Arecleoch Wind Farm | |
---|---|
Country | Scotland, United Kingdom |
Location | South Ayrshire |
Coordinates | 55°03′12″N04°52′56″W / 55.05333°N 4.88222°W |
Status | Operational |
Construction began | 2009 |
Commission date | June 2011 |
Owner(s) | ScottishPower Renewables |
Operator(s) | ScottishPower |
Wind farm | |
Type | Onshore |
Power generation | |
Units operational | 60 X 2 MW |
Make and model | Gamesa: G80 |
Nameplate capacity | 120 MW |
Arecleoch Wind Farm is a 60 turbine wind farm in South Ayrshire, Scotland with a total capacity of 120 megawatts (MW), enough to power over 67,000 homes. [1] Construction started in 2009 and it was commissioned in June 2011. [1] [2]
A 72.8MW extension was approved in 2021, despite objections from South Ayrshire Council. [3]
In January and February 2016 there were two separate incidents of a turbine catching fire overnight while the site was unmanned due to faults in the HV transformer, there was two further turbine fires over the next 12months. On one occasion there were two technicians climbing the tower as the fire took hold, they escaped without injury. The turbines were destroyed and were disassembled and removed from site. Scottish Power reported to the Sunday Mail on 10 April 2016 they were investigating these incidents along with the manufacturer Gamesa.
EDF Energy is a British integrated energy company, wholly owned by the French state-owned EDF, with operations spanning electricity generation and the sale of natural gas and electricity to homes and businesses throughout the United Kingdom. It employs 11,717 people, and handles 5.22 million business and residential customer accounts.
The United Kingdom is the best location for wind power in Europe and one of the best in the world. The combination of long coastline, shallow water and strong winds make offshore wind unusually effective.
The production of renewable energy in Scotland is a topic that came to the fore in technical, economic, and political terms during the opening years of the 21st century. The natural resource base for renewable energy is high by European, and even global standards, with the most important potential sources being wind, wave, and tide. Renewables generate almost all of Scotland's electricity, mostly from the country's wind power.
Greater Gabbard is a 504 MW wind farm, built on sandbanks 23 kilometres (14 mi) off the coast of Suffolk in England at a cost of £1.5 billion. It was completed on 7 September 2012 with all of the Siemens SWT3.6–107 turbines connected. Developed as a joint venture between Airtricity and Fluor, it is now jointly owned by SSE Renewables and RWE.
Wind power is the fastest-growing renewable energy technology in Scotland, with 11,482 megawatts (MW) of installed wind power capacity by Q1 2023. This included 9,316 MW from onshore wind in Scotland and 2,166 MW of offshore wind generators.
Renewable energy in the United Kingdom contributes to production for electricity, heat, and transport.
Whitelee Wind Farm is a windfarm on the Eaglesham moor in Scotland. The main visitor centre is located in East Renfrewshire, but the majority of turbines are located in East Ayrshire and South Lanarkshire. It is the largest on-shore wind farm in the United Kingdom with 215 Siemens and Alstom wind turbines and a total capacity of 539 megawatts (MW), with the average of 2.5 MW per turbine. Whitelee was developed and is operated by ScottishPower Renewables, which is part of the Spanish company Iberdrola.
Robin Rigg Wind Farm, Scotland's first offshore wind farm, was constructed by E.ON at Robin Rigg in the Solway Firth, a sandbank midway between the Galloway and Cumbrian coasts. The wind farm first generated power for test purposes on 9 September 2009 and it was completed on 20 April 2010.
The Kentish Flats Offshore Wind Farm is a wind farm located off the coast of Kent, England on a large, flat and shallow plateau just outside the main Thames shipping lanes. The wind farm is operated by Vattenfall.
The Clyde Wind Farm is a 522 megawatt (MW) wind farm near Abington in South Lanarkshire, Scotland.
The 54-turbine Black Law Wind Farm has a total capacity of 124 megawatts (MW). The first phase of 42 turbines was the largest sufficient to meet the average electricity needs of 70,000 homes each year - or a town the size of Paisley - and is estimated to save around 200,000 tonnes of carbon dioxide emissions a year.
The 24 megawatt (MW) Ardrossan Wind Farm in Ardrossan, North Ayrshire, Scotland was officially opened on 10 August 2004. The Vestas factory in Argyll, which now employs more than 200 people, has supplied the wind turbines for the Airtricity development. The company is providing access to the site for schools and other interested community groups to learn more about wind power.
Crystal Rig Wind Farm is an operational onshore wind farm located on the Lammermuir Hills in the Scottish Borders region of Scotland. When phase 1 was completed in May 2004 it was the largest wind farm in Scotland. As a result of 3 extensions it is currently the second largest wind farm in the UK, in terms of nameplate capacity and one of the top five largest in number of turbines.
West of Duddon Sands Wind Farm (WoDS), occasionally also known as West Duddon Wind Farm is an offshore wind farm located 14 kilometres (8.7 mi) south west of Walney Island off the coast of Barrow-in-Furness in Cumbria, in the Irish Sea, England. It was developed by Scottish Power and Ørsted A/S.
Walney Wind Farms are a group of offshore wind farms 9 miles (14 km) west of Walney Island off the coast of Cumbria, England, in the Irish Sea. The group, operated by Ørsted, consists of Walney Phase 1, Phase 2 and the Walney Extension. The extension has a capacity of 659 MW and it was the world's second largest offshore wind farm in 2018.
REG WindPower is a renewable energy company, in the United Kingdom.
Methil Offshore Wind Turbine is a demonstrator site for experimental offshore wind turbines at Fife Energy Park off the coast of Methil, Fife in Scotland.
Kilgallioch Wind Farm is a 96 turbine wind farm in South Ayrshire, Scotland with a total capacity of up to 239 megawatts (MW). Consent granted by the Scottish Government in February 2013 with construction starting in 2015 and completed in 2017. The wind farm contains 70 km of internal tracks, and a surface area of roughly 32 km2.