GSAT-1

Last updated
GSAT-1
Mission typeCommunications
Technology
Operator ISRO
COSPAR ID 2001-015A OOjs UI icon edit-ltr-progressive.svg
SATCAT no. 26745
Mission durationFailed to reach orbit
Spacecraft properties
Bus I-2K
Manufacturer ISRO
Launch mass1,540 kilograms (3,400 lb)
Start of mission
Launch date18 April 2001, 10:13 (2001-04-18UTC10:13Z) UTC
Rocket GSLV Mk.I
Launch site Shiharikota FLP
Contractor ISRO
Orbital parameters
Reference system Geocentric
Regime Medium Earth
Geostationary planned
Longitude73° west (2000)
99° west (2000–2006)
76.85° west (2006–2009)
Perigee altitude 33,800 kilometres (21,000 mi)
Apogee altitude 35,725 kilometres (22,198 mi)
Inclination 0.9 degrees
Period 1384.09 minutes
Epoch 25 April 2001 [1]
Transponders
Band3 C-band
2 S-band
GSAT-2  

GSAT-1 was an experimental communications satellite launched aboard the maiden flight of the GSLV rocket. The spacecraft was equipped with instrumentation to test Pulse-code modulation (PCM) transmitting on S-band frequencies and transponders operating in the C-band. [2] The spacecraft was unable to complete its mission after a launch failure left it in a lower than planned orbit and propulsion issues prevented the satellite from correcting this via its own maneuvering system.

Contents

Overview

GSAT-1 failed to achieve its target orbit, which prevented it from fulfilling its primary communications mission. The 1.54-tonne satellite was orbiting with a period of 23 hours two minutes, instead of the planned 24-hour geosynchronous orbit, only permitting a limited series of experiments to be conducted, including digital audio broadcasting and compressed digital TV signal transmission.

The GSLV (Geosynchronous Satellite Launch Vehicle) suffered a performance shortfall during its first flight resulting in the injection of the experimental satellite into a geosynchronous transfer orbit (GTO) of 181 x 32.051 km, inclined at 19.2 degrees, having an apogee about 4,000 km below the targeted orbit of 185 x 35.975 km. The satellite used its onboard propulsion system to raise both its apogee and its perigee to geostationary orbit as well as to decrease the orbital inclination to zero, however its propellant was depleted prior to successfully raising its orbit. The satellite used two different propellant tanks, built in Germany and India, which resulted in an unequal flow of fuel, causing the spacecraft to tilt. (The two different fuel tanks were used because they were readily available). Recovery required the use of more propellant than planned which resulted in the satellite having no propellant left to complete its final circularization maneuver. The satellite was possibly used for a few communications experiments but the original purpose of demonstrating digital TV and audio broadcasts, as well as Internet services could not be fulfilled.

The Russian 12KRB cryogenic upper stage was planned to perform for 710 seconds, but its burn apparently lasted only 698 seconds. Another suspect for the shortfall is the launch vehicle navigation system which was derived from the PSLV which has flown only to low earth orbits.

See also

Related Research Articles

Syncom started as a 1961 NASA program for active geosynchronous communication satellites, all of which were developed and manufactured by the Space and Communications division of Hughes Aircraft Company. Syncom 2, launched in 1963, was the world's first geosynchronous communications satellite. Syncom 3, launched in 1964, was the world's first geostationary satellite.

<span class="mw-page-title-main">Geostationary transfer orbit</span> Transfer orbit used to reach geosynchronous or geostationary orbit

In space mission design, a geostationary transfer orbit (GTO) or geosynchronous transfer orbit is a highly elliptical type of geocentric orbit, usually with a perigee as low as low Earth orbit (LEO) and an apogee as high as geostationary orbit (GEO). Satellites that are destined for geosynchronous orbit (GSO) or GEO are often put into a GTO as an intermediate step for reaching their final orbit. Manufacturers of launch vehicles often advertise the amount of payload the vehicle can put into GTO.

<span class="mw-page-title-main">Indian National Satellite System</span> Series of multipurpose geo-stationary satellites launched by ISRO

The Indian National Satellite System or INSAT, is a series of multipurpose geostationary satellites launched by the Indian Space Research Organisation (ISRO) to satisfy telecommunications, broadcasting, meteorology, and search and rescue operations. Commissioned in 1983, INSAT is the largest domestic communication system in the Indo-Pacific Region. It is a joint venture of the Department of Space, Department of Telecommunications, India Meteorological Department, All India Radio and Doordarshan. The overall coordination and management of INSAT system rests with the Secretary-level INSAT Coordination Committee.

<span class="mw-page-title-main">Geosynchronous Satellite Launch Vehicle</span> Class of Indian medium-lift expendable launch vehicles, developed by ISRO

Geosynchronous Satellite Launch Vehicle (GSLV) is a class of expendable launch systems operated by the Indian Space Research Organisation (ISRO). GSLV has been used in fifteen launches since 2001.

GSAT-3, also known as EDUSAT, was a communications satellite which was launched on 20 September 2004 by the Indian Space Research Organisation. EDUSAT is the first Indian satellite built exclusively to serve the educational sector. It is mainly intended to meet the demand for an interactive satellite-based distance education system for the country.

<span class="mw-page-title-main">GSAT-2</span>

GSAT-2 was an experimental communication satellite built by the Indian Space Research Organisation (ISRO) and launched on one of the first GSLVs. The satellite was positioned at 48 deg east longitude in the geo-stationary orbit.

<span class="mw-page-title-main">LVM3</span> Indian expendable medium-lift launch vehicle, developed by ISRO

The Launch Vehicle Mark-3 or LVM3 is a three-stage medium-lift launch vehicle developed by the Indian Space Research Organisation (ISRO). Primarily designed to launch communication satellites into geostationary orbit, it is also due to launch crewed missions under the Indian Human Spaceflight Programme. LVM3 has a higher payload capacity than its predecessor, GSLV.

<span class="mw-page-title-main">GSAT-4</span> Indian experimental communication and navigation satellite

GSAT-4, also known as HealthSat, was an experimental communication and navigation satellite launched in April 2010 by the Indian Space Research Organisation on the maiden flight of the Geosynchronous Satellite Launch Vehicle Mk.II rocket. It failed to reach orbit after the rocket's third stage malfunctioned. The third stage was the first Indian-built cryogenic-fuelled upper stage, and was making its first flight. The ISRO suspects that the failure was caused by the third stage not igniting.

The A2100 is a model of communications satellite spacecraft made by Lockheed Martin Space Systems. It is used as the foundation for telecommunications payloads in geosynchronous orbit, as well as GOES-R weather satellites and GPS Block IIIA satellites. Over 40 satellites use the A2100 bus.

<span class="mw-page-title-main">Orbital propellant depot</span> Cache of propellant used to refuel spacecraft

An orbital propellant depot is a cache of propellant that is placed in orbit around Earth or another body to allow spacecraft or the transfer stage of the spacecraft to be fueled in space. It is one of the types of space resource depots that have been proposed for enabling infrastructure-based space exploration. Many depot concepts exist depending on the type of fuel to be supplied, location, or type of depot which may also include a propellant tanker that delivers a single load to a spacecraft at a specified orbital location and then departs. In-space fuel depots are not necessarily located near or at a space station.

GSAT-5P, or GSAT-5 Prime, was an Indian communications satellite which was lost in a launch failure in December 2010. Part of the Indian National Satellite System, it was intended to operate in geosynchronous orbit as a replacement for INSAT-3E.

Space Infrastructure Servicing (SIS) is a spacecraft concept being developed by Canadian aerospace firm MDA to operate as a small-scale in-space refueling depot for communication satellites in geosynchronous orbit.

INSAT-4CR was a communications satellite operated by ISRO as part of the Indian National Satellite System. Launched in September 2007, it replaced the INSAT-4C satellite which had been lost in a launch failure the previous year. The satellite was initially stationed in geostationary orbit at a longitude of 74 degrees east, with expected operational life of at least ten years, however this may have been reduced by the underperformance of the Geosynchronous Satellite Launch Vehicle which placed it into orbit. INSAT-4CR is planned to be replaced by GSAT-31, which was launched on February 6, 2019.

GSAT-14 is an Indian communications satellite launched in January 2014. It replaced the GSAT-3 satellite, which was launched in 2004. GSAT-14 was launched by a Geosynchronous Satellite Launch Vehicle Mk.II, which incorporated an Indian-built cryogenic engine on the third stage.

<span class="mw-page-title-main">INSAT-4E</span> Indian communication satellite

INSAT-4E, also known as GSAT-6, is a member of the INSAT family and is a multimedia communication satellite that will offer a Satellite Digital Multimedia Broadcasting (S-DMB) service across several digital multimedia terminals or consoles which can be used to provide information services to vehicles on the fly and to the mobile phones. The satellite can be used for other social and strategic applications.

GSAT-7 or INSAT-4F is a multi-band military communications satellite developed by the Indian Space Research Organisation. The Indian Navy is the user of the multi-band communication spacecraft, which has been operational since September 2013. According to defense experts, the satellite will enable the navy to extend its blue water capabilities and stop relying on foreign satellites like Inmarsat, which provide communication services to its ships.

Superbird-A2, known as Superbird-6 before launch, was a geostationary communications satellite ordered and operated by Space Communications Corporation (SCC) that was designed and manufactured by Hughes on the BSS-601 satellite bus. It had a mixed Ku-band and Ka-band payload and was expected replace Superbird-A at the position at 158° East longitude. It was expected to provided television signals and business communications services throughout Japan, South Asia, East Asia, and Hawaii.

<span class="mw-page-title-main">GSAT-6A</span> Indian telecommunications satellite

GSAT-6A was a communication satellite launched by the Indian Space Research Organisation (ISRO). It featured a 6-metre (20 ft) unfurlable S-band antenna similar to the one used on GSAT-6. Around 17 minutes after lift-off, the three stage GSLV Mk.II rocket flying on GSLV F08 mission successfully injected the satellite into a geosynchronous transfer orbit. Due to power failure during its orbit raising burns the communication was lost with GSAT-6A before it could reach its final circular geostationary orbit (GSO).

<span class="mw-page-title-main">GSAT-29</span> Indian communication satellite

GSAT-29 is a high-throughput communication satellite developed by the Indian Space Research Organisation (ISRO). The mission aims at providing high-speed bandwidth to Village Resource Centres (VRC) in rural areas. The two Ku and Ka operational payloads will provide communication services to Jammu and Kashmir and Northeast India under Digital India programme. At the time of launch GSAT-29 was the heaviest satellite, weighing 3,423 kg (7,546 lb), that was placed in orbit by an Indian launch vehicle. Approved cost of GSAT-29 is 175.63 crore (US$20 million).

References

  1. McDowell, Jonathan. "Satellite Catalog". Jonathan's Space Page. Retrieved 27 September 2013.
  2. "GSAT-30: Advancing India's Communication and Digital Connectivity". Environmentsandscience. 2025-01-17. Retrieved 2025-01-17.