Methil Offshore Wind Farm

Last updated

Methil Offshore Wind Farm
Fife coast at Buckhaven - geograph.org.uk - 3928290.jpg
Samsung's wind turbine at Methil
Methil Offshore Wind Farm
CountryScotland, United Kingdom
Location Fife
Coordinates 56°09′46″N03°00′32″W / 56.16278°N 3.00889°W / 56.16278; -3.00889 Coordinates: 56°09′46″N03°00′32″W / 56.16278°N 3.00889°W / 56.16278; -3.00889
StatusUnder construction
Operator(s)Samsung, 2-B Energy
Wind farm
Type Offshore
Power generation
Units operational1 × 7 MW
Nameplate capacity 7 MW

Methil Offshore Wind Turbine (alternatively Levenmouth Demonstration Turbine) is a demonstrator site for experimental offshore wind turbines at Fife Energy Park off the coast of Methil, Fife in Scotland.

Contents

Planning

The initial plan (in 2011) was for test turbines to be operated by Dutch firm 2-B Energy. [1] Permission was given to construct one or two turbines in a test of high-capacity offshore wind turbines. [1] [2] [3] The first turbine would have been 179 metres (587 ft) high with only two blades. [4]

In January 2012 it was announced that Samsung would be the first company to build a demonstrator turbine on the site. [5] [6] In April 2012 the Scottish government announced that it had also signed a deal with 2-B Energy to develop two-bladed offshore wind turbines nearby. [7] In July 2015, the Offshore Renewable Energy Catapult announced that it was in discussions with Samsung to acquire its 7MW demonstration turbine for research purposes. [8]

Samsung

Construction of Samsung's 7 megawatt wind turbine was completed in October 2013. [9] The turbine is located just 50 metres from the coast, and at the time of construction was the world's largest and most powerful offshore wind turbine. [9] The tower stands to a maximum height of 110 metres, and 195 metres to blade tip. [10] The rotor has three blades and spans 171 metres. [10] Samsung has invested £70 million in the demonstrator project, which could run for up to five years. [9]

2-B Energy

2-B Energy secured a £26.5 million investment package for their project in March 2014. [11] 2-B Energy will establish two full-scale test units at the site. [11] The company is developing a 140-metre wide two-bladed turbine with full helicopter landing access. [11] The two 6MW turbines will be located approximately 1.5 km offshore. [12] They will stand at a maximum height of 109 metres above lowest tide, and 186 metres to blade tip. [12] 2-B Energy hopes to have planning consent by 2015, with the turbines being installed in 2016. [12]

See also

Related Research Articles

Wind farm Group of wind turbines

A wind farm or wind park, also called a wind power station or wind power plant, is a group of wind turbines in the same location used to produce electricity. Wind farms vary in size from a small number of turbines to several hundred wind turbines covering an extensive area. Wind farms can be either onshore or offshore.

Vestas Danish wind turbine company

Vestas Wind Systems A/S is a Danish manufacturer, seller, installer, and servicer of wind turbines that was founded in 1945. The company operates manufacturing plants in Denmark, Germany, the Netherlands, Taiwan, India, Italy, Romania, the United Kingdom, Spain, Sweden, Norway, Australia, China, Brazil, Poland and the United States, and employs more than 25,000 people globally.

Wind power in the United Kingdom Wind power in the United Kingdom

The United Kingdom is one of the best locations for wind power in the world and is considered to be the best in Europe. By the beginning of March 2022, the UK had 11,091 wind turbines with a total installed capacity of over 24.6 gigawatts (GW): 14.1 GW of onshore capacity and 10.4 GW of offshore capacity, the sixth largest capacity of any country in 2019. Wind power contributed 24.8% of UK electricity supplied in 2020, having surpassed coal in 2016 and nuclear in 2018. It is the largest source of renewable electricity in the UK. The UK Government has committed to a major expansion of offshore capacity by 2030.

Arklow Bank Wind Park And i am looking for the one who is looking for me

Arklow Bank Wind Park is a 25 megawatt offshore wind farm generating electrical power for the Wicklow region in Ireland. It is the first offshore wind farm in Ireland, and the world's first erection of wind turbines rated over 3 MW. It is located on the Arklow Bank, a shallow water sandbank in the Irish Sea, around 10 kilometers (6.2 mi) off the coast of Arklow with an area of 27 by 2.5 kilometres.

Wind power in Scotland Overview of wind power in Scotland

Wind power in Scotland is the fastest-growing renewable energy technology, with 9,347 MW of installed wind power capacity as of June 2020. This included 8,366 MW from onshore wind in Scotland and 981 MW of offshore wind generators.

Wind power in Ohio has a long history, and as of 2016, Ohio had 545 megawatts (MW) of utility-scale wind power installations installed, responsible for 1.1% of in-state electricity generated. Over 1000 MW more were under construction or pending approval. Some installations have become tourist attractions. There has been a sudden increase in generating capacity, as total wind power capacity in the state was just 9.7 MW in 2010. By 2019, there were 738 MW of capacity, which generated 1.71% of Ohio's electricity.

Clipper Windpower

Clipper Windpower is a wind turbine manufacturing company founded in 2001 by James G.P. Dehlsen. It designed one of the largest wind turbines in the United States, manufactured in Cedar Rapids, Iowa. It was working collaboratively with the National Renewable Energy Laboratory.

Floating wind turbine Type of wind turbine

A floating wind turbine is an offshore wind turbine mounted on a floating structure that allows the turbine to generate electricity in water depths where fixed-foundation turbines are not feasible. Floating wind farms have the potential to significantly increase the sea area available for offshore wind farms, especially in countries with limited shallow waters, such as Japan, France and US West coast. Locating wind farms further offshore can also reduce visual pollution, provide better accommodation for fishing and shipping lanes, and reach stronger and more consistent winds.

Clyde Wind Farm

The Clyde Wind Farm is a 522 megawatt (MW) wind farm near Abington in South Lanarkshire, Scotland.

Neart Na Gaoithe is an offshore wind farm under construction in the outer Firth of Forth, 30 kilometres (19 mi) north of Torness. It has a potential capacity of 450 MW. It is being developed by Mainstream Renewable Power at a cost of £1.4bn. Offshore work began in 2020, with completion planned for 2023.

Offshore wind power Wind turbines in marine locations for electricity production

Offshore wind power or offshore wind energy is the generation of electricity through wind farms in bodies of water, usually at sea. There are higher wind speeds offshore than on land, so offshore farms generate more electricity per amount of capacity installed. Offshore wind farms are also less controversial than those on land, as they have less impact on people and the landscape.

Narec, since 2014 known as the National Renewable Energy Centre, is a part of the Offshore Renewable Energy (ORE) Catapult, a British technology innovation and research centre for offshore wind power, wave energy, tidal energy and low carbon technologies. ORE Catapult's head office is in Glasgow, Scotland. The centre operates multi-purpose offshore renewable energy test and demonstration facilities. It is similar to other centres, such as NREL in the US and National Centre for Renewable Energies (CENER) in Spain. The National Renewable Energy Centre is based in Blyth, Northumberland.

Blyth Offshore Wind Farm

Blyth Offshore Wind Farm was a small coastal wind farm located 0.5 miles (0.80 km) off the coast of Blyth, Northumberland, England.

GE Wind Energy is a branch of GE Renewable Energy, a subsidiary of General Electric. The company manufactures and sells wind turbines to the international market. In 2018, GE was the fourth largest wind turbine manufacturer in the world.

Beatrice Wind Farm Wind farm close to the Beatrice oil field in the Moray Firth, off the north east coast of Scotland

The Beatrice Offshore Wind Farm now known as Beatrice Offshore Windfarm Ltd (BOWL) project, is a wind farm close to the Beatrice oil field in the Moray Firth, part of the North Sea 13 km off the north east coast of Scotland.

West of Duddon Sands Wind Farm

West of Duddon Sands Wind Farm (WoDS), occasionally also known as West Duddon Wind Farm is an offshore wind farm located 14 kilometres (8.7 mi) south west of Walney Island off the coast of Barrow-in-Furness in Cumbria, in the Irish Sea, England. It was developed by Scottish Power and Ørsted A/S.

Walney Wind Farm Offshore wind farm off the coast of Cumbria, England

Walney Wind Farms are a group of offshore wind farms 9 miles (14 km) west of Walney Island off the coast of Cumbria, in the Irish Sea, England. The group, operated by Ørsted, consists of Walney Phase 1, Phase 2 and the Walney Extension. The extension has a capacity of 659 MW making it the world's second largest offshore wind farm.

Vestas V164 Three-bladed offshore wind turbine

The Vestas V164 is a three-bladed offshore wind turbine, produced by Vestas, with a nameplate capacity of up to 10 megawatts, a world record. Vestas revealed the V164's design in 2011 with the first prototype unit operated at Østerild in northern Denmark in January 2014. The first industrial units were installed in 2016 at Burbo Bank, off the west coast of the United Kingdom. By 2021, Vestas had produced 500 of the series.

References

  1. 1 2 UK Operational Wind Farms – Renewable UK Archived 2011-03-19 at the Wayback Machine Accessed 27 September 2011
  2. Methil Offshore Wind Farm – 4COffshore Accessed 27 September 2011
  3. Offshore Wind Scotland – Innovation Archived 2012-03-03 at the Wayback Machine Accessed 12 February 2012
  4. The Courier – 582ft offshore wind turbine at Methil backed Archived 2011-04-23 at the Wayback Machine Accessed 12 February 2012
  5. Samsung’s test turbine to replace 2-B Energy plans, FifeToday, 8 February 2012
  6. Samsung wind turbine project to create 500 jobs in Fife, BBC News, 31 January 2012
  7. Fife Energy Park to host new offshore turbine concept, BBC News, 5 April 2012
  8. "Fife Council maintains renewables optimism despite Samsung blow". www.thecourier.co.uk. Retrieved 7 December 2015.
  9. 1 2 3 World’s biggest turbine now standing tall at Methil, The Courier, 22 October 2013
  10. 1 2 IN DEPTH: Samsung's offshore giant, RechargeNews, 5 November 2013
  11. 1 2 3 £26m deal for new turbines in Methil, FifeToday, 26 March 2014
  12. 1 2 3 Consultation event for new Methil turbines, FifeToday, 25 June 2014