Names | GSAT-9 |
---|---|
Mission type | Communications / Meteorology |
Operator | ISRO |
COSPAR ID | 2017-024A |
SATCAT no. | 42695 |
Website | GSAT-9 |
Mission duration | Planned: 12 years [1] Elapsed: 7 years, 5 months, 16 days |
Spacecraft properties | |
Bus | I-2K [1] |
Manufacturer | ISRO Satellite Centre Space Applications Centre |
Launch mass | 2,230 kg (4,916 lb) [1] |
Dry mass | 976 kg (2,152 lb) [1] |
Dimensions | 1.53 × 1.65 × 2.40 m (5.0 × 5.4 × 7.9 ft) [1] |
Power | 3,500 watts [1] |
Start of mission | |
Launch date | 5 May 2017, 11:27 UTC [2] |
Rocket | GSLV Mk II-F09 [1] |
Launch site | Satish Dhawan SLP |
Contractor | ISRO |
Orbital parameters | |
Reference system | Geocentric |
Regime | Geostationary |
Longitude | 48° E |
Perigee altitude | 35,769 km (22,226 mi) |
Apogee altitude | 35,802 km (22,246 mi) |
Inclination | 0.0413° |
Epoch | 5 June 2017, 17:02:43 UTC [3] |
Transponders | |
Band | 12 × Ku band |
Coverage area | SAARC |
The South Asia Satellite (designated GSAT-9), formerly known as SAARC Satellite, is a geostationary [4] communications and meteorology satellite operated by the Indian Space Research Organisation for the South Asian Association for Regional Cooperation (SAARC) region. [5] The satellite was launched on 5 May 2017. During the 18th SAARC summit held in Nepal in 2014, Indian Prime Minister Narendra Modi mooted the idea of a satellite serving the needs of SAARC member nations [6] [7] as a part of his neighbourhood first policy. [8] Afghanistan, Bangladesh, Bhutan, Maldives, Nepal and Sri Lanka are the users of the multi-dimensional facilities provided by the satellite.
Pakistan "offered technical and monetary support" [9] which India rejected saying that it wanted the project to be a "gift" and multi-national collaboration would be time-consuming. [10] Pakistan later on declined to participate in the project citing India's refusal to collaboration and security reasons. [11] [12] Afghanistan too was initially non-committal to the satellite [13] which led to renaming of satellite from "SAARC Satellite" to "South Asia Satellite" referring just to the subcontinent. As of 2019 with exception of Pakistan, the satellite is in service with all SAARC countries.
The South Asia Satellite provides crucial information on tele-medicine, tele-education, banking and television broadcasting opportunities. It is also equipped with remote sensing state of the art technology which enables collection of real-time weather data and helps in observations of the geology of the South Asian nations. [14]
During the Indian general elections campaign in 2014, Prime Minister Modi hinted that his foreign policy will actively focus on improving ties with India's immediate neighbours which is being termed as Neighbourhood first policy in the Indian media. [15] [16] Modi invited all heads of state/heads of government of SAARC countries during his swearing-in ceremony as Prime Minister of India and held bilateral talks with all of them individually, which was dubbed a "mini SAARC summit" by the media. [17] India is only South Asian nation with orbital launch capability and builds and operates one of largest fleet of artificial satellites in world. [18] [19] Modi said, "There is a lot of poverty in the SAARC nations and we need scientific solutions for this". [7]
In his address to the Sri Lankan Parliament in March 2015, Narendra Modi said "Sri Lanka will take full benefit of India's satellite for the SAARC Region. This should be in Space by December 2016". [18]
The announcement of the satellite was generally met with favourable views by the SAARC nations that supported the program, specifically from Sri Lanka and Bangladesh. [20]
Pakistan maintains its own space program under its Space and Upper Atmosphere Research Commission (SUPARCO), which has launched satellites on Chinese satellite launch vehicles in the past. [18] [20] [10] [21]
Pakistan initially declared that it was "keen" to participate on the project, offering monetary and technical support. [10] However, Pakistan said it did not because "India was not willing to develop the project on a collaborative basis." [22] Pakistan also stated it was working on its own satellite under its existing space commitments, thus declined to join the project. [9] The Indian government declined Pakistani offers of technical and monetary help because it wanted the project to be an Indian "gift" and did not want to make it into a "SAARC project", and that collaborations with Pakistan would have taken some time. [10] Earlier on 27 June 2015, ISRO chairman A. S. Kiran Kumar had announced that India and Pakistan would collaborate on developing the SAARC satellite with SUPARCO performing technical engineering under ISRO's guidance. [23]
During the 70th UN meeting in New York City held on 20 September 2015, officials from India and Pakistan debated over the ownership and control of the satellite. [24] On 2 October 2015, India announced that it had decided to go ahead with building the satellite, without Pakistan's consent. [24] On 23 March 2016, Vikas Swarup, official spokesperson of the Ministry of External Affairs of India said "Pakistan has decided to opt-out of the satellite project. So it cannot be called a SAARC satellite. It will be a South Asia satellite." [25]
There were some reports that Pakistan had security concerns, especially regarding espionage. [26] However, the Pakistani foreign ministry said these reports were "unfounded". [22]
On 23 March 2017, Bangladesh signed the South Asia Satellite agreement with India. The agreement formally known as "Agreement between the Government of Republic of India and the Government of the People's Republic of Bangladesh concerning to orbit frequency co-ordination of 'South Asia Satellite' proposed at 48.E" would cover 12 transponders of the satellite from which, 1 will be gifted to Bangladesh. [27] [28]
Bangladesh has launched its first satellite Bangabandhu-1 on 12 May 2018. Citing the capacity of Thales Alenia Space manufactured Bangabandhu-1 satellite, the Chairman of Bangladesh Communication Satellite Company Limited (BSCL) Dr. Shahjahan Mahmood said, "Our own satellite can be used for commercial purposes and we can also sell its capacity to other countries while South Asia Satellite will be used only for limited purposes and its capacity will never be sold." [29]
In November 2018, Bhutan announced that it is on track to begin using South Asia Satellite by the end of November 2018. Planned utilisation of allotted Ku-band transponder includes connecting three off-grid blocks in remote areas of the country, national TV broadcast, emergency communications and backup for domestic/international voice connectivity. [30]
In November 2015, ISRO chairman A. S. Kiran Kumar stated that the satellite could be launched within 18 months of receiving approval from the SAARC member nations. [14] [31] It was proposed to build a satellite for the SAARC region with 12 Ku-band transponders (36 MHz each) [27] and launch it with the Indian GSLV Mk-II. The cost of the satellite was estimated to be about ₹ 235 crore (equivalent to ₹330 croreorUS$39 million in 2023), and the total cost including operational costs and insurance comes to ₹450 crore (equivalent to ₹631 croreorUS$76 million in 2023). [32] The cost associated with the launch was met by the Government of India.
The satellite will enable a full range of applications and services in the areas of telecommunication and broadcasting applications viz television (TV), direct-to-home (DTH), very small aperture terminals (VSATs), tele-education, tele-medicine and disaster management support. It will provide communication channels for better coordination during disaster management, and will help countries in mapping terrain and natural resources. [33]
GSAT-9 carries 12 Ku band transponders; each participating South Asian Country has access to a dedicated transponder for their communications. [34]
The standalone satellite has a liftoff mass of about 2,230 kg. [34] GSAT-9 is the first Indian satellite to use electric propulsion albeit partially. It carries only 25% of the normal chemical fuel package compared to other Indian satellites, a xenon based electric propulsion system is used for orbital functions of the spacecraft. GSAT-20 is expected to be the first fully electric propulsion system enabled satellite. [35] [36]
The satellite was launched on 5 May 2017 at 11:27 UTC aboard the GSLV-F09 rocket from the Second Launch Pad (SLP) of the Satish Dhawan spaceport in Sriharikota, in the southern part of Andhra Pradesh. [2] [37]
The launch was followed by a series of orbit-raising operations (using an on-board LAM and chemical thrusters) to place the satellite in the intended geostationary orbital slot.
Op # | Date/ Time (UTC) | LAM burn time | Height achieved | Inclination achieved | Orbital period | References | |
---|---|---|---|---|---|---|---|
Apogee | Perigee | ||||||
1 | 5 May 2017 10:21 | 2643 s | 35,873 km (22,290 mi) | 5,687 km (3,534 mi) | 10.38° | 12 h, 22 min | [38] |
2 | 7 May 2017 04:00 | 3529.7 s | 35,858 km (22,281 mi) | 28,608 km (17,776 mi) | 0.755° | 20 h, 58 min | [39] |
3 | 8 May 2017 01:21:52 | 445.8 s | 35,809 km (22,251 mi) | 35,776.8 km (22,230.7 mi) | 0.0° | 23 h, 56 min, 6 s | [40] |
Sri Lankan President Maithripala Sirisena congratulated Modi using satellite technology and claimed that it would help uplift the standards of people. [41] Nepalese officials commented on Nepalese current inability to fully utilize the satellite information. [42]
The Indian National Satellite System or INSAT, is a series of multipurpose geostationary satellites launched by the Indian Space Research Organisation (ISRO) to satisfy telecommunications, broadcasting, meteorology, and search and rescue operations. Commissioned in 1983, INSAT is the largest domestic communication system in the Indo-Pacific Region. It is a joint venture of the Department of Space, Department of Telecommunications, India Meteorological Department, All India Radio and Doordarshan. The overall coordination and management of INSAT system rests with the Secretary-level INSAT Coordination Committee.
Geosynchronous Satellite Launch Vehicle (GSLV) is a class of expendable launch systems operated by the Indian Space Research Organisation (ISRO). GSLV has been used in fifteen launches since 2001.
Indian Space Research Organisation is India's national space agency. It serves as the principal research and development arm of the Department of Space (DoS), overseen by the Prime Minister of India, with the Chairman of ISRO also serving as the chief executive of the DoS. It is primarily responsible for space-based operations, space exploration, international space cooperation and the development of related technologies. The agency maintains a constellation of imaging, communication and remote sensing satellites. It operates the GAGAN and IRNSS satellite navigation systems. It has sent three missions to the Moon and one mission to Mars.
GSAT-3, also known as EDUSAT, was a communications satellite which was launched on 20 September 2004 by the Indian Space Research Organisation. EDUSAT is the first Indian satellite built exclusively to serve the educational sector. It is mainly intended to meet the demand for an interactive satellite-based distance education system for the country.
The GSAT satellites are India's indigenously developed communications satellites, used for digital audio, data and video broadcasting. As of 5 December 2018, 20 GSAT satellites manufactured by ISRO have been launched, out of which 14 are in service.
The Launch Vehicle Mark-3 or LVM3 is a three-stage medium-lift launch vehicle developed by the Indian Space Research Organisation (ISRO). Primarily designed to launch communication satellites into geostationary orbit, it is also due to launch crewed missions under the Indian Human Spaceflight Programme. LVM3 has a higher payload capacity than its predecessor, GSLV.
GSAT-4, also known as HealthSat, was an experimental communication and navigation satellite launched in April 2010 by the Indian Space Research Organisation on the maiden flight of the Geosynchronous Satellite Launch Vehicle Mk.II rocket. It failed to reach orbit after the rocket's third stage malfunctioned. The third stage was the first Indian-built cryogenic-fuelled upper stage, and was making its first flight. The ISRO suspects that the failure was caused by the third stage not igniting.
GSAT-5P, or GSAT-5 Prime, was an Indian communications satellite which was lost in a launch failure in December 2010. Part of the Indian National Satellite System, it was intended to operate in geosynchronous orbit as a replacement for INSAT-3E.
GSAT-14 is an Indian communications satellite launched in January 2014. It replaced the GSAT-3 satellite, which was launched in 2004. GSAT-14 was launched by a Geosynchronous Satellite Launch Vehicle Mk.II, which incorporated an Indian-built cryogenic engine on the third stage.
GSAT-10 is an Indian communication satellite which was launched by Ariane-5ECA carrier rocket in September 2012. It has 12 KU Band, 12 C Band and 6 lower extended c band transponders, and included a navigation payload to augment GAGAN capacity. Following its launch and on-orbit testing, it was placed in Geosynchronous orbit at 83.0° East, from where it will provide communication services in India.
GSAT-11 is an Indian geostationary communications satellite. The 5854 kg satellite is based on the new I-6K Bus and carries 40 transponders in the Ku-band and Ka-band frequencies, which are capable of providing up to 16 Gbit/s throughput. GSAT-11 is India's heaviest satellite.
INSAT-4E, also known as GSAT-6, is a member of the INSAT family and is a multimedia communication satellite that will offer a Satellite Digital Multimedia Broadcasting (S-DMB) service across several digital multimedia terminals or consoles which can be used to provide information services to vehicles on the fly and to the mobile phones. The satellite can be used for other social and strategic applications.
GSAT-7 or INSAT-4F is a multi-band military communications satellite developed by the Indian Space Research Organisation. The Indian Navy is the user of the multi-band communication spacecraft, which has been operational since September 2013. According to defense experts, the satellite will enable the navy to extend its blue water capabilities and stop relying on foreign satellites like Inmarsat, which provide communication services to its ships.
GSAT-15 is an Indian communication satellite similar to GSAT-10 to augment the capacity of transponders to provide more bandwidth for Direct-to-Home television and VSAT services. It was successfully launched on 10 November 2015 at 21:34:07 UTC aboard an Ariane 5 rocket, along with the ArabSat 6B satellite.
GSAT-19 is an Indian communications satellite launched by the Indian Space Research Organisation aboard an LVM3 on 5 June 2017.
GSAT-6A was a communication satellite launched by the Indian Space Research Organisation (ISRO) It featured a 6-metre (20 ft) unfurlable S-band antenna similar to the one used on GSAT-6. Around 17 minutes after lift-off, the three stage GSLV Mk.II rocket flying on GSLV F08 mission successfully injected the satellite into a geosynchronous transfer orbit. Due to power failure during its orbit raising burns the communication was lost with GSAT-6A before it could reach its final circular geostationary orbit (GSO).
GSAT-29 is a high-throughput communication satellite developed by the Indian Space Research Organisation (ISRO). The mission aims at providing high-speed bandwidth to Village Resource Centres (VRC) in rural areas. The two Ku and Ka operational payloads will provide communication services to Jammu and Kashmir and Northeast India under Digital India programme. At the time of launch GSAT-29 was the heaviest satellite, weighing 3,423 kg (7,546 lb), that was placed in orbit by an Indian launch vehicle. Approved cost of GSAT-29 is ₹175.63 crore (US$21 million).
The Defence Space Agency (DSA) is an integrated tri-services agency of the Indian Armed Forces headquartered in Bengaluru, Karnataka, India. The agency is tasked with operating the space-warfare and Satellite Intelligence assets of India. The DSA draws personnel from all three branches of the Armed Forces.