Manjunath Nagar is an elevated metro station on the North-South corridor of the Green Line of Namma Metro in Bengaluru, India. Around this metro station holds the main Bengaluru-Nelamangala Expressway (NH-75) leading towards the suburb of Nelamangala in Karnataka.
The Madavara - Nagasandra stretch trial run was conducted on August 6 2024 [1] [2] and with approval from Commissioner of Metro Railway Safety (CMRS) received on October 4, the section finally opened to public on 7 November 2024, with the formal inauguration to be done at a later stage. [3] [4] [5] [6] [7]
Manjunath Nagar track layout | ||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms | ||||||||||||||||||||||||||||||||||||||||||
| G | Street level | Exit/Entrance |
| L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
| L2 | Side platform | Doors will open on the left | |
| Platform 2 Southbound | Towards → Silk Institute Next Station: Nagasandra | |
| Platform 1 Northbound | Towards ← Madavara Next Station: Chikkabidarakallu | |
| Side platform | Doors will open on the left | ||
| L2 | ||