[[Space Applications Centre]]"},"dry_mass":{"wt":""},"launch_mass":{"wt":"2250 kg"},"power":{"wt":"3 kW"},"launch_date":{"wt":"29 January 2025,06:23 [[Indian Standard Time|IST]]"},"launch_rocket":{"wt":"[[GSLV-F15]]"},"launch_site":{"wt":"[[Satish Dhawan Space Centre|Satish Dhawan]],[[Satish Dhawan Space Centre Second Launch Pad|SLP]]"},"launch_contractor":{"wt":"[[Indian Space Research Organisation|ISRO]]"},"disposal_type":{"wt":""},"deactivated":{"wt":""},"last_contact":{"wt":""},"decay_date":{"wt":""},"orbit_reference":{"wt":"[[Geocentric orbit|Geocentric]]"},"orbit_regime":{"wt":"[[Geostationary Transfer Orbit|GTO]]"},"orbit_periapsis":{"wt":"{{convert|165|km|abbr=on}}"},"orbit_apoapsis":{"wt":"{{convert|36577|km|abbr=on}}"},"orbit_inclination":{"wt":""},"orbit_period":{"wt":""},"orbit_longitude":{"wt":"111.75°East (planned)"},"apsis":{"wt":"gee"},"programme":{"wt":"[[Indian Regional Navigation Satellite System|NVS series]]"},"previous_mission":{"wt":"[[NVS-01]]"},"next_mission":{"wt":"[[NVS-03]]"}},"i":0}}]}" id="mwBw">.mw-parser-output .infobox-subbox{padding:0;border:none;margin:-3px;width:auto;min-width:100%;font-size:100%;clear:none;float:none;background-color:transparent}.mw-parser-output .infobox-3cols-child{margin:auto}.mw-parser-output .infobox .navbar{font-size:100%}@media screen{html.skin-theme-clientpref-night .mw-parser-output .infobox-full-data:not(.notheme)>div:not(.notheme)[style]{background:#1f1f23!important;color:#f8f9fa}}@media screen and (prefers-color-scheme:dark){html.skin-theme-clientpref-os .mw-parser-output .infobox-full-data:not(.notheme) div:not(.notheme){background:#1f1f23!important;color:#f8f9fa}}@media(min-width:640px){body.skin--responsive .mw-parser-output .infobox-table{display:table!important}body.skin--responsive .mw-parser-output .infobox-table>caption{display:table-caption!important}body.skin--responsive .mw-parser-output .infobox-table>tbody{display:table-row-group}body.skin--responsive .mw-parser-output .infobox-table tr{display:table-row!important}body.skin--responsive .mw-parser-output .infobox-table th,body.skin--responsive .mw-parser-output .infobox-table td{padding-left:inherit;padding-right:inherit}}
![]() NVS series spacecraft | |
Mission type | Navigation |
---|---|
Operator | ISRO |
COSPAR ID | 2025-020A |
SATCAT no. | 62850 |
Spacecraft properties | |
Bus | I-2K |
Manufacturer | ISRO Satellite Centre Space Applications Centre |
Launch mass | 2250 kg |
Power | 3 kW |
Start of mission | |
Launch date | 29 January 2025, 06:23 IST |
Rocket | GSLV-F15 |
Launch site | Satish Dhawan, SLP |
Contractor | ISRO |
Orbital parameters | |
Reference system | Geocentric |
Regime | GTO |
Longitude | 111.75° East (planned) |
Perigee altitude | 165 km (103 mi) |
Apogee altitude | 36,577 km (22,728 mi) |
NVS-02 is the second satellite in the NVS series, equipped with navigation payloads in L1, L5, and S bands, as well as a ranging payload in C-band. The vehicle is based on the conventional I-2K bus platform, with a lift-off mass of 2250 kg and a power handling capacity of approximately 3 kW. It was planned to replace IRNSS-1E at the orbital slot of 111.75° East. [1] [2] [3]
NVS-02, the second satellite in the NVS series is configured with Navigation payload in L1, L5 and S bands in addition to ranging payload in C-band like its predecessor-NVS-01.It was planned to provide two types of services, namely, Standard Positioning Service (SPS) and Restricted Service (RS). SPS provides a position accuracy of better than 20 m (2σ) and timing accuracy better than 40 ns (2σ) over the primary service Area. [4]
NVS-02 satellite was designed, developed and integrated at U R Rao Satellite Centre (URSC) with the support of other satellite-based work Centres. On completion of Assembly and Integrated Testing (AIT), the satellite was subjected to satellite level thermovac test to verify and validate its design and performance in simulated space environment during November-December 2024. The satellite underwent dynamic test during December 2024 thus confirming its suitability to withstand the dynamic loads anticipated during launch. [4]
A comprehensive Pre-shipment Review (PSR) of the performance and compliance of the Satellite during various phases of its realization was completed on December 27, 2024. The satellite was flagged off to SDSC-SHAR on January 05, 2025. [4]
NVS-02 was launched aboard GSLV-F15.The rocket lifted off from the spaceport’s second launch pad at 6.23 a.m. on 29th January 2025, marking ISRO's first launch of the year and the 17th flight of the GSLV and the 11th flight of Mk2 Variant. The satellite was injected into the GTO 19 minutes after launch from Sriharikota.This marked ISRO's 100th Spaceflight launch from Satish Dhawan Space Center. [5] [6] [7]
It was the First mission undertaken by newly appointed ISRO chairman V. Narayanan. [8]
Following launch, ISRO reported that orbit raising operations towards positioning the satellite to the designated orbital slot could not be carried out as the valves for admitting the oxidizer fuel for the main engine did not open. From this point, the spacecraft will not be able to complete its mission objectives. The spacecraft is currently still in a Geostationary transfer orbit with a perigree of about 165 km and an apogee of around 36,577 km. All other Systems are reported to be working normally. [9] [10]
ISRO has formed a Failure Analysis committee headed by former Chairman A S Kiran Kumar to look into the causes for the failure of the pyro valve in the spacecraft. [11]