Mission type | Technology |
---|---|
Operator | ISRO |
Mission duration | 19 minutes |
Range | 1,600 kilometres (990 mi) |
Apogee | 126 kilometres (78 mi) |
Spacecraft properties | |
Spacecraft type | Space capsule (Boilerplate) |
Manufacturer | ISRO |
Launch mass | 3,735 kilograms (8,234 lb) |
Dimensions | 3.1 × 2.7 m (10.2 × 8.9 ft) |
Start of mission | |
Launch date | 18 December 2014, 04:00 UTC |
Rocket | LVM3-X |
Launch site | Satish Dhawan SLP |
Contractor | ISRO |
End of mission | |
Landing date | 18 December 2014, 04:15 UTC |
Landing site | Bay of Bengal |
The Crew Module Atmospheric Re-entry Experiment (CARE) is an experimental test vehicle for the Indian Space Research Organisation's future ISRO orbital vehicle called Gaganyaan . [1] It was launched successfully on 18 December 2014 from the Second Launch Pad of the Satish Dhawan Space Centre, by a LVM3 designated by ISRO as the LVM 3X CARE mission. [2] [3] Total cost of mission was ₹155 crore (equivalent to ₹248 croreorUS$30 million in 2023). Cost of launch vehicle and CARE module was ₹140 crore and ₹15 crore. [4]
The crew module was mounted upside-down inside the payload fairing of the LVM3. CARE was made of aluminium alloy with carbon-fiber reinforced polymer (CFRP) panels and had a lift-off mass of 3,735 kg. Its diameter was 3100 mm and its height was 2698 mm. [5] The module had an ablative thermal protection. The side panels were covered with Medium Density Ablative (MDA) tiles and the forward heat shield was made of carbon phenolic tiles. [6] [7] It was powered by batteries and was equipped with six liquid-propellant (MMH/MON3) 100 N thrusters. [8]
The deceleration system consists of two independent chains of parachutes: a primary parachute (31 meters in diameter), a drop parachute (6.2 meters in diameter), and a pilot parachute (2.3 meters in diameter). [9]
A practice run of the recovery of crew module was done on 31 October 2014 with Indian Coast Guard ship ICGS Samudra Pahredar. [10]
CARE was launched on 18 December 2014 at 04:00 UTC. The crew module was separated at the intended height of 126 km and a speed of 5300 m/s. It entered a coast phase during which it performed three axis control manoeuvres in order to ensure zero degree angle of attack at reentry.
The ballistic reentry started from an altitude of about 80 km. At this altitude, the propulsion was shut down. The heat shield experienced temperatures around 1,000 degrees C and the capsule experienced deceleration of up to 13 g. [11]
After the re-entry the vehicle performed a descent and splashdown during which an end-to-end validation of the parachute system was performed, including the demonstration of the apex cover separation and the parachute deployment in cluster configuration. The deployment sequence started when CARE had slowed to a speed of 233 m/s. The crew module carried three stages of parachutes, all of which came in pairs. First, both 2.3-meter diameter pilot parachutes came out, followed by the 6.2-meter drogue parachutes, which cut the capsule's velocity down to 50 m/s. Then both main parachutes were deployed at a height of about 5 km. These parachutes, each 31 meters in diameter, were the largest ever made in India. [12]
CARE splashed down into the Bay of Bengal about 600 km from Port Blair in the Andaman Islands and about 1600 km from the Sriharikota launch site. [13] Immediately afterwards the main parachutes were detached. CARE was recovered by the Indian Coast Guard after tracking its signal beacon. The entire duration of the experiment from launch to splashdown was 20 minutes 43 seconds. [14]
After recovery the module was brought to Chennai on 22 December 2014, from where it will be sent to the Satish Dhawan Space Centre for preliminary processing. [15] The module will then be sent to Vikram Sarabhai Space Centre for further study and analysis. [15]
Doordarshan's telecast of the LVM3 LVM3-X ascent and CARE module's ballistic descent showed screen displays of the following telemetry: [16]
Time (Seconds) | Event | Observations |
---|---|---|
0.1 | S200 ignition | Ground-lit ignition of 2 strap-on Solid Rocket Boosters |
120 | L110 ignition | Air-lit ignition of L110 core which contains 2 liquid fueled Vikas rocket engines |
153.5 | S200 separation | Ejection of 2 spent solid strap-on boosters |
163.4 | CLG initiated | CLG = Closed-Loop Guidance |
237.2 | Heat-shield separation | Nominal |
324.6 | L110 shut-off | Nominal: Relative Velocity 4.92 km/s, Range 565.6 km, Altitude 125.6 km, Azimuth 121.1 degrees |
325.7 | L110 separation | Nominal: Relative Velocity 4.95 km/s, Range 570.5 km, Altitude 125.4 km, Azimuth 121.1 degrees |
330.8 | CARE module separation | Nominal: Relative Velocity 4.96 km/s, Range 599.5 km, Altitude 125.1 km, Azimuth 121.1 degrees |
341.0 | CARE module CLG started | Nominal: Relative Velocity 4.96 km/s, Range 633.1 km, Altitude 125.2 km, Azimuth 121.1 degrees |
385.5 | CARE module in ballistic descent | Nominal: Relative Velocity 4.93 km/s, Range 858.8 km, Altitude 116.6 km, Azimuth 121.0 degrees |
399.5 | CARE module in ballistic descent | Nominal: Relative Velocity 4.94 km/s, Range 926.6 km, Altitude 111.8 km, Azimuth 121.0 degrees |
419.5 | CARE module in ballistic descent | Nominal: Relative Velocity 4.96 km/s, Range 1023.5 km, Altitude 103.1 km, Azimuth 121.0 degrees |
440.5 | CARE module in ballistic descent | Nominal: Relative Velocity 4.98 km/s, Range 1125.6 km, Altitude 91.8 km, Azimuth 121.0 degrees |
460.6 | CARE module reentry | Nominal |
468.5 | CARE module in ballistic descent | Nominal: Relative Velocity 5.00 km/s, Range 1262.4 km, Altitude 73.3 km, Azimuth 121.0 degrees |
573.0 | CARE module in descent | Nominal: Relative Velocity 0.244 km/s, Range 1534.5 km, Altitude 18.1 km |
584.0 | CARE module 15.5 km altitude | Nominal: Relative Velocity 0.210 km/s, Range 1535.6 km, Altitude 15.9 km |
584.3 | APEX cover separation | Nominal |
584.5 | CARE module in descent | Nominal: Relative Velocity 0.209 km/s, Range 1535.7 km, Altitude 15.8 km |
589.4 | Pilot Chute deployed | Nominal |
596 | CARE module in descent | Nominal: Relative Velocity 0.086 km/s, Range 1536.0 km, Altitude 14.2 km |
740.6 | CARE module 5 km altitude | Nominal |
741.4 | Main Chute deployed | CARE module's rate of descent increased abnormally prior to splash-down |
751.0 | CARE module in descent | Displayed telemetry: Relative Velocity 0.431 km/s, Range 1508.2 km, Altitude 0.9 km |
755.0 | CARE module in descent | Displayed telemetry: Relative Velocity 0.443 km/s, Range 1506.6 km, Altitude 0.6 km |
760.0 | CARE module in descent | Displayed telemetry: Relative Velocity 0.459 km/s, Range 1504.7 km, Altitude 0.1 km |
761.0 | CARE module in descent | Displayed telemetry: Relative Velocity 0.462 km/s, Range 1504.3 km, Altitude 0.0 km |
779.0 | CARE module in descent | Displayed telemetry: Relative Velocity 0.518 km/s, Range 1496.7 km, Altitude -1.7 km |
833.0 | CARE module in descent | Displayed telemetry: Relative Velocity 0.689 km/s, Range 1468.7 km, Altitude -7.8 km |
940.0 | CARE module in descent | Final display of telemetry: Relative Velocity 1.014 km/s, Range 1406.3 km, Altitude -21.0 km |
Geosynchronous Satellite Launch Vehicle (GSLV) is a class of expendable launch systems operated by the Indian Space Research Organisation (ISRO). GSLV has been used in fifteen launches since 2001.
A space capsule is a spacecraft designed to transport cargo, scientific experiments, and/or astronauts to and from space. Capsules are distinguished from other spacecraft by the ability to survive reentry and return a payload to the Earth's surface from orbit or sub-orbit, and are distinguished from other types of recoverable spacecraft by their blunt shape, not having wings and often containing little fuel other than what is necessary for a safe return. Capsule-based crewed spacecraft such as Soyuz or Orion are often supported by a service or adapter module, and sometimes augmented with an extra module for extended space operations. Capsules make up the majority of crewed spacecraft designs, although one crewed spaceplane, the Space Shuttle, has flown in orbit.
The Vikram Sarabhai Space Centre (VSSC) is a major space research centre of the Indian Space Research Organisation (ISRO), focusing on rocket and space vehicles for India's satellite programme. It is located in Thiruvananthapuram, in the Indian state of Kerala.
A reentry capsule is the portion of a space capsule which returns to Earth following a spaceflight. The shape is determined partly by aerodynamics; a capsule is aerodynamically stable falling blunt end first, which allows only the blunt end to require a heat shield for atmospheric entry. A crewed capsule contains the spacecraft's instrument panel, limited storage space, and seats for crew members. Because a capsule shape has little aerodynamic lift, the final descent is via parachute, either coming to rest on land, at sea, or by active capture by an aircraft. In contrast, the development of spaceplane reentry vehicles attempts to provide a more flexible reentry profile.
The Advanced Reentry Demonstrator (ARD) was a European Space Agency (ESA) suborbital reentry vehicle. It was developed and operated for experimental purposes, specifically to validate the multiple reentry technologies integrated upon it and the vehicle's overall design, as well as to gain greater insight into the various phenomenon encountered during reentry.
Satish Dhawan Space Centre – SDSC, is the primary spaceport of the Indian Space Research Organisation (ISRO), located in Sriharikota, Andhra Pradesh.
The Intermediate eXperimental Vehicle (IXV) is a European Space Agency (ESA) experimental suborbital re-entry vehicle. It was developed to serve as a prototype lifting body orbital return vehicle to validate the ESA's work in the field of reusable orbital return vehicles.
The Launch Vehicle Mark-3 or LVM3 is a three-stage medium-lift launch vehicle developed by the Indian Space Research Organisation (ISRO). Primarily designed to launch communication satellites into geostationary orbit, it is also due to launch crewed missions under the Indian Human Spaceflight Programme. LVM3 has a higher payload capacity than its predecessor, GSLV.
The Human Rated Launch Vehicle is an ongoing programme by the Indian Space Research Organisation (ISRO) to develop the technology needed to launch crewed orbital spacecraft into low Earth orbit. Three uncrewed flights, named Gaganyaan-1, Gaganyaan-2 and Gaganyaan-3 are scheduled to launch in 2024, followed by crewed flight in 2024 on an HLVM3 rocket.
The Space Capsule Recovery Experiment is an Indian experimental spacecraft which was launched at 03:53 UTC on January 10, 2007, from Sriharikota by the Indian Space Research Organisation (ISRO). The launch was conducted using the C7 launch of the PSLV rocket, along with three other satellites. It remained in orbit for 12 days before re-entering the Earth's atmosphere and splashing down into the Bay of Bengal at 04:16 UTC on January 22.
Gaganyaan is an Indian crewed orbital spacecraft intended to be the formative spacecraft of the Indian Human Spaceflight Programme. The spacecraft is being designed to carry three people, and a planned upgraded version will be equipped with rendezvous and docking capabilities. In its maiden crewed mission, the Indian Space Research Organisation (ISRO)'s largely autonomous 5.3-metric ton capsule will orbit the Earth at 400 km altitude for up to seven days with a two- or three-person crew on board. The first crewed mission was originally planned to be launched on ISRO's HLVM3 rocket in December 2021. As of October 2023, it is expected to be launched by 2025.
Reusable Launch Vehicle–Technology Demonstration Programme is a series of technology demonstration missions that has been conceived by the Indian Space Research Organisation (ISRO) as a first step towards realising a Two Stage To Orbit (TSTO) reusable launch vehicle, in which the second stage is a spaceplane.
The Space Capsule Recovery Experiment II was an Indian re-entry demonstration experiment designed by the Indian Space Research Organisation (ISRO). It was a follow-on mission of SRE-1 which was successfully completed in January 2007. It was supposed to test some of the critical technologies for the Indian human spaceflight programme. The second mission was to carry three experiments devoted to biological science and an improved isothermal furnace with 1000 °C temperature to carry out materials science experiments. As of August 2016, SRE-2 is not mentioned in the ISRO official page.
GSAT-29 is a high-throughput communication satellite developed by the Indian Space Research Organisation (ISRO). The mission aims at providing high-speed bandwidth to Village Resource Centres (VRC) in rural areas. The two Ku and Ka operational payloads will provide communication services to Jammu and Kashmir and Northeast India under Digital India programme. At the time of launch GSAT-29 was the heaviest satellite, weighing 3,423 kg (7,546 lb), that was placed in orbit by an Indian launch vehicle. Approved cost of GSAT-29 is ₹175.63 crore (US$21 million).
The Small Satellite Launch Vehicle (SSLV) is a small-lift launch vehicle developed by ISRO to deliver 500 kg (1,100 lb) payload to low Earth orbit or 300 kg (660 lb) payload to Sun-synchronous orbit. The rocket supports multi-orbital drop-offs capability for small satellites.
The Human Space Flight Centre (HSFC) is a body under the Indian Space Research Organisation (ISRO) to coordinate the Indian Human Spaceflight Programme. The agency will be responsible for implementation of the Gaganyaan project. The first crewed flight is planned for 2024 on a home-grown LVM3 rocket.
Test Vehicle Abort Mission-1 (TV-D1) was a high altitude abort test performed as part of the Gaganyaan program, initially set to be held on 21 October 2023 at around 02:30 UTC. Liftoff was delayed to 03:15 UTC due to weather issues, and five seconds before launch it was put on hold by the on-board computer due to an engine anomaly, as reported in ISRO's mission livestream. The launch occurred at 04:30 UTC, and the crew module successfully separated from the launch vehicle. The crew module was successfully recovered by the Indian Navy. India is the fourth country, after Russia, the United States, and China, to successfully test this technology.
The Next Generation Launch Vehicle or NGLV or "Soorya" is a three-stage partially reusable rocket, currently under development by the Indian Space Research Organisation (ISRO). This vehicle is designed to replace currently operational systems like PSLV, GSLV and LVM3.
Gaganyaan-4 will be the first crewed test flight of the Gaganyaan programme, with launch planned for 2025.