Fortaleza Metro

Last updated
Fortaleza Metro
Logo Metrofor.svg
Light rail in Fortaleza.png
Overview
Native nameMetrô de Fortaleza
Locale Fortaleza, Ceará, Brazil
Transit type
Number of lines
  • 2 [1]
  • 1 (light rail)
Number of stations
Annual ridership15 million (2022) [4]
Website Metrô de Fortaleza
Operation
Began operationOctober 24, 2012
Operator(s)Metrofor
Technical
System length
  • 43.6 km (27.1 mi) [2] [3]
  • 13.2 km (8.2 mi) (light rail)
Track gauge 1,000 mm (3 ft 3+38 in) metre gauge
System map
Map of the Fortaleza Metro network (including planned lines). Fortaleza 2014.svg
Map of the Fortaleza Metro network (including planned lines).

The Metropolitan of Fortaleza, also known popularly as Metro of Fortaleza or Metrofor, is a system of metropolitan transport that operates in the Brazilian city of Fortaleza, operated by Companhia Cearense de Transportes Metropolitanos, company of social capital, captained by the Government of the State of Ceará, in Brazil, and has as current president Eduardo Hotz. Founded on May 2, 1997, the company is responsible for administration, construction and metro planning in the state of Ceará, being present in the systems of Sobral and Cariri, having its main activity in Fortaleza and its metropolitan region.

Contents

According to data released in December 2016, the system is the sixth largest in Brazil among the 12 Brazilian metropolitan regions that have passenger rail transport, having in the period 43.6 km (27.1 mi), behind São Paulo (334.9 km (208.1 mi)), Rio de Janeiro (262.1 km (162.9 mi)), Recife (71.4 km (44.4 mi)), Natal (56.2 km (34.9 mi)), and Porto Alegre (43.9 km (27.3 mi)). The FMR lines represent 4.3% of the total network of subways and trains of Brazil that, in 2015, was of 1,062 km (660 mi) of extension. The Metro was used by 13.2 million passengers in 2018.

The Fortaleza Metro started its operations on June 15, 2012, in assisted operation. With the start of commercial operation on October 1, 2014, a R$2.40 fare started being charged, which gradually increased to R$3.60 as of April 2021. There is fare integration with the Integrated Transport System of Fortaleza (SIT-FOR). Currently in operation are 20 stations on the South Line, 10 stations of West Line light rail (in the future to be converted into a metro system), and 10 stations on the Parangaba-Mucuripe light rail, operating in assisted operation with passenger transportation in the period from 6 am until noon without charge for tickets. Possessing a projected extension of 69.4 kilometers (43.1 mi) distributed in 4 lines, connected by 52 stations, mostly under construction or in design on the East Line (Tirol-Moura Brasil ↔ Edson Queiroz). The system was designed to integrate with two of the city's seven bus terminals, Parangaba and Papicu, and to connect to the passenger terminals at Mucuripe Port and Fortaleza International Airport.

Background

The operator of the Fortaleza Metro, Metrofor, has been in the process of modernizing Fortaleza's rail network since 1999, with plans for improving the network going back to the 1980s. The project involved double tracking and electrification of two of the main passenger rail lines, installation of modern signalling and communications system, construction of new stations, and acquisition of new rolling stock, all with the goal of achieving higher frequency operations on the two lines. The upgraded rail network is expected to serve nearly 700,000 passengers a day. [5]

Operations

The existing Fortaleza rail infrastructure consists of 43 kilometers (27 mi) of rail route, comprising two lines: [1]

Lines

LineTerminiOpenedLength [2] [3] Stations [2] [3] Travel
time
(min) [1]
Operation
South (Sul)Central – Chico da Silva ↔ Carlito Benevides [6] 201224.1 km (15.0 mi)2033Opened, and in higher frequency operation. [7]
West (Oeste)Caucaia ↔ Central – Chico da Silva [8] 201419.5 km (12.1 mi)10 [Note 1] 30Currently operational, but as a commuter rail line with lower frequencies. [9]
  1. Additional stations are under construction.

Routes

The 24.1-kilometer (15.0 mi) long South Line [2] provides passenger services between Carlito Benevides in Maracanaú to Central – Chico da Silva in downtown Fortaleza. The Linha Sul (South Line) is the first of the two lines to be converted to higher frequency service, with headways of 27 minutes. [7] Its route has been diverted into a 4.0-kilometer (2.5 mi) long tunnel, [1] with 4 underground stations [1] all with 110 m (360 ft) long platforms, in the city center. [10]

The West Line, currently operating as a commuter rail line, is 19.5-kilometer (12.1 mi) long. [3] It begins at Caucaia and currently terminates at João Felipe, with plans to extend it to Central – Chico da Silva. It currently operates with train frequencies of 45 minutes. [9]

Stations

Stations on the metro-standards South Line, from south to north: [10]

Rolling stock

The AnsaldoBreda rolling stock used on the system is similar to that used on the Circumvesuviana railway, in Naples, Italy. A total of 20 train-sets were expected to be delivered, and in service, by 2012. [5]

Light rail

A third rail line in the Fortaleza area, which runs between Parangaba and Macuripe and which had operated as a cargo line, was converted into a diesel light rail line. [11] The line partly opened in July 2017, was extended in July 2018, and was then extended to its current 10-station length with the opening of Iate station in September 2020. [12]

LineTerminiOpenedLengthStationsOperation
Parangaba MucuripeParangaba ↔ Iate [13] [14] 201713.2 km (8.2 mi) [13] 10 [13] In operation

Future plans: East Line

A new totally underground line, the East (Leste) line, was expected to begin construction in 2018, [15] with the contract for its constructions awarded to Sacyr and Ferrera Guedes, [16] with an estimated construction time of 48 months. Tunnel boring machines for the construction were announced to be provided by The Robbins Company in 2012, but construction stalled. [17] Current plans are to complete this third metro line as follows:

LineTerminiPlanned
opening
LengthStationsOperation
East (Leste)Central – Chico da Silva ↔ Fórum Clóvis Beviláqua [18] TBD12 km (7 mi)13Under construction

See also

Related Research Articles

<span class="mw-page-title-main">Fortaleza</span> Capital city of Ceará, Brazil

Fortaleza is the state capital of Ceará, located in Northeastern Brazil. It is Brazil's 4th largest city, having surpassed Salvador in 2022 census with a population of slightly over 2.4 million, and the 12th largest city by gross domestic product. It forms the core of the Fortaleza metropolitan area, which is home to almost 4 million people.

<span class="mw-page-title-main">São Paulo Metro</span> Rapid transit system in São Paulo, Brazil

The São Paulo Metro, commonly called the Metrô, is a rapid transit system that forms part of the urban railways that serves the city of São Paulo, alongside the São Paulo Metropolitan Trains Company (CPTM), both forming the largest metropolitan rail transport network of Latin America. The six lines in the metro system operate on 104.4 kilometres (64.9 mi) of route, serving 89 stations. The metro system carries about 4,200,000 passengers a day.

<span class="mw-page-title-main">Companhia Paulista de Trens Metropolitanos</span> Rapid transit and commuter rail company

The Companhia Paulista de Trens Metropolitanos (CPTM) is a rapid transit and commuter rail company owned by the São Paulo State Department for Metropolitan Transports. It was created on 28 May 1992, from several railroads that already existed in Greater São Paulo, Brazil.

<span class="mw-page-title-main">Porto Metro</span> Light rail system in Porto, Portugal

The Porto Metro is a light rail network in Porto, Portugal and a key part of the city's public transport system. Having a semi-metro alignment; it runs underground in central Porto and above ground into the city's suburbs while using low-floor tram vehicles. The first parts of the system have been in operation since 2002. It is a separate system to Porto's vintage trams.

<span class="mw-page-title-main">Rio de Janeiro Metro</span> Rapid transit network serving Rio de Janeiro, Brazil

The Rio de Janeiro Metro, commonly referred to as just the Metrô is a rapid transit network that serves the city of Rio de Janeiro, Brazil. The Metrô was inaugurated on 5 March 1979, and consisted of five stations operating on a single line. The system currently covers a total of 58 kilometres (36 mi), serving 41 stations, divided into three lines: Line 1 ; Line 2, which together travel over a shared stretch of line that covers 10 stations of an approximate distance of 5 kilometres (3.1 mi); and Line 4. Metrô Rio has the second highest passenger volume of the metro systems in Brazil, after the São Paulo Metro.

<span class="mw-page-title-main">Federal District Metro (Brazil)</span> Rapid transit system in the Federal District, Brazil

The Federal District Metro is the rapid transit system of the Federal District, in Brazil. It is operated by Companhia do Metropolitano do Distrito Federal and was opened in 2001. Currently, Federal District's Metro has 27 stations on two lines, and it runs for 42.38 kilometers (26.33 mi). The system passes through 6 Administrative regions of the Federal District, those being Brasília, Guará, Águas Claras, Taguatinga, Ceilândia, and Samambaia.

<span class="mw-page-title-main">Porto Alegre Metro</span> Rapid transit system in Porto Alegre

The Porto Alegre Metro is a transit system operated jointly by the federal government, the state government of Rio Grande do Sul and the city of Porto Alegre through the company Trensurb in Brasil. It has 22 stations, totaling 43.8 kilometers (27.2 mi) of route, and carries about 175,000 users a day.

<span class="mw-page-title-main">Belo Horizonte Metro</span> Rapid transit system in Belo Horizonte

Belo Horizonte Metro is a rapid transit system serving the city of Belo Horizonte, in the state of Minas Gerais in Brazil. The system has one 28.1-kilometre (17.5 mi) line which serves 19 stations. The Metro carried 54.4 million passengers in 2019, or approximately 150,000 passengers per day. The system is operated by Metrô BH company, which is part of the Comporte Group.[4] Two more lines are planned.

<span class="mw-page-title-main">Recife Metro</span> Rapid transit system in Recife

The Recife Metro is a rapid transit system serving the Metropolitan Region of Recife, Pernambuco, Brazil. It is operated by the federally-owned Companhia Brasileira de Trens Urbanos (CBTU) and currently serves 29 stations, along 39.5 kilometers (24.5 mi) of track. The system is complemented by two diesel-powered light rail lines with seven additional stations. In 2018, the combined system carried 102,089,000 passengers.

<span class="mw-page-title-main">Transport in São Paulo</span> Overview of transport in São Paulo

Transport in São Paulo plays a key role in the daily lives of the people of São Paulo and offers various methods of public transport that are offered in the city, including a complex bus system run by SPTrans, and various subway and railway lines. A contactless smartcard is used to pay fares for the buses, subway, and railway systems. São Paulo also has three airports.

<span class="mw-page-title-main">Salvador Metro</span>

The Salvador Metro is a rapid transit system serving Salvador city, the state capital of Bahia and the fourth largest city in Brazil. The current system is 34 km (21 mi) long and has twenty stations, which began partial public service on June 11, 2014. The system arrives until the center of the city of Lauro de Freitas also. It is operated by CCR METRÔ BAHIA Company.

<span class="mw-page-title-main">Line 2 (São Paulo Metro)</span>

Line 2 (Green) (Portuguese: Linha 2–Verde) is one of the six lines that make up the São Paulo Metro, and one of the thirteen lines that make up the Metropolitan Rail Transportation Network. It currently runs between the Vila Madalena and Vila Prudente stations. The line is also called, and was originally known as, the Paulista Line, because it goes along much of the Avenida Paulista, one of the leading financial centers in São Paulo. Despite being the second line to be planned, it was the third to be built—the second line built was actually Line 3 (Red). This line connects the West and South-East regions.

Line 3 (Red) (Portuguese: Linha 3–Vermelha) is one of the six lines that make up the São Paulo Metro and one of the thirteen lines that make up the Metropolitan Rail Transportation Network. It runs between Palmeiras-Barra Funda and Corinthians-Itaquera. It was formerly called the East-West Line. Line 3 is the busiest in the system.

<span class="mw-page-title-main">Line 5 (São Paulo Metro)</span>

Line 5 (Lilac) (Portuguese: Linha 5–Lilás) is one of the six lines that make up the São Paulo Metro and one of the 13 lines that make up the Metropolitan Rail Transportation Network. The line transports about 600,000 people every business day, and since August 2018 it is operated by the private company ViaMobilidade.

<span class="mw-page-title-main">Line 6 (São Paulo Metro)</span>

Line 6 (Orange) (Portuguese: Linha 6–Laranja) is an under construction line of the São Paulo Metro. The first section will be 15.9-kilometre (9.9 mi) long, with 15 stations, and will link the São Joaquim metro station (Line 1 (Blue) to the district of Brasilândia. The branch is known as the "Colleges line" as it will serve many of them along its route (FAAP, PUC-SP and Mackenzie University).

<span class="mw-page-title-main">Line 15 (São Paulo Metro)</span> Monorail in São Paulo

Line 15 (Silver) (Portuguese: Linha 15–Prata) is one of the six lines that make up the São Paulo Metro and one of the thirteen lines that make up the Metropolitan Rail Transportation Network. It is South America's first mass-transit monorail and is the first system in the world to use the Bombardier Innovia Monorail 300. When completed it will be the largest and highest capacity monorail system in the Americas and second worldwide only to the Chongqing Monorail. The first section, from Vila Prudente to Oratório, opened on 30 August 2014, initially running 10 AM–3 PM on weekends only. As of 26 October 2016, the line is operational from 4:40 AM–12 AM. The line has a free connection to Line 2-Green on Vila Prudente station and future connection to CPTM Line 10-Turquoise on Ipiranga station.

<span class="mw-page-title-main">Line 17 (São Paulo Metro)</span> Future monorail line in São Paulo

Line 17 (Gold) (Portuguese: Linha 17–Ouro) is an under construction monorail project for the São Paulo Metro. The line will have 14 stations, beginning at the São Paulo-Morumbi station and ending at the Jabaquara station, with a branch to Congonhas station, connected to the São Paulo/Congonhas Airport. It will have integration with Line 1-Blue, Line 4-Yellow, and Line 5-Lilac as well as CPTM Line 9-Emerald. The line was originally one of the transportation projects supporting the 2014 FIFA World Cup. However, delays and contract disputes have pushed the completion date from the original 2013 full opening date to 2026. Once completed, the line will be the first in the system to have a branch.

<span class="mw-page-title-main">São Mateus–Jabaquara Metropolitan Corridor</span>

The São Mateus–Jabaquara metropolitan corridor (Portuguese: Corredor Metropolitano São Mateus-Jabaquara), also called ABD Corridor (Corredor ABD) is a bus rapid transit line in Brazil, linking the city of São Paulo to three neighboring cities, Diadema, São Bernardo do Campo and Santo André, as well as (indirectly) Mauá. Operations started in 1988. Its other name references one letter per city (A for Santo André, B for São Bernardo do Campo, and D for Diadema), the same way the ABC region in Greater São Paulo is named.

<span class="mw-page-title-main">Cariri Metro</span> Commuter rail line in Ceará state, Brazil

Cariri Metro is a 13.9-kilometer (8.6 mi), nine station diesel commuter rail line in the Cariri region of southern Ceará state, Brazil. It is operated by Companhia Cearense de Transportes Metropolitanos, which also operates the Fortaleza Metro. It is expected to transport about 5,000 passengers per day. The line went into operation on an experimental basis on 1 December 2009, and went into regular service in 2010.

<span class="mw-page-title-main">São Paulo Metropolitan Trains</span> Rapid transit system in São Paulo, Brazil

The São Paulo Metropolitan Train is a public transit rail system implanted in Greater São Paulo, serving 23 of its 39 municipalities. It has 273 km (170 mi) of length, 7 lines and 94 stations, transporting approximately 3 million passengers per day. Currently, it is operated by the state-owned company Companhia Paulista de Trens Metropolitanos (CPTM), but two of the lines were auctioned to ViaMobilidade, which began operating their administrations in January 2022.

References

  1. 1 2 3 4 5 "Mapa das Linhas - Metrô de Fortaleza" (in Portuguese). Metrô de Fortaleza - METROFOR. Archived from the original on 2013-09-25. Retrieved 2014-06-19.
  2. 1 2 3 4 5 "Linha Sul".
  3. 1 2 3 4 5 "Linha Oeste".
  4. "Carta Anual de Governança Corporativa" [Metro system](PDF) (in Portuguese). Metrofor. June 2023. p. 8. Retrieved 2023-07-01.
  5. 1 2 "Fortaleza Metro Rail Project, Brazil". Railway-Technology.com. Retrieved 2014-06-18.
  6. "Metrô de Fortaleza Linha Sul" (in Portuguese). Metrô de Fortaleza - METROFOR. Archived from the original on 2017-08-08. Retrieved 2014-06-19.
  7. 1 2 "HORÁRIO DA PARTIDA DOS TRENS CARLITO BENEVIDES - CHICO DA SILVA" [DEPARTURE TIME OF TRAINS CARLITO BENEVIDES - CHICO DA SILVA](PDF) (in Portuguese). Metrô de Fortaleza - METROFOR. Retrieved 2014-10-11.[ permanent dead link ]
  8. "Metrô de Fortaleza Linha Oeste" (in Portuguese). Metrô de Fortaleza - METROFOR. Archived from the original on 2017-08-08. Retrieved 2014-06-19.
  9. 1 2 "Horário de Partida dos Trens do Centro para Caucaia a partir do dia 28/05/2012" [Departure Time of Trains Centro to Caucaia from the date 28/05/2012](PDF) (in Portuguese). Metrô de Fortaleza - METROFOR. 28 May 2012. Retrieved 2014-10-11.[ permanent dead link ]
  10. 1 2 "Fortaleza". UrbanRail.net. Retrieved 2014-06-18.
  11. "Fortaleza World Cup rail link on schedule". Global Rail News. Rail Media. 19 February 2013. Retrieved 2014-06-21.
  12. "Com duas novas estações, VLT que liga Parangaba ao Mucuripe é concluído em Fortaleza - Metro". 16 September 2020.
  13. 1 2 3 "VLT Parangaba-Mucuripe".
  14. "Duas novas linhas previstas" [Two new lines planned]. Negócios Diário do Nordeste (in Portuguese). 20 September 2007. Retrieved 2014-06-20.
  15. "Sacyr and Ferrera Guedes awarded Fortaleza Metro contract". International Railway Journal. 11 July 2018.
  16. "Contract awarded for Fortaleza Eastern metro line". Railway Pro. 12 July 2018. Retrieved 12 October 2019.
  17. "World rail infrastructure market September 2012". Railway Gazette International . 24 September 2012. Retrieved 16 November 2014.
  18. "Porto e metrô expandidos" [Port and metro expanded]. Negócios Diário do Nordeste (in Portuguese). 25 February 2011. Retrieved 2014-06-20.

Commons-logo.svg Media related to Fortaleza Metro at Wikimedia Commons