Thalaghattapura is an elevated metro station on the North-South corridor of the Green Line of Namma Metro in Bangalore, India. [1] [2] This station was opened on 21 January 2021 to the public. The station was inaugurated along with five other stations, as a part of the Green Line extension. [3] [4]
Thalaghattapura track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms |
G | Street level | Exit/entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 2 Southbound | Towards → Silk Institute | |
Platform 1 Northbound | Towards ← Nagasandra Next station: Vajarahalli | |
Side platform | Doors will open on the left | ||
L2 | ||
There are two entry/exit points – A and B. Commuters can use either for their travel.
Namma Metro, also known as Bengaluru Metro, is a rapid transit system serving the city of Bengaluru, the capital city of the state of Karnataka, India. It is the second-longest operational metro network in India with an operational length of 73.75 kilometers, just behind Delhi Metro. Upon its inauguration in 2011, it became the first underground metro system in South India. Namma Metro has a mix of underground, at grade, and elevated stations. Out of the 65 operational metro stations of Namma Metro as of October 2023, there are 57 elevated stations, eight underground stations, one interchange station and one at-grade station. The system runs on standard-gauge tracks.
Green Line of Namma Metro was built along with the Purple Line during the first phase of construction of the metro rail system for the city of Bengaluru, Karnataka, India. The 30.5 km (19.0 mi) line connects Nagasandra in the northwest to Silk Institute in the south. The line connects the industrial centers of Peenya and Yeshwanthpur in the north with the central hub of Majestic and the southern residential areas of Bangalore. Green Line is mostly elevated, with 26 elevated and 3 underground stations. The Line passes through Majestic station which is an interchange station between Green and Purple Lines.
Chickpete is an underground metro station on the North-South corridor of the Green Line of Namma Metro in Bangalore, India. It is part of the Phase I of Namma Metro project. It was opened to the public on 18 June 2017.
National College is an elevated metro station on the North-South corridor of the Green Line of Namma Metro serving Basavanagudi and the National College areas of Bangalore, India. It was opened to the public on 18 June 2017.
Yelachenahalli is an elevated metro station on the North-South corridor of the Green Line of Namma Metro located on Kanakapura Road between Yelechenahalli and Konanakunte suburbs in Bangalore, India. It was opened to the public on 18 June 2017.
Nagasandra is the elevated northern terminal metro station on the North-South corridor of the Green Line of Namma Metro serving the Bagalakunte area in Bangalore, India. It was opened to the public on 1 May 2015. A foot overbridge connecting Nagasandra metro station to IKEA store was inaugurated on 18 October 2023.
Rashtreeya Vidyalaya Road is an elevated interchange metro station on the North-South corridor of the Green Line and the East-West corridor of the upcoming Yellow Line of Namma Metro serving the 5th and 8th Block of Jayanagar area of Bangalore, India. It was opened to the public on 18 June 2017.
The Yellow Line of Namma Metro is almost complete and will form part of the metro rail network for the city of Bangalore, Karnataka, India. The 18.82 km (11.69 mi) line connects R.V. Road with Bommasandra, and is fully elevated with 16 stations. R.V. Road station is the terminal station on the city side where an interchange is being provided with the Green Line. Jayadeva Hospital station will serve as another elevated interchange station with the Pink Line that is also under construction in Phase 2 of Namma Metro's expansion. Upon its opening, the Jayadeva Station will be the tallest and largest metro station in Bengaluru, with five levels of transport, including the metro lines. Central Silk Board station will be another interchange station between the Yellow Line and Blue Line. The other end of the Yellow Line will terminate at Bommasandra. The line was scheduled to open in June 2023, but due to construction delays the new date was estimated to be July 2024. As per the latest reports, the Yellow Line will be operational from November 2024. This postponement has been attributed to a delay in the delivery of coaches from China.
Transport in Bangalore consists of several intracity commute modes such as BMTC buses, Namma Metro rail services, taxis and auto rickshaws, as well as several intercity forms of transport: Government operated KSRTC, NWKRTC, KKRTC, other states RTC buses, Private bus operators, trains, and flights.
Krishnarajapura is an important elevated metro station on the East-West corridor of the Purple Line as well as the South-North corridor of the upcoming Blue Line of Namma Metro in Bengaluru, India. This will be an upcoming interchange metro station after Nadaprabhu Kempegowda Stn., Majestic having interchange with Purple and Green Lines. Around this station, holds the main KR Puram Railway station followed by some locations like KR Pura Hanging Bridge leading towards Hoskote, Tin Factory, ITI General Hospital and many more. This station under Blue Line is planned to be operational around the year 2026 (TBC).
Whitefield (Kadugodi) (formerly known as Whitefield) is the elevated eastern terminal metro station on the East-West corridor of the Purple Line of Namma Metro in Bengaluru, India which serves the main Whitefield neighbourhood area. Around this station, is the Whitefield railway station followed by some locations like Whitefield Traffic Police Station, Kadugodi Police Station, Kadugodi Bus Terminus, MJR Pearl Apartment, BSNL Telephone Service Center, Sri Sathya Sai Baba Ashram and many more.
Kadugodi Tree Park is an elevated metro station on the East-West corridor of the Purple Line of Namma Metro in Bengaluru, India which serves the suburban area of Kadugodi. Around this station, holds the Kadugudi Tree Park followed by some locations like IT Companies and many more.
Nallurhalli is an elevated metro station on the East-West corridor of the Purple Line of Namma Metro in Bengaluru, India. Around this station, holds the GE Healthcare centre followed by some locations like CWC CFS Container Services, Flipkart ITPL Hub and many more.
Kundalahalli is an elevated metro station on the East-West corridor of the Purple Line of Namma Metro in Bengaluru, India. Around this station, holds the SAP Labs India followed by some locations like Fortune Select Trinity Hotel, Ginger Bangalore and many more.
Singayyanapalya is an elevated metro station on the East-West corridor of the Purple Line of Namma Metro in Bengaluru, India. Around this station, holds the Hindustan Petroleum Corporation Ltd. followed by some locations like Phoenix Marketcity, VR Bengaluru, Exxonmobil Lubricants Pvt. Ltd., DTDC office and many more.
Doddakallasandra is an elevated metro station on the North-South corridor of the Green Line of Namma Metro in Bangalore, India. This station was opened on 21 January 2021 to the public. The station was inaugurated along with five other stations, as a part of the Green Line extension.
Vajarahalli is an elevated metro station on the North-South corridor of the Green Line of Namma Metro in Bangalore, India. This station was opened on 21 January 2021 to the public. The station was inaugurated along with five other stations, as a part of the Green Line extension.
Konanakunte Cross is an elevated metro station on the North-South corridor of the Green Line of Namma Metro serving the Konanakunte area of Bangalore, India. It was opened to the public on 21 January 2021.
Silk Institute is the elevated southern terminal metro station on the North-South corridor of the Green Line of Namma Metro in Bengaluru, India. This station was opened on 21 January 2021 to the public. This station is named after Karnataka State Sericulture Research and Development Institute, located at Kanakapura road. The station was inaugurated along with five other stations, as a part of the Green Line extension.