NE 130th Street station

Last updated
NE 130th Street
Link light rail station
NE 130th Street station under construction, June 2022.jpg
Under construction in June 2022
General information
Location5th Avenue NE & NE 130th Street
Seattle, Washington
Coordinates 47°43′24″N122°19′26″W / 47.72333°N 122.32389°W / 47.72333; -122.32389
Operated by Sound Transit
Line(s)
Platforms2 side platforms
Tracks2
History
Opening2026
Services
Preceding station Sound Transit logo simplified.svg Sound Transit Following station
Sound Transit Link Light Rail logo.svg
Future service
Shoreline South/148th 1 Line
(2026)
Northgate
toward Angle Lake
2 Line
(2026)
Northgate

NE 130th Street is a future station on Sound Transit's Link light rail system in Seattle, Washington, United States. It would be built on a section of the Lynnwood Link Extension, adjacent to the intersection of Interstate 5 and Northeast 130th Street in northern Seattle. The station was originally deferred from Lynnwood Link but restored as an infill station project under the Sound Transit 3 ballot measure, with an opening tentatively set for 2026.

Contents

Location

The station will be located along the east side of Interstate 5 at its interchange with Northeast 130th Street and Roosevelt Way Northeast near Haller Lake and the Jackson Park golf course. It will serve several outlying neighborhoods, including Bitter Lake and Lake City, with proposed bus connections. [1] [2]

Sound Transit initially estimated that the station would serve less than 1,000 daily riders by 2040, [3] but ridership would grow if the area around the station are proposed and approved. [1] A revised estimate in 2021 projected 3,100 to 4,600 daily riders, of which most would switch from adjacent stations. [4]

History

The 130th Street station was deferred from the final plans for the Lynnwood Link Extension, which was approved by the Sound Transit Board on April 23, 2015. Instead, a provision for future accommodation for construction of the station without impacting service was included in the board's resolution, at an estimated cost of $10 million. [5] [6] [7]

The station's construction was supported by advocacy groups from surrounding neighborhoods, including Bitter Lake to the west and Lake City to the east. The Seattle City Council passed a resolution in October 2013 recommending the inclusion of a station at NE 130th Street in the final environmental impact statement for the Lynnwood Link project. [8] In March 2016, city councilmember Debora Juarez of the 5th district, which encompasses most of north Seattle that would be served by the station, criticized its exclusion and lack of priority when compared to other proposals in the Sound Transit 3 plan. She called the station "the focal point of a powerful east–west transit connection", citing a population of 90,000 residents who could benefit from feeder bus service to the station. [9] [10] The city council also recommended the formation of an urban area at the site of the proposed station, allowing for increased building heights and mixed-use development under the city's comprehensive plan. [11] A 2013 report from Sound Transit determined that the station area held limited potential for transit-oriented development, citing existing single-family homes, the presence of Jackson Park and other undevelopable areas, and the low desirability for retail to develop at the site when considering proximity to Northgate Mall. [12] Sound Transit expressed concerns over the inclusion of NE 130th Street station in the Lynnwood Link Extension, including a possible loss of federal funding proposed for the project after the record of decision was published without the station. [10]

The draft plan for Sound Transit 3, a ballot measure for light rail expansion, was revised in May 2016 to include $80 million for an infill station at NE 130th Street that could open in 2031. Earlier plans had listed the station as provisional, deferred until additional funding could be found, but lobbying to the Sound Transit Board by Seattle councilmembers allowed for the amendment to pass unanimously. [13] [14]

A proposal to open the station as soon as 2025 was presented to Sound Transit in January 2020, costing $23 million less than the estimate to build the station in 2031, but requiring additional debt to be raised sooner. [1] In February 2020, the Sound Transit Board approved $29 million in funds for final engineering of the NE 130th Street station, with the goal of opening in 2025. Accelerated construction of the station is expected to cost $144 million. [15] Due to the COVID-19 pandemic and its effects on local sales tax revenue, Sound Transit considered delaying the projected opening to 2036. The Sound Transit Board voted in August 2021 to maintain the projected 2025 opening by transferring funds from a delayed parking garage in Lake Forest Park. [16] The station foundations and substructure were completed in early 2022 as part of work for the Lynnwood Link Extension. [17] In June 2022, the board approved a $240 million budget to construct the NE 130th station, which would open in mid-2026. [4]

Related Research Articles

<span class="mw-page-title-main">Sound Transit</span> Regional transit government agency for the Seattle metropolitan area

Sound Transit (ST), officially the Central Puget Sound Regional Transit Authority, is a public transit agency serving the Seattle metropolitan area in the U.S. state of Washington. It operates the Link light rail system in Seattle and Tacoma, regional Sounder commuter rail, and Sound Transit Express bus service. The agency also coordinates the regional ORCA fare card system, which is also used by local transit operators. In 2019, Sound Transit services carried a total of 48 million passengers and averaged over 161,000 riders on weekdays.

<span class="mw-page-title-main">1 Line (Sound Transit)</span> Light rail line serving Seattle, Washington

The 1 Line, formerly Central Link, is a light rail line in Seattle, Washington, United States, and part of Sound Transit's Link light rail system. It serves 19 stations in the cities of Seattle, SeaTac, and Tukwila, traveling nearly 25 miles (40 km) between Northgate and Angle Lake stations. The line connects the University District, Downtown Seattle, the Rainier Valley, and Seattle–Tacoma International Airport. The 1 Line carried over 25 million total passengers in 2019, with an average of nearly 80,000 daily passengers on weekdays. It runs for 20 hours per day on weekdays and Saturdays, with headways of up to six minutes during peak hours, and reduced 18-hour service on Sundays and holidays.

<span class="mw-page-title-main">Link light rail</span> Light rail system the Seattle metropolitan area

Link light rail is a light rail rapid transit system serving the Seattle metropolitan area in the U.S. state of Washington. It is managed by Sound Transit in partnership with local transit providers, and consists of two non-connected lines: the 1 Line in King County, which travels for 25 miles (40 km) between Seattle and Seattle–Tacoma International Airport; and the T Line in Pierce County, which runs for under 2 miles (3.2 km) between Downtown Tacoma and Tacoma Dome Station. In 2022, the system had a ridership of 23.9 million, or about 74,000 per weekday as of the first quarter of 2023, primarily on the 1 Line. Trains run at frequencies of 6 to 24 minutes.

The Federal Way Link Extension is a planned Link light rail extension of the 1 Line that will travel 7.8 miles (12.6 km) south from Sea-Tac Airport to Federal Way, along the west side of Interstate 5. It was approved in 2008, but scaled back in 2010 to terminate at Kent Des Moines station. The Star Lake and Federal Way Downtown stations were re-instated in 2016, with the passing of Sound Transit 3. The project began construction in 2020 and is expected to open in 2025 or 2026.

<span class="mw-page-title-main">Lynnwood Transit Center</span> Bus station and planned light rail station in Lynnwood, Washington

Lynnwood Transit Center, also known as Lynnwood TC, is a bus station and future light rail station in Lynnwood, Washington. It is the largest transit hub in southwestern Snohomish County and is served by Community Transit and Sound Transit Express. The transit center also includes a parking garage with 1,670 spaces and bicycle facilities.

<span class="mw-page-title-main">2 Line (Sound Transit)</span> Light rail line under construction in the Seattle metropolitan area

The East Link Extension, also known as the 2 Line, is a future light rail line serving the Eastside region of the Seattle metropolitan area in the U.S. state of Washington. It will be part of Sound Transit's Link light rail system, running 18 miles (29 km) from west to east and serving 12 stations in Downtown Seattle, Mercer Island, Bellevue, and Redmond. The first section of the 2 Line, between South Bellevue and Redmond Technology stations, is scheduled to open in 2024. It is planned to be followed in 2025 by an extension east to Downtown Redmond and west to Seattle, where it will continue into the Downtown Seattle Transit Tunnel and share stations with the 1 Line through to Lynnwood City Center station.

<span class="mw-page-title-main">SeaTac/Airport station</span> Light rail station in SeaTac, Washington

SeaTac/Airport station is a light rail station in SeaTac, Washington, serving Seattle–Tacoma International Airport. It is on the 1 Line between Angle Lake and Tukwila International Boulevard stations. The line, part of Sound Transit's Link light rail system, runs north from SeaTac through the Rainier Valley to Downtown Seattle and the University of Washington. The station consists of an elevated island platform east of the terminals and parking garage of the airport.

<span class="mw-page-title-main">University of Washington station</span> Light rail station in Seattle, Washington

University of Washington station is a light rail station on the University of Washington campus in Seattle, Washington, United States. The station is served by the 1 Line of Sound Transit's Link light rail system, which connects Northgate, Downtown Seattle, and Seattle–Tacoma International Airport. University of Washington station is at the intersection of Montlake Boulevard Northeast and Northeast Pacific Street, adjacent to Husky Stadium and the University of Washington Medical Center.

<span class="mw-page-title-main">U District station</span> Light rail station in Seattle, Washington

U District station is a light rail station on the 1 Line of Sound Transit's Link light rail system in Seattle, Washington, United States. It is located in the University District neighborhood, near the University of Washington campus. The underground station has two entrances along Brooklyn Avenue Northeast at 43rd and 45th streets.

<span class="mw-page-title-main">Roosevelt station (Sound Transit)</span> Light rail station in Seattle, Washington

Roosevelt station is a light rail station located in the Roosevelt neighborhood of Seattle, Washington, United States. It is served by the 1 Line of Sound Transit's Link light rail system, which continues north to Northgate station and south to Downtown Seattle and SeaTac. The underground station consists of a single island platform connected to the surface via a mezzanine and two entrances along 12th Avenue Northeast at Northeast 65th and 67th streets.

<span class="mw-page-title-main">Northgate station (Sound Transit)</span> Light rail and bus station in Seattle, Washington, U.S.

Northgate is a light rail and bus station in the Northgate neighborhood of Seattle, Washington, United States. It is the northern terminus of the 1 Line on Sound Transit's Link light rail system. The transit center, located adjacent to the Northgate Mall, has four bus bays served by 22 routes. The station also has parking for 1,525 vehicles.

<span class="mw-page-title-main">First Hill Streetcar</span> Streetcar line in Seattle, Washington

The First Hill Streetcar, officially the First Hill Line, is a streetcar route in Seattle, Washington, United States, forming part of the modern Seattle Streetcar system. It travels 2.5 miles (4.0 km) between several neighborhoods in central Seattle, including the International District, First Hill, and Capitol Hill. The line has ten stops and runs primarily in mixed traffic on South Jackson Street and Broadway.

<span class="mw-page-title-main">Bellevue Transit Center</span> Bus station and future light rail station in downtown Bellevue, Washington

Bellevue Transit Center (BTC) is a bus station and future light rail station in Bellevue, Washington, a suburb of Seattle. It is the main transit hub for the Eastside of King County, serving 20 routes from King County Metro and Sound Transit Express. The transit center is the western terminus of the RapidRide B Line, which runs east to Redmond.

<span class="mw-page-title-main">Angle Lake station</span> Light rail station in SeaTac, Washington

Angle Lake station is a Link light rail station in SeaTac, Washington. The elevated station is the southern terminus of the 1 Line, which travels north to Seattle–Tacoma International Airport, the Rainier Valley, Downtown Seattle, and North Seattle, including the University of Washington.

The Lynnwood Link extension is a planned Link light rail extension traveling north from Northgate to Lynnwood in Snohomish County, Washington, United States. The 8.5-mile (13.7 km) light rail extension includes stations in Lynnwood, Mountlake Terrace, and Shoreline along Interstate 5. It will be served by the 1 Line and 2 Line when it opens in 2024. The project was funded by the Sound Transit 2 (ST2) package approved by voters in November 2008, and began construction in 2019. Ridership is expected to be 63,000 to 74,000 daily in 2035.

<span class="mw-page-title-main">Shoreline North/185th station</span> Future Link light rail station in Shoreline, Washington, U.S.

Shoreline North/185th station is a future Link light rail station on the Lynnwood Link Extension serving Shoreline, Washington. The station will be located in a trench on the east side of Interstate 5, on the north side of Northeast 185th Street. It will include an adjacent bus station and parking garage with 500 stalls. The station is scheduled to open in 2024, with the rest of the line.

<span class="mw-page-title-main">Redmond Technology station</span> Future light rail station in Redmond, Washington

Redmond Technology station, formerly Overlake Transit Center, is a bus station and future light rail station in Redmond, Washington, United States. The current bus station opened in 2002 and is located on the headquarters campus of Microsoft; it is served by Sound Transit Express and King County Metro.

<span class="mw-page-title-main">Shoreline South/148th station</span>

Shoreline South/148th station is a planned elevated station on Sound Transit's Lynnwood Link Extension, part of the Link light rail system. It will be located at the intersection of Interstate 5 and State Route 523 in Shoreline and will open in 2024 with the rest of the line.

<span class="mw-page-title-main">Sound Transit 3</span> Transit referendum in the Seattle metropolitan area

Sound Transit 3, abbreviated as ST3, was a ballot measure during the November 2016 elections in Seattle, Washington, proposing an expansion of the regional public transit system. The measure was proposed by Sound Transit, which was established by a similar initiative passed in 1996 and expanded by the Sound Transit 2 vote in 2008, who have operated regional transit systems in the Seattle metropolitan area since 1999. On November 8, 2016, Sound Transit 3 was approved by over 54 percent of voters in the Puget Sound region; voters in Pierce County rejected the measure, but the measure passed in King and Snohomish counties, and had an overall majority.

References

  1. 1 2 3 Lindblom, Mike (January 9, 2020). "Support grows to add a N.E. 130th Street light-rail station in north Seattle quicker than planned". The Seattle Times. Retrieved January 9, 2020.
  2. "Infill Light Rail Station: 130th Street (Provisional)" (PDF). Sound Transit 3 Candidate Projects List. Sound Transit. March 29, 2016. Archived from the original (PDF) on May 2, 2016. Retrieved May 1, 2016.
  3. Lindblom, Mike (May 26, 2016). "Light-rail stations could open years earlier under new Sound Transit plan". The Seattle Times. Retrieved June 6, 2016.
  4. 1 2 Lindblom, Mike (July 13, 2022). "With no plans yet to boost ridership, Sound Transit bets on isolated North Seattle station site". The Seattle Times. Retrieved July 26, 2022.
  5. Lindblom, Mike (April 23, 2015). "4 North End light-rail stations get Sound Transit's green light". The Seattle Times. Retrieved February 2, 2016.
  6. "Sound Transit Resolution No. 2015-05" (PDF). Sound Transit. April 23, 2015. Archived from the original (PDF) on December 2, 2015. Retrieved February 2, 2016.
  7. "Council Voices Support for Future Light Rail station at 130th Street" (Press release). Seattle City Council. October 9, 2013. Retrieved June 6, 2016.
  8. Juarez, Debora (April 18, 2016). "Sound Transit must add North Seattle light-rail station". The Seattle Times. Retrieved April 20, 2016.
  9. 1 2 Green, Josh (March 30, 2016). "Councilmember calls light rail plan 'unacceptable'". KING 5 News . Retrieved April 20, 2016.
  10. "3.1.1: Preferred Alternative". Seattle 2035: Final Environmental Impact Statement for the Seattle Comprehensive Plan Update (PDF) (Report). City of Seattle Office of Planning and Community Development. May 5, 2016. Retrieved June 6, 2016.
  11. "Chapter 6: NE 130th Street Station TOD Potential". Station Area Transit-oriented Development Potential Report (PDF) (Report). Sound Transit. Retrieved June 6, 2016.
  12. Jaywork, Casey (June 2, 2016). "Light Rail Is Coming to North Seattle". Seattle Weekly . Retrieved June 8, 2016.
  13. Kroman, David (June 6, 2016). "Debora Juarez plays chicken with transit leaders — and wins". Crosscut.com . Retrieved June 6, 2016.
  14. Lindblom, Mike (February 27, 2020). "Sound Transit fast-tracks North Seattle's 130th Street Station". The Seattle Times. Retrieved February 27, 2020.
  15. Lindblom, Mike (August 5, 2021). "Two light-rail stations in Seattle escape ST3 budget chopping, most other projects delayed". The Seattle Times. Retrieved August 13, 2021.
  16. "Sound Transit Resolution No. R2022-17" (PDF). Sound Transit. June 23, 2022. p. 2. Retrieved July 26, 2022.