Kilmelfort Hydro-Electric Scheme

Last updated

Kilmelfort
Hydro-Electric Scheme
Kilmelfort Power Station - geograph.org.uk - 1870168.jpg
The turbine house for the Kilmelfort scheme
Argyll and Bute UK relief location map.jpg
Red pog.svg
Location of Kilmelfort
Hydro-Electric Scheme in Argyll and Bute
CountryScotland
Location Kilmelford, Argyll and Bute
Coordinates 56°16′24″N5°29′22″W / 56.2732°N 5.4895°W / 56.2732; -5.4895
PurposePower
StatusOperational
Opening date1956
Owner(s) SSE plc
Kilmelfort
Hydro-Electric Scheme
BSicon uexCONTg.svg
Allt Braglenmore
BSicon uexRESVGe.svg
Loch na Sreinge
BSicon utSTRl.svg
BSicon utSTRq.svg
BSicon utSTR+r.svg
Tunnel
BSicon uexABZg+l.svg
BSicon uexKHSTeq.svg
Source
BSicon uexABZg+l.svg
BSicon uexKHSTeq.svg
Source
BSicon uexBHF.svg
Lochan a' Bhailis
BSicon uexSTR+l.svg
BSicon uexSTRr.svg
BSicon uexDOCKSa.svg
BSicon uexDOCKSm.svg
BSicon uexRESVGDa.svg
Loch Tralaig dam
BSicon uexABZg+l.svg
BSicon uexSTRq.svg
BSicon uexSTR+r.svg
BSicon uexSKRZ-Au.svg
BSicon uexSTR.svg
A816 road bridge
BSicon uexDOCKSa.svg
BSicon uexSTR.svg
BSicon uexDOCKSm.svg
BSicon uexRESVGe.svg
Loch Cheallair
BSicon uexDOCKSm.svg
BSicon uexRESVGDa.svg
Oude Dam
BSicon utSTR+1.svg
BSicon uexSTR.svg
River Oude
BSicon utENDEa.svg
BSicon utENDEe.svg
BSicon uexSTR.svg
Tunnel/pipeline junction
BSicon utSTRl.svg
BSicon uxSTRbl.svg
Kilmelfort power station
BSicon uexSKRZ-Eu.svg
Access bridge
BSicon uexSTR.svg
BSicon uexSKRZ-Yu.svg
Melfort Bridge
BSicon uDOCKSa.svg
Fearnach Bay, Loch Melfort

Kilmelfort Hydro-Electric Scheme is a small-scale hydro-electric power station, built by the North of Scotland Hydro-Electric Board and commissioned in 1956. It is located near Kilmelford in Argyll and Bute, Scotland. It was originally designed to supply power to the local communities around Kilmelford, but is now connected to the National Grid.

Contents

History

The North of Scotland Hydro-Electric Board was created by the Hydro-electric Development (Scotland) Act 1943, [1] a measure championed by the politician Tom Johnston while he was Secretary of State for Scotland. [2] Johnston's vision was for a public body that could build hydro-electric stations throughout the Highlands. Profits made by selling bulk electricity to the Scottish lowlands would be used to fund "the economic development and social improvement of the North of Scotland." Private consumers would be offered a supply of cheap electricity, and their connection to that supply would not reflect the actual cost of its provision in remote and sparsely-populated areas. [3]

The chairman of the new Board was to be Lord Airlie, who had initially been critical of the 1943 Act because its scope was too limited. The deputy chairman and chief executive was Edward MacColl, an engineer with wide experience of hydro-electric projects and electrical distribution networks. [4] It soon became clear that MacColl intended to push ahead with the aspirations of the Act at breakneck speeds. He produced a list of 102 potential sites in just three months, [5] and in June 1944, the first constructional scheme was published. This was for the Loch Sloy scheme, which had a ready market for bulk supplies to nearby Clydeside, but it included two smaller schemes, to demonstrate the Board's commitment to supplying remote areas. [6]

Kilmelfort was another small scheme, designed to supply the remote communities near Kilmelford, about 15 miles (24 km) south of Oban. The scheme was designed by the architect Ian Gordon Lindsay, and the turbine house is located on the right bank of the River Oude, to the north of the hamlet of Melfort. It contains a single 2 MW undershot turbine, supplied by Gilbert Gilkes & Gordon of Kendal, which is supplemented by a 75 kW machine powered by compensation water released to maintain the habitat in the River Oude. [7] Lindsay was also responsible for the design of an attendant's cottage and the bridge over the River Oude which provides access to the cottage and turbine house. [8]

Water for the scheme is stored in Oude Dam, a reservoir created by constructing a dam across the River Oude. It is a mass gravity dam and is relatively small, as it is located in a steep-sided gorge. It incorporates a fixed spillway, and a walkway for pedestrians runs along the top of it. An intake tower controls the flow of water into a tunnel, [9] with a steel pressure pipeline completing the route to the turbine house. [10] Further upstream is Loch Tralaig, which has been enlarged by the construction of another mass gravity dam, consisting of a central spillway with earth embankments on either side of it. A control tower regulates the water discharged through the dam, which passes through the compensation set to generate additional power before flowing along the stream bed to reach Oude Dam. [11]

The water supply has been increased by the construction of a small dam at the northern end of Loch Cheallair. A stream flows northwards from the dam to join the River Oude just below the Loch Tralaig Dam. [12] [13] Loch Na Sreinge is located to the east of Loch Tralaig, and its natural outlet flows northwards along the Allt Braglenmore to Loch Scammadale, but another dam has been built across the outlet, and some of its water flows through a tunnel which discharges into the streams that feed Loch Tralaig. [14] [13]

The scheme was commissioned in 1956, [15] and was the North of Scotland Hydro-Electric Board's Constructional Scheme No.61. In early 1957, Lord Lucas of Chilworth asked questions in the House of Lords about the costs of Scottish hydro-electricity. Lord Strathclyde stated that for Kilmelfort, the capital cost of the project was £334 per kW, towards the upper end of the 27 schemes mentioned, and considerably higher than the average cost of £175 per kW, reflecting the remote location in which it was built. [16]

Operation

In 2002, the Renewables Obligation (Scotland) legislation was introduced. It was conceived as a way to promote the development of small-scale hydro-electric, wave power, tidal power, photovoltaics, wind power and biomas schemes, but by the time it came into force, the definition of small scale had been increased from 5 MW to 10 MW and then 20 MW, and existing hydro-electric stations that had been refurbished to improve efficiency could be included. [17] Kilmelfort at 2.5 MW was thus included, and between 2004 and 2007 the station qualified for 38,441 Renewable Obligation Certificates, generating a subsidy for SSE of over £1,815,000. The compensation set also qualified for 1,843 certificates, generating £87,001 in the same period. [18]

Documents produced by Lindsay for the design of the scheme [10] were kept by his architectural practice after his death in 1966, but in 1973 many items were given to the National Monuments Record of Scotland, and further acquisitions were made between then and 1992. His archive now consists of around 26,000 drawings and plans. [19]

Hydrology

The surface level of Oude Dam is 367 feet (112 m) above Ordnance datum (AOD), it covers 25 acres (10 ha), and drains an area of 8.87 square miles (22.97 km2). [20] Loch Tralaig is located at 440 feet (134 m) AOD, has a surface area of 0.29 square miles (0.75 km2) and a catchment area of 4.68 square miles (12.12 km2). [21] Loch Cheallair is located at 843 feet (257 m), and has a surface area of just 7.4 acres (3 ha). [22] Loch na Sreinge is at 778 feet (237 m) AOD, has a surface area of 0.08 square miles (0.21 km2) and drains an area of 1.15 square miles (2.98 km2) [23]

The River Oude is crossed by three bridges carrying minor roads below Loch Tralaig dam, and by the A816 Lochgilphead to Oban road above the northern end of Oude Dam. The Eas Tarsuinn, on which there is a dam and a sluice, joins the Oude at the southern end of the Pass of Melfort below Oude Dam. The river flows over a weir, to the west of which the tunnel from Oude Dam ends and the surface pipeline begins. In the vicinity of the power station, there are three more bridges, including the one that provides access to the station, and one carrying the road from Kilmelford to Melfort. Shortly afterwards, the river flows into the sea at Fearnach Bay, part of Loch Melfort. [13]

Bibliography

Related Research Articles

<span class="mw-page-title-main">River Shin</span> River in northern Scotland

The River Shin is a river in the Scottish North West Highlands.

<span class="mw-page-title-main">River Conon</span> River in Scotland

The River Conon is a river in the Highlands of Scotland. It begins at Loch Luichart, and flows in a south-easterly direction to be joined by the River Meig at Scatwell before passing through Loch Achonachie. It is joined by the Black Water at Moy Bridge, and the River Orrin at Urray, before flowing past Conon Bridge and into the Cromarty Firth.

<span class="mw-page-title-main">Tummel hydro-electric power scheme</span> Power stations in Perth and Inverness

The Tummel hydro-electric power scheme is an interconnected network of dams, power stations, aqueducts and electric power transmission in the Grampian Mountains of Scotland. Roughly bounded by Dalwhinnie in the north, Rannoch Moor in the west and Pitlochry in the east it comprises a water catchment area of around 1,800 square kilometres and primary water storage at Loch Ericht, Loch Errochty, Loch Rannoch and Loch Tummel, in Perth and Kinross. Water, depending on where it originates and the path it takes, may pass through as many as five of the schemes nine power stations as it progresses from north-west to south-east. The scheme was constructed in the 1940s and 50s incorporating some earlier sites. It is managed by SSE plc.

<span class="mw-page-title-main">Affric-Beauly hydro-electric power scheme</span> Power stations on River Affric and River Beauly in Scottish Highlands

The Affric-Beauly hydro-electric power scheme for the generation of hydro-electric power is located in the western Highlands of Scotland. It is based around Glen Strathfarrar, Glen Cannich and Glen Affric, and Strathglass further downstream.

<span class="mw-page-title-main">Nostie</span> Human settlement and power station in Scotland

Nostie is a small remote hamlet, lying on Nostie Bay, an inlet at the northeastern end of the sea loch, Loch Alsh in the Scottish Highlands and is in the council area of Highland. Nostie lies a short distance from one of Scotland's popular tourist attractions, Eilean Donan Castle.

<span class="mw-page-title-main">River Garry, Inverness-shire</span> River and power stations in Scotland

The River Garry in Inverness-shire is a Scottish river punctuated by two long Lochs, in the region of Lochaber. It flows broadly west to east through Glen Garry, starting in a wilderness to the east of Knoydart and ending at Loch Oich in the Great Glen, which forms part of the Caledonian Canal. There are a few tiny settlements within Glen Garry, but the only village of any size near to the river is Invergarry, at its mouth. Loch Quoich at the western end of the watercourse is dammed by the largest mass earth fill dam in Scotland, and supplies water to Quoich hydroelectric power station. Loch Garry is dammed by a much smaller dam in the gorge where the river begins its descent to Invergarry, and supplies water to Invergarry hydroelectric power station, close to the mouth of the river. Both hydroelectric schemes were built in the 1950s, with the aim of stimulating economic regeneration in the area. They have altered the ecology of the river, as both lochs were made considerably bigger as a result of constructing the dams.

<span class="mw-page-title-main">Loch Sloy Hydro-Electric Scheme</span> Dam in Argyll and Bute

The Loch Sloy Hydro-Electric Scheme is a hydro-electric facility situated between Loch Sloy and Inveruglas on the west bank of Loch Lomond in Scotland.

<span class="mw-page-title-main">River Moriston</span> River and power stations in Scotland

The River Moriston is a river in Inverness-shire, Scotland. It flows broadly east-north-east from the outfall of the dam at Loch Cluanie to Loch Ness. Its waters and those of its tributaries have been harnessed to generate hydro-electric power.

<span class="mw-page-title-main">Breadalbane Hydro-Electric Scheme</span> Multiple power stations in Scotland

The Breadalbane Hydro-Electric Scheme is a hydroelectric scheme in the Breadalbane area of Perthshire, Scotland. It comprises seven power stations which generate 120MW of power from the dams around Loch Lyon, Loch Earn and Loch Tay.

<span class="mw-page-title-main">River Morar</span> River and power station in Scotland

The River Morar is a river that flows from Loch Morar in the west Highlands of Scotland. It flows from the western end of the loch to the estuary of Morar Bay, an inlet of the Sound of Sleat. It is one of Scotland's shortest rivers, and is known for its white sands beaches where it flows through Morar Bay.

<span class="mw-page-title-main">Storr Lochs Hydro-Electric Scheme</span> Power station on Isle of Skye, Scotland

Storr Lochs is a hydro-electric power station built on the Isle of Skye, Inner Hebrides, Scotland and commissioned in 1952. It was built by the North of Scotland Hydro-Electric Board, and used water from Lochs Leathan and Fada, to provide the first general supply of electricity to the island. Because the location of the turbine house was not easily accessible, it is served by an electric funicular railway.

<span class="mw-page-title-main">Chliostair Hydro-Electric Scheme</span> Power station on Harris, Outer Hebrides, Scotland

Chliostair Hydro-Electric Scheme is a small scheme promoted by the North of Scotland Hydro-Electric Board on Harris, Outer Hebrides. It consists of a single power station powered with water from Loch Chliostair, and was commissioned in 1960.

<span class="mw-page-title-main">Gisla Hydro-Electric Scheme</span> Power station on Lewis, Outer Hebrides, Scotland

Gisla Hydro-Electric Scheme was a small scheme promoted by the North of Scotland Hydro-Electric Board on the Isle of Lewis, Outer Hebrides, Scotland. It consisted of a single power station powered with water from Loch Coirceabhat, and was commissioned in 1960.

<span class="mw-page-title-main">Mucomir Hydro-Electric Scheme</span> Power station near Spean Bridge, Scotland

Mucomir Hydro-Electric Scheme is a small-scale hydro-electric power station, built by the North of Scotland Hydro-Electric Board and commissioned in 1962. It is located on the Mucomir Cut, a waterway created by Thomas Telford during the building of the Caledonian Canal to replace the existing course of the River Lochy below Loch Lochy, so that the old course could be used for the canal. The power station was substantially upgraded in 2017.

<span class="mw-page-title-main">Shira Hydro-Electric Scheme</span> Power stations near Loch Fyne, Scotland

The Shira Hydro-Electric Scheme is a project initiated by the North of Scotland Hydro-Electric Board to use the waters of the River Shira, the River Fyne and other small streams to generate hydroelectricity. It is located between Loch Fyne and Loch Awe in Argyll and Bute, western Scotland. It consists of three power stations and three impounding dams.

<span class="mw-page-title-main">Awe Hydro-Electric Scheme</span> Power stations near Loch Awe, Scotland

The Awe Hydro-Electric Scheme was the penultimate scheme developed by the North of Scotland Hydro-Electric Board. It centres around Loch Awe, in Argyll and Bute, on the southern edge of the Scottish Highlands. It consists of three power stations, two conventional hydro-electric stations, and the Cruachan power station, the first large pumped storage scheme built by the Board. It was completed in 1965.

<span class="mw-page-title-main">Lussa Hydro-Electric Scheme</span> Power station near Peninver, Scotland

Lussa Hydro-Electric Scheme is a small-scale hydro-electric power station, built by the North of Scotland Hydro-Electric Board and commissioned in 1956. It is located near Peninver on the Kintyre peninsula, part of Argyll and Bute in Scotland. It was originally designed to supply power to Campbeltown, but is now connected to the National Grid.

<span class="mw-page-title-main">Kerry Falls Hydro-Electric Scheme</span> Power station near Peninver, Scotland

Kerry Falls Hydro-Electric Scheme, sometimes known as Gairloch is a small-scale hydro-electric power station, built by the North of Scotland Hydro-Electric Board and commissioned in 1952. It is located near Gairloch in Wester Ross, part of the Highlands of Scotland. It was originally designed to supply power to local communities in this remote area, but is now connected to the National Grid.

<span class="mw-page-title-main">Loch Dubh Hydro-Electric Scheme</span> Power station near Ullapool, Scotland

Loch Dubh Hydro-Electric Scheme is a small-scale hydro-electric power station, built by the North of Scotland Hydro-Electric Board and commissioned in 1955. It is located near Ullapool in Ross and Cromarty, Scotland. It was originally designed to supply power to the remote communities around Ullapool, but is now connected to the National Grid.

<span class="mw-page-title-main">Loch Gair Hydro-Electric Scheme</span> Power station near Lochgilphead, Scotland

Loch Gair Hydro-Electric Scheme is a small-scale hydro-electric power station, built by the North of Scotland Hydro-Electric Board and commissioned in 1956. It is located near Lochgair, a hamlet to the north-east of Lochgilphead, Argyll and Bute in Scotland. It was originally designed to supply power to Lochgilphead and the surrounding communities, but is now connected to the National Grid.

References

  1. Payne 1988, pp. 50, 298.
  2. Miller 2002, pp. 19–20.
  3. Wood 2002, pp. 58–59.
  4. Payne 1988, pp. 50–51.
  5. Payne 1988, p. 55.
  6. Payne 1988, pp. 60–61.
  7. "Kilmelfort Hydroelectric Power Station". Canmore. Archived from the original on 14 January 2024.
  8. "Kilmelfort Hydro-electric Power Station, Site Attendant's Cottage". Canmore. Archived from the original on 14 January 2024.
  9. "Oude Dam". Canmore. Archived from the original on 14 January 2024.
  10. 1 2 "Oude Dam collections". Canmore. Archived from the original on 14 January 2024.
  11. "Loch Tralaig, Dam". Canmore. Archived from the original on 14 January 2024.
  12. "Loch Cheallair, General". Canmore. Archived from the original on 14 January 2024.
  13. 1 2 3 Ordnance Survey, 1:25000 map
  14. "Loch Na Sreinge, General". Canmore. Archived from the original on 14 January 2024.
  15. Miller 2002, p. 256.
  16. "North of Scotland Hydro-Electric Costs". Hansard. 22 January 1957. Archived from the original on 14 June 2023.
  17. Swap 2005, pp. 5–7.
  18. Dekker 2008, p. 28.
  19. "Records of Ian Gordon Lindsay and Partners, architects". Canmore. Archived from the original on 14 January 2024.
  20. "River Oude Water body ID 24438". UK Centre for Ecology & Hydrology. Archived from the original on 15 January 2024.
  21. "Loch Tralaig Water body ID 24417". UK Centre for Ecology & Hydrology.
  22. "Loch Cheallair Water body ID 24465". UK Centre for Ecology & Hydrology.
  23. "Loch na Sreinge Water body ID 24399". UK Centre for Ecology & Hydrology.

Commons-logo.svg Media related to Kilmelfort hydro-electric scheme at Wikimedia Commons