Redmond Technology | ||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | ||||||||||||||||||||||||||
Location | 3929 156th Avenue Northeast Redmond, Washington United States | |||||||||||||||||||||||||
Coordinates | 47°38′41″N122°08′01″W / 47.64472°N 122.13361°W | |||||||||||||||||||||||||
Owned by | Sound Transit | |||||||||||||||||||||||||
Platforms | 1 island platform | |||||||||||||||||||||||||
Tracks | 2 | |||||||||||||||||||||||||
Train operators | Sound Transit | |||||||||||||||||||||||||
Bus stands | 6 | |||||||||||||||||||||||||
Bus operators | King County Metro Sound Transit Express | |||||||||||||||||||||||||
Construction | ||||||||||||||||||||||||||
Structure type | At-grade | |||||||||||||||||||||||||
Parking | 222 spaces | |||||||||||||||||||||||||
Bicycle facilities | Lockers and racks | |||||||||||||||||||||||||
Accessible | Yes | |||||||||||||||||||||||||
History | ||||||||||||||||||||||||||
Opened | February 4, 2002[1] April 27, 2024 (rail station) | (bus station) |||||||||||||||||||||||||
Rebuilt | 2017–2024 | |||||||||||||||||||||||||
Previous names | Overlake Transit Center (2002–2017) | |||||||||||||||||||||||||
Services | ||||||||||||||||||||||||||
| ||||||||||||||||||||||||||
|
Redmond Technology station, formerly Overlake Transit Center, is a bus and light rail station in Redmond, Washington, United States. The bus station opened in 2002 adjacent to State Route 520 on the headquarters campus of Microsoft. It was served by Sound Transit Express and King County Metro, as well as Microsoft's private shuttle buses. The light rail station is the eastern terminus of the 2 Line, part of Sound Transit's Link light rail system, and opened on April 27, 2024.
The light rail station is located adjacent to State Route 520 near its interchange with NE 40th Street. [2]
A pedestrian bridge over State Route 520, connecting the station to the Microsoft west campus, was funded by Microsoft and the City of Redmond in 2013 and began construction in 2020. [3] [4] It opened in April 2024 after the completion of approach ramps and will be maintained by the city government. [5] [6]
Overlake Transit Center opened on February 4, 2002, and cost $8 million to construct with funds from Sound Transit, the City of Redmond, King County Metro, Microsoft, and the Federal Transit Administration, opened on February 4, 2002. [1] The new transit center initially lacked passenger shelters and a paved parking lot, which were added in May. The 10-acre (4.0 ha) site was donated by Microsoft, who also contributed $1.2 million to the project and added commuter bus and shuttle bus services. [7] Microsoft's involvement was part of a development agreement with the City of Redmond for its campus expansion project. [8] The transit center had eight bus bays. [9]
The park and ride closed in May 2017, as part of preparations for light rail construction. [10] In late July, Sound Transit shifted bus service to a series of temporary bus bays near NE 36th Street and began demolition of the old transit center. [11] The new light rail station's name was shortened from Redmond Technology Center to Redmond Technology in March 2018 in response to a request from Redmond and Microsoft. [12]
The new bus bays at the station were opened in December 2019 under the partially completed parking garage. [13] During construction of the parking garage, cracks were discovered in the concrete above the bus exit. The bus stops and pedestrian walkways were temporarily moved from the garage in April 2020 while an investigation was conducted. [14] The southeast corner of the garage, where several structural deficiencies were found, was demolished in 2021. [15] The bus loop reopened for Microsoft buses in August 2023 and was followed a month later by Sound Transit Express and King County Metro buses. [16] [17] The garage was reopened for parking on October 31. [18]
Light rail service from the station began on April 27, 2024, with trains operating between South Bellevue and Redmond Technology as part of the 2 Line's starter segment. [19] [20] Service is expected to be extended further east to Downtown Redmond in 2025. [21]
Bellevue is a city in the Eastside region of King County, Washington, United States, located across Lake Washington from Seattle. It is the third-largest city in the Seattle metropolitan area, and the fifth-largest city in Washington. It has variously been characterized as a satellite city, a suburb, a boomburb, or an edge city. The population was 151,854 at the 2020 census. The city's name is derived from the French term belle vue.
State Route 520 (SR 520) is a state highway and freeway in the Seattle metropolitan area, part of the U.S. state of Washington. It runs 13 miles (21 km) from Seattle in the west to Redmond in the east. The freeway connects Seattle to the Eastside region of King County via the Evergreen Point Floating Bridge on Lake Washington. SR 520 intersects several state highways, including Interstate 5 (I-5) in Seattle, I-405 in Bellevue, and SR 202 in Redmond.
Sound Transit (ST), officially the Central Puget Sound Regional Transit Authority, is a public transit agency serving the Seattle metropolitan area in the U.S. state of Washington. It operates the Link light rail system in Seattle and Tacoma, regional Sounder commuter rail, and Sound Transit Express bus service. The agency also coordinates the regional ORCA fare card system, which is also used by local transit operators. In 2019, Sound Transit services carried a total of 48 million passengers and averaged over 161,000 riders on weekdays.
Link light rail is a light rail rapid transit system serving the Seattle metropolitan area in the U.S. state of Washington. It is managed by Sound Transit in partnership with local transit providers, and consists of three non-connected lines: the 1 Line in King County, which travels for 26 miles (42 km) between Seattle and Seattle–Tacoma International Airport; the 2 Line in King County's Eastside region between Bellevue and Redmond; and the T Line in Pierce County, which runs for 4 miles (6.4 km) between Downtown Tacoma and Tacoma Dome Station. In 2023, the system had a ridership of 23.9 million, or about 70,600 per weekday as of the first quarter of 2024, primarily on the 1 Line. Trains run at frequencies of 6 to 24 minutes.
Lynnwood Transit Center, also known as Lynnwood TC, is a bus station and future light rail station in Lynnwood, Washington. It is the largest transit hub in southwestern Snohomish County and is served by Community Transit and Sound Transit Express. The transit center also includes a parking garage with 1,670 spaces and bicycle facilities.
The 2 Line, also known as the East Link Extension, is a light rail line serving the Eastside region of the Seattle metropolitan area in the U.S. state of Washington. It is part of Sound Transit's Link light rail system and runs for 6.6 miles (10.6 km) in the cities of Bellevue and Redmond. The initial segment serves eight stations between South Bellevue and Redmond Technology stations and opened on April 27, 2024. The full line is scheduled to open in 2025 and is planned to include 18 miles (29 km) from west to east and serve twelve stations in Downtown Seattle, Mercer Island, Bellevue, and Redmond. The 2 Line will continue through the Downtown Seattle Transit Tunnel and share stations with the 1 Line through to Lynnwood City Center station.
RapidRide is a network of limited-stop bus routes with some bus rapid transit features in King County, Washington, operated by King County Metro. The network consists of seven routes totaling 76 miles (122 km) that carried riders on approximately 64,860 trips on an average weekday in 2016, comprising about 17 percent of King County Metro's total daily ridership.
Northgate is a light rail and bus station in the Northgate neighborhood of Seattle, Washington, United States. It is the northern terminus of the 1 Line on Sound Transit's Link light rail system. The transit center, located adjacent to the Northgate Mall, has four bus bays served by 22 routes. The station also has parking for 1,525 vehicles.
Downtown Redmond station is a future Link light rail station on the north side of Redmond Town Center shopping mall in downtown Redmond, Washington. It will be elevated located along Cleveland Street between 164th and 166th avenues.
South Bellevue station is an elevated light rail station located in Bellevue, Washington, United States, an eastern suburb of Seattle. It opened on April 27, 2024, as the western terminus of the 2 Line of Sound Transit's Link light rail system. The station has a park and ride garage with 1,500 stalls and bus service from King County Metro and Sound Transit Express.
East Main station is an at-grade light rail station in Bellevue, Washington, United States. It is served by the 2 Line, part of Sound Transit's Link light rail system, and opened on April 27, 2024.
Bellevue Transit Center (BTC) is a bus station and light rail station in Bellevue, Washington, a suburb of Seattle. It is the main transit hub for the Eastside of King County, serving 20 routes from King County Metro and Sound Transit Express. The transit center is the western terminus of the RapidRide B Line, which runs east to Redmond.
Wilburton station is an elevated Link light rail station in Bellevue, Washington, United States. It is served by the 2 Line, part of Sound Transit's Link light rail system, and opened in April 2024 as part of the line's starter segment. The station serves the area immediately east of Downtown Bellevue, including Lake Bellevue and the Overlake Hospital Medical Center.
The Microsoft campus is the corporate headquarters of Microsoft Corporation, located in Redmond, Washington, United States, a part of the Seattle metropolitan area. Microsoft initially moved onto the grounds of the campus on February 26, 1986, shortly before going public on March 13. The headquarters has undergone multiple expansions since its establishment and is presently estimated to encompass over 8 million square feet (740,000 m2) of office space and have over 50,000 employees.
BelRed station is an at-grade Link light rail station in the Bel-Red area of Bellevue, Washington. It opened on April 27, 2024, as part of the 2 Line, which serves several Eastside communities.
Overlake Village station is a light rail station in Redmond, Washington, United States. It is at-grade station on the 2 Line, part of Sound Transit's Link light rail system. The station serves the Overlake neighborhood and its existing park and ride. Construction began on the station in 2017 and it opened on April 27, 2024.
Mountlake Terrace Transit Center is a bus station and future light rail station in Mountlake Terrace, Washington.
Marymoor Village station is a future Link light rail station near Marymoor Park in Redmond, Washington. The station is located along the south side of State Route 520 southwest of its interchange with State Route 202 near Downtown Redmond. It also includes a 1,400-stall park and ride in a garage built on the site.
Esterra Park is a transit-oriented development under construction in the Overlake area of Redmond, Washington. The 28-acre (11 ha), 3.0 million square feet (280,000 m2) project is near major regional shopping and employment centers and multiple modes of transportation, including the future Overlake Village light rail station scheduled to open in 2023. The Esterra Park campus is expected to be home to a combined 8,000 residents and workers.