Everett Station | |||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||||||||||||||||||||||
Location | 3201 Smith Avenue Everett, Washington United States | ||||||||||||||||||||||||||||||
Coordinates | 47°58′31″N122°11′51″W / 47.9754°N 122.1976°W | ||||||||||||||||||||||||||||||
Owned by | City of Everett | ||||||||||||||||||||||||||||||
Line(s) | BNSF Scenic Subdivision | ||||||||||||||||||||||||||||||
Platforms | 2 side platforms | ||||||||||||||||||||||||||||||
Tracks | 3 | ||||||||||||||||||||||||||||||
Bus routes | 22 | ||||||||||||||||||||||||||||||
Bus stands | 26 | ||||||||||||||||||||||||||||||
Bus operators | Amtrak Thruway, Greyhound Lines, Northwestern Trailways, ST Express, Community Transit, Everett Transit, Skagit Transit, Island Transit | ||||||||||||||||||||||||||||||
Construction | |||||||||||||||||||||||||||||||
Structure type | Four-floor brick-and-glass structure | ||||||||||||||||||||||||||||||
Parking | 1,607 spaces | ||||||||||||||||||||||||||||||
Bicycle facilities | Racks and 30 lockers (annual fee) | ||||||||||||||||||||||||||||||
Accessible | Yes | ||||||||||||||||||||||||||||||
Other information | |||||||||||||||||||||||||||||||
Station code | Amtrak: EVR | ||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||
Opened | February 4, 2002 [1] | ||||||||||||||||||||||||||||||
Passengers | |||||||||||||||||||||||||||||||
FY 2023 | 38,182 [2] (Amtrak only) | ||||||||||||||||||||||||||||||
Services | |||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||
|
Everett Station is a train station serving the city of Everett, Washington, United States. The station has been served by Cascades and Empire Builder since opening in 2002, replacing an earlier station near the Port of Everett. The four-story building also houses social service programs and is the center of a 10-acre (4 ha) complex that includes parking lots and a large bus station used primarily by Community Transit, Everett Transit, and Sound Transit Express. The station has served as the northern terminus of the Sounder N Line since 2003 and the Swift Blue Line since 2009. It consists of two side platforms, one serving Amtrak and the other serving Sounder commuter trains. Everett Station also functions as a park and ride, with 1,067 short-term parking spaces located in lots around the station after it was expanded by Sound Transit in 2009.
Everett Station is served by six daily Amtrak trains: four Cascades runs between Seattle and Vancouver, British Columbia, [3] and two Empire Builder runs between Seattle and Chicago. [4] The station is also served by the N Line of Sound Transit's Sounder commuter rail service, running four trains in peak direction towards King Street Station in Seattle during the morning commute and four trains from Seattle during the evening commute, only on weekdays and during special events. [5] Train service to Everett is most often disrupted and canceled during the autumn and winter seasons because of landslides along the shoreline of the Puget Sound, where the BNSF mainline tracks run. [6] During the 2012–2013 winter season, a record-high of 206 passenger trains between Everett and Seattle were canceled, [7] [8] prompting the Washington State Department of Transportation to begin a three-year landslide mitigation project in 2013 that will stabilize slopes above the railroad between Seattle and Everett. [9] [10]
The Everett Station complex also includes a bus station with 26 bus bays that serve as a major transfer station for routes from Snohomish County. Everett Transit operates the majority of its bus routes out of their 12 bus bays on Smith Avenue. [11] [12] Community Transit has six routes at the station, serving as the terminus for local service from Smokey Point, Marysville, Snohomish, Lake Stevens, and Monroe; [13] CT also debuted their Swift Blue Line bus rapid transit service in 2009, with Everett Station as the northern terminus of the route along the Highway 99 corridor to Shoreline. [14] Sound Transit runs three of its ST Express bus routes out of Everett Station, with peak-only, limited-stop service to Seattle and Bellevue, as well as all-day service to Lynnwood Transit Center, along Interstate 5. [15] Skagit Transit runs a weekday inter-county express route (Route 90X) from the station to Skagit Station in Mount Vernon and Chuckanut Park & Ride in Burlington; [16] Island Transit also runs a peak-only weekday express route (Route 412C) from Everett Station to Stanwood and Camano Island. [17] Paratransit to the front door of the station building is provided by Community Transit and Everett Station through the Dial a Ride program. [13] [18]
Daily intercity bus service to Everett Station is provided by Greyhound Lines and Northwestern Trailways. [19] [20] In March 2019, Greyhound's BoltBus express service began serving Everett Station with 48 departures to Vancouver, Bellingham, Tacoma, and Portland, Oregon. [21] The service was discontinued by Greyhound in 2021. [22]
The Everett Station complex is located on 10 acres (4.0 ha ; 0.016 sq mi ) [23] situated between Downtown Everett to the west and Interstate 5 to the east. [13] The train platforms are located on the east side of the station building and bus bays, along three BNSF-owned railway tracks. The covered west platform, used by the Sounder commuter rail service, is located directly east of the station building, while a partially sheltered platform, used by Amtrak, is situated on the second set of tracks and is accessible by several pedestrian at-grade crossings. [24] Directly south of the main building are the bus bays, which are centered around a covered walkway that connects the train platforms to the Swift bus rapid transit station, served by the Blue Line. [13] 1,067 short-term parking spaces are located around the station complex, including the initial parking lot west of the tracks and an additional parking lot accessible by a pedestrian bridge over the tracks. [15] In addition to the short-term parking lots, there are 25 designated Amtrak/Greyhound parking stalls and eight rideshare vehicles stalls located at the front of the station building. [12]
The station building is a four-floor brick-and-glass structure housing 64,000 square feet (5,900 m2) that includes ticketing offices, a waiting area, classrooms, and community rooms. The front façade mainly comprises a three-story glass wall inside of a 34,000-pound (15,000 kg; 15 t) precast steel arch, facing a small plaza at the intersection of Smith Avenue and 32nd Street. [25] The lobby is decorated with an inlaid terrazzo floor with a design representing local waterways, accompanied by a three-story atrium consisting of a large glass wall and a large clock. [26] The station building, designed by architectural firm Zimmer Gunsul Frasca Partnership, [27] houses ticket counters and waiting areas for Amtrak and Greyhound in addition to passenger amenities, such as restrooms, payphones, a customer service center, and ORCA card vending machines, open daily from 6am to 10pm. [28] The station has weatherproof bicycle lockers in addition to 6 short-term bicycle racks located at the front of the station. [1] [12]
In addition to being a multimodal hub for train and bus service, Everett Station functions as a home to social services and educational programs. University Center of North Puget Sound was formerly located on the 2nd floor of the station building, providing baccalaureate and graduate degrees through local universities and colleges until it moved to the campus of Everett Community College in 2010. [29] [30] The Everett branches of WorkForce and WorkSource, public employment services operated by the Washington State Employment Security Department that provide career development training and job placement assistance to unemployed, are located on the 3rd and 4th floors, respectively. [31] The 4th floor is also home to the Weyerhaeuser Room, a 2,800-square-foot (0.00026 km2) public meeting space, named for the philanthropic arm of the Weyerhaeuser Company in 2003 after their donation of murals displayed throughout Everett Station. [1] [32]
The first floor is occupied by the Bezos Academy, a private tuition-free preschool funded by Amazon founder Jeff Bezos. It opened on March 2, 2023, with three classrooms, a kitchen, and an outdoor playground in a former parking lot. [33] A ten-year lease for the 3,800-square-foot (350 m2) space was approved by the Everett City Council in January 2022 for $1 per month. [34] A lease for 640 square feet (59 m2) on the ground floor for a model railroad club was approved in 2023; the Swamp Creek and Western Railroad Association plans to move their exhibit from Edmonds station to the new space in June 2023. [35]
A seasonal farmers' market at the station was established in 2019 and opened on Wednesdays with vendors along 32nd Street, which was closed to traffic. [36] It was suspended during the COVID-19 pandemic and returned in 2023 with an artificial turf surface laid over the street. [37]
The City of Everett and ZGF Partnership were recognized by the Puget Sound Regional Council with a "Vision 2020" award for its combination of a transportation hub and community gathering place into a single project. [38] [39] Everett Station also won the 2006 Citation Award from the Washington branch of the American Institute of Architects, whose jury commended the City of Everett on the station housing "an innovative mix of transit, educational functions, and community spaces; delights travelers; and is welcoming to the public for classes, public meetings, and banquets." [1] [40]
Prior to the opening of Everett Station in 2002, Amtrak served the city of Everett at a small station located at 2900 Bond Street, overlooking the Port of Everett west of downtown. It saw free commuter rail service from January to March 1995 as part of the "Try Rail" demonstration, consisting of two daily roundtrips from Seattle and special service to Seattle SuperSonics games at the Tacoma Dome. [41] [42] The Bond Street Station, originally built by the Great Northern Railway in 1910, [43] was originally planned to be kept as a secondary commuter rail station without parking or major bus connections until it was removed from Sound Transit's plans in 2001. [44] [45] [46] The station was closed in November 2002 and has since become the offices of the BNSF Railway Northwest Division. [24]
The City of Everett selected a straightaway track segment east of downtown as the preferred location of a multimodal train/bus station, to replace the existing Amtrak station at Bond Street, in 1993. [30] The Everett City Council chose a two-block industrial site bordered by Pacific Avenue to the north in 1995, estimating a cost of $30 million and an opening in 1998. [47] Everett Mayor Ed Hansen proposed adding two additional stories to the station building to house classrooms and space for career counseling services, inspired by a similar project in Oakland, California. [48] [49] The Sound Transit Board passed a resolution in February 1999 allowing the use of $14 million to begin work on the Everett Multimodal Facility, which was to be the terminus for Sounder commuter rail and Sound Transit Express bus service. [44] [50] A groundbreaking ceremony was held on July 13, 2000, allowing for construction on Everett Station to begin. [51] Sound Transit began with the construction of the Pacific Avenue overpass, replacing an earlier at-grade crossing, that opened on November 14, 2001 at a cost of $20 million. [52] The station building was designed by the Zimmer Gunsul Frasca Partnership and built by Wilder Construction Company in 2000 and 2001. [53]
The $46.9 million station was opened during a ribbon-cutting ceremony on February 4, 2002, attended by Everett Mayor Ed Hansen, Governor Gary Locke, U.S. Representative Rick Larsen, Snohomish County Executive Bob Drewel and Sound Transit Board chairman and King County Executive Ron Sims. [1] [26] [30] [54] Initially, only Everett Transit and Community Transit operated out of the station on opening day, [1] but they were quickly joined by Sound Transit Express service the following day and Greyhound intercity bus service that summer. [1] [55] Amtrak was initially expected to begin serving Everett Station in July 2002, but the construction of a passing track delayed the move of the Cascades and Empire Builder from Bond Street Station to November 12. [56] Construction of a Sounder commuter rail platform and rail spur was approved by the Everett City Council in September 2002, pending reimbursement from Sound Transit and Amtrak for its cost of $726,000. [57] Sounder service to King Street Station in Seattle via Edmonds began with special Seattle Seahawks gameday service on December 22, 2003, carrying 700 passengers on the inaugural run of the Sounder North Line (now the N Line). [58] [59]
Sound Transit expanded parking capacity at Everett Station to 1,067 spaces with the addition of 440 stalls, located east of the station and connected via a pedestrian overpass, that opened in May 2009 at a cost of $13.6 million. [60] The southern lot of the station was cleared to build the terminus of Community Transit's Swift Bus Rapid Transit Blue Line, which began service on November 29, 2009, connecting Everett to Shoreline via the State Route 99 corridor. [61] [62]
Everett Station was proposed as the site of a University of Washington branch campus, with state consultants choosing 32 acres (0.13 km2) around the station to house 5,000 students from Snohomish, Island County and Skagit County. [63] [64] [65] The project, dubbed UW North Sound, was put on hold in December 2008 and has since been canceled. [66] [67]
Link light rail service is expected to be extended from Lynnwood Transit Center to Everett in 2037 or 2041 depending on the availability of funding. The project was approved in the Sound Transit 3 package passed by voters in 2016. [68] The terminus serving downtown Everett is planned to either be located adjacent to Everett Station, as presumed in earlier studies, [69] [70] or closer to Broadway between Pacific Avenue and Wall Street to serve other destinations. [68] [71] In 2012, the City of Everett began to rezone the station's surrounding area to allow multifamily housing, encouraging transit-oriented development by raising height limits to 80 feet (24 m). [23] Another proposal would have a 500-stall parking garage built to replace the southernmost lot at a cost of $15–18 million, [23] allowing Everett Transit to transform the existing western lot into mixed-use development. [72]
Everett Station is also among several options for a future high-speed rail station serving Snohomish County on the Pacific Northwest Corridor, generally following the existing Cascades corridor. The project, led by the Washington State Department of Transportation, was approved for planning in 2022 but is not expected to begin construction for at least a decade. [73]
Snohomish County is a county located in the U.S. state of Washington. With a population of 827,957 as of the 2020 census, it is the third-most populous county in Washington, after nearby King and Pierce counties, and the 72nd-most populous in the United States. The county seat and largest city is Everett. The county forms part of the Seattle metropolitan area, which also includes King and Pierce counties to the south.
Sound Transit (ST), officially the Central Puget Sound Regional Transit Authority, is a public transit agency serving the Seattle metropolitan area in the U.S. state of Washington. It manages the Link light rail system in Seattle and Tacoma, regional Sounder commuter rail, and Sound Transit Express bus service. The agency also coordinates the regional ORCA fare card system, which is also used by local transit operators. In 2019, Sound Transit services carried a total of 48 million passengers and averaged over 161,000 riders on weekdays.
Community Transit (CT) is the public transit authority of Snohomish County, Washington, United States, in the Seattle metropolitan area. It operates local bus, paratransit and vanpool service within Snohomish County, excluding the city of Everett. CT is publicly funded, financed through sales taxes, federal grants, and farebox revenue, with an annual operating budget of $231.6 million as of 2024. In 2023, the system had a ridership of 7,133,700, or about 28,000 per weekday as of the second quarter of 2024, placing it fourth among transit agencies in the Puget Sound region. The city of Everett, which serves as the county seat, is served by Everett Transit, a municipal transit system.
Transportation in Seattle is largely focused on the automobile like many other cities in western North America; however, the city is just old enough for its layout to reflect the age when railways and trolleys predominated. These older modes of transportation were made for a relatively well-defined downtown area and strong neighborhoods at the end of several former streetcar lines, now mostly bus lines.
Sounder commuter rail is a commuter rail service operated by BNSF on behalf of Sound Transit. Service operates Monday through Friday during peak hours from Seattle, Washington, north to Everett and south to Lakewood. In 2023, the system had a ridership of 1,630,000, or about 8,000 per weekday as of the second quarter of 2024.
The 1 Line, formerly Central Link, is a light rail line in Seattle, Washington, United States, and part of Sound Transit's Link light rail system. It serves 23 stations in King and Snohomish counties, traveling 33 miles (53 km) between Lynnwood City Center and Angle Lake stations. The line connects Lynnwood, Mountlake Terrace, Shoreline, the University District, Downtown Seattle, the Rainier Valley, and Seattle–Tacoma International Airport. The 1 Line carried over 26 million total passengers in 2023, with an average of nearly 80,000 daily passengers on weekdays. It runs for 20 hours per day on weekdays and Saturdays, with headways as low as six minutes during peak hours, and reduced 18-hour service on Sundays and holidays.
Edmonds station is a train station serving the city of Edmonds, Washington, in the United States. The station is served by Amtrak's Cascades and Empire Builder routes, as well as Sound Transit's N Line, a Sounder commuter rail service which runs between Everett and Seattle. It is located west of Downtown Edmonds adjacent to the city's ferry terminal, served by the Edmonds–Kingston ferry, and a Community Transit bus station. Edmonds station has a passenger waiting room and a single platform.
Mukilteo station is a train station serving the city of Mukilteo, Washington. It is owned by Sound Transit, who runs the N Line of the Sounder commuter rail service through the station from Everett to King Street Station in Seattle. The station includes a parking lot with 63 spaces, as well as connections to nearby Washington State Ferries, Community Transit, and Everett Transit service on State Route 525. Mukilteo station opened in 2008 with a single side platform, later supplemented with a second platform and pedestrian overpass in 2016.
Lynnwood Transit Center is a bus station and light rail station in Lynnwood, Washington. It is the largest transit hub in southwestern Snohomish County and is served by Community Transit and Sound Transit Express. The transit center also includes a parking garage with 1,670 spaces and bicycle facilities.
The University of Washington North Sound was a discontinued branch campus establishment proposal for the University of Washington. The sites had to be north of Lynnwood and south of Arlington, and have good transportation access. The two proposed sites were in Smokey Point and in Everett. The plan had been for a 4-year college with an emphasis in math, science, engineering and technology.
International District/Chinatown station is a light rail station that is part of the Downtown Seattle Transit Tunnel in Seattle, Washington, United States. The station is located at the tunnel's south end, at 5th Avenue South and South Jackson Street in the Chinatown-International District neighborhood, and is served by the 1 Line of Sound Transit's Link light rail system. The station is located adjacent to Sound Transit headquarters at Union Station, as well as intermodal connections to Amtrak and Sounder commuter rail at King Street Station and the First Hill Streetcar.
Tukwila station is a train station in Tukwila, Washington, United States. The station was built by Sound Transit to serve its Sounder commuter rail service on the S Line, as well as Amtrak's intercity Cascades line. It includes 390 parking spaces and a bus platform served by King County Metro's RapidRide F Line and other routes.
Tacoma Dome Station is a train station and transit hub in Tacoma, Washington, United States. It is served by Amtrak trains, the S Line of Sounder commuter rail, the T Line of Link light rail, and buses on local and intercity routes. Located near the Tacoma Dome south of Downtown Tacoma, the station consists of two train platforms used by Sounder and Amtrak trains, a platform for the T Line, a bus terminal, and two parking garages. The Sounder station is integrated into Freighthouse Square, a former Milwaukee Road depot that was converted into a shopping mall, and is on the east side of the Amtrak station.
Northgate is a light rail and bus station in the Northgate neighborhood of Seattle, Washington, United States, and part of 1 Line on Sound Transit's Link light rail system. The transit center, located adjacent to the Northgate Mall, has four bus bays served by 22 routes. The station also has parking for 1,475 vehicles.
The Lynnwood Link extension is a Link light rail extension traveling north from Northgate to Lynnwood in Snohomish County, Washington, United States. The 8.5-mile (13.7 km) light rail extension includes stations in Lynnwood, Mountlake Terrace, and Shoreline along Interstate 5. It is served by 1 Line when it opened on August 30, 2024, and the 2 Line in 2025. The project was funded by the Sound Transit 2 (ST2) package approved by voters in November 2008, and began construction in 2019. Ridership is expected to be 47,000 to 55,000 daily on the section in 2026.
Shoreline North/185th station is a Link light rail station on the Lynnwood Link Extension serving Shoreline, Washington. The station is located in a trench on the east side of Interstate 5, on the north side of Northeast 185th Street. It includes an adjacent bus station and two-story parking garage with 360 stalls. The station opened on August 30, 2024, with the rest of the line. Shoreline North/185th station also serves as the terminus of the Swift Blue Line.
Redmond Technology station, formerly Overlake Transit Center, is a bus and light rail station in Redmond, Washington, United States. The bus station opened in 2002 adjacent to State Route 520 on the headquarters campus of Microsoft. It was served by Sound Transit Express and King County Metro, as well as Microsoft's private shuttle buses. The light rail station is the eastern terminus of the 2 Line, part of Sound Transit's Link light rail system, and opened on April 27, 2024.
Mountlake Terrace is a bus station and light rail station in Mountlake Terrace, Washington, U.S. It is served by the 1 Line of Sound Transit's Link light rail system.
Sound Transit 3, abbreviated as ST3, was a ballot measure during the November 2016 elections in Seattle, Washington, proposing an expansion of the regional public transit system. The measure was proposed by Sound Transit, which was established by a similar initiative passed in 1996 and expanded by the Sound Transit 2 vote in 2008, who have operated regional transit systems in the Seattle metropolitan area since 1999. On November 8, 2016, Sound Transit 3 was approved by over 54 percent of voters in the Puget Sound region; voters in Pierce County rejected the measure, but the measure passed in King and Snohomish counties, and had an overall majority.
The Swift Blue Line is a bus rapid transit route operated by Community Transit in Snohomish County, Washington, as part of the Swift system. The Blue Line is 16.7 miles (26.9 km) long and runs on the State Route 99 and Evergreen Way corridor between Everett Station and Shoreline North/185th station. It has 36 stations in the cities of Everett, Lynnwood, Edmonds, and Shoreline.