NE 130th Street station

Last updated
NE 130th Street
Link light rail station
NE 130th Street station under construction, June 2022.jpg
Under construction in June 2022
General information
Location5th Avenue NE & NE 130th Street
Seattle, Washington
Coordinates 47°43′24″N122°19′26″W / 47.72333°N 122.32389°W / 47.72333; -122.32389
Operated by Sound Transit
Line(s)
Platforms2 side platforms
Tracks2
History
Opening2026
Services
Preceding station Sound Transit logo simplified.svg Sound Transit Following station
Sound Transit Link Light Rail logo.svg
Future service
Shoreline South/148th 1 Line
(2026)
Northgate
toward Angle Lake
2 Line
(2026)
Northgate

NE 130th Street is a future station on Sound Transit's Link light rail system in Seattle, Washington, United States. It would be built on a section of the Lynnwood Link Extension, adjacent to the intersection of Interstate 5 and Northeast 130th Street in northern Seattle. The station was originally deferred from Lynnwood Link but restored as an infill station project under the Sound Transit 3 ballot measure, with an opening tentatively set for 2026.

Contents

Location

The station will be located along the east side of Interstate 5 at its interchange with Northeast 130th Street and Roosevelt Way Northeast near Haller Lake and the Jackson Park golf course. It will serve several outlying neighborhoods, including Bitter Lake and Lake City, with proposed bus connections. [1] [2]

Sound Transit initially estimated that the station would serve less than 1,000 daily riders by 2040, [3] but ridership would grow if the area around the station are proposed and approved. [1] A revised estimate in 2021 projected 3,100 to 4,600 daily riders, of which most would switch from adjacent stations. [4]

History

The 130th Street station was deferred from the final plans for the Lynnwood Link Extension, which was approved by the Sound Transit Board on April 23, 2015. Instead, a provision for future accommodation for construction of the station without impacting service was included in the board's resolution, at an estimated cost of $10 million. [5] [6] [7]

The station's construction was supported by advocacy groups from surrounding neighborhoods, including Bitter Lake to the west and Lake City to the east. The Seattle City Council passed a resolution in October 2013 recommending the inclusion of a station at NE 130th Street in the final environmental impact statement for the Lynnwood Link project. [8] In March 2016, city councilmember Debora Juarez of the 5th district, which encompasses most of north Seattle that would be served by the station, criticized its exclusion and lack of priority when compared to other proposals in the Sound Transit 3 plan. She called the station "the focal point of a powerful east–west transit connection", citing a population of 90,000 residents who could benefit from feeder bus service to the station. [9] [10] The city council also recommended the formation of an urban area at the site of the proposed station, allowing for increased building heights and mixed-use development under the city's comprehensive plan. [11] A 2013 report from Sound Transit determined that the station area held limited potential for transit-oriented development, citing existing single-family homes, the presence of Jackson Park and other undevelopable areas, and the low desirability for retail to develop at the site when considering proximity to Northgate Mall. [12] Sound Transit expressed concerns over the inclusion of NE 130th Street station in the Lynnwood Link Extension, including a possible loss of federal funding proposed for the project after the record of decision was published without the station. [10]

The draft plan for Sound Transit 3, a ballot measure for light rail expansion, was revised in May 2016 to include $80 million for an infill station at NE 130th Street that could open in 2031. Earlier plans had listed the station as provisional, deferred until additional funding could be found, but lobbying to the Sound Transit Board by Seattle councilmembers allowed for the amendment to pass unanimously. [13] [14]

A proposal to open the station as soon as 2025 was presented to Sound Transit in January 2020, costing $23 million less than the estimate to build the station in 2031, but requiring additional debt to be raised sooner. [1] In February 2020, the Sound Transit Board approved $29 million in funds for final engineering of the NE 130th Street station, with the goal of opening in 2025. Accelerated construction of the station is expected to cost $144 million. [15] Due to the COVID-19 pandemic and its effects on local sales tax revenue, Sound Transit considered delaying the projected opening to 2036. The Sound Transit Board voted in August 2021 to maintain the projected 2025 opening by transferring funds from a delayed parking garage in Lake Forest Park. [16] The station foundations and substructure were completed in early 2022 as part of work for the Lynnwood Link Extension. [17] In June 2022, the board approved a $240 million budget to construct the NE 130th station, which would open in mid-2026. [4]

Related Research Articles

<span class="mw-page-title-main">Sound Transit</span> Regional transit government agency for the Seattle metropolitan area

Sound Transit (ST), officially the Central Puget Sound Regional Transit Authority, is a public transit agency serving the Seattle metropolitan area in the U.S. state of Washington. It manages the Link light rail system in Seattle and Tacoma, regional Sounder commuter rail, and Sound Transit Express bus service. The agency also coordinates the regional ORCA fare card system, which is also used by local transit operators. In 2019, Sound Transit services carried a total of 48 million passengers and averaged over 161,000 riders on weekdays.

<span class="mw-page-title-main">1 Line (Sound Transit)</span> Light rail line serving Seattle, Washington

The 1 Line, formerly Central Link, is a light rail line in Seattle, Washington, United States, and part of Sound Transit's Link light rail system. It serves 23 stations in King and Snohomish counties, traveling 33 miles (53 km) between Lynnwood City Center and Angle Lake stations. The line connects Lynnwood, Mountlake Terrace, Shoreline, the University District, Downtown Seattle, the Rainier Valley, and Seattle–Tacoma International Airport. The 1 Line carried over 26 million total passengers in 2023, with an average of nearly 80,000 daily passengers on weekdays. It runs for 20 hours per day on weekdays and Saturdays, with headways as low as six minutes during peak hours, and reduced 18-hour service on Sundays and holidays.

<span class="mw-page-title-main">Link light rail</span> Light rail system the Seattle metropolitan area

Link light rail is a light rail rapid transit system serving the Seattle metropolitan area in the U.S. state of Washington. It is managed by Sound Transit in partnership with local transit providers, and consists of three non-connected lines: the 1 Line in King County and Snohomish County, which travels for 33 miles (53 km) between Lynnwood, Seattle, and Seattle–Tacoma International Airport; the 2 Line in King County's Eastside region between Bellevue and Redmond; and the T Line in Pierce County, which runs for 4 miles (6.4 km) between Downtown Tacoma and Tacoma Dome Station. In 2023, the system had a ridership of 23.9 million, or about 88,000 per weekday as of the second quarter of 2024, primarily on the 1 Line. Trains run at frequencies of 6 to 24 minutes.

The Federal Way Link Extension is a planned Link light rail extension of the 1 Line that will travel 7.8 miles (12.6 km) south from Sea-Tac Airport to Federal Way, along the west side of Interstate 5. It was approved in 2008, but scaled back in 2010 to terminate at Kent Des Moines station. The Star Lake and Federal Way Downtown stations were re-instated in 2016, with the passing of Sound Transit 3. The project began construction in 2020 and is expected to open in 2026.

<span class="mw-page-title-main">Lynnwood Transit Center</span> Bus station and light rail station in Lynnwood, Washington

Lynnwood Transit Center is a bus station and light rail station in Lynnwood, Washington. It is the largest transit hub in southwestern Snohomish County and is served by Community Transit and Sound Transit Express. The transit center also includes a parking garage with 1,670 spaces and bicycle facilities.

<span class="mw-page-title-main">2 Line (Sound Transit)</span> Light rail line in the Seattle metropolitan area

The 2 Line, also known as the East Link Extension, is a light rail line serving the Eastside region of the Seattle metropolitan area in the U.S. state of Washington. It is part of Sound Transit's Link light rail system and runs for 6.6 miles (10.6 km) in the cities of Bellevue and Redmond. The initial segment serves eight stations between South Bellevue and Redmond Technology stations and opened on April 27, 2024. The full line is scheduled to open in 2025 and is planned to include 18 miles (29 km) from west to east and serve twelve stations in Downtown Seattle, Mercer Island, Bellevue, and Redmond. The 2 Line will continue through the Downtown Seattle Transit Tunnel and share stations with the 1 Line through to Lynnwood City Center station.

<span class="mw-page-title-main">SeaTac/Airport station</span> Light rail station in SeaTac, Washington

SeaTac/Airport station is a light rail station in SeaTac, Washington, serving Seattle–Tacoma International Airport. It is on the 1 Line between Angle Lake and Tukwila International Boulevard stations. The line, part of Sound Transit's Link light rail system, runs north from SeaTac through the Rainier Valley to Downtown Seattle and the University of Washington. The station consists of an elevated island platform east of the terminals and parking garage of the airport.

<span class="mw-page-title-main">Beacon Hill station (Sound Transit)</span> Light rail station in Seattle, Washington

Beacon Hill station is a light rail station located in Seattle, Washington. It is situated between the Mount Baker and SODO stations on the 1 Line, which runs from Seattle–Tacoma International Airport to Downtown Seattle and the University of Washington as part of the Link light rail system. The station is located 160 feet (49 m) under the southeast corner of Beacon Avenue South and South Lander Street in Seattle's Beacon Hill neighborhood.

<span class="mw-page-title-main">Stadium station (Sound Transit)</span> Light rail station in Seattle, Washington

Stadium station is a light rail station located in Seattle, Washington. It is situated between the SODO and International District/Chinatown stations on the 1 Line, part of Sound Transit's Link light rail system. The station consists of an at-grade island platform at the intersection of the SODO Busway and South Royal Brougham Way in the SODO neighborhood of Seattle, adjacent to Lumen Field and T-Mobile Park.

<span class="mw-page-title-main">University of Washington station</span> Light rail station in Seattle, Washington

University of Washington station is a light rail station on the University of Washington campus in Seattle, Washington, United States. The station is served by the 1 Line of Sound Transit's Link light rail system, which connects Northgate, Downtown Seattle, and Seattle–Tacoma International Airport. University of Washington station is at the intersection of Montlake Boulevard Northeast and Northeast Pacific Street, adjacent to Husky Stadium and the University of Washington Medical Center.

<span class="mw-page-title-main">U District station</span> Light rail station in Seattle, Washington

U District station is a light rail station on the 1 Line of Sound Transit's Link light rail system in Seattle, Washington, United States. It is located in the University District neighborhood, near the University of Washington campus. The underground station has two entrances along Brooklyn Avenue Northeast at 43rd and 45th streets.

<span class="mw-page-title-main">Roosevelt station (Sound Transit)</span> Light rail station in Seattle, Washington

Roosevelt station is a light rail station located in the Roosevelt neighborhood of Seattle, Washington, United States. It is served by the 1 Line of Sound Transit's Link light rail system, which continues north to Northgate station and south to Downtown Seattle and SeaTac. The underground station consists of a single island platform connected to the surface via a mezzanine and two entrances along 12th Avenue Northeast at Northeast 65th and 67th streets.

<span class="mw-page-title-main">Northgate station (Sound Transit)</span> Light rail and bus station in Seattle, Washington, U.S.

Northgate is a light rail and bus station in the Northgate neighborhood of Seattle, Washington, United States, and part of 1 Line on Sound Transit's Link light rail system. The transit center, located adjacent to the Northgate Mall, has four bus bays served by 22 routes. The station also has parking for 1,475 vehicles.

<span class="mw-page-title-main">Angle Lake station</span> Light rail station in SeaTac, Washington

Angle Lake station is a Link light rail station in SeaTac, Washington. The elevated station is the southern terminus of the 1 Line, which travels north to Seattle–Tacoma International Airport, the Rainier Valley, Downtown Seattle, and North Seattle, including the University of Washington. It also includes a large parking garage for passengers.

The Lynnwood Link extension is a Link light rail extension traveling north from Northgate to Lynnwood in Snohomish County, Washington, United States. The 8.5-mile (13.7 km) light rail extension includes stations in Lynnwood, Mountlake Terrace, and Shoreline along Interstate 5. It is served by 1 Line when it opened on August 30, 2024, and the 2 Line in 2025. The project was funded by the Sound Transit 2 (ST2) package approved by voters in November 2008, and began construction in 2019. Ridership is expected to be 47,000 to 55,000 daily on the section in 2026.

<span class="mw-page-title-main">Shoreline North/185th station</span> Link light rail station in Shoreline, Washington, U.S.

Shoreline North/185th station is a Link light rail station on the Lynnwood Link Extension serving Shoreline, Washington. The station is located in a trench on the east side of Interstate 5, on the north side of Northeast 185th Street. It includes an adjacent bus station and two-story parking garage with 360 stalls. The station opened on August 30, 2024, with the rest of the line. Shoreline North/185th station also serves as the terminus of the Swift Blue Line.

<span class="mw-page-title-main">Mountlake Terrace station</span> Light rail station in Washington state, U.S.

Mountlake Terrace is a bus station and light rail station in Mountlake Terrace, Washington, U.S. It is served by the 1 Line of Sound Transit's Link light rail system.

<span class="mw-page-title-main">Shoreline South/148th station</span> Link light rail station in Shoreline, Washington, U.S.

Shoreline South/148th station is an elevated station on Sound Transit's 1 Line, part of the Link light rail system. It is located at the intersection of Interstate 5 and State Route 523 in Shoreline and opened on August 30, 2024, with the rest of the Lynnwood Link Extension.

<span class="mw-page-title-main">Sound Transit 3</span> Transit referendum in the Seattle metropolitan area

Sound Transit 3, abbreviated as ST3, was a ballot measure during the November 2016 elections in Seattle, Washington, proposing an expansion of the regional public transit system. The measure was proposed by Sound Transit, which was established by a similar initiative passed in 1996 and expanded by the Sound Transit 2 vote in 2008, who have operated regional transit systems in the Seattle metropolitan area since 1999. On November 8, 2016, Sound Transit 3 was approved by over 54 percent of voters in the Puget Sound region; voters in Pierce County rejected the measure, but the measure passed in King and Snohomish counties, and had an overall majority.

References

  1. 1 2 3 Lindblom, Mike (January 9, 2020). "Support grows to add a N.E. 130th Street light-rail station in north Seattle quicker than planned". The Seattle Times. Retrieved January 9, 2020.
  2. "Infill Light Rail Station: 130th Street (Provisional)" (PDF). Sound Transit 3 Candidate Projects List. Sound Transit. March 29, 2016. Archived from the original (PDF) on May 2, 2016. Retrieved May 1, 2016.
  3. Lindblom, Mike (May 26, 2016). "Light-rail stations could open years earlier under new Sound Transit plan". The Seattle Times. Retrieved June 6, 2016.
  4. 1 2 Lindblom, Mike (July 13, 2022). "With no plans yet to boost ridership, Sound Transit bets on isolated North Seattle station site". The Seattle Times. Retrieved July 26, 2022.
  5. Lindblom, Mike (April 23, 2015). "4 North End light-rail stations get Sound Transit's green light". The Seattle Times. Retrieved February 2, 2016.
  6. "Sound Transit Resolution No. 2015-05" (PDF). Sound Transit. April 23, 2015. Archived from the original (PDF) on December 2, 2015. Retrieved February 2, 2016.
  7. "Council Voices Support for Future Light Rail station at 130th Street" (Press release). Seattle City Council. October 9, 2013. Retrieved June 6, 2016.
  8. Juarez, Debora (April 18, 2016). "Sound Transit must add North Seattle light-rail station". The Seattle Times. Retrieved April 20, 2016.
  9. 1 2 Green, Josh (March 30, 2016). "Councilmember calls light rail plan 'unacceptable'". KING 5 News . Retrieved April 20, 2016.
  10. "3.1.1: Preferred Alternative". Seattle 2035: Final Environmental Impact Statement for the Seattle Comprehensive Plan Update (PDF) (Report). City of Seattle Office of Planning and Community Development. May 5, 2016. Retrieved June 6, 2016.
  11. "Chapter 6: NE 130th Street Station TOD Potential". Station Area Transit-oriented Development Potential Report (PDF) (Report). Sound Transit. Retrieved June 6, 2016.
  12. Jaywork, Casey (June 2, 2016). "Light Rail Is Coming to North Seattle". Seattle Weekly . Retrieved June 8, 2016.
  13. Kroman, David (June 6, 2016). "Debora Juarez plays chicken with transit leaders — and wins". Crosscut.com . Retrieved June 6, 2016.
  14. Lindblom, Mike (February 27, 2020). "Sound Transit fast-tracks North Seattle's 130th Street Station". The Seattle Times. Retrieved February 27, 2020.
  15. Lindblom, Mike (August 5, 2021). "Two light-rail stations in Seattle escape ST3 budget chopping, most other projects delayed". The Seattle Times. Retrieved August 13, 2021.
  16. "Sound Transit Resolution No. R2022-17" (PDF). Sound Transit. June 23, 2022. p. 2. Retrieved July 26, 2022.