Locomotives of the Lancashire and Yorkshire Railway

Last updated

This is a list of the locomotives of the Lancashire and Yorkshire Railway. The Lancashire and Yorkshire Railway locomotive works were originally at Miles Platting, Manchester. From 1889 they were at Horwich.

Contents

Constituent companies

The L&YR came into being in 1847 when the Manchester and Leeds Railway changed its name. Locomotives added to its stock before that date came from the:

As the L&YR, locomotives were taken into stock from the:

The Miles Platting era

William Jenkins (Indoor) 1845–1867 & William Hurst (Outdoor) 1846–1854

Although Jenkins was the Locomotive Superintendent the early years of this period saw Hawkshaw specifying the locomotives. As Hawkshaw was not a locomotive engineer the resultant locomotives were not of the best and were hopelessly outdated long before they were withdrawn. Hurst left to join the North British Railway in 1854 and Jenkins continued on his own.

No. of
1st built
TypeQuantityManufacturerDateDriving
wheel
diameter
Notes
54 0-4-0 37 Wm. Fairbairn (22)
Edward Bury (15)
1847–494 ft 9 inBetween 10 and 13 rebuilt as 0-4-2
53 2-2-2 43L&YR Miles Platting (26)
Wm. Fairbairn (17)
1847–495 ft 9 inAlmost all (69) rebuilt 1867-72 as 2-4-0
62 2-2-2 10L&YR Miles Platting (6)
Wm. Fairbairn (4)
1847–495 ft 6 in
112 2-2-2 29 Bury, Curtis & Kennedy 18495 ft 10 in
202 0-6-0 2 E. B. Wilson & Co. 18494 ft 9 in
163 0-4-2 35L&YR Miles Platting (26)
Wm. Fairbairn (9)
1849–704 ft 9 inTwo rebuilt in 1869 as 0-6-0
217 0-6-0 12L&YR Miles Platting1854–555 ft 0 in
141 0-6-0 149L&YR Miles Platting1855–704 ft 10 inBetween 1878 and 1887 34 were rebuilt as 0-6-0ST, 18 as 0-6-2T and 3 as 0-4-4T
119 0-6-0ST 11L&YR Miles Platting1855–674 ft 0 in
130 0-6-0ST 26L&YR Miles Platting1856–715 ft 0 in
286 2-4-0 22L&YR Miles Platting1861–675 ft 9 in

William Yates (Indoor) 1868–1875 & William Hurst (Outdoor) 1868–1875

Following the death of Jenkins responsibility passed to Yates as Indoor Superintendent and Hurst returned as the Outdoor Superintendent. Hurst retired in 1875 and Yates resigned. A disastrous fire at the Miles Platting works in 1873 led to the building of the new Horwich Works.

The official system of numbered classes was not introduced until 1919, therefore classes are listed here according to the number of the first locomotive built.

No. of
1st built
TypeQuantityManufacturerDateNotes
4 2-4-0 23L&YR Miles Platting (23)1870–756 ft 0 in wheels, 16×24-in cylinders
2-4-0 4 ELR Bury works (4)1873
456 2-4-0 10 LNWR Crewe 1873LNWR Newton Class
63 2-4-0 10L&YR Miles Platting1875–766 ft 0 in wheels, 17×24-in cylinders
103 2-4-0 1L&YR Miles Platting18755 ft 6 in wheels, 16×24-in cylinders
90 0-6-0 62L&YR Miles Platting (62)1869–72
0-6-0 10 Kitson & Co. (10)1871
0-6-0 12 Yorkshire Engine Co. (12)1875
413 0-6-0 86 LNWR Crewe 1871–74 LNWR “DX” Class
23 2-4-0ST 1L&YR Miles Platting1868
32 2-4-0ST 25L&YR Miles Platting1868–74
403 0-4-0ST 5 LNWR Crewe 1872
216 0-6-0ST 45L&YR Miles Platting1868–754 ft 0 in wheels
191 0-6-0ST 6L&YR Miles Platting1873–745 ft 0 in wheels
161 0-6-0ST 23L&YR Miles Platting1872–784 ft 6 in wheels

The Horwich era

Note: The class numbers below are those introduced by Hughes in 1919. Each can cover several similar varieties, e.g. all the non-superheated 0-8-0s are Class 30

William Barton Wright (1875–1886)

During this period the Horwich Works was under construction and apart from a few built at Miles Platting, engines came from outside manufacturers.

No. of 1st builtTypeQuantityManufacturerDateLYR ClassLMS power classificationLMS nos.Notes
605 0-4-2 8 Sharp, Stewart & Co. 1876 GNR class F2 diverted to L&YR
629 4-4-0 18 Sharp, Stewart & Co. (18)1880–81
4-4-0 30 Neilson & Co. (30)1883–84
4-4-0 20 Kitson & Co. (20)1885
4-4-0 20 Vulcan Foundry (20)1886
209 4-4-0 16 Vulcan Foundry 1887 2 1P10100–10101
111 0-4-4T 12 Kitson & Co. (12)1877–78
0-4-4T 10 Dübs & Co. (10)1878
0-4-4T 10 Neilson & Co. (10)1879
0-4-4T 40 Sharp, Stewart & Co. (40)1885–86
789 0-4-0ST 4 Manning, Wardle & Co. 1882
883 0-4-0ST 2 Black, Hawthorn & Co.1885
885 0-4-0ST 1 Kitson & Co. 1885
72 0-6-0ST 8L&YR Miles Platting1877Similar to Yates "161" class but with 4 ft 0 in wheels
141 0-6-2T 8 Kitson & Co. 1880–81 22 1F11600–11601
243 0-6-2T 14 Kitson & Co. (14)1881 22 1F11602–11606
0-6-2T 40 Dübs & Co. (40)1882–83 22 1F11607–11621
528 0-6-0 57 Kitson & Co. (57)1876–80All converted to Class 23 saddle tanks (below)
0-6-0 18 Sharp, Stewart & Co. (18)1877All converted to Class 23 saddle tanks (below)
0-6-0 40L&YR Miles Platting (40)1878–81All converted to Class 23 saddle tanks (below)
0-6-0 45 Vulcan Foundry (45)1880–83All converted to Class 23 saddle tanks (below)
0-6-0 50 Beyer, Peacock & Co. (50)1881–82All converted to Class 23 saddle tanks (below)
0-6-0 20 Kitson & Co. (20)1885All converted to Class 23 saddle tanks (below)
928 0-6-0 20 Vulcan Foundry (20)1887 25 2F12015–12034
0-6-0 30 Beyer, Peacock & Co. (30)1887 25 2F12035–12064

John Audley Frederick Aspinall (1886–1899)

From 1889 Horwich Works was completed and from that time all engines were constructed there.

No. of 1st builtTypeQuantityManufacturerDateLYR ClassLMS power classificationLMS nos.Notes
978 4-4-0 30 Beyer, Peacock & Co. 1888–89 2 (Aspinall) 1P10102–10130
1093 4-4-0 40 Horwich Works 1891–94 3 2P10150–101836 rebuilt with Superheater to become Class 4. One engine spent some time as a 4-cylinder compound. First 20 reused tenders from converted "568" class engines.
1400 4-4-2 40 Horwich Works 1899–1902 7 2P10300–10339"High-Flyers." First 20 reused tenders from converted "568" class engines.
1008 2-4-2T 270 Horwich Works 1889–1901 5 2P10621–1086926 rebuilt with Superheater to become Class 6
916 0-4-0ST 3 Vulcan Foundry 1886 21 11200
1153 0-4-0ST 57 Horwich Works 1891–1910 21 11201–11257
Dot 0-4-0WT 8 Beyer, Peacock & Co. (3)
Horwich Works (5)
1887-190118-inch gauge, for use at Horwich Works.
0-6-0ST 230 Horwich Works 1891–1900 23 2F11303–11532Rebuilds of "528" class tender engines
11 0-6-0 448 Horwich Works 1889–1918 27 3F12083–12467Many reused tenders from rebuilt "528" class engines.
63 rebuilt with Superheater to become Class 28
1351 0-6-0T 20 Horwich Works 1897 24 2F11533–11546
91 0-8-0 110 Horwich Works 1900–08 30 5F12700–12759Small boiler, 50 later rebuilt (see below)

Henry Albert Hoy (1899–1904)

No. of 1st builtTypeQuantityManufacturerDateLYR ClassLMS power classificationLMS nos.Notes
202 2-6-2T 20 Horwich Works 1903–04 26 3F11700–11716
392 0-8-0 211903 30 First was experimental rebuild of "91" class, rest new, all with corrugated cylindrical steel firebox.
All rebuilt by Hughes (below).

George Hughes (1904–1922)

No. of 1st builtTypeQuantityManufacturerDateLYR ClassLMS power classificationLMS nos.Notes
4-4-0 61908–09 4 3P10190–10195Superheated. Rebuilds of Class 3
1506 4-6-0 20 Horwich Works 1908–09 8 3P10400–10404 [1] 4-Cylinder, 15 rebuilt with superheaters (see below)
1522 4-6-0 70 Horwich Works 1920–24 8 5P10405–10474 [2] Superheated, 15 were rebuilds.
1 0-2-2T 2 Kerr, Stuart & Co. 1905 [3] Railmotor locos. Withdrawn 1909 and replaced by following class.
3 0-4-0T 18 Horwich & Newton Heath Works 1906–11 1 10600–10617 [4] Railmotor locos
816 2-4-2T 40 Horwich Works 1905–10 5 2P10870–10899 [5] Belpaire firebox, 18 later superheated to become Class 6
18 2-4-2T 64 Horwich Works 1911 6 3P10900–10954 [6] Belpaire & Superheated, 44 were rebuilds of Class 5
1501 0-8-2T 5 Horwich Works 1908 32 6F11800–11804 [7]
898 0-6-0 22 Horwich Works 1906–09 28 3F12515–12536 [8] Superheated
657 0-6-0 20 Horwich Works 1912 28 3F12537–12556 [9] Belpaire & Superheated
0-6-0 631913–22 28 4F12557–12619Belpaire & Superheated, rebuilds of Class 27
1452 0-8-0 11 Horwich Works 1906–07 30 (Hughes compound) 5F12760–12770 [10] 4-cylinder compound; first was rebuilt, rest new
9 0-8-0 73 Horwich Works 1910–18 30 (Hughes) 6F12771–12839 [11] Large saturated boiler, with Belpaire firebox. 33 were rebuilds, 40 new. 4 later rebuilt with superheaters as Class 31.
1546 0-8-0 15 Horwich Works 1912–21 31 7F12840–12994 [12] Superheated Belpaire boiler. 115 were new builds, others were rebuilds of Class 30 0-8-0s.
2-10-0 not built1914 2-10-0 A design for a heavy mineral loco, not constructed owing to the outbreak of war.
(1684) 4-6-4T 10 Horwich Works 1924 (none) 5P11110–11119 [13] Superheated. L&YR design introduced after grouping. Twenty more were ordered but were constructed as Class 8 4-6-0. [14]
1629 2-8-0 27 Kitson & Co. (1)
R. Stephenson & Co. (5)
Nasmyth, Wilson & Co. (2)
North British Loco. Co. (19)
1919 [15] Robinson ROD 2-8-0 type. Hired from the government in November 1919, but transferred to GWR and LNWR March–June 1920. No L&YR numbers allocated
11-AA-11 Horwich Works 1912 [16] Electric locomotive
2B1 Horwich Works 1917 [15] Battery-Electric

Notes on L&Y classes

The "number only" classes are those introduced by George Hughes in 1919 and shown in the L&YR working timetable appendix of 1921. [17] There is also a series of unofficial "letter and number" classes which was devised by the author R. W. Rush, and which has been copied by some other authors. [18]

Preservation

Seven locomotives survive, these being:

ImageClassTypeL&Y No.LMS No.BR No.ManufacturerSerial NumberDateNotes
LYR Aspinall 0-6-0ST No. 752 Rainhill 1980.jpg 23 0-6-0ST 75211456 Beyer, Peacock & Co. 19891881Rebuilt as saddle tank in 1896; sold to coal industry 1937; owned by Lancashire and Yorkshire Railway Trust, restored to steam in public service at the East Lancashire Railway at Bury in early 2020.
Lancashire and Yorkshire Railway 0-4-0ST locomotive WREN.jpg Dot 0-4-0ST WrenWrenWren Beyer, Peacock & Co. 2825188718-inch gauge Horwich Works shunter; static display, National Railway Museum, York
Lancashire & Yorkshire Railway No. 957.jpg 25 0-6-0 9571204452044 Beyer, Peacock & Co. 28401887Owned by 957 Bowers Trust, awaiting overhaul, last used on Keighley and Worth Valley Railway in January 2013 but in 2021 restored to steam initially in green as the 'Green Dragon' as used in 1970 Railway Children film, now running as 52044 in BR goods black livery.
Hugh llewelyn 1008 (6684209005).jpg 5 2-4-2T 10081062150621 Horwich Works 11889Static display, National Railway Museum, York
27 class 1300 at Buckley Wells.jpg 27 0-6-0 13001232252322 Horwich Works 4201895In regular use on preserved railways since 2009
L&YR Class 21 'Pug' No. 68 on display at Oxenhope.jpg 21 0-4-0ST 681121851218 Horwich Works 8111901First preserved loco to arrive at Keighley and Worth Valley Railway in 1965, owned by Lancashire and Yorkshire Railway Trust, awaiting restoration at Keighley and Worth Valley Railway.
Riverside Railway Museum - LYR 19.JPG 21 0-4-0ST 1911243 Horwich Works 10971910Sold by LMS to private industry, now owned by Lancashire and Yorkshire Railway Trust, on display at Ribble Steam Railway for many years, in early 2020 relocated to the East Lancashire Railway at Bury and restoration to steam completed there in 2022.

Related Research Articles

<span class="mw-page-title-main">Lancashire and Yorkshire Railway</span> Pre-1923 grouping British Railway company

The Lancashire and Yorkshire Railway (L&YR) was a major British railway company before the 1923 Grouping. It was incorporated in 1847 from an amalgamation of several existing railways. It was the third-largest railway system based in northern England.

George Hughes was an English locomotive engineer, and chief mechanical engineer (CME) of the Lancashire and Yorkshire Railway (L&YR) and the London, Midland and Scottish Railway (LMS).

<span class="mw-page-title-main">John Ramsbottom (engineer)</span> English engineer

John Ramsbottom was an English mechanical engineer. Born in Todmorden, then on the county border of Yorkshire and Lancashire. He was the Chief Mechanical Engineer for the London and North Western Railway for 14 years. He created many inventions for railways but his main legacy is the split metal piston ring, virtually all reciprocating engines continue to use these today.

<span class="mw-page-title-main">Richard Maunsell</span> Irish locomotive engineer, also working in Britain

Richard Edward Lloyd Maunsell held the post of chief mechanical engineer (CME) of the South Eastern and Chatham Railway from 1913 until the 1923 Grouping and then the post of CME of the Southern Railway in England until 1937. He had previously worked his way up through positions in other railways in Ireland, England and India.

The East Lancashire Railway operated from 1844 to 1859 in the historic county of Lancashire, England. It began as a railway from Clifton via Bury to Rawtenstall, and during its short life grew into a complex network of lines connecting towns and cities including Liverpool, Manchester, Salford, Preston, Burnley and Blackburn.

The North Union Railway was an early British railway company, operating two main routes, from Parkside to Preston and from Bolton Trinity Street to Preston, all in Lancashire. The northerly part of the routes sharing the line from Euxton to Preston.

Locomotives of the London and North Western Railway. The London and North Western Railway (LNWR) Locomotive Department was headquartered at Crewe from 1862. The Crewe Works had been built in 1840–43 by the Grand Junction Railway (GJR).

William Barton Wright was an English mechanical engineer, also tea plantation owner and mine owner. He was Locomotive Superintendent of the Lancashire and Yorkshire Railway (LYR) from 1875. During his ten-year career in that post he helped to make the LYR one of the most efficient railways in the United Kingdom, by designing a range of good locomotives to haul the LYR's traffic.

<span class="mw-page-title-main">Horwich Works</span>

Horwich Works was a railway works built in 1886 by the Lancashire and Yorkshire Railway (LYR) in Horwich, near Bolton, in North West England when the company moved from its original works at Miles Platting, Manchester.

<span class="mw-page-title-main">L&YR Class 5</span> Lancashire & Yorkshire Railway 2-4-2T passenger tank locomotive introduced in 1889

The Lancashire and Yorkshire Railway Class 5 were 2-4-2T steam locomotives designed by Chief Mechanical Engineer (CME) John Aspinall and introduced from 1889 for local passenger work. Later batches included progressive modifications such as extended coal bunkers and Belpaire fireboxes. The final batch built from 1911 to 1914 under George Hughes incorporating superheated boilers gave increased tractive effort, others were also rebuilt to this standard. When Hughes introduced his classification system in 1919, the more powerful superheated locomotives were designated Class 6. The final examples were withdrawn in 1961.

<span class="mw-page-title-main">L&YR Class 21</span>

The L&YR Class 21 is a class of small 0-4-0ST steam locomotive built by the Lancashire and Yorkshire Railway for shunting duties. They were nicknamed Pugs.

<span class="mw-page-title-main">L&YR Class 27</span>

The Lancashire and Yorkshire Railway Class 27 is a class of 0-6-0 steam locomotive designed for freight work on the Lancashire and Yorkshire Railway (L&YR).

<span class="mw-page-title-main">L&YR Class 23</span>

The Lancashire and Yorkshire Railway (L&YR) Class 23 is a class of 0-6-0ST steam locomotive. Their main use was for shunting and for short-trip freight working.

Longton Bridge was a railway station on the West Lancashire Railway in England. It served the village of Longton.

<span class="mw-page-title-main">L&YR Class 8</span>

The Lancashire and Yorkshire Railway (L&YR) Class 8 was a four-cylinder 4-6-0 express passenger locomotive designed by George Hughes introduced in 1908.

<span class="mw-page-title-main">L&YR Hughes 4-6-4T</span>

The Lancashire and Yorkshire RailwayHughes 4-6-4T was a class of steam locomotives. They were a 4-6-4T tank engine version of the L&YR Class 8, hence they were known as "Dreadnought tanks".

The Lancashire and Yorkshire Railway (L&YR) operated two classes of twenty steam railmotors in total.

<span class="mw-page-title-main">L&YR Class 24</span>

The L&YR Class 24 was a class of short-wheelbase 0-6-0T steam locomotives of the Lancashire and Yorkshire Railway (L&YR). It was designed by Aspinall and introduced in 1897 for shunting duties. Twenty locomotives were built, but six were withdrawn between 1917 and 1922.

The Bolton and Preston Railway (B&PR) connected Bolton and Preston, in Lancashire, England. Its authorising Act of Parliament forbade its early completion to protect the North Union Railway (NUR) and imposed other restrictions that limited the success of the B&PR. A change of route was authorised to bypass the delay making it dependent on the goodwill of the NUR to reach Preston. The NUR saw the B&PR as a competitor and used underhand tactics to harm the success of the B&PR.

<span class="mw-page-title-main">LNWR Newton Class</span>

The LNWR Newton Class was a class of ninety-six 2-4-0 steam locomotives built by the London and North Western Railway at their Crewe Works between 1866 and 1873.

References

  1. Baxter 1982, p. 92.
  2. Baxter 1982, pp. 92–94.
  3. Baxter 1982, p. 87.
  4. Baxter 1982, pp. 87–88.
  5. Baxter 1982, p. 86.
  6. Baxter 1982, pp. 86–87.
  7. Baxter 1982, p. 99.
  8. Baxter 1982, pp. 90–91.
  9. Baxter 1982, pp. 91–92.
  10. Baxter 1982, pp. 94–95.
  11. Baxter 1982, pp. 82–84, 94–96.
  12. Baxter 1982, pp. 82–84, 94–99.
  13. Baxter 1982, p. 94.
  14. Marshall 1972, p. 196.
  15. 1 2 Baxter 1982, p. 100.
  16. Baxter 1982, pp. 99–100.
  17. Marshall 1972, p. 273.
  18. "Railway Archive Issues 11 to 20". Steamindex.com. Retrieved 14 April 2012.