Mahakavi Kuvempu Road (formerly known as Kuvempu Road) is an elevated metro station on the North-South corridor of the Green Line of Namma Metro in Bengaluru, India. The station was constructed by Punj Lloyd - Sembawang Infrastructure (India) JV, [1] and was opened to the public on 1 March 2014. [2] [3]
Mahakavi Kuvempu Road track layout | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms | ||||||||||||||||||||||||||||||||||||||||||
| G | Street level | Exit/Entrance |
| L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| L2 | Side platform | Doors will open on the left | |
| Platform 2 Southbound | Towards → Silk Institute Next Station: Srirampura | |
| Platform 1 Northbound | Towards ← Madavara Next Station: Rajajinagar | |
| Side platform | Doors will open on the left | ||
| L2 | ||
There are 3 Entry/Exit points – A, B and C. Commuters can use either of the points for their travel.