Kilmelfort Hydro-Electric Scheme | |
---|---|
Country | Scotland |
Location | Kilmelford, Argyll and Bute |
Coordinates | 56°16′24″N5°29′22″W / 56.2732°N 5.4895°W |
Purpose | Power |
Status | Operational |
Opening date | 1956 |
Owner(s) | SSE plc |
Kilmelfort Hydro-Electric Scheme | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Kilmelfort Hydro-Electric Scheme is a small-scale hydro-electric power station, built by the North of Scotland Hydro-Electric Board and commissioned in 1956. It is located near Kilmelford in Argyll and Bute, Scotland. It was originally designed to supply power to the local communities around Kilmelford, but is now connected to the National Grid.
The North of Scotland Hydro-Electric Board was created by the Hydro-electric Development (Scotland) Act 1943, [1] a measure championed by the politician Tom Johnston while he was Secretary of State for Scotland. [2] Johnston's vision was for a public body that could build hydro-electric stations throughout the Highlands. Profits made by selling bulk electricity to the Scottish lowlands would be used to fund "the economic development and social improvement of the North of Scotland." Private consumers would be offered a supply of cheap electricity, and their connection to that supply would not reflect the actual cost of its provision in remote and sparsely-populated areas. [3]
The chairman of the new Board was to be Lord Airlie, who had initially been critical of the 1943 Act because its scope was too limited. The deputy chairman and chief executive was Edward MacColl, an engineer with wide experience of hydro-electric projects and electrical distribution networks. [4] It soon became clear that MacColl intended to push ahead with the aspirations of the Act at breakneck speeds. He produced a list of 102 potential sites in just three months, [5] and in June 1944, the first constructional scheme was published. This was for the Loch Sloy scheme, which had a ready market for bulk supplies to nearby Clydeside, but it included two smaller schemes, to demonstrate the Board's commitment to supplying remote areas. [6]
Kilmelfort was another small scheme, designed to supply the remote communities near Kilmelford, about 15 miles (24 km) south of Oban. The scheme was designed by the architect Ian Gordon Lindsay, and the turbine house is located on the right bank of the River Oude, to the north of the hamlet of Melfort. It contains a single 2 MW undershot turbine, supplied by Gilbert Gilkes & Gordon of Kendal, which is supplemented by a 75 kW machine powered by compensation water released to maintain the habitat in the River Oude. [7] Lindsay was also responsible for the design of an attendant's cottage and the bridge over the River Oude which provides access to the cottage and turbine house. [8]
Water for the scheme is stored in Oude Dam, a reservoir created by constructing a dam across the River Oude. It is a mass gravity dam and is relatively small, as it is located in a steep-sided gorge. It incorporates a fixed spillway, and a walkway for pedestrians runs along the top of it. An intake tower controls the flow of water into a tunnel, [9] with a steel pressure pipeline completing the route to the turbine house. [10] Further upstream is Loch Tralaig, which has been enlarged by the construction of another mass gravity dam, consisting of a central spillway with earth embankments on either side of it. A control tower regulates the water discharged through the dam, which passes through the compensation set to generate additional power before flowing along the stream bed to reach Oude Dam. [11]
The water supply has been increased by the construction of a small dam at the northern end of Loch Cheallair. A stream flows northwards from the dam to join the River Oude just below the Loch Tralaig Dam. [12] [13] Loch Na Sreinge is located to the east of Loch Tralaig, and its natural outlet flows northwards along the Allt Braglenmore to Loch Scammadale, but another dam has been built across the outlet, and some of its water flows through a tunnel which discharges into the streams that feed Loch Tralaig. [14] [13]
The scheme was commissioned in 1956, [15] and was the North of Scotland Hydro-Electric Board's Constructional Scheme No.61. In early 1957, Lord Lucas of Chilworth asked questions in the House of Lords about the costs of Scottish hydro-electricity. Lord Strathclyde stated that for Kilmelfort, the capital cost of the project was £334 per kW, towards the upper end of the 27 schemes mentioned, and considerably higher than the average cost of £175 per kW, reflecting the remote location in which it was built. [16]
In 2002, the Renewables Obligation (Scotland) legislation was introduced. It was conceived as a way to promote the development of small-scale hydro-electric, wave power, tidal power, photovoltaics, wind power and biomas schemes, but by the time it came into force, the definition of small scale had been increased from 5 MW to 10 MW and then 20 MW, and existing hydro-electric stations that had been refurbished to improve efficiency could be included. [17] Kilmelfort at 2.5 MW was thus included, and between 2004 and 2007 the station qualified for 38,441 Renewable Obligation Certificates, generating a subsidy for SSE of over £1,815,000. The compensation set also qualified for 1,843 certificates, generating £87,001 in the same period. [18]
Documents produced by Lindsay for the design of the scheme [10] were kept by his architectural practice after his death in 1966, but in 1973 many items were given to the National Monuments Record of Scotland, and further acquisitions were made between then and 1992. His archive now consists of around 26,000 drawings and plans. [19]
The surface level of Oude Dam is 367 feet (112 m) above Ordnance datum (AOD), it covers 25 acres (10 ha), and drains an area of 8.87 square miles (22.97 km2). [20] Loch Tralaig is located at 440 feet (134 m) AOD, has a surface area of 0.29 square miles (0.75 km2) and a catchment area of 4.68 square miles (12.12 km2). [21] Loch Cheallair is located at 843 feet (257 m), and has a surface area of just 7.4 acres (3 ha). [22] Loch na Sreinge is at 778 feet (237 m) AOD, has a surface area of 0.08 square miles (0.21 km2) and drains an area of 1.15 square miles (2.98 km2) [23]
The River Oude is crossed by three bridges carrying minor roads below Loch Tralaig dam, and by the A816 Lochgilphead to Oban road above the northern end of Oude Dam. The Eas Tarsuinn, on which there is a dam and a sluice, joins the Oude at the southern end of the Pass of Melfort below Oude Dam. The river flows over a weir, to the west of which the tunnel from Oude Dam ends and the surface pipeline begins. In the vicinity of the power station, there are three more bridges, including the one that provides access to the station, and one carrying the road from Kilmelford to Melfort. Shortly afterwards, the river flows into the sea at Fearnach Bay, part of Loch Melfort. [13]
The River Shin is a river in the Scottish North West Highlands.
The River Conon is a river in the Highlands of Scotland. It begins at Loch Luichart, and flows in a south-easterly direction to be joined by the River Meig at Scatwell before passing through Loch Achonachie. It is joined by the Black Water at Moy Bridge, and the River Orrin at Urray, before flowing past Conon Bridge and into the Cromarty Firth.
The Tummel hydro-electric power scheme is an interconnected network of dams, power stations, aqueducts and electric power transmission in the Grampian Mountains of Scotland. Roughly bounded by Dalwhinnie in the north, Rannoch Moor in the west and Pitlochry in the east it comprises a water catchment area of around 1,800 square kilometres and primary water storage at Loch Ericht, Loch Errochty, Loch Rannoch and Loch Tummel, in Perth and Kinross. Water, depending on where it originates and the path it takes, may pass through as many as five of the schemes nine power stations as it progresses from north-west to south-east. The scheme was constructed in the 1940s and 50s incorporating some earlier sites. It is managed by SSE plc.
The Affric-Beauly hydro-electric power scheme for the generation of hydro-electric power is located in the western Highlands of Scotland. It is based around Glen Strathfarrar, Glen Cannich and Glen Affric, and Strathglass further downstream.
Nostie is a small remote hamlet, lying on Nostie Bay, an inlet at the northeastern end of the sea loch, Loch Alsh in the Scottish Highlands and is in the council area of Highland. Nostie lies a short distance from one of Scotland's popular tourist attractions, Eilean Donan Castle.
The River Garry in Inverness-shire is a Scottish river punctuated by two long Lochs, in the region of Lochaber. It flows broadly west to east through Glen Garry, starting in a wilderness to the east of Knoydart and ending at Loch Oich in the Great Glen, which forms part of the Caledonian Canal. There are a few tiny settlements within Glen Garry, but the only village of any size near to the river is Invergarry, at its mouth. Loch Quoich at the western end of the watercourse is dammed by the largest mass earth fill dam in Scotland, and supplies water to Quoich hydroelectric power station. Loch Garry is dammed by a much smaller dam in the gorge where the river begins its descent to Invergarry, and supplies water to Invergarry hydroelectric power station, close to the mouth of the river. Both hydroelectric schemes were built in the 1950s, with the aim of stimulating economic regeneration in the area. They have altered the ecology of the river, as both lochs were made considerably bigger as a result of constructing the dams.
The Loch Sloy Hydro-Electric Scheme is a hydro-electric facility situated between Loch Sloy and Inveruglas on the west bank of Loch Lomond in Scotland.
The River Moriston is a river in Inverness-shire, Scotland. It flows broadly east-north-east from the outfall of the dam at Loch Cluanie to Loch Ness. Its waters and those of its tributaries have been harnessed to generate hydro-electric power.
The Breadalbane Hydro-Electric Scheme is a hydroelectric scheme in the Breadalbane area of Perthshire, Scotland. It comprises seven power stations which generate 120MW of power from the dams around Loch Lyon, Loch Earn and Loch Tay.
The River Morar is a river that flows from Loch Morar in the west Highlands of Scotland. It flows from the western end of the loch to the estuary of Morar Bay, an inlet of the Sound of Sleat. It is one of Scotland's shortest rivers, and is known for its white sands beaches where it flows through Morar Bay.
Storr Lochs is a hydro-electric power station built on the Isle of Skye, Inner Hebrides, Scotland and commissioned in 1952. It was built by the North of Scotland Hydro-Electric Board, and used water from Lochs Leathan and Fada, to provide the first general supply of electricity to the island. Because the location of the turbine house was not easily accessible, it is served by an electric funicular railway.
Chliostair Hydro-Electric Scheme is a small scheme promoted by the North of Scotland Hydro-Electric Board on Harris, Outer Hebrides. It consists of a single power station powered with water from Loch Chliostair, and was commissioned in 1960.
Gisla Hydro-Electric Scheme was a small scheme promoted by the North of Scotland Hydro-Electric Board on the Isle of Lewis, Outer Hebrides, Scotland. It consisted of a single power station powered with water from Loch Coirceabhat, and was commissioned in 1960.
Mucomir Hydro-Electric Scheme is a small-scale hydro-electric power station, built by the North of Scotland Hydro-Electric Board and commissioned in 1962. It is located on the Mucomir Cut, a waterway created by Thomas Telford during the building of the Caledonian Canal to replace the existing course of the River Lochy below Loch Lochy, so that the old course could be used for the canal. The power station was substantially upgraded in 2017.
The Shira Hydro-Electric Scheme is a project initiated by the North of Scotland Hydro-Electric Board to use the waters of the River Shira, the River Fyne and other small streams to generate hydroelectricity. It is located between Loch Fyne and Loch Awe in Argyll and Bute, western Scotland. It consists of three power stations and three impounding dams.
The Awe Hydro-Electric Scheme was the penultimate scheme developed by the North of Scotland Hydro-Electric Board. It centres around Loch Awe, in Argyll and Bute, on the southern edge of the Scottish Highlands. It consists of three power stations, two conventional hydro-electric stations, and the Cruachan power station, the first large pumped storage scheme built by the Board. It was completed in 1965.
Lussa Hydro-Electric Scheme is a small-scale hydro-electric power station, built by the North of Scotland Hydro-Electric Board and commissioned in 1956. It is located near Peninver on the Kintyre peninsula, part of Argyll and Bute in Scotland. It was originally designed to supply power to Campbeltown, but is now connected to the National Grid.
Kerry Falls Hydro-Electric Scheme, sometimes known as Gairloch is a small-scale hydro-electric power station, built by the North of Scotland Hydro-Electric Board and commissioned in 1952. It is located near Gairloch in Wester Ross, part of the Highlands of Scotland. It was originally designed to supply power to local communities in this remote area, but is now connected to the National Grid.
Loch Dubh Hydro-Electric Scheme is a small-scale hydro-electric power station, built by the North of Scotland Hydro-Electric Board and commissioned in 1955. It is located near Ullapool in Ross and Cromarty, Scotland. It was originally designed to supply power to the remote communities around Ullapool, but is now connected to the National Grid.
Loch Gair Hydro-Electric Scheme is a small-scale hydro-electric power station, built by the North of Scotland Hydro-Electric Board and commissioned in 1956. It is located near Lochgair, a hamlet to the north-east of Lochgilphead, Argyll and Bute in Scotland. It was originally designed to supply power to Lochgilphead and the surrounding communities, but is now connected to the National Grid.
Media related to Kilmelfort hydro-electric scheme at Wikimedia Commons