Green Line (Tel Aviv Light Rail)

Last updated
Green Line
Dankal Logo.svg
Overview
StatusUnder construction
Locale Tel Aviv, Rishon LeZion, Holon, Herzliya
Stations58
Website www.nta.co.il
Service
Type BSicon TRAM1.svg Light rail
System Dankal Logo.svg Tel Aviv Light Rail
Services2
Operator(s)NTA
Rolling stock Alstom Citadis
History
Planned opening2028 (southern section), 2030 (entirely)
Technical
Line length35 km (22 mi)
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge
Electrification 1500 V DC OHLE
Operating speed50 km/h (31 mph) in Street Level
70 km/h (43 mph) Underground
Route map

IsraelTrainLogoSymbolOnly.svg Abba Eban
BSicon uexKBHFa.svg
BSicon uexKBHFa.svg
Neveh Sharet
 
HaHoshlim
BSicon uexHST.svg
BSicon uexHST.svg
Dvora HaNevi'a
Altneuland
BSicon uexHST.svg
BSicon uexHST.svg
HaNehoshet
Hof HaTkhelet North
BSicon uexHST.svg
BSicon uexHST.svg
HaBarzel
Hof HaTkhelet South
BSicon uexHST.svg
BSicon uexHST.svg
Pinchas Rosen IsraelTrainLogoSymbolOnly.svg
Unichman
BSicon uexHST.svg
BSicon uexHST.svg
Stadium
Levinsky College North
BSicon uexHST.svg
BSicon uexHST.svg
HaYarkon Park
Levinsky College South
BSicon uexHST.svg
BSicon uexHST.svg
Gane HaTa'arukha IsraelTrainLogoSymbolOnly.svg
Shoshanna Parsitz
BSicon uexHST.svg
BSicon uexHST.svg
Rosenfeld
Azore Hen
BSicon uexHST.svg
BSicon uexHST.svg
University
Propes
BSicon uexHST.svg
BSicon uexHST.svg
Brodetsky
HaGush HaGadol
BSicon uexHST.svg
BSicon uexHST.svg
Namir
BSicon uexSTR.svg
BSicon uexHST.svg
Levi Eshkol
BSicon uexKRWl.svg
BSicon uexKRWg+r.svg
BSicon uexHST.svg
Einstein
BSicon uexHST.svg
Dov
BSicon uexHST.svg
Reading
BSicon PORTALf.svg
BSicon uexHST.svg
Nordau
BSicon uextHST.svg
Arlosoroff West
BSicon uextHST.svg
Rabin
BSicon uextHST.svg
Kaplan
BSicon uextHST.svg
Carlebach (Red Line)
BSicon PORTALg.svg
BSicon uexHST.svg
Levinski
BSicon uexHST.svg
Hizkiyahu
BSicon uexHST.svg
Kibbuts Galuyot
BSicon uexHST.svg
Abu Kabir
BSicon uexHST.svg
Gittit
BSicon uexHST.svg
Holon Junction IsraelTrainLogoSymbolOnly.svg
BSicon uexHST.svg
Yad LaBanim
BSicon uexKRW+l.svg
BSicon uexKRWgr.svg
HaHistadrut
BSicon uexHST.svg
BSicon uexHST.svg
HaNesi'im
Golda
BSicon uexHST.svg
BSicon uexHST.svg
Krauze
Lavun
BSicon uexHST.svg
BSicon uexHST.svg
Serlin
Begin
BSicon uexHST.svg
BSicon uexHST.svg
Ge'ullim
Hayyim Sharon
BSicon uexHST.svg
BSicon uexHST.svg
HeHarash
Laskov
BSicon uexHST.svg
BSicon uexHST.svg
HaMelakha
Khet-500
BSicon uexHST.svg
BSicon uexHST.svg
Mifrats Shlomo
Sakharov
BSicon uexHST.svg
BSicon uexHST.svg
HaMerkava
Avnei Choshen
BSicon uexHST.svg
BSicon uexHST.svg
Holon Depot
Lishansky
BSicon uexHST.svg
BSicon uexHST.svg
HaYovel
IsraelTrainLogoSymbolOnly.svg Dayan Terminal
BSicon uexKBHFe.svg
BSicon uexKBHFe.svg
Agricultural Center

The Green Line is the second section of a light rail system in the Tel Aviv metropolitan area, known as the Tel Aviv Light Rail, which is under construction. The line will run from Rishon LeZion northwards through Holon through central Tel Aviv and will split into two branches: One to Herzliya in the north, and one to Ramat HaHayal neighborhood in Tel Aviv in the northeast. The expected annual passenger forecast is 65 million.

NTA Metropolitan Mass Transit System Limited [1] is including the design and boring of the Green Line's tunnels as part of Red Line's tunnels overall contract so that work on the Green Line's underground portion can commence immediately following the completion of the Red Line tunnels.


References

  1. "About NTA". www.nta.co.il. Retrieved 1 May 2023.