Nordsee-Ost offshore wind farm

Last updated
Nordsee-Ost
Nordsee-Ost offshore wind farm
Country
  • Germany
Location North Sea
Coordinates 54°26′N7°41′E / 54.43°N 7.68°E / 54.43; 7.68
StatusOperational
Commission date
  • 11 May 2015
Wind farm
Type
Max. water depth25 m [1]
Distance from shore57 km [1]
Hub height92 m [1]
Rotor diameter
  • 126 m (413 ft)
Site area36 km2 [1]
Power generation
Units operational48 × 6.15 MW
Make and model Senvion 6.2M126 (48)
Nameplate capacity
  • 295.2 MW
External links
Website Nordsee Ost
Commons Related media on Commons
Nordsee-Ost offshore wind farm
Wind farm layout
Nordsee Ost's location in the wind farms of the German Bight Map of the offshore wind power farms in the German Bight.png
Nordsee Ost's location in the wind farms of the German Bight

Nordsee-Ost offshore wind farm is an offshore wind farm in operation in the eastern part of the North Sea German sector. The project was developed by RWE Innogy, a subsidiary of RWE.

The wind farm consists of 48 turbines with a total capacity of 295 MW. The 6.15 MW turbines were provided by REpower. [2] Steel foundations for generators were supplied by Aker Verdal. [3] [4] Power converters were supplied by Woodward Governor Company. [5] A consortium of Siemens and Prysmian built the high-voltage direct current submarine cable from the wind farm to the German transmission system operated by Transpower, a subsidiary of TenneT. [6]

Delays in power line construction by Dutch TenneT delayed its operational start. [7]

On 11 May 2015 the wind farm was officially put into operation. [8]

See also

Related Research Articles

<span class="mw-page-title-main">Greater Gabbard wind farm</span>

Greater Gabbard is a 504 MW wind farm, built on sandbanks 23 kilometres (14 mi) off the coast of Suffolk in England at a cost of £1.5 billion. It was completed on 7 September 2012 with all of the Siemens SWT3.6–107 turbines connected. Developed as a joint venture between Airtricity and Fluor, it is now jointly owned by SSE Renewables and RWE.

<span class="mw-page-title-main">Thorntonbank Wind Farm</span> Belgian offshore wind farm in the North Sea

The Thorntonbank Wind Farm is an offshore wind farm, 30 km (19 mi) off the Belgian coast, in water ranging from 12 to 27 metres deep. It is the first offshore wind farm in Belgium.

<span class="mw-page-title-main">Senvion</span> German wind turbine manufacturer

Senvion S.A. was a German wind turbine manufacturer founded in 2001 in Germany, majority owned by a private equity firm. Senvion as REpower Systems, as it was initially called, was established in 2001 through the merger of German wind companies: HSW, the engineering consultancy Pro+Pro, the wind turbine manufacturer BWU and Jacobs Energie; and since April 2015 Centerbridge Partners. It was under the ownership of Suzlon, an India wind turbine manufacturer, from 2007 to 2015.

TenneT is a transmission system operator in the Netherlands and in a large part of Germany.

<span class="mw-page-title-main">Alpha Ventus Offshore Wind Farm</span>

Alpha Ventus Offshore Wind Park is a German offshore wind farm. This is Germany’s first offshore wind farm. It is situated in the North Sea, 45 kilometres (28 mi) north of the island of Borkum.

Gode Wind 1, 2, and 3 are offshore wind farms located north-west of Norderney in the German sector of North Sea. They are owned by Ørsted. Gode Wind 1 and 2 are operational, while Gode Wind 3 is being developed.

<span class="mw-page-title-main">DanTysk</span>

DanTysk is a 288 megawatt (MW) offshore wind farm in the North Sea 70 kilometres (43 mi) west of the island Sylt, in the German EEZ at the border to Denmark. The wind farm operates 80 Siemens Wind Power's SWT-3.6-120 turbines with a capacity of 3.6 MW each.

<span class="mw-page-title-main">Wind power in the Netherlands</span>

As of May 2024, wind power in the Netherlands has an installed capacity of 11,611 MW, 40.9% of which is based offshore. In 2022, the wind turbines provided the country with 18.37% of its electricity demand during the year. Windmills have historically played a major part in the Netherlands by providing an alternative to water driven mills.

<span class="mw-page-title-main">Ormonde Wind Farm</span> Wind farm in the Irish Sea

The Ormonde Wind Farm is a wind farm west of Barrow-in-Furness in the Irish Sea. The wind farm covers an area of 8.7 square kilometres (3.4 sq mi). It has a total capacity of 150 MW and is expected to produce around 500 GWh of electricity per year.

A2SEA was an offshore wind farm installation and services company based in Fredericia, Denmark. The company specializes in transport, installation, and servicing of offshore wind farms. In addition to Denmark, the company has subsidiaries in the United Kingdom and Germany. A2SEA was bought in 2017 by GeoSea which was then integrated in DEME Offshore in 2019.

<span class="mw-page-title-main">HVDC HelWin1</span>

HVDC HelWin1 is a high voltage direct current (HVDC) link built to transmit Offshore wind power to the power grid of the German mainland. The project differs from most HVDC systems in that one of the two converter stations is built on a platform in the sea. Voltage-Sourced Converters are used and the total cable length is 130 km. The project was completed and handed over to its owner, TenneT, in February 2015.

Adwen GmbH is an offshore wind service company headquartered in Bremerhaven, Germany. It is a wholly owned subsidiary of Spanish-German company Siemens Gamesa. Previously the company designed, assembled, and installed 5-Megawatt wind turbines for offshore wind farms. It also designed and manufactured rotor blades through its subsidiary Adwen Blades GmbH, headquartered in Stade, Germany.

Dogger Bank Wind Farm is a group of offshore wind farms under construction 130 to 200 kilometres off the east coast of Yorkshire, England in the North Sea. It is considered to be the world's largest offshore windfarm. It was developed by the Forewind consortium, with three phases envisioned - first phase, second phase and third phase. In 2015, the third phase was abandoned, while the first and second phases were granted consent. It was initially expected that the Dogger Bank development will consist of four offshore wind farms, each with a capacity of up to 1.2 GW, creating a combined capacity of 4.8 GW. As of 2024, a total of 8.1 GW generating capacity is expected to be installed on Dogger Bank.

<span class="mw-page-title-main">HVDC BorWin2</span>

HVDC BorWin2 is a high voltage direct current (HVDC) link built to transmit offshore wind power to the power grid of the German mainland. The project differs from most HVDC systems in that one of the two converter stations is built on a platform in the sea. Voltage-Sourced Converters are used and the total cable length is 200 km. The project was completed by the Siemens/ Prysmian consortium and handed over to its owner, TenneT, in January 2015, becoming the first such project to be completed.

<span class="mw-page-title-main">HVDC HelWin2</span> Offshore HVDC connection in Germany

HVDC HelWin2 is a high voltage direct current (HVDC) link built to transmit offshore wind power to the power grid of the German mainland. The project differs from most HVDC systems in that one of the two converter stations is built on a platform in the sea. Voltage-Sourced Converters with DC ratings of 690 MW, ±320 kV are used and the total cable length is 130 km. The project was built by the Siemens/Prysmian consortium with the offshore platform built by Heerema in Zwijndrecht, Netherlands. The topside measures 98 m x 42 m x 28 m and weighs 10200 tonnes. The project was handed over to its owner, TenneT, in June 2015, the fourth such project to be completed in 2015.

<span class="mw-page-title-main">HVDC SylWin1</span>

HVDC SylWin1 is a high voltage direct current (HVDC) link to transmit offshore wind power to the power grid of the German mainland. The project differs from most HVDC systems in that one of the two converter stations is built on a platform in the sea. Voltage-Sourced Converters with DC ratings of 864 MW, ±320 kV are used and the total cable length is 205 km. The project is similar to the HVDC BorWin2 project but has slightly higher power and voltage ratings. It is being built by the Siemens/ Prysmian consortium and was handed over to its owner, TenneT, in April 2015.

<span class="mw-page-title-main">Nordsee One offshore wind farm</span>

Nordsee One is an offshore wind farm in the German part of the North Sea. It has a nameplate capacity of 332 MW and was commissioned in 2017. It uses 54 Senvion 6.2M126 wind turbines that are expected to produce 1200 GWh of electricity annually. The wind farm is owned by Northland Power (85%) and Innogy (15%). Offshore construction began in December 2015. All 54 turbines were scheduled to have their rotor shaft main bearings replaced during 2021-2022.

<span class="mw-page-title-main">Kaskasi Offshore Wind Farm</span> Offshore wind farm in Germany

Kaskasi is an offshore wind farm in the German part of the North Sea. It is located 35 km off the coast of Helgoland. The wind farm lies south of the Amrumbank West wind farm and to the north of the Nordsee Ost wind farm. The wind farm is owned by RWE

References

  1. 1 2 3 4 "Nordsee Ost Offshore Wind Farm". 4coffshore.com. Retrieved 2017-03-05.
  2. Backwell, Ben (2010-02-01). "REpower to supply 295MW of turbines for RWE's Nordsee Ost" . ReCharge. NHST Media Group. Retrieved 2010-07-17.
  3. "Aker wins deal at Nordsee Ost" . ReCharge. NHST Media Group. 2010-06-17. Retrieved 2010-07-17.
  4. "Aker Verdal wins wind project in Germany" (Press release). Aker Solutions. 2010-06-17. Retrieved 2010-07-17.
  5. "Woodward power converters chosen for Nordsee Ost" . ReCharge. NHST Media Group. 2010-04-15. Retrieved 2010-07-17.
  6. Backwell, Ben (2010-07-16). "Siemens and Prysmian win €500m Nordsee-Ost wind farm contract". ReCharge. NHST Media Group. Archived from the original on 2012-02-24. Retrieved 2017-03-05.
  7. David Crossland (6 March 2012). "German wind energy plans in the doldrums". thenational.ae. Retrieved 24 June 2015.
  8. "G7-Energieministertreffen in Hamburg". Bundesministerium für Wirtschaft und Energie. 2015-05-11.