Liverpool, Crosby and Southport Railway

Last updated

Liverpool, Crosby
and Southport Railway
The street railway review (1891) (14574746669).jpg
Electric trains on the Southport to Liverpool line
Overview
StatusOperational
Locale Lancashire
Merseyside
Termini
Stations7 in 1848
12 in 1855
History
Opened24 July 1848 (1848-07-24)
Extended from Waterloo to
Sandhills junction
1 October 1850 (1850-10-01)
Extended to Southport
Chapel Street
22 August 1851
Acquired by L&YR 14 June 1855
Technical
Line length18 miles 40 chains (29.8 km)
Track gauge 1,435 mm
(4 ft 8+12 in)
standard gauge
Route map

The Liverpool, Crosby and Southport Railway was a British railway company, which opened a line in 1848 between Southport and Waterloo, extending into Liverpool in 1850. The company was acquired by the Lancashire and Yorkshire Railway in 1855. The line is still open.

Contents

Formation and opening

Liverpool was thriving in the 1840's and growing fast, the number of ships using the port almost doubled from 1830 to 1840, and the tonnage they carried more than doubled. it was not surprising that the stretch of sandy coast north along the Mersey attracted wealthier residents and holiday-makers. The principal places in the area were Bootle, Crosby and Southport. [1]

A project for a railway between Liverpool, Crosby and Southport was proposed in 1846, surveys were undertaken and parliamentary notices given. The Liverpool, Crosby and Southport Railway (LC&SR) received parliamentary approval on 2 July 1847 and the company was incorporated, the first directors' meeting on 26 July 1847 elected William Blundell as chairman. [act 1] [3]

The Act enabled the building of an 18 mi 40 ch (29.8 km) line from a junction with the Liverpool and Bury Railway to Southport. [a]

The company engineer reported there should be no difficulty in building the 12 mi 60 ch (20.5 km) single-track line, although the ground work was constructed to take a double-track, from Waterloo (about 5 miles (8.0 km) north of Liverpool) to Southport by June 1848. Construction was undertaken by McCormick & Holme starting in March 1848 and the line finished within three months. [6] The single-track line was hastily built, with light track on sand foundation. [7]

It was inspected and passed on 17 July 1848, formally opened on 21 July with public traffic starting on 24 July 1848. [6]

Early services

When the railway opened in 1848 there were three services each way on Tuesdays to Fridays, four each way on Mondays and Saturdays and two each way on Sundays, this improved slightly in 1849 when four trains went each way Monday to Saturday with two on Sundays. [8]

In February 1855 there were five services each way along the whole line with an additional seven each way between Liverpool and Waterloo (three and three on Sundays). [9]

Stations

The original, temporary, Southport terminus was at Southport Eastbank Street until 22 August 1851 when the line was extended half a mile (800 metres) into Southport Chapel Street station, a road-bridge was constructed to carry Eastbank Street over the railway. [b] [10] [11]

The initial southern terminus was at Waterloo, then a part of Lancashire, omnibuses operated by Mr Busby under contract, were used to complete the journey into Liverpool. [6] [12]

The intermediate stations that opened with the line were Crosby (later Blundellsands & Crosby), Hightown and Formby and Altcar (later Formby), Ainsdale and Gilbert's Crossing (later Birkdale Park, and then Birkdale). [13] Freshfield station opened in 1854. [14]

On 1 October 1850 the line was extended using double-track from Waterloo to Liverpool where it joined the East Lancashire Railway (ELR) and Lancashire and Yorkshire Railway (L&YR) joint line at Sandhills junction, the railway then used their lines into their terminus at Tithebarn Street/Liverpool Exchange station, upon payment of a toll to do so. [c] [12] [15]

The extension opened with only one intermediate station at Seaforth (later Seaforth & Litherland), but shortly after the line opened further stations were provided at Miller's Bridge, Bootle Village and Marsh Lane (later Marsh Lane & Strand Road then Bootle New Strand). [12] The L&YR opened Liverpool North Docks station (later North Docks then Sandhills) on their section of the line in 1854. [16]

The traffic levels between Liverpool and Crosby were quite high and the section of line from Sandhills junction to Crosby was double-tracked, at the same time a new station was constructed at Crosby that could function partly as a terminus for the suburban traffic, the station opened on 1 June 1852, the remainder of the line was doubled by September 1852. [17] [18]

Leasing and amalgamation

In August 1850 the LC&SR had been authorised to lease, sell or transfer its railway to the L&YR, in October 1850 an agreement was reached with the L&YR for them to take on a lease starting on 10 October 1850, the L&YR took over the working of the line from this date and the LC&SR locomotives and stock were passed over to the L&YR. [act 2] [20] [21]

The lease was renewed at least once before being re-negotiated in January 1854 which involved some of the locomotives being returned to the LC&SR with some remuneration to cover the depreciation. The LC&SR then ran the railway itself from March 1854 until on 14 June 1855 the L&YR purchased and took over the LC&SR. [22] [23] [24]

Equipment

Locomotives

The company's first three locomotives were outside cylinder 0-4-2s purchased from Charles Tayleur and Company for delivery in July 1848, they cost £2,150 each and were named Sefton, Formby and Blundell. [25]

Two more locomotives were acquired in August 1848, they were outside cylinder 2-2-2s purchased for £1,500 each from the Norfolk Railway where they had been used by their contractor Samuel Peto. These locomotives had been built in 1844 by Robert Stephenson, they were named Waterloo and Southport and numbered 4 and 5, although which was which was not clear. These locomotives were modified in 1850, the nature of the modification is unknown, at which point they were renamed Antelope and Gazelle, which became which was still unclear. [7]

A new "off-the-shelf" 2-2-2 was ordered from Sharp Brothers in 1849, this was delivered in July 1849 and became number 6 Firefly. [21]

Engine number 3 was sold in January 1850 and was replaced by a 2-2-2 locomotive built by Forrester of Liverpool to a McConachie & Claude patent design. This locomotive, named Firefly was taken into service just two days before the L&YR took the lease for the railway and therefore became responsible for the running of the line. This engine was apparently built as a four-wheeled engine and then had two centre wheels, without flanges added to make it a 2-2-2. [21]

A further 'light tank' locomotive was purchased in September 1850 from George England of Hatcham Ironworks, this was named England. [21]

Locomotive Summary October 1850 (on leasing)
DateNoNameTypeMakerDisposal
18481Blundell0-4-2Charles TayleurL&YR 222
18482Formby0-4-2Charles TayleurL&YR 223
18483Sefton0-4-2Charles TayleurSold in 1850
August 18484 (or 5)Waterloo2-2-2Robert StephensonL&YR 224
August 18485 (or 4)Southport2-2-2Robert StephensonL&YR 225
July 18496Firefly2-2-2Sharp BrothersL&YR 226
September 1850-England2-2-2TGeorge EnglandL&YR 228
October 1850-Spitfire2-2-2Forrester & Co.L&YR 227

In January 1854, the lease having been re-negotiated, the L&YR retained three of the LC&SR locomotives, Blundell, Formby and Firefly and returned the other four. The L&YR sold Blundell and Formby by the end of the year. [22]

In October 1854 the LC&SR ordered three light well-tank 2-2-2WT engines from William Fairbairn which were delivered in January 1855, when a further locomotive of this type was ordered and promptly delivered, a further 2-4-0 locomotive was also ordered but was not delivered before the L&YR took over, it was sold on elsewhere. Two other locomotives were purchased second-hand from the L&NWR in February 1855, they were ex-Grand Junction Railway locos, 0-4-2 number 3 Sirius built in 1838 and rebuilt in 1844 and 2-2-2 number 8 Wildfire, built in 1837 and rebuilt in 1844–1845. [22] [26]

Shortly before the final taking over of the LC&SR by the L&YR the locomotive fleet passed into the hands of the L&YR, the following table summarises the situation.

Locomotive Summary June 1855 (on amalgamation)
DateNoNameTypeMakerDisposal
August 18484 (or 5)Waterloo2-2-2Robert Stephenson
August 18485 (or 4)Southport2-2-2Robert Stephenson
September 1850-England2-2-2TGeorge EnglandL&YR 124
October 1850-Spitfire2-2-2Forrester & Co.L&YR 125
January 1855-2-2-2WTWilliam FairbairnL&YR 2
January 1855-2-2-2WTWilliam FairbairnL&YR 5
January 1855-2-2-2WTWilliam FairbairnL&YR 6
January 1855-2-2-2WTWilliam FairbairnL&YR 7
February 1855(LNWR 3 Sirius)0-4-2 Jones, Turner and Evans L&YR 154
February 1855(LNWR 8 Wildfire)2-2-2Grand Junction Railway, CreweL&YR 15

Rolling stock

Little is known about the lines rolling stock with the exception of a newspaper report about the opening of the railway that reported "the comparative ease with which the carriages traversed the line. There was none of that uncomfortable shaking which is experienced in most railways, especially in the carriage furthest from the engine". [18] [27]

Engine sheds

An engine shed was opened at Waterloo in August 1848, when the line was extended into Southport another shed was built to the west of the running lines just before Chapel Street station. [b] [28]

Lancashire and Yorkshire Railway

The line was busy enough to require four-tracks between Bank Hall and Seaforth which were installed in 1886–1887. [29]

Later stations

There were numerous additions, alterations, renamings and closings of stations during the L&YR ownership years including:

Electrification

In 1902 the L&YR decided to electrify the line, a contract for the entire work, except the carriage bodies that were constructed in-house, was let to Dick, Kerr & Co. and work began in 1903. By the end of the year it was possible make an experimental run with the first train, and a partial service was introduced from 22 March 1904, the service was interrupted in April due to subsidence at the power station, and a full service was provided from 13 May. [32]

The system adopted was 650V DC initially using a four rail system, with an outside rail providing the power, the return circuit using a fourth rail between the running rails, the running rails and the fourth rail were all bonded together with the return circuit being made through the wheels, that is there was no return shoe contacting the fourth rail. [33] [34]

Subsequently the fourth rail was removed and the return circuit was made through the running rails. [35]

Electric train service

The electric trains introduced followed the American design pattern, they were open saloons with centre aisles, the first batch had clerestory roofs. The trains had gangway connections so it was possible to walk through the train, but they were not of the multiple unit type so they could not be coupled together and driven from the front cab. [36]

There were 56 vehicles provided for the service constructed at the L&YR Newton Heath works using electrical equipment supplied by Dick, Kerr & Co. 28 motor coaches seated 69 third-class passengers on rattan-covered reversible seats, whilst 28 first-class trailers each seated 66 on tapestry covered seats. Each vehicle was 60 ft (18 m) long and 10 ft (3.0 m) wide, making them the widest railway vehicles in the country. The trains usually comprised a motor coach at each end with two trailer coaches between. [33] [34]

In 1905 two additional motor coaches and twelve third-class trailers seating 80 were introduced and five-car trains became the rule. Traffic growth led to the provision in 1910 of a further eight motor and twelve trailers coaches, six first and six third-class. In 1913–1914 a further six third-class motor coaches were introduced, most of these later vehicles were built to a longer length of 63 ft 7 in (19.38 m). Stock variations and levels got more complicated after this time as the L&YR electrified other lines and stock was shared. [34]

Later modifications and newer stock were fitted for multiple unit control, had end gangways so it was possible to move from one unit into another and had dome roofs. They were finished in two-tone brown with gilt lining and lettering. [37]

The electric train service provided for more capacity, prior to their introduction there were approximately 36 through trains and a similar number terminating at Crosby each weekday. Once the electric service was fully operational the through service increased to approximately 50 with an additional 56 services terminating at Hall Road, which had replaced Crosby as the local service terminus. [38]

Electric trains became the norm on passenger services on the line but there were still steam locomotives to cater for the goods and coal traffic. Some Barton-Wright 0-4-4 and Aspinall 2-4-2T locomotives that had been used for general traffic before the electrification stayed for these duties. [39] One passenger service on the line did remain steam hauled, the through carriages for the daily Southport to London Euston which went via Bootle junction (between Bootle and Bank Hall) onto the L&NWR line and were attached to other trains at either Liverpool Lime Street or Edge Hill. [40] [41]

After the L&YR

The Lancashire and Yorkshire Railway amalgamated with the London and North Western Railway on 1 January 1922 and in turn was Grouped into the London, Midland and Scottish Railway (LMS) in 1923. [42]

The London, Midland and Scottish Railway opened Hillside station on 1 May 1926. [43] The LMS introduced new stock onto the line in 1940 (they later became BR Class 502) and all the early stock was withdrawn by 1942. [44]

Nationalisation followed in 1948. [45]

The line was destined for closure under the 1963 Beeching plan but was reprieved by the Minister of Transport Ernest Marples and it survived. [46] [47]

From 1978, Class 507 units began to arrive on the network and the 502s, which by now were considered life-expired, were gradually withdrawn. Their final regular passenger service was on 1 September 1980, the last set was withdrawn in November 1980. [48]

In 1978 the station became part of the Merseyrail network's Northern Line (operated by British Rail until privatised in 1995). [49]

See also

LYR electric units

Related Research Articles

<span class="mw-page-title-main">Lancashire and Yorkshire Railway</span> Pre-1923 grouping British Railway company

The Lancashire and Yorkshire Railway (L&YR) was a major British railway company before the 1923 Grouping. It was incorporated in 1847 from an amalgamation of several existing railways. It was the third-largest railway system based in northern England.

<span class="mw-page-title-main">Liverpool Exchange railway station</span> Former railway station in Liverpool, England

Liverpool Exchange railway station was a railway station located in the city centre of Liverpool, England. Of the four terminal stations in Liverpool's city centre, Exchange station was the only station not accessed via a tunnel.

<span class="mw-page-title-main">North Mersey Branch</span> Railway line in Liverpool, England

The North Mersey Branch (NMB) is a railway line that was constructed by the Lancashire and Yorkshire Railway to connect its mainline with the northern Mersey dock system.

<span class="mw-page-title-main">Bootle New Strand railway station</span> Railway station in Bootle, Merseyside, England

Bootle New Strand railway station is a railway station in the centre of Bootle, Merseyside, England. It is on the Northern Line of the Merseyrail network and serves in particular the nearby New Strand Shopping Centre. The platforms are elevated and are reached by ramps from the entrance at street level. Connecting bus services leave from the nearby bus station in the basement of New Strand Shopping Centre.

<span class="mw-page-title-main">Bootle Oriel Road railway station</span> Merseyrail railway station in Bootle, Sefton

Bootle Oriel Road railway station is a railway station in Bootle, Merseyside, England. It is situated near the town's Victorian civic centre, opposite Bootle Town Hall, although the surrounding area is now largely residential. It is located on the Northern Line of the Merseyrail network.

<span class="mw-page-title-main">Formby railway station</span> Railway station located on the Northern Line in Formby, Merseyside, England

Formby railway station is a railway station in the town of Formby, Merseyside, England. The station is located on the Southport branch of the Merseyrail network's Northern Line. The station has a car park.

<span class="mw-page-title-main">Waterloo railway station (Merseyside)</span> Railway station in Merseyside, United Kingdom

Waterloo railway station is a railway station in Waterloo, Merseyside, England, on the Northern Line of the Merseyrail network. It serves a largely residential area, although there is a number of shops along South Road, where the station entrance is situated.

<span class="mw-page-title-main">Seaforth & Litherland railway station</span> Railway station in Merseyside, England

Seaforth & Litherland railway station is a railway station in Seaforth, Merseyside, England, on the Northern Line of the Merseyrail network. It also serves the adjacent area of Litherland.

<span class="mw-page-title-main">Birkdale railway station</span> Railway station in Southport, England

Birkdale railway station serves the Birkdale suburb of Southport, England. The station is located on the Southport branch of the Merseyrail network's Northern Line.

<span class="mw-page-title-main">Ainsdale railway station</span> Railway station in Merseyside, England

Ainsdale railway station serves the village of Ainsdale near Southport, England. The station is located on the Southport branch of the Merseyrail network's Northern Line.

<span class="mw-page-title-main">Freshfield railway station</span> Railway station located on the Northern Line in Formby, Merseyside, England

Freshfield railway station serves the Freshfield district of Formby, Merseyside, England. The station is located on the Southport branch of the Merseyrail network's Northern Line.

<span class="mw-page-title-main">Hightown railway station</span> Railway station in Merseyside, England

Hightown railway station serves the village of Hightown in Merseyside, England. The station is located on the Southport branch of the Merseyrail network's Northern Line.

<span class="mw-page-title-main">Blundellsands & Crosby railway station</span> Railway station in Merseyside, England

Blundellsands & Crosby railway station is a railway station in the Blundellsands area of Merseyside, England. It also serves the adjacent town of Crosby. It is situated on the Northern Line of the Merseyrail network.

<span class="mw-page-title-main">Ford railway station (Merseyside)</span> Former railway station in England

Ford railway station was a station located on the North Mersey Branch, north Liverpool, Merseyside, England.

Linacre Road railway station was a station located on the North Mersey Branch in Litherland, Lancashire.

Gladstone Dock railway station was a station in Bootle, Lancashire, England, located on the North Mersey Branch. Situated west of Rimrose Road within the Mersey Docks and Harbour Board Estate, it was named after the nearby Gladstone Dock.

<span class="mw-page-title-main">Southport Eastbank Street railway station</span> Former railway station in England

Southport Eastbank Street was a railway station in Southport, Merseyside.

<span class="mw-page-title-main">Formby Power Station railway station</span> Former railway station in England

Formby Power Station railway station was a railway station on the Liverpool, Crosby and Southport Railway, situated south of Hogshill Lane and just north of the River Alt.

Miller's Bridge railway station was a station in Bootle, Lancashire, England, which opened in 1851 and closed in 1876.

Bootle Village railway station was a station in Bootle, Lancashire, England, which opened in 1850 and closed in 1876.

References

Acts of Parliament

  1. An Act for making a Railway from the Liverpool and Bury Railway near Liverpool, through Crosby, to the Town of Southport, to be called "The Liverpool, Crosby, and Southport Railway." [2]
  2. An Act to enable the Liverpool, Crosby, and Southport Railway Company to sell or lease their Railway to the Lancashire and Yorkshire Railway Company. [19]

Notes

  1. Railways in the United Kingdom are, for historical reasons, measured in miles and chains. [4] A chain is 22 yards (20 m) long, there are 80 chains to the mile. [5]
  2. 1 2 The OS six-inch map has a publication date of 1848 yet shows the completed line into Southport that was constructed in 1851, no explanation is given. [10]
  3. The station had two names because the joint owners could not agree on a name. The (L&YR) named the station Liverpool Exchange Station with the (ELR) naming the station Liverpool Tithebarn Street. [15]

Citations

  1. Marshall 1969, pp. 130 & 150.
  2. "Local and Personal Act, 10 & 11 Victoria I, c. cv" (PDF). UK Parliament Parliamentary Archives. UK Parliament. 1847. Retrieved 27 June 2024.
  3. Marshall 1969, pp. 150–152.
  4. Jacobs 2009, p. 11.
  5. "Weights and Measures Act 1985". Legislation.gov.uk. Sch 1, Part VI. Retrieved 25 September 2014.
  6. 1 2 3 Marshall 1969, p. 152.
  7. 1 2 Marshall 1972, p. 40.
  8. Gahan 1985, p. 37.
  9. Bradshaw 1855, table 103.
  10. 1 2 Lancashire Sheet LXXV (Map). Six-inch. Ordnance Survey. 1848.
  11. Quick 2023, p. 424.
  12. 1 2 3 Holt & Biddle 1986, p. 33.
  13. Quick 2023, pp. 46, 82, 90, 198 & 242.
  14. Quick 2023, p. 199.
  15. 1 2 Welbourn 2003, p. 79.
  16. 1 2 Quick 2023, p. 404.
  17. Bolger 1994, p. 18.
  18. 1 2 3 Marshall 1969, p. 153.
  19. "Local and Personal Act, 13 & 14 Victoria I, c. xcix" (PDF). UK Parliament Parliamentary Archives. UK Parliament. 14 August 1850. Retrieved 28 June 2024.
  20. Marshall 1969, p. 154.
  21. 1 2 3 4 Marshall 1972, p. 41.
  22. 1 2 3 Marshall 1972, p. 42.
  23. Awdry 1990, p. 88.
  24. Baxter 1982, p. 17.
  25. Marshall 1972, p. 39.
  26. Baxter 1982, pp. 18–19.
  27. "The Opening of the Liverpool, Crosby and Southport Railway" . The Liverpool Mercury. 25 July 1848. p. 6. Retrieved 30 June 2024 via British Newspaper Archive.
  28. Gahan 1985, p. 18.
  29. Gahan 1985, p. 79.
  30. 1 2 3 Holt & Biddle 1986, p. 34.
  31. Quick 2023, p. 50.
  32. Marshall 1970, pp. 154–157.
  33. 1 2 "Liverpool and Southport Electrification". Street Railway Review. Vol. XIV, no. 5. Chicago: Kenfield Publishing Co. 20 May 1904. pp. 321–323.
  34. 1 2 3 Marsden 2008, p. 75.
  35. Marshall 1970, p. 160.
  36. Gahan 1985, pp. 50–51.
  37. Gahan 1985, p. 51.
  38. Gahan 1985, p. 63.
  39. Gahan 1985, pp. 44–46.
  40. Gahan 1985, p. 46.
  41. Bradshaw 1985, pp. 390 & 404.
  42. Ferneyhough 1975, p. 164.
  43. Quick 2023, p. 242.
  44. Marsden 2008, pp. 76 & 135.
  45. Ferneyhough 1975, pp. 176–177.
  46. Beeching 1963, p. 105.
  47. Jones 2013, p. 51.
  48. Longworth 2015, pp. 17–18.
  49. Pettitt & Comfort 2015, pp. 59 & 171.

Bibliography