Redmond Technology station

Last updated
Redmond Technology
Redmond Technology Station - Overpass View, April 2024 01.jpg
View of the light rail station from an overpass on NE 40th St.
General information
Location3929 156th Avenue Northeast
Redmond, Washington
United States
Coordinates 47°38′41″N122°08′01″W / 47.64472°N 122.13361°W / 47.64472; -122.13361
Owned by Sound Transit
Platforms1 island platform
Tracks2
Train operators Sound Transit
Bus stands6
Bus operators King County Metro
Sound Transit Express
Construction
Structure typeAt-grade
Parking222 spaces
Bicycle facilities Lockers and racks
AccessibleYes
History
OpenedFebruary 4, 2002 (February 4, 2002) (bus station) [1]
April 27, 2024 (rail station)
Rebuilt2017–2024
Previous namesOverlake Transit Center (2002–2017)
Services
Preceding station Sound Transit logo simplified.svg Sound Transit Following station
Sound Transit Link Light Rail logo.svg
Overlake Village 2 Line
Starter Line
Terminus
Future service
Overlake Village 2 Line
(2025)
Marymoor Village
Location
Redmond Technology station

Redmond Technology station, formerly Overlake Transit Center, is a bus and light rail station in Redmond, Washington, United States. The bus station opened in 2002 adjacent to State Route 520 on the headquarters campus of Microsoft. It was served by Sound Transit Express and King County Metro, as well as Microsoft's private shuttle buses. The light rail station is the eastern terminus of the 2 Line, part of Sound Transit's Link light rail system, and opened on April 27, 2024.

Contents

Location

The light rail station is located adjacent to State Route 520 near its interchange with NE 40th Street. [2]

A pedestrian bridge over State Route 520, connecting the station to the Microsoft west campus, was funded by Microsoft and the City of Redmond in 2013 and began construction in 2020. [3] [4] It opened in April 2024 after the completion of approach ramps and will be maintained by the city government. [5] [6]

History

Overlake Transit Center opened on February 4, 2002, and cost $8 million to construct with funds from Sound Transit, the City of Redmond, King County Metro, Microsoft, and the Federal Transit Administration, opened on February 4, 2002. [1] The new transit center initially lacked passenger shelters and a paved parking lot, which were added in May. The 10-acre (4.0 ha) site was donated by Microsoft, who also contributed $1.2 million to the project and added commuter bus and shuttle bus services. [7] Microsoft's involvement was part of a development agreement with the City of Redmond for its campus expansion project. [8] The transit center had eight bus bays. [9]

The bus bays at the old Overlake Transit Center before it was demolished Overlake Transit Center bus bays.jpg
The bus bays at the old Overlake Transit Center before it was demolished

The park and ride closed in May 2017, as part of preparations for light rail construction. [10] In late July, Sound Transit shifted bus service to a series of temporary bus bays near NE 36th Street and began demolition of the old transit center. [11] The new light rail station's name was shortened from Redmond Technology Center to Redmond Technology in March 2018 in response to a request from Redmond and Microsoft. [12]

The new bus bays at the station were opened in December 2019 under the partially completed parking garage. [13] During construction of the parking garage, cracks were discovered in the concrete above the bus exit. The bus stops and pedestrian walkways were temporarily moved from the garage in April 2020 while an investigation was conducted. [14] The southeast corner of the garage, where several structural deficiencies were found, was demolished in 2021. [15] The bus loop reopened for Microsoft buses in August 2023 and was followed a month later by Sound Transit Express and King County Metro buses. [16] [17] The garage was reopened for parking on October 31. [18]

Light rail service from the station began on April 27, 2024, with trains operating between South Bellevue and Redmond Technology as part of the 2 Line's starter segment. [19] [20] Service is expected to be extended further east to Downtown Redmond in 2025. [21]

Related Research Articles

<span class="mw-page-title-main">Bellevue, Washington</span> City in Washington, United States

Bellevue is a city in the Eastside region of King County, Washington, United States, located across Lake Washington from Seattle. It is the third-largest city in the Seattle metropolitan area, and the fifth-largest city in Washington. It has variously been characterized as a satellite city, a suburb, a boomburb, or an edge city. The population was 151,854 at the 2020 census. The city's name is derived from the French term belle vue.

<span class="mw-page-title-main">Washington State Route 520</span> Freeway in Washington state

State Route 520 (SR 520) is a state highway and freeway in the Seattle metropolitan area, part of the U.S. state of Washington. It runs 13 miles (21 km) from Seattle in the west to Redmond in the east. The freeway connects Seattle to the Eastside region of King County via the Evergreen Point Floating Bridge on Lake Washington. SR 520 intersects several state highways, including Interstate 5 (I-5) in Seattle, I-405 in Bellevue, and SR 202 in Redmond.

<span class="mw-page-title-main">Sound Transit</span> Regional transit government agency for the Seattle metropolitan area

Sound Transit (ST), officially the Central Puget Sound Regional Transit Authority, is a public transit agency serving the Seattle metropolitan area in the U.S. state of Washington. It operates the Link light rail system in Seattle and Tacoma, regional Sounder commuter rail, and Sound Transit Express bus service. The agency also coordinates the regional ORCA fare card system, which is also used by local transit operators. In 2019, Sound Transit services carried a total of 48 million passengers and averaged over 161,000 riders on weekdays.

<span class="mw-page-title-main">Link light rail</span> Light rail system the Seattle metropolitan area

Link light rail is a light rail rapid transit system serving the Seattle metropolitan area in the U.S. state of Washington. It is managed by Sound Transit in partnership with local transit providers, and consists of three non-connected lines: the 1 Line in King County, which travels for 26 miles (42 km) between Seattle and Seattle–Tacoma International Airport; the 2 Line in King County's Eastside region between Bellevue and Redmond; and the T Line in Pierce County, which runs for 4 miles (6.4 km) between Downtown Tacoma and Tacoma Dome Station. In 2023, the system had a ridership of 23.9 million, or about 70,600 per weekday as of the first quarter of 2024, primarily on the 1 Line. Trains run at frequencies of 6 to 24 minutes.

<span class="mw-page-title-main">Lynnwood Transit Center</span> Bus station and planned light rail station in Lynnwood, Washington

Lynnwood Transit Center, also known as Lynnwood TC, is a bus station and future light rail station in Lynnwood, Washington. It is the largest transit hub in southwestern Snohomish County and is served by Community Transit and Sound Transit Express. The transit center also includes a parking garage with 1,670 spaces and bicycle facilities.

<span class="mw-page-title-main">2 Line (Sound Transit)</span> Light rail line in the Seattle metropolitan area

The 2 Line, also known as the East Link Extension, is a light rail line serving the Eastside region of the Seattle metropolitan area in the U.S. state of Washington. It is part of Sound Transit's Link light rail system and runs for 6.6 miles (10.6 km) in the cities of Bellevue and Redmond. The initial segment serves eight stations between South Bellevue and Redmond Technology stations and opened on April 27, 2024. The full line is scheduled to open in 2025 and is planned to include 18 miles (29 km) from west to east and serve twelve stations in Downtown Seattle, Mercer Island, Bellevue, and Redmond. The 2 Line will continue through the Downtown Seattle Transit Tunnel and share stations with the 1 Line through to Lynnwood City Center station.

<span class="mw-page-title-main">RapidRide</span> Brand of bus routes in King County, Washington

RapidRide is a network of limited-stop bus routes with some bus rapid transit features in King County, Washington, operated by King County Metro. The network consists of seven routes totaling 76 miles (122 km) that carried riders on approximately 64,860 trips on an average weekday in 2016, comprising about 17 percent of King County Metro's total daily ridership.

<span class="mw-page-title-main">Northgate station (Sound Transit)</span> Light rail and bus station in Seattle, Washington, U.S.

Northgate is a light rail and bus station in the Northgate neighborhood of Seattle, Washington, United States. It is the northern terminus of the 1 Line on Sound Transit's Link light rail system. The transit center, located adjacent to the Northgate Mall, has four bus bays served by 22 routes. The station also has parking for 1,525 vehicles.

<span class="mw-page-title-main">Downtown Redmond station</span> Future light rail station in Redmond, Washington

Downtown Redmond station is a future Link light rail station on the north side of Redmond Town Center shopping mall in downtown Redmond, Washington. It will be elevated located along Cleveland Street between 164th and 166th avenues.

<span class="mw-page-title-main">South Bellevue station</span> Light rail station in Bellevue, Washington

South Bellevue station is an elevated light rail station located in Bellevue, Washington, United States, an eastern suburb of Seattle. It opened on April 27, 2024, as the western terminus of the 2 Line of Sound Transit's Link light rail system. The station has a park and ride garage with 1,500 stalls and bus service from King County Metro and Sound Transit Express.

<span class="mw-page-title-main">East Main station</span> Light rail station in Bellevue, Washington

East Main station is an at-grade light rail station in Bellevue, Washington, United States. It is served by the 2 Line, part of Sound Transit's Link light rail system, and opened on April 27, 2024.

<span class="mw-page-title-main">Bellevue Transit Center</span> Bus and light rail station in downtown Bellevue, Washington

Bellevue Transit Center (BTC) is a bus station and light rail station in Bellevue, Washington, a suburb of Seattle. It is the main transit hub for the Eastside of King County, serving 20 routes from King County Metro and Sound Transit Express. The transit center is the western terminus of the RapidRide B Line, which runs east to Redmond.

<span class="mw-page-title-main">Wilburton station (Sound Transit)</span> Light rail station in Bellevue, Washington

Wilburton station is an elevated Link light rail station in Bellevue, Washington, United States. It is served by the 2 Line, part of Sound Transit's Link light rail system, and opened in April 2024 as part of the line's starter segment. The station serves the area immediately east of Downtown Bellevue, including Lake Bellevue and the Overlake Hospital Medical Center.

<span class="mw-page-title-main">Microsoft campus</span> Corporate headquarters of Microsoft

The Microsoft campus is the corporate headquarters of Microsoft Corporation, located in Redmond, Washington, United States, a part of the Seattle metropolitan area. Microsoft initially moved onto the grounds of the campus on February 26, 1986, shortly before going public on March 13. The headquarters has undergone multiple expansions since its establishment and is presently estimated to encompass over 8 million square feet (740,000 m2) of office space and have over 50,000 employees.

<span class="mw-page-title-main">BelRed station</span> Light rail station in Bellevue, Washington

BelRed station is an at-grade Link light rail station in the Bel-Red area of Bellevue, Washington. It opened on April 27, 2024, as part of the 2 Line, which serves several Eastside communities.

<span class="mw-page-title-main">Overlake Village station</span> Light rail station in Redmond, Washington

Overlake Village station is a light rail station in Redmond, Washington, United States. It is at-grade station on the 2 Line, part of Sound Transit's Link light rail system. The station serves the Overlake neighborhood and its existing park and ride. Construction began on the station in 2017 and it opened on April 27, 2024.

<span class="mw-page-title-main">Mountlake Terrace Transit Center</span>

Mountlake Terrace Transit Center is a bus station and future light rail station in Mountlake Terrace, Washington.

<span class="mw-page-title-main">Marymoor Village station</span> Future light rail station in Redmond, Washington

Marymoor Village station is a future Link light rail station near Marymoor Park in Redmond, Washington. The station is located along the south side of State Route 520 southwest of its interchange with State Route 202 near Downtown Redmond. It also includes a 1,400-stall park and ride in a garage built on the site.

Esterra Park is a transit-oriented development under construction in the Overlake area of Redmond, Washington. The 28-acre (11 ha), 3.0 million square feet (280,000 m2) project is near major regional shopping and employment centers and multiple modes of transportation, including the future Overlake Village light rail station scheduled to open in 2023. The Esterra Park campus is expected to be home to a combined 8,000 residents and workers.

References

  1. 1 2 Lindblom, Mike; Brooks, Diane (February 2, 2002). "Modern transit centers for riders in Everett, Redmond to debut Monday". The Seattle Times . p. B1. Retrieved July 15, 2016.
  2. "Redmond Technology Station". Sound Transit. Retrieved July 7, 2019.
  3. Ervin, Keith (November 26, 2013). "Microsoft pitches in on bridge over Overlake Transit Center". The Seattle Times. Retrieved July 21, 2015.
  4. "City of Redmond, Sound Transit team up for new pedestrian-bicycle bridge" (Press release). Sound Transit. August 28, 2014. Retrieved July 21, 2015.
  5. Minnick, Benjamin (May 22, 2020). "Kiewit-Hoffman installs first part of pedestrian bridge over SR 520". Seattle Daily Journal of Commerce. Retrieved January 3, 2023.
  6. Schlosser, Kurt (April 22, 2024). "Microsoft and partners open major new pedestrian bridge to span campus and transportation needs". GeekWire . Retrieved April 28, 2024.
  7. Brooks, Diane (May 15, 2002). "Overlake center all gussied up for its new role in area transit". The Seattle Times. p. B3. Retrieved December 27, 2016.
  8. Perry, Nick (August 7, 2001). "Microsoft giving land, money for Park & Ride". Eastside Journal. Retrieved January 31, 2024 via NewsBank.
  9. "Overlake Transit Center Boarding Locations". King County Metro . Retrieved July 15, 2016.
  10. Graf, Heather (May 1, 2017). "East Link construction to close two popular Park & Ride l". KING 5 News. Archived from the original on August 6, 2017. Retrieved August 5, 2017.
  11. "Construction alert: Changes coming to Overlake Transit Center". Sound Transit. July 26, 2017. Retrieved August 5, 2017.
  12. "Sound Transit Motion No. M2018-38" (PDF). Sound Transit. March 22, 2018. Retrieved July 7, 2019.
  13. Cunningham, Rachelle (December 10, 2019). "Overlake Transit Center bus stops are moving". The Platform. Sound Transit. Retrieved May 2, 2020.
  14. Lindblom, Mike (May 1, 2020). "Cracks halt progress on Sound Transit park-and-ride garage in Redmond". The Seattle Times. Retrieved May 2, 2020.
  15. "Redmond Technology Station Garage Update". Sound Transit. April 2, 2021. Retrieved April 12, 2021.
  16. "Stay Informed about the Redmond Technology Station Bus Loop Opening". City of Redmond. August 14, 2023. Retrieved August 24, 2023.
  17. "Sound Transit announces September 2023 Service Change" (Press release). Sound Transit. August 31, 2023. Retrieved November 1, 2023.
  18. Lindblom, Mike (November 1, 2023). "Look both ways! Eastside light-rail trains begin practice runs". The Seattle Times. Retrieved November 1, 2023.
  19. Lindblom, Mike (February 15, 2024). "Sound Transit sets a date for Bellevue-Redmond trains". The Seattle Times. Retrieved February 15, 2024.
  20. Sires, Cameron (April 27, 2024). "Long-awaited Bellevue-to-Redmond light rail line opens for riders". Bellevue Reporter. Retrieved April 27, 2024.
  21. Lindblom, Mike (August 24, 2023). "Eastside-only light rail should open in March, Sound Transit says". The Seattle Times. Retrieved August 24, 2023.