Mantri Square Sampige Road (formerly known as Sampige Road) is an important elevated metro station on the North-South corridor of the Green Line of Namma Metro serving the Malleswaram area of Bengaluru, India. It was opened to the public on 1 March 2014. [1] [2] The station was constructed by Mantri Developers and consists of two basements, one ground and one upper floor. The station was named Mantri Square Sampige Road due to a PPP agreement between the Bangalore Metro Rail Corporation Ltd (BMRCL) and Mantri. [3] Mantri Square is a shopping mall located near the station. [4]
The station area covers around 80,000 sq feet. A bridge connecting the station to the first floor of the mall was inaugurated on 20 August 2014. This was the first bridge in India directly linking a metro station with a mall. [5] [6] [7]
The BMRCL acquired 5.03 acres of land from Mantri Developers for the station in 2007. The former then entered into an agreement with Mantri for joint development of the land. As per the agreement, Mantri would construct the station at a cost of ₹30 crore and also develop the surrounding land by building about 800,000 square feet of commercial space under a 99-year lease. [8] The Bruhat Bangalore Mahanagara Palike (BBMP) approved plans to construct a 32-storey residential complex and a 27-storey commercial complex adjacent to the Mantri Square mall and the Sampige Road station. The towers will be 112.9 metres and 100.85 metres tall respectively. The residential tower will have three basements, one ground and 32 floors, while the commercial/office tower will have three basements, one ground and 27 upper floors. The station and the two towers will occupy 1,77,885.10 square metres of land. The project is a joint venture of the BMRCL and Mantri Infrastructure Private Limited. [9] [3]
Mantri handed over 12,286 square metres in the acquired area for the construction of a 24-metre four-lane road for commuters. [9] [3] The presence of the Mantri Square mall in the area has created traffic gridlock on Sampige Road. However, traffic experts believe that the construction of the two towers will not affect the traffic flow in the area. Traffic engineering expert M.N. Sreehari stated that the 24 metre-wide road would be able to handle the traffic emanating from the towers. [3] The project was opposed by then Gandhinagar MLA Dinesh Gundu Rao, who felt that it would benefit neither the metro nor the general public. He instead wanted the BMRCL to scrap the agreement, and construct the station on its own. [8]
The BBMP had initially denied approval to the project when its internal probe showed that the builder had allegedly encroached on two acres and 11 guntas of government land comprising railway land, a part of Jakkarayana Kere and a mud road. [9] The BBMP argued that the builder could receive transferable development rights (TDR) in exchange for handing over the encroached mud road to them for the construction of a road. The Survey and Settlement Department affirmed that Mantri had encroached on government land. Then BBMP commissioner Siddaiah opposed approving the plans to Mantri and the BMRCL for the construction of Swastik metro station, which was later renamed as the Mantri Square Sampige Road station. The Indian Railways had removed the encroachment from its land, following the disclosure. It is unclear whether the project was built on the encroached railway land. However, a single judge bench of the High Court, on a writ petition by Mantri, directed the BBMP to approve the plan on 15 April 2013. The BBMP's appeal against this order was disposed of by a division bench on 18 June. The court stated that Mantri could be compelled to surrender the TDR if the court [in a separate pending case] found that it had actually encroached government land. Then BBMP Commissioner M. Lakshminarayana ordered the plan be approved on 26 July, and the Joint Director (Town Planning) approved the same on 22 August 2013. [9] [3]
Mantri Square Sampige Road track layout | ||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||
Station with two tracks and two side platforms |
G | Street level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left | |
Platform 2 Southbound | Towards → Silk Institute Next Station: Nadaprabhu Kempegowda Stn., Majestic Change at the next station for Purple Line | |
Platform 1 Northbound | Towards ← Madavara Next Station: Srirampura | |
Side platform | Doors will open on the left | ||
L2 | ||
There are 3 Entry/Exit points – A, B and C. Commuters can use either of the points for their travel.
Bannerghatta Road is an Indian State Highway in Karnataka. It connects Bangalore with the towns of Bannerghatta, Jigani, and Anekal. It extends for 49 kilometres (30 mi). It starts as a branch from Hosur Road near the Adugodi Christian Cemetery and ends at Anekal.
Namma Metro, also known as Bengaluru Metro, is a rapid transit system serving the city of Bengaluru, the capital city of the state of Karnataka, India. It is the second-longest operational metro network in India with an operational length of 76.95 kilometers, just behind Delhi Metro. Upon its inauguration in 2011, it became the first underground metro system in South India. Namma Metro has a mix of underground, at grade, and elevated stations. Out of the 68 operational metro stations of Namma Metro as of November 2024, there are 59 elevated stations, eight underground stations and one at-grade station. The system runs on standard-gauge tracks.
Malleshwaram is a northwest neighborhood and one of the zones of Bruhat Bengaluru Mahanagara Palike in Bengaluru, India. It was planned in 1889 after the great plague of 1898, developed as a suburb in 1892 and handed over to the city municipality in 1895. As per the 1878 Survey of India map, the area came under the village of Ranganatha Palya and was later named after the Kadu Malleshwara Temple. The neighbourhood houses many offices, one them being World Trade Center Bengaluru. It has two shopping malls, Mantri Square and Orion Mall. As an education hub,it houses the education boards of the state KSEEB and PU boards, Mysore Education Society and Indian Institute of Science.
Mantri Square is a shopping mall situated in the Malleswaram locality in Bangalore, Karnataka, India. Mantri Square is one of the biggest malls in the country. It also has metro rail-connectivity with Sampige Road metro station.
Green Line of Namma Metro was built along with the Purple Line during the first phase of construction of the metro rail system for the city of Bengaluru, Karnataka, India. The 30.5 km (19.0 mi) line connects Madavara in the northwest to Silk Institute in the south. The line connects the industrial centers of Peenya and Yeshwanthpur along Tumakuru Road in the north with the central hub of Majestic and the southern residential areas of Bangalore such as Basavanagudi, Jayanagar, Banashankari, Konanakunte Cross, Thalaghattapura along Kanakapura Road. Green Line is mostly elevated, with 26 elevated and 3 underground stations. The Line passes through Majestic station which is an interchange station between Green and Purple Lines.
The Purple Line is a part of the Namma Metro rail system for the city of Bengaluru, Karnataka, India. As of 2023, the line is 43.49 km (27.02 mi) long and spans 37 stations from Challaghatta in the southwest to Whitefield (Kadugodi) to the east. The Purple Line is mostly elevated, with 31 elevated stations, 5 underground stations and 1 at-grade station. The Line passes through many prime activity centers of the city including Whitefield, Krishnarajapura, MG Road, Vidhana Soudha and Majestic station, which is an interchange station between Purple and Green Lines. Phase I of the Purple Line was the first underground metro section in South India.
Mahatma Gandhi Road is an elevated metro station on the East-West corridor of the Purple Line of Namma Metro in Bengaluru, India. Purple line station was constructed by Punj Lloyd and opened to the public on 20 October 2011. The station MG Road has a bicycle stand next to the Urban Square, from where commuters can rent cycles. This metro station will serve as Purple line's 2nd interchange station after Majestic metro station for the upcoming Pink Line, being constructed by Larsen & Toubro.
Nadaprabhu KempegowdaStation, Majestic is an underground interchange metro station on the east–west corridor of the Purple Line and north–south corridor of Green Line of Namma Metro in Bengaluru, in the state of Karnataka, India. It opened to the public on 30 April 2016 as part of Namma Metro's Phase-1. This important metro station serves as the interchange station allowing passengers to transfer between these lines for ease of travel. The station is located within walking distance from BMTC & KSRTC's Kempegowda Bus Station, as also the City's Main Railway station.
Rajajinagar is an elevated metro station on the North-South corridor of the Green Line of Namma Metro serving the Rajajinagar area of Bengaluru, India. Located close to Navrang Theatre. The station was constructed by Punj Lloyd-Sembawang Infrastructure (India) JV, and was opened to the public on 1 March 2014.
Mahakavi Kuvempu Road is an elevated metro station on the North-South corridor of the Green Line of Namma Metro in Bengaluru, India. The station was constructed by Punj Lloyd - Sembawang Infrastructure (India) JV, and was opened to the public on 1 March 2014.
Sandal Soap Factory is an elevated metro station on the North-South corridor of the Green Line of Namma Metro serving the nearby Orion Mall area of Bengaluru, India. It acquires its name from the factory of the Karnataka Soaps and Detergents Limited situated nearby. It was opened to the public on 1 March 2014.
Goraguntepalya is an elevated metro station on the north–south corridor of the Green Line of Namma Metro serving the area of Goraguntepalaya in Bengaluru, India. It was opened to the public on 1 March 2014.
Srirampura is an elevated metro station on the North-South corridor of the Green Line of Namma Metro serving the Srirampura area of Bengaluru, India. It was opened to the public on 1 March 2014.
Mahalakshmi is an elevated metro station on the North-South corridor of the Green Line of Namma Metro serving Mahalakshmi Layout, ISKCON temple and surrounding areas in Bengaluru, India. It was opened to the public on 1 March 2014.
The Yellow Line of Namma Metro is almost complete and will form part of the metro rail network for the city of Bangalore, Karnataka, India. The 18.82 km (11.69 mi) line connects R.V. Road with Bommasandra, and is fully elevated with 16 stations. R.V. Road station is the terminal station on the city side where an interchange is being provided with the Green Line. Jayadeva Hospital station will serve as another elevated interchange station with the Pink Line which is under construction. Upon its opening, the Jayadeva Station will emerge as the tallest and largest metro station in Bengaluru, with five levels of transport, including the metro lines. Central Silk Board station will be another interchange between the Yellow and Blue Lines. The other end of the Yellow Line will terminate at Delta Electronics - Bommasandra. As per the latest reports, the Yellow Line is slated to be operational between 2nd and 4th week of January 2025. This postponement has been attributed to a delay in the delivery of coaches from China.
Transport in Bengaluru consists of several intracity commute modes such as BMTC buses, Namma Metro rail services, taxis and auto rickshaws, as well as several intercity forms of transport: Government operated KSRTC, NWKRTC, KKRTC, other states RTC buses, Private bus operators, trains, and flights.
The Blue Line or ORR-Airport Metro Line is part of the Namma Metro rail network for the city of Bangalore, Karnataka, India. It consists of two sections - Phase-2A and Phase-2B. Construction of Phase-2A began in August 2021. Construction of Phase-2B began in February 2022. The 58.19 km line connects Central Silk Board with the Kempegowda International Airport. The Line is mostly elevated but also has an at-grade (surface) section close to the Airport and 2 short underground sections where it passes the Jakkur Aerodrome and Yelahanka AFB. There are 30 stations on the line of which the two station/s at the Airport may be at surface level or underground. Blue Line will have interchanges with the Yellow Line at Central Silk Board, Purple Line at KR Pura, Pink Line at Nagawara and with the future /proposed Orange Line at Hebbal.
Whitefield (Kadugodi) (formerly known as Whitefield) is the elevated eastern terminal metro station on the East-West corridor of the Purple Line of Namma Metro in Bengaluru, India which serves the main Whitefield neighbourhood area. Around this station is the Whitefield railway station, followed by some locations like Whitefield Traffic Police Station, Kadugodi Police Station, Kadugodi Bus Terminus, MJR Pearl Apartment, BSNL Telephone Service Center, Sri Sathya Sai Baba Ashram and many more.
Pattandur Agrahara is an elevated metro station on the East-West corridor of the Purple Line of Namma Metro in Bengaluru, India. The Vivanta Bengaluru Hotel and some locations like ITPL, Ascendes Park Square Mall, Alfred Herbert India Ltd. and many more, are situated near this station.