse Gas Emissions of Utility-Scale Wind Power Systematic Review and Harmonization". Journal of Industrial Ecology. 16: S136–S154. doi:10.1111/j.1530-9290.2012.00464.x. S2CID   153821669.
  57. 1 2 3 4 Joseph Wheatley (December 2013). "Quantifying CO2 savings from wind power". Energy Policy. 63: 89–96. doi:10.1016/j.enpol.2013.07.123.
  58. 1 2 Martin, Owen. "Quantifying CO2 savings from wind power | Biospherica". Joewheatley.net. Retrieved 15 January 2017.
  59. White, S. W. (2007). "Net Energy Payback and CO2 Emissions from Three Midwestern Wind Farms: An Update". Natural Resources Research. 15 (4): 271–281. doi:10.1007/s11053-007-9024-y. S2CID   110647290.
  60. 1 2 "IPCC Working Group III – Mitigation of Climate Change, Annex II I: Technology - specific cost and performance parameters" (PDF). IPCC. 2014. p. 10. Archived from the original (PDF) on 15 December 2014. Retrieved 1 August 2014.
  61. 1 2 "IPCC Working Group III – Mitigation of Climate Change, Annex II Metrics and Methodology. pg 37 to 40,41" (PDF). Archived from the original (PDF) on 8 September 2015.
  62. "Impact of Wind Generation in Ireland on the Operation of Conventional Plant and the Economic Implications" (PDF). ESB National Grid. February 2004. Archived from the original (PDF) on 17 May 2005. Retrieved 15 January 2008.
  63. "Study of Electricity Storage Technologies and Their Potential to Address Wind Energy Intermittency in Ireland. Co-authored with Dr. Brian Ó Gallachóir" (PDF).
  64. "Archived copy" (PDF). Archived from the original (PDF) on 22 July 2015. Retrieved 19 July 2015.{{cite web}}: CS1 maint: archived copy as title (link)
  65. COM/2015/082 final: "Achieving the 10% electricity interconnection target" Text PDF page 2-5. European Commission , 25 February 2015. Archive Mirror
  66. Bach, Paul F. "Enlarged Wind Power Statistics 2010", page 4. Archive
  67. "Our Wind Farms". Bord na Móna. Retrieved 1 December 2016.
  68. "Study shows Ireland can be world leader in renewable energy". Department of Communications, Energy and National Resources. January 2008. Archived from the original on 21 March 2012. Retrieved 20 October 2008.
  69. "All Island Grid Study" (PDF). Department of Communications, Energy and Natural Resources. January 2008. pp. 3–5, 15. Archived from the original (PDF) on 18 March 2009. Retrieved 15 October 2008.