This article needs additional citations for verification .(December 2024) |
JS Muroto on 5 May 2016 | |
History | |
---|---|
Japan | |
Name |
|
Namesake | Muroto |
Ordered | 2009 |
Builder | Mitsubishi, Tokyo |
Laid down | 7 September 2011 |
Launched | 5 July 2012 |
Commissioned | 15 March 2013 |
Identification |
|
Status | Active |
Class overview | |
Preceded by | Muroto class (1979) |
General characteristics | |
Type | Cable layer |
Displacement |
|
Length | 131 m (429 ft 9 in) |
Beam | 19 m (62 ft 4 in) |
Draft | 5.7 m (18 ft 8 in) |
Depth | 11 m (36 ft 1 in) |
Propulsion |
|
Speed | 16 knots (30 km/h; 18 mph) |
Complement | 110 |
Sensors and processing systems |
|
JS Muroto (ARC-483) is a cable laying ship of the Japanese Maritime Self-Defense Force.
The second generation Muroto was built with a budget in 2009 as a successor ship due to the deterioration of the predecessor Muroto (ARC-482). As with its predecessor, it seems that its main task is to install underwater hearing monitoring equipment at bases, ports, strategic sea areas, but details are not disclosed. It is equipped with cable laying equipment and various underwater equipment related to marine surveys, and the hull is equipped with bow thrusters and azimuth thrusters for smooth operation. In addition, the hull has a commercial ship structure as much as possible in order to keep the ship price down, and it is within the range that can demonstrate the minimum capacity as a laying ship.
The construction cost is about 28.4 billion yen. The predecessor Muroto was retired on 4 April 2012 without waiting for the commissioning of this ship.
The vessel was laid down on 7 September 2011 and launched on 5 July 2012 at Mitsubishi Heavy Industries Shipyard in Tokyo. Muroto was commissioned on 15 March 2013. From 7 September to 30 October of the same year, she participated in the 33rd Guam Island Dispatch Training and conducted laying training in the Guyam Island area.
From 19 August to 8 November 2014, Muroto participated in the 34th Guam Island Dispatch Training and conducted laying training in the Guam Island area. From 31 July to 24 September 2015, the ship participated in the 35th Guam Island Dispatch Training, and with the cooperation of the United States Navy, conducted laying training in the Guam Island area. [1] On 1 December 2015, the Oceanographic Command was reorganized into the Oceanographic Command/Anti-submarine Support Group.
From 1 July to 18 August 2016, Muroto participated in the 36th Guam Island Dispatch Training and conducted laying training in the Guam Island area with the cooperation of the United States Navy. [2] From 10 June to 3 August 2017, she participated in the 37th Guam Island Dispatch Training and conducted laying training in the Guam Island area with the cooperation of the United States Navy. [3]
From 20 October to 17 December 2018, Muroto participated in the 2018 Guam Island Dispatch Training (38th) and conducted laying training in the Guam Island area with the cooperation of the United States Navy. [4] From 17 October to 5 December 2019, she participated in the Guam Island dispatch training (39th) in the first year of Reiwa, and with the cooperation of the United States Navy, conducted laying training in the Guam Island area. [5] From 2 October to 15 November 2020, the vessel participated in the second year of Reiwa dispatch training for Guam Island (40th), and with the cooperation of the United States Navy, carry out laying training, in the direction of Guam Island. [6]
JS Chōkai (DDG-176) is a Kongō-class guided missile destroyer in the Japan Maritime Self-Defense Force (JMSDF). Chōkai was named after Mount Chōkai. She was laid down by IHI Corporation in Tokyo on 29 May 1995 and was launched on 27 August 1996. Commissioning happened on March 20, 1998.
JS Shimokita (LST-4002) is the second ship of the Ōsumi-class tank landing ships of the Japan Maritime Self-Defense Force (JMSDF).
JS Ōsumi (LST-4001) is the lead ship of the Ōsumi-class tank landing ships of the Japan Maritime Self-Defense Force (JMSDF).
JS Kunisaki (LST-4003) is the third ship of the Ōsumi-class tank landing ships of the Japan Maritime Self-Defense Force (JMSDF).
JS Hyūga (DDH-181) is the lead ship of the Hyūga-class helicopter destroyers of the Japan Maritime Self-Defense Force (JMSDF).
JS Ise (DDH-182) is a Hyūga-class helicopter destroyer of the Japan Maritime Self-Defense Force (JMSDF). It is the second ship to be named Ise, the first being the Imperial Japanese Navy World War II-era battleship Ise.
JS Teruzuki (DD-116) is the second ship of Akizuki-class destroyers. She was commissioned on 7 March 2013.
JS Suzutsuki (DD-117) is the third ship of Akizuki-class destroyers, operated by the Japan Maritime Self-Defense Force. She was commissioned on 12 March 2014.
JS Fuyuzuki (DD-118) is the fourth ship of Akizuki-class destroyers. She was commissioned on 13 March 2014.
JS Unryū (SS-502) is the second boat of the Sōryū-class submarines. She was commissioned on 25 March 2010.
JS Akebono (DD-108) is the eighth ship of Murasame-class destroyers. She was commissioned on 19 March 2002.
JS Sawagiri (DD-157) is an Asagiri-class destroyer of the Japan Maritime Self-Defense Force.
JS Setogiri (DD-156) is an Asagiri-class destroyer of the Japan Maritime Self-Defense Force.
JS Hamagiri (DD-155) is an Asagiri-class destroyer of the Japan Maritime Self-Defense Force.
JS Chiyoda (ASR-404) is a submarine rescue ship of Japan Maritime Self-Defense Force.
JS Takashio (SS-597) is the eighth boat of the Oyashio-class submarines. She was commissioned on 9 March 2005.
JS Mochisio (SS-600) is the eleventh boat of the Oyashio-class submarines. She was commissioned on 6 March 2008.
JS Uraga (MST-463), a ship of the Japan Maritime Self-Defense Force, is the lead ship of the Uraga-class mine countermeasure vessels.
JS Bungo (MST-464) is the second ship of Uraga-class mine countermeasure vessel.
JS Hirado (MSO-305) is the second ship of the Awaji-class minesweepers of the Japan Maritime Self-Defense Force (JMSDF).