This article needs to be updated.(October 2024) |
Electricity generation in Pakistan |
---|
Wind power is a form of renewable energy in Pakistan which makes up more than 6% of the total electricity production in the country. As of 2018, wind power capacity in Pakistan was 1,287 MW. [1] [2] The government is looking to increase the share of renewable energy and plans to add around 3.5 GW of wind energy capacity by 2018. [3]
The first practical wind-powered machines, the windmill and the windpump, were invented in what are now Afghanistan, Iran and Pakistan by the 9th century. [4]
The Pakistan Meteorological Department conducted a study in 2013 entitled "Wind Power Potential Survey of Coastal Areas of Pakistan", which the Ministry of Science & Technology provided funding for. This study enabled PMD to identify potential "wind corridors" where economically feasible wind farm could be established. The Gharo-Jhimpir wind corridor in Sindh was identified as the most lucrative site for wind power plants. [5] The wind power potential covered an area of 9700 km2 with a gross wind power potential of 43000 MW. [6]
The Jhimpir Wind Power Plant was developed in Jhimpir, Sindh by Zorlu Energy Pakistan. The total cost of project is $136 million. [7] Completed in 2002, it has a total capacity of 50 MW. This wind Corridor has a 50000 megawatt potential with average wind speeds over 7-meter per second. The government has announced upfront tariff and ROI of 17 per cent which is highest in the world. There are 14 projects in the pipeline out of which 50 MW FFCEL project will achieve COD by mid December 2012.
Fauji Foundation setup two wind projects (50 MW each) at Gharo, Thatta District. The EPC contractors were Nordex and Descon with Nordex as the lead contractor. Foundation Wind Energy II (Private) Limited was commissioned in July 2014. Foundation Wind Energy I (Private) Limited was commissioned on Feb 2015.
Artistic Energy (Pvt) Ltd. setup 49.3 MW wind power project in Jhimpir Sindh. The EPC contractor was Hydro-china. Artistic Energy (Pvt) Ltd was commissioned in March 2018. It consists of 29 Wind turbines GE 1.7 MW each, and having hub height of 92m, highest hub height in the region. It supplies power to 220 kV Jhimpir New Grid Station through two 132KV lines, one is Tapal line and other is New Jhimpir line.
Three Gorges First Wind Farm Pakistan has started the operation of 50 MW wind power project on 24 November 2014 at Jhimpir, Sindh. Contract of supply and installation of wind turbines was given to GOLDWIND and EPC contractor in the project was CWE (China International Water & Electric Corporation). TGF is the sister concern of China Three Gorges Corporation (CTG), who have built the world largest dam with the installed capacity of 22500 MW in Yiling District, Yichang, Hubei, China. Three Gorges have also planned to build two more wind power projects of 50 MW each in Jhimphir, Sindh in 2015.
Three Gorges Second Wind Farm Pakistan has started the operation of 50 MW wind power project in 2018 at Jhimpir, Sindh. Contract of supply and installation of wind turbines was given to GOLDWIND.
A 52.8 MW wind power plant attained commercial operation date (COD) in a record time of only 14 months on 22 November 2015. Its availability in RRT (Run Reliability Test) was also a record in Pakistan. Hydro China, a Chinese EPC contractor using 33x1.68 MW GE wind turbines constructed the power plant. SWPCL is the first wind project of General Electric in Pakistan and it was also a first project of Hydrochina. Some $95 million debt financing was secured for the project from Oversees Private Investment Corporation (OPIC), USA. The project is a joint ownership of Sapphire Textile and Bank Alfalah.
Tricon Boston Consulting corporation setup 50 MW * 3 = 150MW wind power project in Jhimpir Sindh. The EPC contractor was Hydro-china International. Tricon Boston was commissioned in 2018. It consists of 87 Wind turbines GE 1.7 MW. It supplies power to 220 kV Jhimpir New Grid Station through two 132KV lines.
The ACT wind farm is located at the province of Sindh. HydroChina, a subsidiary of China Power Construction Corporation, is constructing the project. It will be run by three local Pakistani Groups Namely Akhtar, Candyland and Tapal Groups. The deal is for 20 GW82 1.5MW turbine. The machines will be customised to suit the local wind and climate conditions. Shipments will be made at the end of 2015. Installation work is scheduled for completion in the third quarter of 2016. The plant went live on 7 October 2016.
Metro Power Project, a 50 MW wind power project of Metro Power Company Limited located in Jhimpir, district Thatta, Sindh, achieved financial close on 19 February 2015. The project is expected to achieve commercial operation by August 2016. The initiative in sponsored by Iqbal Ali Mohamed and Family, Infraco Asia Development Pvt Ltd out of Singapore and International Finance Corporation is scheduled to commence operation in third quarter 2016. It is financed by ETDB, National Bank, UBL, Bank Alfalah and Askari Bank.
Station | Location | Capacity (MW) | Wind turbine manufacturer | In-service date | Operation & Maintenance | Notes |
---|---|---|---|---|---|---|
FFC Energy Wind Project | Jhimpir, Sindh | 49.5 | Nordex | 2013 | Descon Power Solutions | |
Zorlu Enerji Pakistan | Jhimpir, Sindh | 56.4 | Vestas | 2013 | In-house | |
Three Gorges | Jhimpir, Sindh | 150 | Goldwind | 2014 | In-house | First Three Gorges Wind Project of 50MW was commissioned in 2014. Second and third were commissioned in 2018. [8] |
Foundation Wind Energy | Gharo, Sindh | 100 | Nordex | 2015 | Descon Power Solutions | |
Sapphire Wind Power | Jhimpir, Sindh | 52.8 | General Electric | 2015 | Albario Engineering | |
Yunus Energy | Jhimpir, Sindh | 50 | Nordex | 2016 | Descon Power Solutions | |
Metro Wind Power | Jhimpir, Sindh | 50 | Nordex | 2016 | Descon Power Solutions | |
Tenaga Generai | Gharo, Sindh | 49.5 | General Electric | 2016 | Albario Engineering | |
Gul Ahmed Wind Power | Jhimpir, Sindh | 50 | Nordex | 2016 | Descon Power Solutions | |
Master Wind Energy | Jhimpir, Sindh | 52.8 | General Electric | 2016 | Albario Engineering | |
ACT Wind | Jhimpir, Sindh | 30 | Goldwind | 2016 | HydroChina | Formerly known as the Tapal Wind Energy (Private) Limited which was formed on 6 December 2010. [9] It is a joint-venture between Tapal Group, Akhtar Group, and Ismail Industries. [9] ACT Wind has outsourced operation & maintenance to HydroChina for ten years. [10] |
HydroChina Dawood Wind Power Project | Gharo, Sindh | 50 | Ming Yang | 2017 | HydroChina | |
Sachal Energy Wind Farm | Jhimpir, Sindh | 50 | Goldwind | 2017 | In-house | |
United Energy Pakistan Wind | Jhimpir, Sindh | 100 | Goldwind | 2017 | China Gezhouba Group | |
Hawa Energy Ltd | Jhimpir, Sindh | 50 | General Electric | 2018 | Albario Engineering | |
Burj Capital Jhimpir Wind Power | Jhimpir, Sindh | 50 | General Electric | 2018 | Albario Engineering | |
Artistic Energy | Jhimpir, Sindh | 49.3 | General Electric | 2018 | Descon Power Solutions | Formerly known as Hartford Alternative Energy Pvt Limited |
Tricon Boston | Jhimpir, Sindh | 150 | General Electric | 2018 | Albario Engineering | Tricon Boston Consulting Corporation is a subsidiary of Sapphire Textile. [11] |
Zephyr Power | Gharo, Sindh | 50 | Siemens Gamesa | 2019 | Orient Energy Systems | The turbines were provided by Siemens Gamesa which was their first contract in Pakistan. [12] It is funded by CDC Group UK. [13] |
Station | Location | Capacity (MW) | In-service date | Wind turbine | Notes |
---|---|---|---|---|---|
Tricom Wind Power Ltd | Jhimpir, Sindh | 50 | 2021 | Siemens Gamesa | Under construction. To be operational by Dec 2021. [14] The project is sponsored by Yunus Brothers Group. [15] The wind turbines are provided by Siemens Gamesa. [16] |
Metro Wind Power Ltd | Jhimpir, Sindh | 60 | 2021 | Siemens Gamesa | Under construction. [14] The EPC contractor of the project is HydroChina and wind turbines are provided by Siemens Gamesa. [17] |
Din Energy Ltd | Jhimpir, Sindh | 50 | 2021 | Goldwind | Under construction. [14] The project is sponsored by the Din Group which is active in textile and leather industry in Pakistan. The EPC contractor of the project is HydroChina and wind turbines are provided by Goldwind. [18] |
Act 2 Wind Ltd | Jhimpir, Sindh | 50 | 2021 | Goldwind | Under construction. To be operational by Dec 2021. [14] The wind turbines are provided by Goldwind. [19] |
Artistic Alternate Energy Pvt Ltd | Jhimpir, Sindh | 50 | 2021 | Goldwind | Under construction. [14] The EPC contractor of the project is HydroChina and wind turbines are provided by Goldwind. [20] |
Gul Ahmed Electric Pvt Ltd | Jhimpir, Sindh | 50 | 2021 | Goldwind | Under construction. [14] The EPC contractor of the project is HydroChina and wind turbines are provided by Goldwind. [21] |
Indus Wind Energy Pvt Ltd | Jhimpir, Sindh | 50 | 2021 | Siemens Gamesa | Under construction. To be operational by Dec 2021. [14] The wind turbines are provided by Siemens Gamesa. [22] |
Liberty Wind Power Pvt Ltd | Jhimpir, Sindh | 100 | 2021 | Siemens Gamesa | Under construction. It includes Liberty Wind Power-1 and Liberty Wind Power-2. [14] Formerly known as Zulaikha Energy Pvt Ltd. The wind turbines are provided by Siemens Gamesa. [23] |
NASDA Green Energy Pvt Ltd | Jhimpir, Sindh | 50 | 2021 | Siemens Gamesa | Under construction. To be operational by Dec 2021. [14] The wind turbines are provided by Siemens Gamesa. [24] |
Lakeside Energy Pvt Ltd | Jhimpir, Sindh | 50 | 2021 | Siemens Gamesa | Under construction. To be operational by Dec 2021. [14] The wind turbines are provided by Siemens Gamesa. [25] |
Master Green Energy Pvt Ltd | Jhimpir, Sindh | 50 | 2021 | Siemens Gamesa | Under construction. To be operational by Dec 2021. [14] The wind turbines are provided by Siemens Gamesa. [26] |
Hydroelectricity, or hydroelectric power, is electricity generated from hydropower. Hydropower supplies 15% of the world's electricity, almost 4,210 TWh in 2023, which is more than all other renewable sources combined and also more than nuclear power. Hydropower can provide large amounts of low-carbon electricity on demand, making it a key element for creating secure and clean electricity supply systems. A hydroelectric power station that has a dam and reservoir is a flexible source, since the amount of electricity produced can be increased or decreased in seconds or minutes in response to varying electricity demand. Once a hydroelectric complex is constructed, it produces no direct waste, and almost always emits considerably less greenhouse gas than fossil fuel-powered energy plants. However, when constructed in lowland rainforest areas, where part of the forest is inundated, substantial amounts of greenhouse gases may be emitted.
A wind farm or wind park, or wind power plant, is a group of wind turbines in the same location used to produce electricity. Wind farms vary in size from a small number of turbines to several hundred wind turbines covering an extensive area. Wind farms can be either onshore or offshore.
The Hub Power Company Limited, colloquially known as Hubco, is a Pakistani power company based in Karachi, Sindh. It was the first independent power producer (IPP) established in Pakistan, and currently is the largest IPP in the country.
The Zorlu Energy Power Project is a wind farm located at Jhimpir in Thatta District of Sindh province in Pakistan, 120 kilometres north-east of Karachi. The project has been developed by Zorlu Energy Pakistan, a subsidiary of the Turkish firm Zorlu Enerji. The total cost of project is $143 million.
Jhimpir is a village in Thatta District, Sindh, Pakistan. It is situated 114 km away from Karachi. It is the site of Pakistan's first wind power project. However, Jhimpir has a railway station and train service is available for Karachi and upcountry from here.
Renewable energy in Pakistan is a relatively underdeveloped sector; however, in recent years, there has been more and more interest to explore renewable energy resources for the energy production. Around 10.57% of Pakistan’s total installed power generation capacity comes renewables. Most of Pakistan's renewable energy comes from hydroelectricity. As per the vision of the Prime Minister, there is the aim to “induct 20% of RE by the year 2025 and 30% of RE by the year 2030.”
The following outline is provided as an overview of and topical guide to wind energy:
Renewable energy in Taiwan contributed to 8.7% of national electricity generation as of end of 2013. The total installed capacity of renewable energy in Taiwan by the end of 2013 was 3.76 GW.
Jamshoro Thermal Power Station also known by other names such as GENCO-I, and TPS Jamshoro is a gas / furnace oil and coal based thermal power plant with a total installed capacity of 880 MW located in Jamshoro near Hyderabad, Sindh in Pakistan. It is operated by the Jamshoro Power Company. The first phase of the project was commissioned between 1989 and 1991. It consists of one 250 MW unit and three 210 MW units. The power station is undergoing a planned expansion with additional 2 x 660 MW coal fired units. One 660 MW unit has been constructed and is ready for commissioning. Site preparation of second 660 MW unit is in progress with an expected commissioning date of July 2029.
The Quaid-e-Azam Solar Park is a photovoltaic power station in Bahawalpur, Punjab, Pakistan, named in honor of Quaid-e-Azam Muhammad Ali Jinnah, the Founder of Pakistan. It is a 400 MW solar facility spanning an area of 8 km2 and hosting 1.6 million solar modules. The initial phase of the project was constructed by the Government of Punjab through a 100% owned subsidiary QA Solar in May 2015 at a cost of $131 million. On 5 May 2015, the then Prime Minister of Pakistan Nawaz Sharif inaugurated the first 100 MW project and dedicated it to the nation. Subsequent expansion was done in public-private partnership with Appolo Solar Development Pakistan Limited, Best Green Energy Pakistan Limited and Crest Energy Pakistan Limited each installing a 100 MW unit. The next phase of 100 MW will be installed by Zorlu Solar Pakistan (Pvt.) Limited, making it a 500 MW facility. Total planned capacity of the solar park is 1,000 MW.
The 1,320 megawatt Port Qasim Power Project comprises two 660 megawatt supercritical coal power plants, one of which was inaugurated in December 2016 as part of the China–Pakistan Economic Corridor. The $2.09 billion project is located on 330.7 acres at Port Qasim, 37 kilometers east of Karachi in Sindh Province. The project is part of a group of 14 energy projects which fall under the fast-tracked "Early Harvest" program of the $46 billion China Pakistan Economic Corridor project.
The Sahiwal Coal Power Project is a coal power plant project located in the province of Punjab in Pakistan by the name of Huaneng Shandong Ruyi (Pakistan) Energy (Limited). It has an installed capacity of 1320 MW. It commenced full operations on 3 July 2017.
SK Hydro also known as Suki Kinari HPP, is a run-of-the-river hydropower project located on the Kunhar River at Balakot Tehsil in District Mansehra, Khyber Pakhtunkhwa, which has an installed generation capacity of 884 MW.
The Engro Thar Coal Power Project (Thar-ll), also known as Engro Powergen Thar, is a coal-fired power plant developed as part of the China–Pakistan Economic Corridor by Sindh Engro Coal Mining Company and China Machinery Engineering Corporation in the Thar Block-II of the Thar Coalfield, Tharparkar District, Sindh, Pakistan 25 kilometers from the town of Islamkot near the village of Singharo-Bitra.
The HydroChina Dawood Wind Power Project is a wind farm which was developed as part of the China–Pakistan Economic Corridor's Early Harvest energy projects on 1,720 acres of tidal flats is located in Gharo, Sindh – approximately 80 kilometers east of Karachi. It is being developed by the Chinese firm HydroChina, and is expected to provide electricity to the Pakistani grid by August 2016.
The Formosa 1 Offshore Wind Farm is a 128 MW offshore wind power station in Miaoli County, Taiwan. It is Taiwan's first offshore wind farm.
The Golden Valley Wind Energy Facility is a wind farm in the Amathole District Municipality, built within the wind energy generation zone located in the centre of Bedford, Cookhouse and Somerset East, in the Eastern Cape province of South Africa.
The Rosh Pinah Wind Power Station, was a planned 40 MW wind-power plant in Namibia. The wind farm was under development by Namibia Power Corporation Limited (NamPower), the Namibian electricity parastatal company. This wind farm is intended to increase Namibia's energy generation mix. An environmental impact assessment study by the consulting firm Enviro Dynamics, has been ongoing since 2020 and will inform the management of this renewable energy project.