Linton Lock | |
---|---|
Country | England |
Location | Linton-on-Ouse, North Yorkshire |
Coordinates | 54°02′01.4″N1°14′17.8″W / 54.033722°N 1.238278°W |
Status | Active |
Commission date | 1923 (first generation) 2011 (second generation) 2017 (third generation) |
Decommission date | 1961 (first generation) |
Power generation | |
Units operational | 2 |
Units decommissioned | 1 |
Annual net output | 380 kWh |
Linton Lock Hydro is a hydroelectric plant on the River Ouse in North Yorkshire, England, between the villages of Linton-on-Ouse and Nun Monkton. The first hydroelectric scheme was built here in 1923, but that was abandoned in the early 1960s. The second scheme to be sited at Linton Lock was installed in 2011 and a new generating unit came on stream in 2017. The combined output from the second and third generation plants is 380 kW, which is enough to power 450 homes.
Linton Lock was built in 1767 on the north bank of the River Ouse in North Yorkshire near to the village of Linton-on-Ouse. The river at Linton-on-Ouse was canalised by John Smeaton as part of a number of acts that were intended to make the Ouse (and further upstream, the Swale) navigable as far as Bedale. [1] As part of the lock construction, a weir was built on the south bank of the Ouse to help control the flow of water into the lock. Both the lock and the weir are listed structures. [2] [3]
The first hydroelectric scheme at the lock was instituted by the York Corporation in response to the high price of coal after the First World War. [4] The hydroelectric plant was opened in 1923 and visited in that same year by Princess Mary. [5] This scheme was abandoned in 1962 [6] as the National Grid came into effect with power being sourced from larger generating stations fed mostly by coal. [7]
A second plant was Commissioned in 2012 [8] after a protracted planning process that saw rival schemes being promoted on the north and south banks of the river, which meant that the plans were submitted to two different local authorities (Harrogate Borough Council for the south bank scheme and Hambleton Council for the other). [9] [10] As well as local opposition to the schemes (which was down to visual impact as opposed to the actual scheme itself), the British Canoe Union (BCU) objected to the proposals. [11] They, like the local communities next to the river, were not in objection of green power, but the building of the scheme would seriously hamper what the BCU described as "the second best place in the country to practise our sport." [12]
The 2012 scheme saw an Archimedes Screw installed with a length of 28 feet (8.5 m) and a diameter of 9.8 feet (3 m). The screw was installed in 2011 with a capacity to generate 101 kW. [13]
A second scheme was proposed soon afterwards and gained approval in 2016 with construction starting in that same year. This scheme involves the world's largest Archimedes Screw used in hydroelectric generation [7] [14] and is situated immediately to the south of the 2012 screw. [15] The second screw generates 1,250 MWh per year and in addition to the siting of the turbine, the company behind the venture, Linton Hydro, also reconditioned the fish ladder, built a new adjacent fish ladder and installed a new slalom canoe course via a new cut in the south bank. [16] Canoe England invested £200,000 to match the same amount of money by the company to build the new canoe course. [17] When complete the course will be open to all canoeists including a local club which competes at national level. [15]
The operators of the 2017 scheme acquired 100% of the rights to the 2012 scheme, which means the combined output from the plant is 380 kW or enough to power 450 homes. [18]
The River Aire is a major river in Yorkshire, England, 92 miles (148 km) in length. Part of the river below Leeds is canalised, and is known as the Aire and Calder Navigation.
The River Ouse is a river in North Yorkshire, England. Hydrologically, the river is a continuation of the River Ure, and the combined length of the River Ure and River Ouse makes it, at 129 miles (208 km), the sixth-longest river of the United Kingdom and the longest to flow entirely in one county. The length of the Ouse alone is about 52 miles (84 km) but the total length of the river is disputed.
Micro hydro is a type of hydroelectric power that typically produces from 5 kW to 100 kW of electricity using the natural flow of water. Installations below 5 kW are called pico hydro. These installations can provide power to an isolated home or small community, or are sometimes connected to electric power networks, particularly where net metering is offered. There are many of these installations around the world, particularly in developing nations as they can provide an economical source of energy without the purchase of fuel. Micro hydro systems complement solar PV power systems because in many areas water flow, and thus available hydro power, is highest in the winter when solar energy is at a minimum. Micro hydro is frequently accomplished with a pelton wheel for high head, low flow water supply. The installation is often just a small dammed pool, at the top of a waterfall, with several hundred feet of pipe leading to a small generator housing. In low head sites, generally water wheels and Archimedes' screws are used.
Sandford Lock is a lock on the River Thames in England, situated at Sandford-on-Thames which is just south of Oxford. The first pound lock was built in 1631 by the Oxford-Burcot Commission although this has since been rebuilt. The lock has the deepest fall of all locks on the Thames at 8 ft 9in (2.69m) and is connected to a large island which is one of three at this point. The lock lies at the end of Church Lane in Sandford on Thames.
Romney Island is an island in the River Thames in England connected to Romney Lock, at Windsor, Berkshire. It is a long thin island with trees and scrub, with the upstream end in Windsor and the downstream end almost at Black Potts.
Low-head hydro power refers to the development of hydroelectric power where the head is typically less than 20 metres, although precise definitions vary. Head is the vertical height measured between the hydro intake water level and the water level at the point of discharge. Using only a low head drop in a river or tidal flows to create electricity may provide a renewable energy source that will have a minimal impact on the environment. Since the generated power is a function of the head these systems are typically classed as small-scale hydropower, which have an installed capacity of less than 5MW.
Torrs Hydro is a micro hydroelectric scheme, owned by the community, in New Mills, Derbyshire. It is on the River Goyt, immediately below its confluence with the River Sett at the Torr weir. A 2.4-metre diameter steel trough screw turbine generates up to 63 kW of electricity.
Settle Hydro is a micro hydroelectric scheme, owned by the community, in Settle, North Yorkshire, England. It is located on the River Ribble, at Settle Weir near Bridge End Mill. It generates 50 kW of electricity using a screw turbine in part of the former mill race.
The Monmouth New Hydro Scheme, which incorporates the Osbaston fish pass, is a hydroelectric scheme in Osbaston, near Monmouth, in South-East Wales.
Beeston Hydro is a small hydroelectric scheme, in Beeston, Nottinghamshire. It is located on the River Trent, and generates up to 1.66 MW of electricity.
A screw turbine is a water turbine that converts the potential energy of water on an upstream level into work. This hydropower converter is driven by the weight of water, similar to water wheels, and can be considered as a quasi-static pressure machine. Archimedes screw generators operate in a wide range of flows and heads, including low heads and moderate flow rates that are not ideal for traditional turbines and not occupied by high performance technologies.
The River Bain Hydro is a hydroelectric generator on the River Bain in the village of Bainbridge, North Yorkshire, England. Its screw turbine powers most of the properties in the village, with excess electricity being sold off to the National Grid. It was opened in 2011 with an installed capacity of 45 kW, and is expected to last 40 years. It is a low-demand ecofriendly scheme.
Ruswarp Hydro or Whitby Esk Energy, is a Hydroelectric generation scheme that operates on the River Esk at Ruswarp, North Yorkshire, England. The project uses an Archimedes Screw in a reverse direction to generate electricity and was funded by people in the community. Around 4 tonnes of water pass along the screw per second, which generates enough electricity to power 45–48 homes.
Burley Hydro Scheme, also known as Greenholme Mill Hydro is a micro hydroelectric scheme installed on the River Wharfe at Burley-in-Wharfedale, West Yorkshire, England. The power output of the hydro scheme is 330 kW with an annual output of 1,400 MWh and is the fourth hydro scheme on the river after the opening of similar power plants at Linton near Grassington, and two further downstream from Burley at Pool-in-Wharfedale and Garnett Wharfe at Otley. All of these schemes have been located on sites previously used to generate power from the water flow.
Linton Falls Hydro is a hydroelectric generating power station located on the Linton Falls Weir of the River Wharfe, near Grassington, North Yorkshire, England. The power station is located on the same site as a hydroelectric scheme that was first opened in 1909, but had closed by 1948. The new scheme, which opened in March 2012, uses the original building which is now a scheduled monument.
Kirkthorpe hydro is a hydroelectric generating plant located on the River Calder at Kirkthorpe Weir, 4 miles (6.4 km) east of the City of Wakefield in West Yorkshire, England. The plant was opened in 2017 and expects to be generating electricity for 100 years. Kirkthorpe Weir is the highest industrial weir in Yorkshire and has prevented fish passing upstream to spawn; the new hydro project has a fish pass built into it.
Radyr Hydro Scheme is a 400kW small-scale hydroelectric station located in Radyr, Cardiff, Wales.
Reading Hydro is a run of the river micro hydroelectric scheme in Reading, England. It is located on the River Thames, at the upstream end of View Island and using the head of water provided by the weir at Caversham Lock. With a drop of about 1.4 metres and an average water flow of 37 cubic metres (1,300 cu ft) per second, it can generate 46 kilowatts (62 hp) of electricity with its twin archimedes screw turbines.
Osney Lock Hydro is a micro hydroelectric scheme in Oxford, England. It is located on the River Thames, using the head of water provided by the weir at Osney Lock. It can generate 49 kilowatts (66 hp) of electricity with its archimedes screw turbine. Between 2015 and 2020 the scheme generated an average of 188 megawatt-hours (680 GJ) a year of electricity, which is enough to power around 60 homes.
Sandford Hydro is a small hydroelectric scheme located on the River Thames in Oxfordshire, England. It uses the head of water provided by the weir at Sandford Lock in Sandford-on-Thames, but is actually situated on the opposite bank of the river in Kennington. It can generate 450 kilowatts (600 hp) of electricity with its three archimedes screw turbines. Construction began in 2011, and the plant became operational in 2018.
{{cite journal}}
: CS1 maint: DOI inactive as of December 2024 (link)