GE Offshore Wind is a joint venture with Alstom and a subsidiary of GE Vernova, created in 2015 when most of Alstom's electrical power and generation assets were acquired by General Electric. GE's stake in the joint venture is 50% plus 1 share.
Formerly known as Alstom Wind, originally Alstom Ecotècnia, the company was the wind power company of energy infrastructure company Alstom, within its 'Power' operating division, from 2010 to 2015. The company originated as Ecotècnia S.c.c.l., a Spanish wind power equipment manufacturing and installation company established in 1981, acquired by Alstom 2007 for €350 million.
The subsidiary's main product is the 14MW Haliade-X offshore wind turbine, amongst the most powerful on Earth. [1]
Ecotècnia was a manufacturer and installer of wind turbines established in 1981, headquartered in Barcelona, Spain. In 1999 it became part of the Basque-based cooperative Mondragon Corporation. [2]
The company's first wind generator was a 30 kW machine, developed by 1984 with funding assistance from the Spanish Science Ministry. In 1991 the company developed a 150 kW machine, and in 1992 won its first commercial project - for fifty 150 kW turbines at Tarifa, Spain. [3] The particular demands of installing wind turbines in mountainous regions in Spain which included poor road access and blustery (high turbulence) conditions led to specific design features of Ecotècnia's turbines - including a modular construction of the turbine (three components: rotor and shaft; mainframe and yaw system; and the drive train - each less than 30t), as well as isolation of the gearbox from the main drive, reducing non-torque gearbox loads. [3] [4]
In the first half of the 1990s the company installed wind farms using its ECO20 150 kW model, from 1995 to 2000 the company's primary models were the ECO44 (640 kW) and ECO48 (750 kW) models. [5] After 2003 most of the company's installations used its 1.67MW IEC 61400 class II ECO74, [6] and class IIIA ECO80, [7] three blade turbine models; [5] both typically used a mechanically isolated Winergy AG PEAB 4390.2 planetary gearbox driving a doubly fed induction generator (typically ABB, Siemens, Winergy sourced) with IGBT inverter control, driven by individually pitch controlled blades manufactured by LM Wind Power. [4] [6] [7]
The majority of its installations were in Spain, with approximately 10% in other countries including Portugal, France, Italy as well as installations in Japan and India. [5]
In 2005 the company's estimate world market share (by installed capacity) was 2.1%. [4] By 2007 the company had installed over wind farms with over 1GW total of rate power; [5] the company had increased the power output of its wind turbine offering from 30 kW in 1984 to 1.67MW by 2003. [8]
In mid 2007 Alstom acquired Ecotècnia for 350 million euro. [9] By late 2007 the company employed over 800 people, with sales of approximately €400 million pa., and operated wind turbine assembly plants in Somozas and Buñuel, other sites at Rio del Pozo (control panels) and Coreses (tower manufacturing). [10] The company also manufactured small scale autonomous energy systems for isolated locations (tradename 'CICLOPS') comprising windgenerator (10 kW), photovoltaic solar source (2 to 10 kW), generator, battery and inverter, and was active in small scale photovoltaic cell installation (factory Pla de Santa Maria. [10] ). [11]
The first ECO100 3 MW wind turbine was formally inaugurated at the Vieux Moulin wind farm (Pithiviers, Paris, France) 1 October 2009. [12]
The company was renamed Alstom Wind S.L. in April 2010. [13]
In 2010 Alstom began construction of a turbine nacelle factory in Amarillo, USA, [14] completed in mid 2011. [15] In November 2011 a 300MW per year capacity manufacturing plant in Camaçari near Salvador, Bahia, Brazil was formally opened. [16]
In March 2012 a prototype of Alstom Haliade 150 6 MW offshore turbine was formally inaugurated; the turbine was developed for large scale offshore wind projects off the French coast; [17] in January 2011 Alstom joined a consortium led by EDF Energies Nouvelles as turbine supplier (also including DONG Energy, Nass & Wind, WPD Offshore) to bid for proposed offshore wind farms in France of 6GW capacity. [18] The Haliade 150 turbine was a development of the previous mechanically isolated transmission designs developed by Ecotècnia; [note 1] the gearbox driven electrically generator was omitted and replaced with a gearless direct drive permanent magnet synchronous generator designed for higher efficiency and greater reliability with fewer moving parts. The turbine uses 73.5m turbine blades from LM Wind Power. [20]
In April 2012 the French state awarded an EDF/DONG Energy/Alstom consortium three contracts for offshore wind farms (Saint-Nazaire, Courseulles-sur-Mer, Fécamp. [21] ) off the northwestern coast of France of total power 1.4 GW. As a result, Alstom confirmed that it would be constructing wind turbine factories at Cherbourg-en-Cotentin (Turbine blades in association with LM Power, wind turbine towers), and at Saint-Nazaire (Nacelles and generators) in the Montoir-de-Bretagne port area. [22]
A 6 MW Haliade turbine began generating electricity in July 2012 during certification testing. The turbine's electrical generator was supplied by partner company, General Electric subsidiary GE Power Conversion (Converteam), who were also expected to establish a production plant in Saint Nazaire. [23]
In late 2012 Alstom announced the intention to construct a wind turbine tower manufacturing facility in Canoas, Rio Grande do Sul, Brazil, on a site adjacent to an established Alstom power transmission factory. [24] The plant was officially inaugurated in August 2013. [25]
In February 2013 the company announced the cut of 35% of its workforce in Spain, due to a collapse in the Spanish wind market because of a change to governmental support for wind developments. [26] [note 2] The facilities at Somozas, Galicia (electrical equipment), and Zamora, Castille and Leon region (towers) were to close with electrical equipment production moved to the plant at Buñuel, Navarra. [26] [29] Total job losses were later reduced from 373 to 265. [30]
A Haliade 150 turbine was installed at the Belwind wind farm in November 2013 for operational tests, at the time being one of the largest operational wind turbines in the world. [31] [32] [note 3]
In December 2014 the St. Nazaire nacelle and generator assembly factory was officially opened. [33] [34]
In early 2015 a wind turbine tower factory was opened in Jacobina, Bahia, Brazil; constructed as a joint venture (51%/49%) between Andrade Gutierrez and Alstom. [35]
Initial orders for the company's Haliade wind turbine included 5 units for the Block Island Wind Farm (USA, March 2015); [36] and 66 units for DEME for the Merkur offshore wind farm (Germany, July 2015). [37]
In November 2015 most of Alstom's energy generation and transmission assets were bought by General Electric. The combined business under GE was named GE Power. [38] The two parties also created three joint ventures, among them a hydro and offshore renewable business unit.
In February 2016 the first of a series production of 300 permanent magnet wind generators was completed at the St. Nazaire factory. [39] [40] A long planned test period for the 6MW Haliade is expected to start in Spring 2016 at Østerild Wind Turbine Test Field. [41] [42]
Alstom SA is a French multinational rolling stock manufacturer which operates worldwide in rail transport markets. It is active in the fields of passenger transportation, signaling, and locomotives, producing high-speed, suburban, regional and urban trains along with trams.
Spain is one of the countries with the largest wind power capacity installed, with over 27 GW in 2020. In 2013, it had become the first country in the world to have wind power as its main source of energy.
Siemens Gamesa Renewable Energy, S.A. was formed in 2017 in a merger of Siemens' Wind Power division with Gamesa Corporación Tecnológica, S.A.; it is a Spanish-German wind engineering company based in Zamudio, Biscay, Spain. The company has two other main sites in Spain: one in Madrid and the other in Sarriguren. Other than its headquarters, its onshore business is primarily based in Spain, while the offshore business is based in Germany and Denmark. It is the world's second largest wind turbine manufacturer behind Vestas.
Sheringham Shoal Offshore Wind Farm is a Round 2 wind farm in North Sea off the coast of Norfolk. A lease for use of the sea bed was obtained in 2004 by Scira Offshore Energy, the development gained offshore planning consent in 2008, and was constructed 2009–2011, being officially opened in 2012.
The Burbo Bank Offshore Wind Farm is a 348 MW offshore wind farm located on the Burbo Flats in Liverpool Bay on the west coast of the UK in the Irish Sea. It consists of an original 90 MW wind farm commissioned in 2007 and a 258 MW extension completed in 2017.
GE Power was an American energy technology company owned by General Electric (GE). In April 2024, GE completed the spin-off of GE Power into a separate company, GE Vernova. Following this, General Electric ceased to exist as a conglomerate and pivoted to aviation, rebranding as GE Aerospace.
Neart Na Gaoithe is an offshore wind farm under construction in the outer Firth of Forth, 15.5 kilometres (9.6 mi) east of Fife Ness. It has a potential capacity of 450 MW. It is being developed by EDF Renewables and ESB. Offshore work began in 2020, with completion originally planned for 2023 but delayed due to supply chain challenges, the Covid pandemic and "construction woes" until summer 2025.
Gunfleet Sands Offshore Wind Farm is a 172 MW wind farm about 7 kilometres (4.3 mi) off the Clacton-on-Sea coast in the Northern Thames Estuary.
GE Wind is a division of GE Vernova. The company manufactures and sells wind turbines to the international market. In 2018, GE Wind was the fourth largest wind turbine manufacturer in the world. Vic Abate is the CEO of GE Vernova’s Wind businesses.
Ming Yang Wind Power Group Limited is the largest private wind turbine manufacturer in China and the fifth largest overall in the country. The company was listed on the New York Stock Exchange from 1 October 2010 to June 22, 2016. It is developing the world's largest wind turbine with a capacity of 18 MW.
A nacelle is a cover housing that houses all of the generating components in a wind turbine, including the generator, gearbox, drive train, and brake assembly.
The Vestas V164 is a three-bladed offshore wind turbine, produced by Vestas, with a nameplate capacity of up to 10 megawatts, a world record. Vestas revealed the V164's design in 2011 with the first prototype unit operated at Østerild in northern Denmark in January 2014. The first industrial units were installed in 2016 at Burbo Bank, off the west coast of the United Kingdom. By 2021, Vestas had produced 500 of the series.
Dogger Bank Wind Farm is a group of offshore wind farms under construction 130 to 200 kilometres off the east coast of Yorkshire, England in the North Sea. It is considered to be the world's largest offshore windfarm. It was developed by the Forewind consortium, with three phases envisioned - first phase, second phase and third phase. In 2015, the third phase was abandoned, while the first and second phases were granted consent. It was initially expected that the Dogger Bank development will consist of four offshore wind farms, each with a capacity of up to 1.2 GW, creating a combined capacity of 4.8 GW. As of 2024, a total of 8.1 GW generating capacity is expected to be installed on Dogger Bank.
Block Island Wind Farm was the first commercial offshore wind farm in the United States, located 3.8 mi (6.1 km) from Block Island, Rhode Island in the Atlantic Ocean. The five-turbine, 30 MW project was developed by Deepwater Wind, now known as Ørsted US Offshore Wind.
GE Renewable Energy was a manufacturing and services division of the American company General Electric. It is headquartered in Boulogne-Billancourt, near Paris, France and focuses on the production of energy systems that use renewable sources. Its products include wind, hydroelectric and solar power generating facilities.
Ocean Wind was a proposed utility-scale 2,248 MW offshore wind farm to be located on the Outer Continental Shelf approximately 15 miles (24 km) off the coast of Atlantic City, New Jersey. It was being developed by Ørsted US Offshore Wind in conjunction with Public Service Enterprise Group (PSE&G). Construction and commissioning were planned for the mid-2020s. The closed Oyster Creek Nuclear Generating Station and B.L. England Generating Station would provide transmission points for energy generated by the wind farm.
Vineyard Wind 1 is an offshore wind farm under construction in U.S. federal waters in the Atlantic Ocean in Bureau of Ocean Energy Management-designated Lease Area OCS-A 0520, about 13 nautical miles south of Martha's Vineyard and Nantucket, Massachusetts. The array is designed to include 62 Haliade-X wind turbines manufactured by GE Offshore Wind with a nameplate capacity of 804 MW combined, equivalent to the annual power use of 400,000 homes. The Massachusetts Department of Public Utilities approved the project in 2019. Construction began on November 18, 2021. In October 2023, the first turbine was installed. Power from the first turbine started flowing into the ISO New England grid on January 2, 2024. Construction is expected to be complete by the end of 2024.
GE Vernova Inc., formerly GE Power and GE Renewable Energy, is an energy equipment manufacturing and services company headquartered in Cambridge, Massachusetts.