China is the world leader in wind power generation, with the largest installed capacity of any nation [1] and continued rapid growth in new wind facilities. [2] With its large land mass and long coastline, China has exceptional wind power resources: [3] Wind power remained China's third-largest source of electricity at the end of 2021, accounting for 7.5% of total power generation. [4]
In 2020, China added 71.6 GW of wind power generation capacity to reach a total capacity of 281GW. [5] Both China's installed capacity and new capacity in 2020 are the largest in the world by a wide margin, with the next largest market, the United States, adding 14 GW in 2020 and having an installed capacity of 118 GW. [6]
China is forecast to have 1200 GW of combined wind and solar capacity by 2030 as part of the government's pledge to increase the share of non-fossil fuels in primary energy consumption to around 25% by that year. [7] In late 2020, the Chinese government set out a road map for total installed capacity of wind and solar to be 1,200 gigawatts by 2030. [8] China has identified wind power as a key growth component of the country's economy. [9] Experts say that China can achieve carbon neutrality before 2060 and peak emissions before 2030. [10]
In 2021, China was responsible for almost 70% of new wind installed capacity while United States accounted at 14% and Brazil at 7%. [11]
As of at least 2024, China is the world's largest wind power equipment manufacturing base. [12] [13] The largest domestic wind turbine manufacturer in China is Goldwind from Xinjiang province. Established in 1998, Goldwind aggressively developed new technology and expanded its market share, though this then decreased from 35% in 2006 to 19% in 2012. [14] In 2019, Goldwind was one of the first partners to sign up for a wind-to-hydrogen project in northeast China, in the hopes of putting China's currently unused wind generation potential to good use and turn stranded wind power into a cheap energy source for hydrogen production. [15] The China Longyuan Electric Power Group Corp., another subsidiary of China Guodian Corporation, was an early pioneer in wind farm operation; at one point it operated 40% of the wind farms in China. [16]
According to a 2020 forecast by Fitch Solutions, wind generation is expected to reach approximately 1,000TWh in China by 2028 compared to previous forecasts of 870TWh, due to reduced project cost made feasible by upgrades in the efficiency of technology. [17]
Between 2006 and 2009, China's wind power grew particularly quickly, with capacity doubling every year for four years in a row. [19] : 175–176
Year | Capacity (MW) [20] | Production (GWh) [21] | Capacity factor |
---|---|---|---|
2005 | 1,260 | 1,927 | 17.5% |
2006 | 2,599 | 3,675 | 16.1% |
2007 | 5,912 | 5,710 | 11.0% |
2008 | 12,200 | 14,800 | 13.8% |
2009 | 16,000 | 26,900 | 19.2% |
2010 | 31,100 | 44,622 | 16.4% |
2011 | 62,700 | 74,100 | 13.5% |
2012 | 75,000 | 103,000 | 15.7% |
2013 | 91,424 | 134,900 | 16.8% |
2014 | 114,763 | 153,400 | 15.3% |
2015 | 129,700 | 186,300 | 16.4% |
2016 | 149,000 | 241,000 | 18.5% |
2017 | 163,670 | 305,700 | 21.3% |
2018 [22] | 184,260 | 366,000 | 22.7% |
2019 [23] | 210,050 | 405,700 | 22.0% |
2020 | 282,650 | 466,500 | 18.8% |
2021 [24] | 328,480 | 655,600 | 22.9% |
In 2005, the standing committee of the National People's Congress passed a law that requires Chinese power grid enterprises to purchase all the electricity produced by the renewable energy sector. [25]
Chinese developers unveiled the world's first permanent Maglev wind turbine at the Wind Power Asia Exhibition 2006 held in Beijing. The Zhongke Hengyuan Energy Technology company invested CN¥400 million in building the base for the maglev wind turbine generators, in which construction began in November 2007. Zhongke Hengyuan expects a yearly revenue of CN¥1.6 billion from the generators.
In 2006 the Shanghai Power Company purchased 64.485 gigawatt-hours (GWh) of green energy (primarily from wind farms), yet the amount of renewable energy which was subscribed by customers from Shanghai Power Company was only 23% of that total. In 2006 there were just 6,482 households in Shanghai that subscribed to renewable energy in part because the cost of wind power is 0.53 Yuan/kWh higher than power produced from coal plants; in 2007 total output of wind farms in Shanghai will total 100 GWh, which is sufficient to power 120,000 households. Though there were 22 entities that purchased renewable energy in Shanghai, though with the exception of 1/3 of that total being state owned enterprises, the remainder was foreign invested enterprises. Shanghai's city government did not purchase any renewable energy. Of the top ten power customers in Shanghai, only Bao Steel purchased renewable energy; in 2006 Bao Steel entered into an agreement to purchase 1.2 GWh over three years. [26]
By the end of 2008, at least 15 Chinese companies were commercially producing wind turbines and several dozen more were producing components. [27] Turbine sizes of 1.5 MW to 3 MW became common. Leading wind power companies in China were Goldwind, Dongfang Electric, and Sinovel [28] along with most major foreign wind turbine manufacturers. [29] China also increased production of small-scale wind turbines to about 80,000 turbines in 2008. Through all these developments, the Chinese wind industry appeared unaffected by the Great Recession, according to industry observers. [28]
China became the largest wind energy provider worldwide in 2010, with the installed wind power capacity reaching 41.8 GW at the end of the year. However, about a quarter of this capacity was not connected to the grid. [30]
In 2011, China put forth a plan to have 100 GW of grid-connected wind power capacity by the end of 2015 and to generate 190 terawatt-hours of wind power annually. [31] This target was reached in 2014, making China the first country in the world to reach 100 GW of installed wind capacity. [32] As of 2014, Goldwind remains the largest competitor in the Chinese wind energy market, with a 19% share of new installations. It is followed by Guodian United Power Technology Company (a subsidiary of China Guodian Corporation) at 11%, and Mingyang Wind Power at 9%. [32]
The Gansu Wind Farm Project in western Gansu province is one of six national wind power megaprojects approved by the Chinese government. [33]
Although in some countries there are aesthetic objections to large-scale wind farms, in China they are often perceived as an aesthetic positive due to their associations with modernity and green development. [34] : 119
Offshore wind power is a major part of China's clean energy development strategy. The country has a coastline measuring 18,000 kilometers long and is estimated to have up to 750 million kilowatts of offshore exploitable wind power resources. [12] In 2012 China set the goal of 5 GW of installed offshore wind capacity by 2015 and 30 GW by 2020. [35] [36] However, development of offshore wind power did not come as fast as expected. Construction of Donghai Bridge Wind Farm, the first offshore wind farm in China started in April 2009, close to Donghai Bridge, and commissioned in 2010 to provide electricity to the 2010 Shanghai Expo. The wind farm consists of 34 Sinovel 3 MW wind turbines at a cost of US$ 102 million. [3] [37] [38] The next is the 150 MW Longyuan Rudong Intertidal Wind Farm costing 500 million ¥, operational in 2012. [39] [40] [41] By the end of 2012, China had only installed 389.6 MW offshore wind capacity, still far from the target goal of 5 GW by the end of 2015. [36]
In May 2014, total capacity of offshore wind power in China was 565 MW, [42] which raised to about 900 MW in 2015, less than a fifth of the expected target. [43] Installations increased substantially in 2016, with 592 MW of offshore wind power capacity deployed, ranking third in the world behind Germany and the Netherlands. [44] By the end of 2016, the total cumulative offshore wind power capacity in the country was 1.9 GW. [45]
Offshore wind development slower pace in China is mainly due to the lack of experience of domestic turbine manufacturers in the sector. This forces local development to use foreign products, resulting in Siemens being the largest supplier of offshore wind turbines in China. Another problem is the huge investment needed and associated risks of offshore development, which discourage private companies. [43]
On 5 August 2020, a new report revealed by the Global Wind Energy Council stated that China is expected to host more than a fifth of the world's offshore wind turbines, equating to 52 GW, claiming the top spot for the largest market for offshore wind by 2030. [46]
In 2021 alone, China built more offshore wind capacity than the rest of the world had built in the last 5 years put together. It commissioned 16.9 GW of offshore wind capacity, which accounted for 80% of all new capacity in 2021 worldwide. That massive expansion had meant that China today operates almost half of the world's installed offshore wind, with 26 GW of a total of 54 GW worldwide. [47] [48]
External videos | |
---|---|
Access to mountaintops can be challenging |
Areas with great wind power potential such as Gansu are sometimes far away from established industrial and residential centers. Coal-fired plants have a constituency of miners and local governments which wind-power projects lack. This has led to power generated by wind remaining underused. [49]
Transmission capacity of the grid hasn't kept up with the growth of China's wind farms. In 2009, only 72% (8.94 GW) of China's total wind power capacity was connected to the grid. [50] In 2014, 96.37 GW of China's capacity was connected to the grid, [51] out of a total capacity of 114.6 GW. [32] In the first half of 2015, 1.75 TWh of wind power was wasted according to China's National Energy Administration. The slowdown in the Chinese economy in 2015 also led to overcapacity in the power sector, reducing demand. [52] In an effort to reduce excess power capacity and encourage greater use of renewables, the Chinese government halted approvals for construction of new coal power plants for the three-year period starting in 2016. [53] Combined curtailment of North China wind power was nearly 34 TWh in 2015. [54]
In 2014, the US generated more electricity from wind (167 TWh) despite a lower generating capacity because of China's connectivity and grid capacity problems. [55] According to a 2013 report in The Economist, the US produced 40% more energy from a similar capacity of wind power, because Chinese wind farms are not efficiently connected to the power grid. [56]
A potential solution will be to move wind turbines to urban areas, but not without challenges. Shen et al. (2019) discover that Chinese city-dwellers may be somewhat resistant to building wind turbines in urban areas, with a surprisingly high proportion of people citing an unfounded fear of radiation as driving their concerns. [57] In addition, the study finds that like their counterparts in OECD countries, urban Chinese respondents are sensitive to direct costs and to wildlife externalities. Distributing relevant information about turbines to the public may alleviate resistance.
A wind farm or wind park, also called a wind power station or wind power plant, is a group of wind turbines in the same location used to produce electricity. Wind farms vary in size from a small number of turbines to several hundred wind turbines covering an extensive area. Wind farms can be either onshore or offshore.
The United Kingdom is the best location for wind power in Europe and one of the best in the world. The combination of long coastline, shallow water and strong winds make offshore wind unusually effective.
Many countries and territories have installed significant solar power capacity into their electrical grids to supplement or provide an alternative to conventional energy sources. Solar power plants use one of two technologies:
Wind power is a form of renewable energy in Pakistan which makes up more than 6% of the total electricity production in the country. As of 2018, wind power capacity in Pakistan was 1,287 MW. The government is looking to increase the share of renewable energy and plans to add around 3.5 GW of wind energy capacity by 2018.
Spain is one of the countries with the largest wind power capacity installed, with over 27 GW in 2020. In 2013, it had become the first country in the world to have wind power as its main source of energy.
Wind power in Germany is a growing industry. The installed capacity was 55.6 gigawatts (GW) at the end of 2017, with 5.2 GW from offshore installations. In 2020, 23.3% of the country's total electricity was generated through wind power, up from 6.2% in 2010 and 1.6% in 2000.
As of 2023, Europe had a total installed wind capacity of 255 gigawatts (GW). In 2017, a total of 15,680 MW of wind power was installed, representing 55% of all new power capacity, and the wind power generated 336 TWh of electricity, enough to supply 11.6% of the EU's electricity consumption.
Wind power generation capacity in India has significantly increased in recent years. As of 31 March 2024, the total installed wind power capacity was 45.887 gigawatts (GW). India has the fourth largest installed wind power capacity in the world. Wind power capacity is mainly spread across the southern, western, and northwestern states. The onshore wind power potential of India was assessed at 132 GW with minimum 32% CUF at 120 m above the local ground level (agl). Whereas, the estimated potential at minimum 25% CUF is 695 GW at 120 agl.
Wind power in California had initiative and early development during Governor Jerry Brown's first two terms in the late 1970s and early 1980s. The state's wind power capacity has grown by nearly 350% since 2001, when it was less than 1,700 MW. In 2016, wind energy supplied about 6.9% of California's total electricity needs, or enough to power more than 1.3 million households. Most of California's wind generation is found in the Tehachapi area of Kern County, California, with some large projects in Solano, Contra Costa and Riverside counties as well. California is among the states with the largest amount of installed wind power capacity. In recent years, California has lagged behind other states when it comes to the installation of wind power. It was ranked 4th overall for wind power electrical generation at the end of 2016 behind Texas, Iowa, and Oklahoma. As of 2019, California had 5,973 megawatts (MW) of wind power generating capacity installed.
Wind power is the fastest-growing renewable energy technology in Scotland, with 11,482 megawatts (MW) of installed wind power capacity by Q1 2023. This included 9,316 MW from onshore wind in Scotland and 2,166 MW of offshore wind generators.
Sweden has a total of 16.4 GW of wind power capacity at the end of 2023, the 5th highest in Europe and most per capita. Wind power produced 20.9% of national electricity generation in 2023, up from 0.3% in 2000.
China is the world's leader in electricity production from renewable energy sources, with over triple the generation of the second-ranking country, the United States. China's renewable energy sector is growing faster than its fossil fuels and nuclear power capacity, and is expected to contribute 43% of global renewable capacity growth. China's total renewable energy capacity exceeded 1,000 GW in 2021, accounting for 43.5 per cent of the country's total power generation capacity, 10.2 percentage points higher than in 2015. The country aims to have 80 per cent of its total energy mix come from non-fossil fuel sources by 2060, and achieve a combined 1,200 GW of solar and wind capacity by 2030. In 2023, it was reported that China was on track to reach 1,371 gigawatts of wind and solar by 2025, five years ahead of target due to new renewables installations breaking records. In 2024, it was reported that China would reach its target by the end of July 2024, six years ahead of target.
China Guodian Corporation is one of the five largest power producers in China, administrated by SASAC for the State Council. It is engaged in development, investment, construction, operation and management of power plants and power generation for electricity supply in Northern China, Northeast China, Central China, East China. Sichuan and Chongqing, Shandong, Yunnan, Guizhou, Guangxi, and Xinjiang, as well as in Myanmar. The installed capacity of company power plants is exceeding 100,000 MWe. On August 28, 2017, SASAC announced that China Guodian Corporation and Shenhua Group will be jointly restructured. Shenhua Group will become China Energy Investment Corporation and will absorb China Guodian Corporation.
Wind power is a growing source of electricity in Poland. In 2019, wind was the second most important source of electricity produced in Poland, after coal, accounting for about 10% of the electricity production.
Wind power in Italy, at the end of 2015, consisted of more than 1,847 wind turbines with a total installed capacity of 8,958 megawatts. Wind power contributed 5.4% of Italy electricity generation in 2015 (14,589 GWh). Italy is ranked as the world's tenth producer of wind power as of the end of 2016. Prospects for Italian wind energy beyond 2020 were positive, with several projects planned to go live before 2030.
Goldwind Science & Technology Co., Ltd., commonly known as Goldwind, is a Chinese multinational wind turbine manufacturer headquartered in Beijing, China. Goldwind was a state-owned enterprise before 2007, with largest shareholders including Hexie Health Insurance, China Three Gorges Renewables Group, and the National Social Security Fund, state-controlled corporations holding almost 40% shares. Its founder, Wu Gang, is a Communist Party member and had a seat in the 12th National People's Congress.
As of May 2024, wind power in the Netherlands has an installed capacity of 11,611 MW, 40.9% of which is based offshore. In 2022, the wind turbines provided the country with 18.37% of its electricity demand during the year. Windmills have historically played a major part in the Netherlands by providing an alternative to water driven mills.
Renewable energy in Taiwan contributed to 8.7% of national electricity generation as of end of 2013. The total installed capacity of renewable energy in Taiwan by the end of 2013 was 3.76 GW.
Dogger Bank Wind Farm is a group of offshore wind farms under construction 130 to 200 kilometres off the east coast of Yorkshire, England in the North Sea. It is considered to be the world's largest offshore windfarm. It was developed by the Forewind consortium, with three phases envisioned - first phase, second phase and third phase. In 2015, the third phase was abandoned, while the first and second phases were granted consent. It was initially expected that the Dogger Bank development will consist of four offshore wind farms, each with a capacity of up to 1.2 GW, creating a combined capacity of 4.8 GW. As of 2024, a total of 8.1 GW generating capacity is expected to be installed on Dogger Bank.
Wind power is a major industry in Taiwan. Taiwan has abundant wind resources however a lack of space on land means that most major developments are offshore.
{{cite news}}
: CS1 maint: multiple names: authors list (link){{cite web}}
: CS1 maint: numeric names: authors list (link)