Knabs Ridge Wind Farm | |
---|---|
Country | England |
Location | Penny Pot Lane, Felliscliffe, North Yorkshire |
Coordinates | 53°59′53″N1°38′51″W / 53.9981°N 1.6474°W Coordinates: 53°59′53″N1°38′51″W / 53.9981°N 1.6474°W |
Status | Active |
Construction began | March 2007 |
Commission date | November 2008 |
Operator(s) | RWE Npower Renewables |
Wind farm | |
Type | Onshore |
Hub height | 190 feet (58 m) |
Rotor diameter | 230 feet (70 m) |
Site area | 197 acres (80 ha) |
Site elevation | 708 feet (216 m) |
Power generation | |
Units operational | Eight |
Nameplate capacity | 16 MW |
External links | |
Commons | Related media on Commons |
Knabs Ridge Wind Farm is an electricity generating site just south of the A59 road near to Felliscliffe, Kettlesing, North Yorkshire, England. It was the first wind farm to be built in North Yorkshire in over 15 years, [1] and was believed to be the first time that civilian air traffic was considered in the planning permission process.
The proposal to build a wind farm on the site was first unveiled in 2003 when 6,000 homes in the area were leafleted with information about the wind farm. At that early stage, many objections were registered, including one from the Campaign for the Protection of Rural England (CPRE). [2] Planning consent for the wind farm was rejected by Harrogate Borough Council in November 2004. The management team at Leeds Bradford Airport (LBA), whose runway is only 10 miles (16 km) south of the site, stated that the farm would have a detrimental effect on air traffic control as it could create false indications of aircraft. [3] Other objectors pointed out that the site of was only 50 feet (15 m) away from the Nidderdale AONB. [4] [5] Npower appealed against the decision and the application then went before a public enquiry, [6] which gained government consent in September 2005. [4] The objection by LBA towards the wind farm is believed to be the first time that civilian air traffic paths have featured in an onshore wind farm consent inquiry. The planning inspector also rejected the idea of affixing red lights to each tower as it was thought that they could interfere with drivers concentration on the adjacent A59 road. [3]
Building of the £13 million wind farm 3 miles (4.8 km) west of Harrogate in Felliscliffe by the A59 road, [7] was started in March 2007, completed by the summer of 2008 with full commissioning of the site starting in November of the same year. The wind farm consists of eight towers which are 190 feet (58 m) high, with the addition of the rotors, the full height that they extend to is 305 feet (93 m). [8] [9] The site covers an area of 197 acres (80 ha) at an elevation of 708 feet (216 m) above sea level, so they can be seen from some distance away. [10] [11]
Each generating unit was constructed by Senvion and is capable of generating 2 MW of power with the whole farm itself generating 16 MW in total. [12] [13] This provides enough electricity per year to power 7,000 homes and offsets over 23,000 tonnes (25,000 tons) of carbon dioxide going into the environment on an annual basis. [14]
One of the turbines caught fire in January 2017 and had to be extinguished by North Yorkshire fire service. Each unit operates in tandem with three others (the Knabs Ridge site has eight units, which operate in two groups of four) which resulted in all four generating units being turned off. [9] [15] Seven months after the fire, the owners were seeking to overturn a condition in the planning permission of the site that was set in 2005. If a turbine was to not generate power in over twelve months, then the owners are required to remove the tower and return the land to grazing purposes for cattle. By October 2017, the tower was still not active. [16]
Felliscliffe is a civil parish in North Yorkshire, England, in Nidderdale, Harrogate borough. The population of the civil parish at the 2011 census was 283. The principal settlement in the parish is the village of Kettlesing, and the parish also includes the hamlet of Swincliffe.
The United Kingdom is one of the best locations for wind power in the world and is considered to be the best in Europe. By mid-August 2022, the UK had 11,198 wind turbines with a total installed capacity of over 25.5 gigawatts (GW): 14.2 GW of onshore capacity and 11.3 GW of offshore capacity, the sixth largest capacity of any country in 2019. Wind power contributed 24.8% of UK electricity supplied in 2020, having surpassed coal in 2016 and nuclear in 2018. It is the largest source of renewable electricity in the UK. The UK Government has committed to a major expansion of offshore capacity by 2030 which was extended from 40GW to 50GW, with 5GW from floating wind sources in a statement by the Secretary of State for Business, Energy and Industrial Strategy in 2022.
Wind power in Scotland is the fastest-growing renewable energy technology, with 9,347 MW of installed wind power capacity as of June 2020. This included 8,366 MW from onshore wind in Scotland and 981 MW of offshore wind generators.
Gwynt y Môr is a 576-megawatt (MW) offshore wind farm located off the coast of Wales and is the fifth largest operating offshore windfarm in the world. The farm has 160 wind turbines of 150 metres (490 ft) tip height above mean sea level.
Whitelee Wind Farm is a windfarm on the Eaglesham moor in Scotland. The main visitor centre is located in East Renfrewshire, but the majority of turbines are located in East Ayrshire and South Lanarkshire. It is the largest on-shore wind farm in the United Kingdom with 215 Siemens and Alstom wind turbines and a total capacity of 539 megawatts (MW), with the average of 2.5 MW per turbine. Whitelee was developed and is operated by ScottishPower Renewables, which is part of the Spanish company Iberdrola.
The Clyde Wind Farm is a 522 megawatt (MW) wind farm near Abington in South Lanarkshire, Scotland.
Scout Moor Wind Farm is the second largest onshore wind farm in England. The wind farm, which was built for Peel Wind Power Ltd, produces electricity from 26 Nordex N80 wind turbines. It has a total nameplate capacity of 65 MW of electricity, providing 154,000 MW·h per year; enough to serve the average needs of 40,000 homes. The site occupies 1,347 acres (545 ha) of open moorland between Edenfield, Rawtenstall and Rochdale, and is split between the Metropolitan Borough of Rochdale in northern Greater Manchester and the Borough of Rossendale in south-eastern Lancashire. The turbines are visible from as far away as south Manchester, 15–20 miles (24–32 km) away.
The Lincs Wind Farm is a 270 MW offshore wind farm 8 kilometres (5.0 mi) off Skegness on the east coast of England. The total cost of the project is estimated at £1 billion including electrical transmission links. The farm was completed in 2013. It is adjacent to the smaller Lynn and Inner Dowsing Wind Farm.
Brechfa Forest West Wind Farm is a wind farm in Brechfa Forest in Carmarthenshire in south west Wales. Construction of the wind farm began in November 2016 and power generation commenced in January 2018.
Triton Knoll Wind Farm is an 857 MW round 2 offshore wind farm nearing completion 33 kilometres (21 mi) off the coast of Lincolnshire, in the North Sea, England.
Humber Gateway Wind Farm is an offshore wind farm 8 kilometres (5 mi) east of Spurn Point off the coast of North East Lincolnshire, in the North Sea, England; the wind farm is located in water depths around 15 metres (49 ft) and covers an area of approximately 25 square kilometres (9.7 sq mi). The wind farm became operational in June 2015.
Walney Wind Farms are a group of offshore wind farms 9 miles (14 km) west of Walney Island off the coast of Cumbria, in the Irish Sea, England. The group, operated by Ørsted, consists of Walney Phase 1, Phase 2 and the Walney Extension. The extension has a capacity of 659 MW making it the world's second largest offshore wind farm.
Windpark Noordoostpolder is an onshore and near-shore wind farm in Flevoland, the Netherlands. Upon completion in 2017, it was the largest wind farm in the Netherlands, and as of 2019 it is still one of the largest. Owner-operators are members of the Koepel Windenergie Noordoostpolder, a partnership of more than 100 agricultural entrepreneurs from the North East Polder (Noordoostpolder), and Innogy, a subsidiary of German energy company RWE.
Dogger Bank Wind Farm is a group of offshore wind farms under construction 125 to 290 kilometres off the east coast of Yorkshire, England in the North Sea. It was developed by the Forewind consortium, while three phases were envisioned - first phase, second phase and third phase. In 2015 the third phase was abandoned, while first and second phase was granted consent. It is expected that the Dogger Bank development will consist of four offshore wind farms, each with a capacity of up to 1.2 GW, creating a combined capacity of 4.8 GW.
The European Offshore Wind Deployment Centre (EOWDC), also known as the Aberdeen Bay Wind Farm is an offshore wind test and demonstration facility located around 3 kilometres off the east coast of Aberdeenshire, in the North Sea, Scotland. It was developed by the European Offshore Wind Deployment Centre consortium. The scheme is relatively small - it consists of 11 wind turbines with an installed capacity of 93.2 megawatts. It is located between Blackdog and Bridge of Don near Aberdeen. First power was generated in July 2018, with full commissioning following in September 2018.
Hornsea Wind Farm is a Round 3 wind farm which began construction in 2018. Sited in the North Sea 120 km (75 mi) off the east coast of England, the eventual wind farm group is planned to have a total capacity of up to 6 gigawatt (GW).
Ovenden Moor Wind Farm is a wind powered electricity generating site in England. Ovenden Moor is located north of Halifax and west of Bradford in West Yorkshire. The site was opened in 1993 with 23 turbines, but these were later removed in favour of larger turbines but with 14 fewer towers. This updated the output of the site from 9.2 MWh to 22.5 MWh with an expected generation lifetime of 25 years. As the turbines can be seen from some distance and the fact that they overlook the Brontë Country to the north, they have the subject of continued criticism and objections.
Fraisthorpe Wind Farm is a wind power generating site located in the village of Fraisthorpe in the East Riding of Yorkshire, England. The site is just 2 miles (3.2 km) south of Bridlington and 40 miles (64 km) east of York. It was granted full planning permission in early 2015 when the Ministry of Defence dropped their objection to the site. This was despite the apparent vocal opposition by local people and councillors. It started generating electricity in August 2016.
North Steads Wind Farm is an onshore electricity generating site west of Widdrington in Northumberland, England. The site was developed on old coal opencast workings and has nine turbines delivering over 18 megawatts of power per year.