Lynnwood Transit Center

Last updated

Lynnwood Transit Center
Lynnwood Transit Center bays repainted.jpg
Northward view of the A and B bays in 2016
General information
Location20100 48th Avenue West
Lynnwood, Washington, U.S.
Coordinates 47°48′58″N122°17′47″W / 47.81611°N 122.29639°W / 47.81611; -122.29639
Owned by Washington State Department of Transportation, Sound Transit
Train operators Sound Transit (planned)
Bus routes19
Bus stands20
Bus operators Community Transit
Sound Transit Express
Construction
Parking1,670 parking spaces
Bicycle facilities Bicycle lockers and racks
AccessibleYes
History
OpenedMay 25, 1981 (1981-05-25) (bus)
Rebuilt2003, 2019–2024
Services
Preceding station Sound Transit logo simplified.svg Sound Transit Following station
Sound Transit Link Light Rail logo.svg
Future service
Terminus 1 Line
(2024)
Mountlake Terrace
toward Angle Lake
2 Line
(2025)
Mountlake Terrace
Proposed service
West Alderwood
toward Everett
3 Line
(2037)
Mountlake Terrace
Location
Lynnwood Transit Center

Lynnwood Transit Center, also known as Lynnwood TC, is a bus station and future light rail station in Lynnwood, Washington. It is the largest transit hub in southwestern Snohomish County and is served by Community Transit and Sound Transit Express. The transit center also includes a parking garage with 1,670 spaces and bicycle facilities.

Contents

In August 2024, Lynnwood Transit Center will become the northern terminus of Sound Transit's Link light rail system; the 1 Line and 2 Line will serve the Lynnwood City Center station as part of the Lynnwood Link Extension. The Link extension was approved in 2008 as part of the Sound Transit 2 ballot measure and began construction in 2019. The Stride bus rapid transit system will also terminate at the station, connecting it with areas along Interstate 405.

Location and layout

The Lynnwood Transit Center is located on the north side of Interstate 5 at 44th Avenue West, southwest of Alderwood Mall in Lynnwood. The 17.5-acre (7.1 ha) transit center includes 20 bus bays and a park and ride. [1] A five-story parking garage on the southeast side of the site provides 1,670 park and ride spaces and has driveways from two streets. [2] The bus bays have passenger information displays that have real-time arrival information for inbound buses. A customer service center called "RideStore" is located at the north end of the transit center. [3] [4]

The transit center is also located adjacent to the Interurban Trail, which runs through the southeast parking lot and connects it to Alderwood Mall, Aurora Village and downtown Everett. [5]

The 2003 renovation of the transit center came with the installation of two pieces of public artwork created by Claudia Fitch, known collectively as Shift. The art installation consists of a pair of 30-foot-tall (9.1 m) steel beacons resembling newel posts that are used to mark the two main crosswalks. [6]

History

Planning for a large park and ride lot in Lynnwood began in the late 1970s with the formation of Community Transit and increasing population growth in Lynnwood that had begun to affect the nearby Northgate lot. [7] Construction on 13-acre (5.3 ha) lot began in February 1980, with the project's $1.5 million cost paid for almost entirely by the Federal Highway Administration. [8] It was scheduled to open in September 1980, but construction was delayed by the discovery of underground springs. [9] The Lynnwood park and ride opened on May 25, 1981, with 808 stalls, becoming the largest park and ride in the state of Washington, serving Community Transit as well as Seattle-bound commuter buses operated by Metro Transit. [10] It also became the main bus hub for southern Snohomish County, replacing a street on the north side of the Fred Meyer store in Lynnwood. [11] [12]

In September 2003, Sound Transit and Community Transit rebuilt the park and ride lot and renamed it to "Lynnwood Transit Center". [13] The $33.6 million project expanded the lot to over 17 acres (6.9 ha), added 300 parking spaces to the lot, and consolidated the bus bays on the site of an old warehouse; additional amenities built during the project included a coffee stand, bathrooms, public art, and a customer service center. [1] [14] The following year, a $31.2 million direct access ramp to Interstate 5's high-occupancy vehicle lanes, the first in the state, was opened to replace the congested onramp on 44th Avenue West. [15]

Light rail

A typical bus bay at Lynnwood Transit Center Lynnwood Transit Center Bay B1.jpg
A typical bus bay at Lynnwood Transit Center

Lynnwood Transit Center was selected as the northern terminus of the Lynnwood Link Extension, a 8.5-mile (13.7 km) light rail extension that is part of the Link light rail system. The extension and its $1.6 billion in funding was approved by voters in 2008. [16] The extension is projected to carry 63,000 to 74,000 daily riders by 2035; [17] 17,900 daily riders are expected to board at Lynnwood Transit Center's station. [18]

The Lynnwood City Center [19] light rail station will be elevated 24 feet (7.3 m) above the direct access ramp and southeastern parking lot, crossing from the southwest to the northeast. The station will have two entrances connected to its mezzanine below platform level: one that travels across the roadway and leads to a ground-level plaza; and another with direct access to a five-story parking garage with 500 stalls. The existing bus station would be retained and slightly expanded to accommodate more layover space. Parking at the transit center would increase to 1,900 stalls, with room to expand further. [18] [20]

Lynnwood Transit Center Parking Garage opened in April 2023 Lynnwood Transit Center Parking Garage.jpg
Lynnwood Transit Center Parking Garage opened in April 2023

Construction of the station will require the demolition of a furniture store to the east of the bus bays, a well as a gas station, restaurant and strip mall. [21] Demolition of the stores began in July 2018 and the project broke ground in September 2019. [22] [23] In early 2020, Sound Transit opened a temporary parking lot on the east side of 46th Avenue West to replace several closed areas of the park and ride that will be used for construction staging. [24] Construction on the five-story parking garage began in October 2020 and it opened for use on April 17, 2023. [25] [26] The garage replaces the existing and temporary surface lots, which will be used for construction staging and bus layover space; 226 surface stalls will remain once construction is complete, giving Lynnwood Transit Center a total of 1,900 park and ride spaces. [26] [27]

Sound Transit determined in 2011 that the area around the transit center had "moderate to strong" potential for transit-oriented development, including housing and offices. [28] The area around the transit center is part of a regional growth center designated by the Puget Sound Regional Council; [29] the Lynnwood city government designated the area between the transit center and the Alderwood Mall to the northeast as its city center, preparing for heavy development that is expected to follow light rail expansion. [30] [31] The city raised the height limits for buildings in the area to 350 feet (110 m) in 2005, looking to "resemble downtown Bellevue". [30] [32] The light rail station's northeast construction staging area is planned to be offered for transit-oriented affordable housing development after 2024. [33]

Light rail service is scheduled to begin on August 30, 2024, on the 1 Line and 2025 on the 2 Line. [34] [35] Trains from Lynnwood are anticipated to take 28 minutes to reach Westlake station in Downtown Seattle. [36] Community Transit plans to truncate most of its commuter routes to Lynnwood Transit Center and add new all-day express routes along the Interstate 5 corridor; [37] a temporary Sound Transit Express route that runs parallel to the 1 Line is planned to launch in 2024 to accommodate overflow passengers until the 2 Line opens and provides full capacity to Lynnwood. [38] A further extension of the light rail system to Everett is planned to carry the 1 Line and 2 Line and be opened in phases from 2037 to 2041. [39]

Services

As of 2016, more than 40 percent of Community Transit's bus routes serve the transit center, with 500 total buses passing through each day. Buses arrive at Lynnwood Transit Center at an average frequency of every three minutes during peak periods. [40] In 2022, Community Transit launched a ride-hailing service, called "Zip", to serve Lynnwood with a focus on connections between the transit center and local destinations. [41]

Related Research Articles

<span class="mw-page-title-main">Lynnwood, Washington</span> City in Washington, United States

Lynnwood is a city in Snohomish County, Washington, United States. The city is part of the Seattle metropolitan area and is located 16 miles (26 km) north of Seattle and 13 miles (21 km) south of Everett, near the junction of Interstate 5 and Interstate 405. It is the fourth-largest city in Snohomish County, with a population of 38,568 in the 2020 U.S. census.

<span class="mw-page-title-main">Sound Transit</span> Regional transit government agency for the Seattle metropolitan area

Sound Transit (ST), officially the Central Puget Sound Regional Transit Authority, is a public transit agency serving the Seattle metropolitan area in the U.S. state of Washington. It operates the Link light rail system in Seattle and Tacoma, regional Sounder commuter rail, and Sound Transit Express bus service. The agency also coordinates the regional ORCA fare card system, which is also used by local transit operators. In 2019, Sound Transit services carried a total of 48 million passengers and averaged over 161,000 riders on weekdays.

<span class="mw-page-title-main">Community Transit</span> Bus transit agency serving Snohomish County, Washington

Community Transit (CT) is the public transit authority of Snohomish County, Washington, United States, excluding the city of Everett, in the Seattle metropolitan area. It operates local bus, paratransit and vanpool service within Snohomish County, as well as commuter buses to Downtown Seattle and Northgate station. CT is publicly funded, financed through sales taxes, and farebox revenue, with an operating budget of $133.2 million. In 2023, the system had a ridership of 7,133,700, or about 24,700 per weekday as of the first quarter of 2024, placing it fourth among transit agencies in the Puget Sound region. The city of Everett, which serves as the county seat, is served by Everett Transit, a municipal transit system.

<span class="mw-page-title-main">1 Line (Sound Transit)</span> Light rail line serving Seattle, Washington

The 1 Line, formerly Central Link, is a light rail line in Seattle, Washington, United States, and part of Sound Transit's Link light rail system. It serves 19 stations in the cities of Seattle, SeaTac, and Tukwila, traveling nearly 25 miles (40 km) between Northgate and Angle Lake stations. The line connects the University District, Downtown Seattle, the Rainier Valley, and Seattle–Tacoma International Airport. The 1 Line carried over 26 million total passengers in 2023, with an average of nearly 80,000 daily passengers on weekdays. It runs for 20 hours per day on weekdays and Saturdays, with headways as low as six minutes during peak hours, and reduced 18-hour service on Sundays and holidays.

<span class="mw-page-title-main">Everett Station</span> Amtrak and commuter train station in Everett, Washington

Everett Station is an Amtrak train station serving the city of Everett, Washington, United States. The station has provided service to the Cascades and Empire Builder routes since its opening in 2002, replacing an earlier station near the Port of Everett. The four-story building also houses social service programs and is the center of a 10-acre (4 ha) complex that includes parking lots and a large bus station used primarily by Community Transit, Everett Transit, and Sound Transit Express. The station has served as the northern terminus of the Sounder N Line since 2003 and the Swift Blue Line since 2009. It consists of two side platforms, one serving Amtrak and the other serving Sounder commuter trains. Everett Station also functions as a park and ride, with 1,067 short-term parking spaces located in lots around the station after it was expanded by Sound Transit in 2009.

<span class="mw-page-title-main">Link light rail</span> Light rail system the Seattle metropolitan area

Link light rail is a light rail rapid transit system serving the Seattle metropolitan area in the U.S. state of Washington. It is managed by Sound Transit in partnership with local transit providers, and consists of three non-connected lines: the 1 Line in King County, which travels for 26 miles (42 km) between Seattle and Seattle–Tacoma International Airport; the 2 Line in King County's Eastside region between Bellevue and Redmond; and the T Line in Pierce County, which runs for 4 miles (6.4 km) between Downtown Tacoma and Tacoma Dome Station. In 2023, the system had a ridership of 23.9 million, or about 70,600 per weekday as of the first quarter of 2024, primarily on the 1 Line. Trains run at frequencies of 6 to 24 minutes.

<span class="mw-page-title-main">Alderwood Mall</span> Shopping mall in Lynnwood, Washington

Alderwood, formerly Alderwood Mall, is a regional shopping mall in Lynnwood, Washington. It is anchored by JCPenney, Macy's and Nordstrom and comprises both a traditional enclosed mall and two open-air areas known as The Village and The Terraces. Brookfield Properties manages and co-owns the property with an institutional investor.

<span class="mw-page-title-main">Federal Way Downtown station</span> Transit center in Federal Way, Washington

Federal Way Downtown is a future light rail station at the site of the Federal Way Transit Center, a bus station in Federal Way, Washington. The bus station opened in 2006 and has 1,190 parking spaces available in its parking garage and surface lots. It is served by King County Metro, Pierce Transit and Sound Transit Express buses and is the southern terminus of the RapidRide A Line. The transit center is located adjacent to The Commons at Federal Way shopping mall and Interstate 5, connected via a direct access ramp to its high-occupancy vehicle lanes.

<span class="mw-page-title-main">Northgate station (Sound Transit)</span> Light rail and bus station in Seattle, Washington, U.S.

Northgate is a light rail and bus station in the Northgate neighborhood of Seattle, Washington, United States. It is the northern terminus of the 1 Line on Sound Transit's Link light rail system. The transit center, located adjacent to the Northgate Mall, has four bus bays served by 22 routes. The station also has parking for 1,525 vehicles.

<span class="mw-page-title-main">South Bellevue station</span> Light rail station in Bellevue, Washington

South Bellevue station is an elevated light rail station located in Bellevue, Washington, United States, an eastern suburb of Seattle. It opened on April 27, 2024, as the western terminus of the 2 Line of Sound Transit's Link light rail system. The station has a park and ride garage with 1,500 stalls and bus service from King County Metro and Sound Transit Express.

<span class="mw-page-title-main">Angle Lake station</span> Light rail station in SeaTac, Washington

Angle Lake station is a Link light rail station in SeaTac, Washington. The elevated station is the southern terminus of the 1 Line, which travels north to Seattle–Tacoma International Airport, the Rainier Valley, Downtown Seattle, and North Seattle, including the University of Washington. It also includes a large parking garage for passengers.

The Lynnwood Link extension is a planned Link light rail extension traveling north from Northgate to Lynnwood in Snohomish County, Washington, United States. The 8.5-mile (13.7 km) light rail extension includes stations in Lynnwood, Mountlake Terrace, and Shoreline along Interstate 5. It will be served by the 1 Line when it opens on August 23, 2024, and the 2 Line in 2025. The project was funded by the Sound Transit 2 (ST2) package approved by voters in November 2008, and began construction in 2019. Ridership is expected to be 63,000 to 74,000 daily in 2035.

<span class="mw-page-title-main">Shoreline North/185th station</span> Future Link light rail station in Shoreline, Washington, U.S.

Shoreline North/185th station is a future Link light rail station on the Lynnwood Link Extension serving Shoreline, Washington. The station will be located in a trench on the east side of Interstate 5, on the north side of Northeast 185th Street. It will include an adjacent bus station and parking garage with 500 stalls. The station is scheduled to open in 2024, with the rest of the line.

<span class="mw-page-title-main">Redmond Technology station</span> Light rail station in Redmond, Washington

Redmond Technology station, formerly Overlake Transit Center, is a bus and light rail station in Redmond, Washington, United States. The bus station opened in 2002 adjacent to State Route 520 on the headquarters campus of Microsoft. It was served by Sound Transit Express and King County Metro, as well as Microsoft's private shuttle buses. The light rail station is the eastern terminus of the 2 Line, part of Sound Transit's Link light rail system, and opened on April 27, 2024.

<span class="mw-page-title-main">Mountlake Terrace Transit Center</span>

Mountlake Terrace Transit Center is a bus station and future light rail station in Mountlake Terrace, Washington.

<span class="mw-page-title-main">NE 130th Street station</span>

NE 130th Street is a future station on Sound Transit's Link light rail system in Seattle, Washington, United States. It would be built on a section of the Lynnwood Link Extension, adjacent to the intersection of Interstate 5 and Northeast 130th Street in northern Seattle. The station was originally deferred from Lynnwood Link but restored as an infill station project under the Sound Transit 3 ballot measure, with an opening tentatively set for 2026.

<span class="mw-page-title-main">Sound Transit 3</span> Transit referendum in the Seattle metropolitan area

Sound Transit 3, abbreviated as ST3, was a ballot measure during the November 2016 elections in Seattle, Washington, proposing an expansion of the regional public transit system. The measure was proposed by Sound Transit, which was established by a similar initiative passed in 1996 and expanded by the Sound Transit 2 vote in 2008, who have operated regional transit systems in the Seattle metropolitan area since 1999. On November 8, 2016, Sound Transit 3 was approved by over 54 percent of voters in the Puget Sound region; voters in Pierce County rejected the measure, but the measure passed in King and Snohomish counties, and had an overall majority.

<span class="mw-page-title-main">Swift Blue Line</span> Bus rapid transit route in Snohomish County, Washington

The Swift Blue Line is a bus rapid transit route operated by Community Transit in Snohomish County, Washington, as part of the Swift system. The Blue Line is 16.7 miles (26.9 km) long and runs on the State Route 99 and Evergreen Way corridor between Everett Station and Aurora Village Transit Center. It has 34 stations in the cities of Everett, Lynnwood, Edmonds, and Shoreline.

<span class="mw-page-title-main">Swift Orange Line</span> Bus rapid transit route in Washington, U.S.

The Swift Orange Line is a bus rapid transit line in Snohomish County, Washington, United States. It is the third line of the Swift Bus Rapid Transit system operated by Community Transit and opened in March 2024. The 11-mile (18 km) line runs from Edmonds College to McCollum Park, generally serving the cities of Lynnwood and Mill Creek with 16 stations. The Orange Line provides connections between the existing Swift Blue and Green lines, Edmonds College, Alderwood Mall, and Lynnwood Transit Center—the future terminus of the Link light rail system.

References

  1. 1 2 Hadley, Jane (October 27, 2003). "New bus-rider center typifies transit projects". Seattle Post-Intelligencer . Retrieved July 21, 2016.
  2. "New Lynnwood Station garage to open for parking" (Press release). Sound Transit. April 13, 2023. Retrieved April 17, 2023.
  3. Bus Plus: Schedules & Route Maps (PDF). Community Transit. September 11, 2016. p. 32. Archived from the original (PDF) on March 8, 2022. Retrieved February 23, 2017.
  4. "RideStore". Community Transit. Retrieved August 2, 2016.
  5. Everett to North Seattle Interurban Trail (PDF) (Map). Community Transit. 2014. Retrieved February 23, 2017.
  6. "Lynnwood Transit Center - Public Art". Sound Transit. Archived from the original on July 16, 2010. Retrieved August 2, 2016.
  7. "17-acre site urged for park-ride lot". The Seattle Times . August 27, 1977. p. H7.
  8. "Work to start on largest park-ride lot". The Seattle Times. February 20, 1980. p. G3.
  9. Copeland, Joe (June 20, 1980). "Park-and-ride lots running behind schedule, state says". The Everett Herald. p. A3. Retrieved March 22, 2024 via Newspapers.com.
  10. Aweeka, Charles (May 20, 1981). "Lynnwood park-and-ride lot ready for use". The Seattle Times. p. G2.
  11. "Park-and-ride lot opens". The Everett Herald. May 26, 1981. p. D2. Retrieved March 22, 2024 via Newspapers.com.
  12. Copeland, Joe (March 28, 1980). "Commuters take note: bus time tables will change". The Everett Herald. p. D1. Retrieved March 22, 2024 via Newspapers.com.
  13. "New transit center to debut in Lynnwood on Sunday". The Seattle Times. September 24, 2003. Retrieved July 21, 2016.
  14. Sitt, Pam (August 30, 2002). "Park-and-ride will be improved - Lynnwood lot to have more parking, covered waiting areas, better lighting". The Seattle Times. p. B2.
  15. Hadley, Jane (November 16, 2004). "State opens direct-access ramps to I-5 at Lynnwood Transit Center". Seattle Post-Intelligencer. Retrieved July 21, 2016.
  16. "Lynnwood Link moves into final design" (Press release). Sound Transit. April 11, 2016. Retrieved August 1, 2016.
  17. "Fact sheet for Lynnwood Link Extension" (PDF). Sound Transit. July 2015. Retrieved August 1, 2016.
  18. 1 2 "Chapter 3: Transportation Impacts and Mitigation" (PDF). Lynnwood Link Extension Final Environmental Impact Statement (Report). Sound Transit. April 1, 2015. pp. 3–24, 3–46. Retrieved August 1, 2016.
  19. "Project update: Lynnwood Link Extension, July 28, 2017: Permanent station names adopted". Sound Transit. July 28, 2017. Retrieved July 31, 2017.
  20. "Appendix F: Conceptual Plans" (PDF). Lynnwood Link Extension Final Environmental Impact Statement (Report). Sound Transit. April 1, 2015. pp. 44–45. Retrieved August 1, 2016.
  21. Davis, Jim (July 25, 2016). "Behind scenes work underway to bring light rail to Lynnwood". The Everett Herald. Retrieved August 1, 2016.
  22. Haglund, Noah (August 4, 2018). "Demo removes eyesores from future light rail path". The Everett Herald. Retrieved August 6, 2018.
  23. Giordano, Lizz (September 4, 2019). "Historic groundbreaking for Lynnwood light rail extension". The Everett Herald. Retrieved February 11, 2020.
  24. Watanabe, Ben (February 11, 2020). "Early light rail station preparations under way in Lynnwood". The Everett Herald. Retrieved February 11, 2020.
  25. "Construction begins on new garage at Lynnwood Transit Center" (Press release). Sound Transit. October 14, 2020. Retrieved December 1, 2020.
  26. 1 2 "Sound Transit opening big garage today near Lynnwood Transit Center" . Seattle Daily Journal of Commerce. April 17, 2023. Retrieved April 17, 2023.
  27. Zhou, Amanda (April 17, 2023). "Lynnwood parking garage opens in anticipation of light-rail service". The Seattle Times. Retrieved April 19, 2023.
  28. "Chapter 12: TOD Potential for Stations Serving Lynnwood Transit Center" (PDF). Lynnwood Link Extension Station Area Transit-Oriented Development Potential (Report). Sound Transit. April 2013. Retrieved August 2, 2016.
  29. Growing Transit Communities Oversight Committee (October 2013). "Lynnwood Transit Center: Future Light Rail/Bus" (PDF). The Growing Transit Communities Strategy. Puget Sound Regional Council . Retrieved August 2, 2016.
  30. 1 2 Lindblom, Mike (November 3, 2016). "Lynnwood eager for growth and transformation that light-rail station will bring". The Seattle Times. Retrieved November 3, 2016.
  31. King, Rikki (April 22, 2015). "Lynnwood's City Center to include two apartment complexes, hotel". The Everett Herald. Retrieved August 2, 2016.
  32. Brooks, Diane (July 26, 2006). "Hotel, condos may start city's makeover". The Seattle Times. Archived from the original on October 1, 2019. Retrieved November 3, 2016.
  33. Miller, Brian (June 21, 2023). "Sound Transit readying Lynnwood site for affordable housing RFP". Seattle Daily Journal of Commerce. Retrieved June 24, 2023.
  34. Lindblom, Mike (April 4, 2024). "When will light rail reach Lynnwood? Sound Transit sets opening date". The Seattle Times. Retrieved April 5, 2024.
  35. Lindblom, Mike (August 24, 2023). "Eastside-only light rail should open in March, Sound Transit says". The Seattle Times. Retrieved August 24, 2023.
  36. Lindblom, Mike (January 13, 2023). "Lynnwood or Bellevue: Which city should get light-rail service first?". The Seattle Times. Retrieved April 19, 2023.
  37. Watanabe, Ben (April 16, 2023). "Plan aims to restore 'community' to Community Transit bus service". The Everett Herald. Retrieved April 19, 2023.
  38. Lindblom, Mike (March 8, 2024). "Sound Transit pulls out the stops to solve a Lynnwood train shortage". The Seattle Times. Retrieved March 9, 2024.
  39. Watanabe, Ben (June 27, 2022). "Everett light rail study adds I-5, Evergreen Way options". The Everett Herald. Retrieved April 19, 2023.
  40. "Lynnwood Transit Center Multimodal Accessibility Plan" (PDF). Washington State Department of Transportation. November 2016. p. 24. Retrieved December 20, 2017.
  41. Watanabe, Ben (October 20, 2022). "$2.50 on-demand transit launches in Lynnwood's Alderwood area". The Everett Herald. Retrieved April 19, 2023.