Mission type | Communication satellite |
---|---|
Operator | ISRO |
COSPAR ID | 2004-036A |
SATCAT no. | 28417 |
Website | www |
Mission duration | 7 years planned [1] 6 years achieved [2] |
Spacecraft properties | |
Bus | I-2K |
Manufacturer | ISRO Satellite Centre Space Applications Centre |
Launch mass | 1,950 kilograms (4,300 lb) |
Power | 2040 watts |
Start of mission | |
Launch date | 20 September 2004, 10:31:00 UTC [3] |
Rocket | GSLV Mk.I F01 |
Launch site | Satish Dhawan FLP |
Contractor | ISRO |
Entered service | 24 September 2004 |
End of mission | |
Disposal | Moved to Graveyard orbit |
Deactivated | 30 September 2010[2] |
Orbital parameters | |
Reference system | Geocentric |
Regime | Geostationary |
Longitude | 74° East |
Perigee altitude | 36,066 kilometres (22,410 mi) |
Apogee altitude | 36,084 kilometres (22,422 mi) |
Inclination | 2.71 degrees |
Period | 24.17 hours |
Epoch | 14 December 2013, 14:55:38 UTC [4] |
GSAT-3, also known as EDUSAT, was a communications satellite which was launched on 20 September 2004 by the Indian Space Research Organisation. EDUSAT is the first Indian satellite built exclusively to serve the educational sector. It is mainly intended to meet the demand for an interactive satellite-based distance education system for the country. [5]
EDUSAT carries five Ku band transponders providing spot beams, one Ku band transponder providing a national beam and six extended C band transponders providing national coverage beams.
EDUSAT was successfully launched into a Geosynchronous Transfer Orbit (GTO) on the first operational launch of the Geosynchronous Satellite Launch Vehicle, which flew from the First Launch Pad at the Satish Dhawan Space Centre in Sriharikota. EDUSAT was initially placed into a transfer orbit with a perigee of 180 kilometres (110 mi) and an apogee of 35,985 kilometres (22,360 mi) and a period of 10.5 hours, inclined at 19.2 degrees to the equator.
EDUSAT was decommissioned in September 2010 and relocated to a graveyard orbit. [2] [4]
The 414 tonne, 49 m tall GSLV, carrying the 1950 kg GSAT-3, lifted off from Sriharikota at 4:01 pm. About seventeen minutes after lift off, the satellite was successfully placed in GTO. At 4.8 seconds before the countdown reached zero, the four liquid propellant strap-on stages, each carrying 40 tonne of hypergolic liquid propellants (UH25 and N2O4), were ignited. At count zero and after confirming the normal performance of all the four strap-on motors, the 138 tonne solid propellant first stage core motor was ignited and GSLV blazed into the sky. The major phases of the flight included the first stage burn-out at 104 seconds, the strap on burn-out at 150 seconds, ignition of the second stage at 150 seconds, heat shield separation at an altitude of 115 km and 227 seconds into the flight, second stage burn-out at 288 seconds, ignition of the 12.5 tonne cryogenic stage at 304 seconds and its shut down at 999 seconds after attaining the required velocity of 10.2 km per second.
EDUSAT was put into orbit at 1014 seconds about 5000 km away from Sriharikota. The separated cryogenic stage was subsequently reoriented and passivated.
Soon after its injection into GTO, the two solar arrays of EDUSAT were automatically deployed. The deployment of the arrays as well as the general health of the satellite were monitored by the ground station of the ISRO Telemetry, Tracking and Command network (ISTRAC) located in the Indonesian island of Biak. The Master Control Facility (MCF) at Hassan in Karnataka has since taken control of EDUSAT for all its post launch operations. Ground stations at Lake Cowichan (Canada), Fucino (Italy) and Beijing (China) are supporting MCF in monitoring the health of the satellite and its orbit raising operations.
Its designated orbital slot is 74 degree East longitude in the Geostationary Orbit. There, it will be co-located with KALPANA-1 and INSAT-3C.
EDUSAT was developed by ISRO Satellite Centre, Bangalore. The payloads were developed by Space Applications Centre, Ahmedabad. Master Control Facility (ISRO) at Hassan is responsible for all post launch operations of the satellite.
India's first broadband network on EDUSAT for schools, VICTERS (Versatile ICT Enabled Resource for Students) inaugurated by Dr. A.P.J Abdul Kalam, former president of India on 28 July 2005 in Thiruvananthapuram has revolutionized classrooms. Through IT@School Project, Kerala has demonstrated how EDUSAT could be used to successfully empower teachers.
The Indian National Satellite SystemINSAT, is a series of multipurpose geostationary satellites launched by ISRO to satisfy telecommunications, broadcasting, meteorology, and search and rescue operations. Commissioned in 1983, INSAT is the largest domestic communication system in the Indo-Pacific Region. It is a joint venture of the Department of Space, Department of Telecommunications, India Meteorological Department, All India Radio and Doordarshan. The overall coordination and management of INSAT system rests with the Secretary-level INSAT Coordination Committee.
Geosynchronous Satellite Launch Vehicle (GSLV) is a class of expendable launch systems operated by the Indian Space Research Organisation (ISRO). GSLV has been used in fifteen launches since 2001.
The GSAT satellites are India's indigenously developed communications satellites, used for digital audio, data and video broadcasting. As of 5 December 2018, 20 GSAT satellites of ISRO have been launched out of which 14 satellites are in service.
GSAT-1 was an experimental communications satellite launched aboard the maiden flight of the GSLV rocket. The spacecraft was equipped with instrumentation to test Pulse-code modulation (PCM) transmitting on S-band frequencies and transponders operating in the C-band. The spacecraft was unable to complete its mission after a launch failure left it in a lower than planned orbit and propulsion issues prevented the satellite from correcting this via its own maneuvering system.
Satish Dhawan Space Centre – SDSC, is the primary spaceport of the Indian Space Research Organisation (ISRO), located in Sriharikota, Andhra Pradesh.
The Launch Vehicle Mark-3 or LVM3 is a three-stage medium-lift launch vehicle developed by the Indian Space Research Organisation (ISRO). Primarily designed to launch communication satellites into geostationary orbit, it is also due to launch crewed missions under the Indian Human Spaceflight Programme. LVM3 has a higher payload capacity than its predecessor, GSLV.
GSAT-4, also known as HealthSat, was an experimental communication and navigation satellite launched in April 2010 by the Indian Space Research Organisation on the maiden flight of the Geosynchronous Satellite Launch Vehicle Mk.II rocket. It failed to reach orbit after the rocket's third stage malfunctioned. The third stage was the first Indian-built cryogenic-fuelled upper stage, and was making its first flight. The ISRO suspects that the failure was caused by the third stage not igniting.
The CE-7.5 is a cryogenic rocket engine developed by the Indian Space Research Organisation to power the upper stage of its GSLV Mk-2 launch vehicle. The engine was developed as a part of the Cryogenic Upper Stage Project (CUSP). It replaced the KVD-1 (RD-56) Russian cryogenic engine that powered the upper stage of GSLV Mk-1.
GSAT-5P, or GSAT-5 Prime, was an Indian communications satellite which was lost in a launch failure in December 2010. Part of the Indian National Satellite System, it was intended to operate in geosynchronous orbit as a replacement for INSAT-3E.
INSAT-4CR was a communications satellite operated by ISRO as part of the Indian National Satellite System. Launched in September 2007, it replaced the INSAT-4C satellite which had been lost in a launch failure the previous year. The satellite was initially stationed in geostationary orbit at a longitude of 74 degrees east, with expected operational life of at least ten years, however this may have been reduced by the underperformance of the Geosynchronous Satellite Launch Vehicle which placed it into orbit. INSAT-4CR is planned to be replaced by GSAT-31, which was launched on February 6, 2019.
GSAT-14 is an Indian communications satellite launched in January 2014. It replaced the GSAT-3 satellite, which was launched in 2004. GSAT-14 was launched by a Geosynchronous Satellite Launch Vehicle Mk.II, which incorporated an Indian-built cryogenic engine on the third stage.
INSAT-4E, also known as GSAT-6, is a member of the INSAT family and is a multimedia communication satellite that will offer a Satellite Digital Multimedia Broadcasting (S-DMB) service across several digital multimedia terminals or consoles which can be used to provide information services to vehicles on the fly and to the mobile phones. The satellite can be used for other social and strategic applications.
M.Y.S. Prasad is an Indian scientist and the former director of the Satish Dhawan Space Centre Sriharikota Range (SDSC-SHAR). Govt. of India’s Civilian Award Padma Shri for the year 2014 for his distinguished service in Science and Technology.
GSAT-7 or INSAT-4F is a multi-band military communications satellite developed by the Indian Space Research Organisation. The Indian Navy is the user of the multi-band communication spacecraft, which has been operational since September 2013. According to defense experts, the satellite will enable the navy to extend its blue water capabilities and stop relying on foreign satellites like Inmarsat, which provide communication services to its ships.
GSAT-6A was a communication satellite launched by the Indian Space Research Organisation (ISRO) It featured a 6-metre (20 ft) unfurlable S-band antenna similar to the one used on GSAT-6. Around 17 minutes after lift-off, the three stage GSLV Mk.II rocket flying on GSLV F08 mission successfully injected the satellite into a geosynchronous transfer orbit. Due to power failure during its orbit raising burns the communication was lost with GSAT-6A before it could reach its final circular geostationary orbit (GSO).
GSAT-29 is a high-throughput communication satellite developed by the Indian Space Research Organisation (ISRO). The mission aims at providing high-speed bandwidth to Village Resource Centres (VRC) in rural areas. The two Ku and Ka operational payloads will provide communication services to Jammu and Kashmir and Northeast India under Digital India programme. At the time of launch GSAT-29 was the heaviest satellite, weighing 3,423 kg (7,546 lb), that was placed in orbit by an Indian launch vehicle. Approved cost of GSAT-29 is ₹175.63 crore (US$22 million).
The GSLV F12 is the 15th flight of the GSLV and the 9th flight of Mk2 variant using indigenous Cryogenic engine.
The Next Generation Launch Vehicle or NGLV is a three-stage partially reusable rocket, currently under development by the Indian Space Research Organisation (ISRO). This vehicle is designed to replace currently operational systems like PSLV, GSLV and LVM3.