Line C (Rome Metro)

Last updated
Line C
Metropolitana di Roma C.svg
Rails End of Line C Metro of Rome.jpg
Elevated section of Line C close to its eastern terminus
Overview
OwnerATAC
Locale Rome, Italy
Termini
Stations22 [2]
Service
Type Rapid transit
System Rome Metro
Operator(s) ATAC
Rolling stock AnsaldoBreda Driverless Metro
Daily ridership40,999 (2023) [3]
History
Opened9 November 2014;10 years ago (2014-11-09)
Technical
Line length19.5 km (12.1 mi)
Characterunderground, at-grade and elevated
Track gauge 1,435 mm (4 ft 8+12 in)
Electrification Overhead lines
Route map
Roma - mappa metropolitana linea C (geografica).svg

Line C is a Rome Metro line which runs from Monte Compatri-Pantano in the eastern suburbs of Rome, in Italy, to San Giovanni near the city centre, where it meets Line A. [4] It is the third metro line to be built in the city and the first to be fully automated. [5]

Contents

The first section, between Monte Compatri-Pantano and Parco di Centocelle, opened on 9 November 2014. The second, from Parco di Centocelle to Lodi, opened on 29 June 2015. [6] The third, from Lodi to San Giovanni, opened on 12 May 2018. [4] The line reuses parts of the old Rome-Pantano railway, a light railway that is the last remaining part of the Rome-Fiuggi railway.

Construction

BSicon KBHFa grey.svg
Venezia
3
BSicon BHF grey.svg
Fori Imperiali-Colosseo B
BSicon BHF grey.svg
Porta Metronia
3
BSicon KBHFa green.svg
BSicon KSTRe grey.svg
San Giovanni A
BSicon BHF green.svg
Lodi
RM-Giard.
BSicon BHF green.svg
Pigneto
BSicon BHF green.svg
Malatesta
BSicon BHF green.svg
Teano
5   19
BSicon BHF green.svg
Gardenie
5   19
BSicon BHF green.svg
Mirti
RM-Giard.
BSicon BHF green.svg
Parco di Centocelle
BSicon BHF green.svg
Alessandrino
BSicon BHF green.svg
Torre Spaccata
BSicon BHF green.svg
Torre Maura
BSicon BHF green.svg
Giardinetti
BSicon BHF green.svg
Torrenova
BSicon BHF green.svg
Torre Angela
BSicon BHF green.svg
Torre Gaia
BSicon BHF green.svg
Grotte Celoni
BSicon BHF green.svg
Due Leoni-Fontana Candida
BSicon BHF green.svg
Borghesiana
BSicon BHF green.svg
Bolognetta
BSicon BHF green.svg
Finocchio
BSicon BHF green.svg
Graniti
BSicon KBHFe green.svg
Monte Compatri-Pantano

Archeological investigations began in August 2006, before the first construction sites opened in March 2007 on Piazza Roberto Malatesta, to construct Malatesta station. The Lodi station followed one month later. [7]

In May 2008, crews constructed two tunnel boring machines at Giardinetti, and two months later the old Rome-Pantano railway was truncated at Giardinetti to allow restructuring part of the old surface line, which forms a part of the new metro. [8] This section, from Montecompatri-Pantano to Parco di Centocelle, opened in 2014. [9] The section between Parco di Centocelle to Lodi opened on 29 June 2015, one further station (San Giovanni) opened in May 2018. [4] The section of Line C further west is partly under construction (to Piazza Venezia with two further station in between). Project planning for further extensions crossing the city centre (from Venezia to Clodio-Mazzini) was suspended in 2010. [10] A shortened extension to Ottaviano (thus providing a second interchange with Line A) is again under discussion.

In 2009, during preliminary excavations for the station at Piazza Venezia (near the Capitoline Hill) workers found remains of what has been identified as emperor Hadrian's Athenaeum.

Route

Line C operates on 19.5 kilometers (12.1 mi) of route (of which 8.7 kilometers (5.4 mi) is at grade), [6] and serves 22 stations. Of the entire route, about 11 kilometers (6.8 mi) are underground, while the rest is located in the open air. [11]

Initially, the planned termini were Pantano (a frazione of the comune of Monte Compatri) in the east and Clodio-Mazzini in the north, but in March 2007, a northward extension along the Via Cassia was announced, with nine more stations to Grottarossa. A depot has been built at Graniti. Once construction is complete, the line will cross Line A not only at San Giovanni but also at Ottaviano, and Line B at Colosseo. At Pigneto, a new railway station is currently being constructed on the FL1 line. At the Colosseo stop a public museum was to be constructed in the station to display archaeological material that was excavated during construction, but the project has been scrapped due to the lack of funds. [12] Instead, a portion of the ruins of the barracks used by the Praetorian Guard will be viewable through a large glass window. [13]

The initial plan featured a station at Largo di Torre Argentina in the city center. However, archaeological remains on the site were even more extensive than expected and the station was cancelled. [14] [ better source needed ]

Extensions

The following extensions have been studied:

Rolling stock

Line C is served by 30 AnsaldoBreda Driverless Metro convoys.

The metro depot of Line C, the Deposito di Graniti, which extends over 21.7 hectare, is located between the station Graniti and the Eastern terminus Monte Compatri-Pantano. It additionally serves as the maintenance and control center of Line C. [15]

Statistics

Year2014 [16] 2015 [17] 2016 [18] 2017 [19] 2018 [18] 2019 [18] 2020 [18] 2021 [18] 2022 [20] 2023 [3]
Passengers (millions)0.507.6413.3012.2616.2018.7210.2611.7013.5514.96

References

  1. "12 maggio, ore 12.00: apre la stazione Metro C "S. Giovanni"" (in Italian). romamobilita.it. Retrieved 2018-05-11.
  2. "Apre la stazione San Giovanni: da lunedì modifiche alle linee bus" (in Italian). romatoday.it. Retrieved 2018-05-11.
  3. 1 2 "Il trasporto pubblico locale a Roma. Anno 2024" (PDF) (in Italian). Retrieved 10 August 2025.
  4. 1 2 3 Biondino, Alessio (13 May 2018). "Raggi inaugura la stazione Metro C San Giovanni: "Giornata storica"" (in Italian). Romait. Retrieved 24 May 2018.
  5. "The Driverless System". Metro C Spa. Retrieved 1 December 2017.
  6. 1 2 Chiandoni, Marco (30 June 2015). "Rome metro Line C reaches Lodi". International Railway Journal . Retrieved 2015-06-30.
  7. "Notiziario" [News Bulletin](PDF) (in Italian). Roma Metropolitane. 1 October 2007. Archived from the original (PDF) on 2007-10-13. Retrieved 2008-07-26.
  8. "Diario del Cantiere" [Construction Site Diary] (in Italian). Roma Metropolitane. Archived from the original on 2008-08-04. Retrieved 1 December 2017.
  9. "Linea C: I Dettagli Dell'Accordo. Date, Penali e Prolungamento" [Line C: Details of the Agreement, Dates, Penalties and Extension] (in Italian). Metroxroma. September 10, 2013.
  10. "Future Developments" (PDF) (in Italian). Metro C Spa. 22 April 2015. Retrieved 1 December 2017.
  11. "I numeri della metro" [The Numbers of the Metro] (in Italian). Metropolitana di Roma. Retrieved 1 December 2017.
  12. "Metro C, niente museo alla stazione Colosseo" [Metro C: No museum at the Colosseum Station]. la Repubblica (in Italian). Retrieved 5 March 2017.
  13. Lorenzi, Rosella (Jun–Aug 2017). "While you are waiting" . Archaeology. 70 (4): 12. ISSN   0003-8113 . Retrieved 2 July 2017.
  14. "La Linea C" (in Italian). Metro C scpa. Archived from the original on 8 March 2016.
  15. "Il Deposito di Graniti" [The Granite Deposits](PDF). Metrocspa.it (in Italian). Archived from the original (PDF) on 2014-11-02. Retrieved 22 April 2015.
  16. "IL TRASPORTO PUBBLICO LOCALE A ROMA. Anno 2015" . Retrieved 10 August 2025.
  17. "IL TRASPORTO PUBBLICO LOCALE A ROMA. Anno 2016" (PDF). Retrieved 10 August 2025.
  18. 1 2 3 4 5 "Cap.9 Mobilità e trasporti" (PDF). Retrieved 10 August 2025.
  19. "Il trasporto pubblico locale a Roma. Anno 2018" (PDF) (in Italian). Retrieved 10 August 2025.
  20. "Il trasporto pubblico locale a Roma. Anno 2023" (PDF) (in Italian). Retrieved 10 August 2025.