Loch Dubh Hydro-Electric Scheme

Last updated

Loch Dubh
Hydro-Electric Scheme
Loch Dubh Penstock - geograph.org.uk - 322454.jpg
The pipeline that feeds Loch Dubh power station
Ross and Cromarty UK relief location map.jpg
Red pog.svg
Location of Loch Dubh
Hydro-Electric Scheme in Ross and Cromarty
CountryScotland
Location Ullapool, Ross and Cromarty
Coordinates 57°57′42″N5°07′48″W / 57.9618°N 5.1299°W / 57.9618; -5.1299
PurposePower
StatusOperational
Opening date1955
Owner(s) SSE
Loch Dubh
Hydro-Electric Scheme
BSicon uexCONTgq.svg
BSicon uexSKRZ-Auq.svg
BSicon uexABZq+r.svg
BSicon uexSTRq.svg
BSicon uexSTRq.svg
BSicon utENDEa.svg
BSicon uexSTRq.svg
BSicon uexSTRq.svg
A835 + River Canaird
BSicon uexSTR.svg
BSicon utSTRbm.svg
Loch Dubh power station
BSicon uexSTR.svg
BSicon utSTR.svg
Allt a' Mhuilinn + pipeline
BSicon uexSTR2.svg
BSicon uexSTRc3.svg
BSicon utSTR.svg
BSicon uexSTRr+1.svg
BSicon uexSTR+4.svg
BSicon utSTR3.svg
BSicon uexKBHFa.svg
Loch Bad nan Calman
BSicon uexRESVGDe.svg
BSicon uexSTR.svg
Loch Beinne Deirg Dam
BSicon uexDOCKSm.svg
BSicon uexDOCKS.svg
Loch na Maoile
BSicon uexDOCKSm.svg
BSicon uexSTR.svg
BSicon uexDOCKSm.svg
BSicon uexSTRq.svg
BSicon uexRESVGDr.svg
Loch na Maoile dam
BSicon uexDOCKSm.svg
BSicon uexDOCKSe.svg
BSicon uexKBHFeq.svg
Loch Cnoc a' Choilich
BSicon uexDOCKSm.svg
BSicon uexDOCKS.svg
Loch Bad na h-Achlaise
BSicon uexDOCKSe.svg
BSicon uexSTR.svg
BSicon uexRESVGDe.svg
BSicon uexDOCKSm.svg
Loch Dubh
BSicon uexDOCKSm.svg
BSicon uexDOCKSe.svg
BSicon uexDOCKS.svg
Loch Ob an Lochain
BSicon uexSTRl.svg
BSicon uexDOCKS.svg
Loch a' Choire Bhuig

Loch Dubh Hydro-Electric Scheme is a small-scale hydro-electric power station, built by the North of Scotland Hydro-Electric Board and commissioned in 1955. It is located near Ullapool in Ross and Cromarty, Scotland. It was originally designed to supply power to the remote communities around Ullapool, but is now connected to the National Grid.

Contents

History

The North of Scotland Hydro-Electric Board was created by the Hydro-electric Development (Scotland) Act 1943, [1] a measure championed by the politician Tom Johnston while he was Secretary of State for Scotland. [2] Johnston's vision was for a public body that could build hydro-electric stations throughout the Highlands. Profits made by selling bulk electricity to the Scottish lowlands would be used to fund "the economic development and social improvement of the North of Scotland." Private consumers would be offered a supply of cheap electricity, and their connection to that supply would not reflect the actual cost of its provision in remote and sparsely-populated areas. [3]

The chairman of the new Board was to be Lord Airlie, who had initially been critical of the 1943 Act because its scope was too limited. The deputy chairman and chief executive was Edward MacColl, an engineer with wide experience of hydro-electric projects and electrical distribution networks. [4] It soon became clear that MacColl intended to push ahead with the aspirations of the Act at breakneck speeds. He produced a list of 102 potential sites in just three months, [5] and in June 1944, the first constructional scheme was published. This was for the Loch Sloy scheme, which had a ready market for bulk supplies to nearby Clydeside, but it included two smaller schemes, to demonstrate the Board's commitment to supplying remote areas. [6]

Loch Dubh was another small scheme, designed to supply the remote village of Ullapool. It is located about 4 miles (6.4 km) to the north of Ullapool, and is fed by a number of lochs located to the south of the turbine house. [7] The principal one consists of Loch Dubh and Loch Ob an Lochain, which were once separate, but have become one because the dam built across the river that formed the northern outlet of Loch Dubh has raised the water level of both. It flows into Loch Beinne Deirg, which has also increased in size significantly due to the presence of a second dam on the river below its outlet. To the east of Loch Beinne Deirg is Loch na Maoile, which is joined to Loch Bad na h-Achlaise since the dam on the western outlet of Loch na Maoile was constructed. Further east is Loch Cnoc a' Choilich or Loch Maoile, while to the north Loch Bad nan Calman feeds water into the system. A network of small lochs and streams drain the foothills of Beinn Donuill and Cnoc a' Choilich, flowing into the main lochs. [8] [9]

The dam that creates Loch Dubh is the furthest upsteam of the three dams that were built, and Loch Dubh is the main source of water for the power station. It is a concrete gravity dam, the downstream face of which is flared, and it includes fixed spillways to allow excess water to overflow into Loch Beinne Deirg. [10] From Loch Beinne Deirg dam, a surface pipeline descends into Strath Canaird, which is occupied by the River Canaird. The turbine house is located on the left bank of the river [8] and contains two turbines made by Gilkes of Kendal, [11] which have a combined output of 1.2 MW. [7] The tailrace discharges into the river.

Structures for the scheme were designed by the architect James Shearer, [12] who was one of the architectural advisors for the North of Scotland Hydro-Electric Board. The Board appointed three Scottish architects to act as architectural advisors in 1943, and their role was to judge competitive entries submitted by others, but by 1947 this model had been abandoned, and Shearer, together with Reginald Fairlie and Harold Tarbolton designed the buildings themselves. [13]

The scheme was the North of Scotland Hydro-Electric Board's Constructional Scheme no.20, and the order to authorise it was laid before Parliament and signed on 8 March 1949. [14] The scheme was commissioned in 1955. [15] In early 1957, Lord Lucas of Chilworth asked questions in the House of Lords about the costs of Scottish hydro-electricity. Lord Strathclyde stated that for Loch Dubh, the capital cost of the project was £366 per kW, the third highest of the 27 schemes mentioned, and considerably higher than the average cost of £175 per kW, reflecting the remote location in which it was built. [16]

Operation

In 2002, the Renewables Obligation (Scotland) legislation was introduced. It was conceived as a way to promote the development of small-scale hydro-electric, wave power, tidal power, photovoltaics, wind power and biomas schemes, but by the time it came into force, the definition of small scale had been increased from 5 MW to 10 MW and then 20 MW, and existing hydro-electric stations that had been refurbished to improve efficiency could be included. [17] Loch Dubh at 1.2 MW thus qualified, and between 2003 and 2007 the station qualified for 14,292 Renewable Obligation Certificates, generating a subsidy for SSE of nearly £691,000. [18] Both turbines at the station were refurbished in the two-year period prior to April 2008. [19]

Shearer produced a large amount of documentation relating to the scheme, including two boxes containing job files and lots of prints and drawings. [20] His architectural practice continued after his death in 1962, but when it closed in 1994, the records were given to the Royal Incorporation of Architects in Scotland. The archive, which consists of over 20,000 drawings and 205 boxes of manuscripts, is currently in the care of Historic Environment Scotland. [21]

Hydrology

The surface level of Loch Dubh and Loch Ob an Lochain is 633 feet (193 m) above Ordnance datum (AOD), they cover 0.27 square miles (0.70 km2), and drain an area of 2.92 square miles (7.56 km2). [22] Loch Beinn Deirg is located at 178 metres (584 ft) AOD, is smaller with a surface area of 0.058 square miles (0.15 km2) but has a catchment area of 4.81 square miles (12.46 km2). [23] Loch Bad na h-Achlaise and Loch na Maoile are both at the same level of 614 feet (187 m). Together, they cover an area of 0.116 square miles (0.30 km2) and have a catchment of 1.69 square miles (4.4 km2). [24] The rest of the lochs are relatively small, with Loch Maoile or Cnoc a'Choilich at 646 feet (197 m) AOD [25] and Loch a' Choire Bhuig at 748 feet (228 m) AOD. [26]

Bibliography

Related Research Articles

<span class="mw-page-title-main">River Shin</span> River in northern Scotland

The River Shin is a river in the Scottish North West Highlands.

<span class="mw-page-title-main">River Conon</span> River in Scotland

The River Conon is a river in the Highlands of Scotland. It begins at Loch Luichart, and flows in a south-easterly direction to be joined by the River Meig at Scatwell before passing through Loch Achonachie. It is joined by the Black Water at Moy Bridge, and the River Orrin at Urray, before flowing past Conon Bridge and into the Cromarty Firth.

<span class="mw-page-title-main">Tummel hydro-electric power scheme</span> Power stations in Perth and Inverness

The Tummel hydro-electric power scheme is an interconnected network of dams, power stations, aqueducts and electric power transmission in the Grampian Mountains of Scotland. Roughly bounded by Dalwhinnie in the north, Rannoch Moor in the west and Pitlochry in the east it comprises a water catchment area of around 1,800 square kilometres and primary water storage at Loch Ericht, Loch Errochty, Loch Rannoch and Loch Tummel, in Perth and Kinross. Water, depending on where it originates and the path it takes, may pass through as many as five of the schemes nine power stations as it progresses from north-west to south-east. The scheme was constructed in the 1940s and 50s incorporating some earlier sites. It is managed by SSE plc.

<span class="mw-page-title-main">Affric-Beauly hydro-electric power scheme</span> Power stations on River Affric and River Beauly in Scottish Highlands

The Affric-Beauly hydro-electric power scheme for the generation of hydro-electric power is located in the western Highlands of Scotland. It is based around Glen Strathfarrar, Glen Cannich and Glen Affric, and Strathglass further downstream.

<span class="mw-page-title-main">Nostie</span> Human settlement and power station in Scotland

Nostie is a small remote hamlet, lying on Nostie Bay, an inlet at the northeastern end of the sea loch, Loch Alsh in the Scottish Highlands and is in the council area of Highland. Nostie lies a short distance from one of Scotland's popular tourist attractions, Eilean Donan Castle.

<span class="mw-page-title-main">River Garry, Inverness-shire</span> River and power stations in Scotland

The River Garry in Inverness-shire is a Scottish river punctuated by two long Lochs, in the region of Lochaber. It flows broadly west to east through Glen Garry, starting in a wilderness to the east of Knoydart and ending at Loch Oich in the Great Glen, which forms part of the Caledonian Canal. There are a few tiny settlements within Glen Garry, but the only village of any size near to the river is Invergarry, at its mouth. Loch Quoich at the western end of the watercourse is dammed by the largest mass earth fill dam in Scotland, and supplies water to Quoich hydroelectric power station. Loch Garry is dammed by a much smaller dam in the gorge where the river begins its descent to Invergarry, and supplies water to Invergarry hydroelectric power station, close to the mouth of the river. Both hydroelectric schemes were built in the 1950s, with the aim of stimulating economic regeneration in the area. They have altered the ecology of the river, as both lochs were made considerably bigger as a result of constructing the dams.

<span class="mw-page-title-main">Loch Sloy Hydro-Electric Scheme</span> Dam in Argyll and Bute

The Loch Sloy Hydro-Electric Scheme is a hydro-electric facility situated between Loch Sloy and Inveruglas on the west bank of Loch Lomond in Scotland.

<span class="mw-page-title-main">River Moriston</span> River and power stations in Scotland

The River Moriston is a river in Inverness-shire, Scotland. It flows broadly east-north-east from the outfall of the dam at Loch Cluanie to Loch Ness. Its waters and those of its tributaries have been harnessed to generate hydro-electric power.

<span class="mw-page-title-main">Breadalbane Hydro-Electric Scheme</span> Multiple power stations in Scotland

The Breadalbane Hydro-Electric Scheme is a hydroelectric scheme in the Breadalbane area of Perthshire, Scotland. It comprises seven power stations which generate 120MW of power from the dams around Loch Lyon, Loch Earn and Loch Tay.

<span class="mw-page-title-main">River Morar</span> River and power station in Scotland

The River Morar is a river that flows from Loch Morar in the west Highlands of Scotland. It flows from the western end of the loch to the estuary of Morar Bay, an inlet of the Sound of Sleat. It is one of Scotland's shortest rivers, and is known for its white sands beaches where it flows through Morar Bay.

<span class="mw-page-title-main">Storr Lochs Hydro-Electric Scheme</span> Power station on Isle of Skye, Scotland

Storr Lochs is a hydro-electric power station built on the Isle of Skye, Inner Hebrides, Scotland and commissioned in 1952. It was built by the North of Scotland Hydro-Electric Board, and used water from Lochs Leathan and Fada, to provide the first general supply of electricity to the island. Because the location of the turbine house was not easily accessible, it is served by an electric funicular railway.

<span class="mw-page-title-main">Chliostair Hydro-Electric Scheme</span> Power station on Harris, Outer Hebrides, Scotland

Chliostair Hydro-Electric Scheme is a small scheme promoted by the North of Scotland Hydro-Electric Board on Harris, Outer Hebrides. It consists of a single power station powered with water from Loch Chliostair, and was commissioned in 1960.

<span class="mw-page-title-main">Gisla Hydro-Electric Scheme</span> Power station on Lewis, Outer Hebrides, Scotland

Gisla Hydro-Electric Scheme was a small scheme promoted by the North of Scotland Hydro-Electric Board on the Isle of Lewis, Outer Hebrides, Scotland. It consisted of a single power station powered with water from Loch Coirceabhat, and was commissioned in 1960.

<span class="mw-page-title-main">Shira Hydro-Electric Scheme</span> Power stations near Loch Fyne, Scotland

The Shira Hydro-Electric Scheme is a project initiated by the North of Scotland Hydro-Electric Board to use the waters of the River Shira, the River Fyne and other small streams to generate hydroelectricity. It is located between Loch Fyne and Loch Awe in Argyll and Bute, western Scotland. It consists of three power stations and three impounding dams.

<span class="mw-page-title-main">Inver Hydro-Electric Scheme</span> Power station on Jura, Inner Hebrides, Scotland

Inver Hydro-Electric Scheme is a remote hydro-electric plant on the Scottish island of Jura, part of the Inner Hebrides. Construction began in 2011, and it was operational by June 2012. It is the third scheme built on the Inver Estate, but the first to be connected to the National Grid. It can produce 2 MW of electric power.

<span class="mw-page-title-main">Lussa Hydro-Electric Scheme</span> Power station near Peninver, Scotland

Lussa Hydro-Electric Scheme is a small-scale hydro-electric power station, built by the North of Scotland Hydro-Electric Board and commissioned in 1956. It is located near Peninver on the Kintyre peninsula, part of Argyll and Bute in Scotland. It was originally designed to supply power to Campbeltown, but is now connected to the National Grid.

<span class="mw-page-title-main">Striven Hydro-Electric Scheme</span> Power station near Ardtaraig, Scotland

Striven Hydro-Electric Scheme is a small-scale hydro-electric power station, built by the North of Scotland Hydro-Electric Board and commissioned in 1951. It is located near Ardtaraig on the Cowal peninsula, part of Argyll and Bute in Scotland. It is sometimes known as the Cowal Hydro-Electric Scheme. It was originally designed to supply power to the remote communities on the peninsula, but is now connected to the National Grid.

<span class="mw-page-title-main">Kerry Falls Hydro-Electric Scheme</span> Power station near Peninver, Scotland

Kerry Falls Hydro-Electric Scheme, sometimes known as Gairloch is a small-scale hydro-electric power station, built by the North of Scotland Hydro-Electric Board and commissioned in 1952. It is located near Gairloch in Wester Ross, part of the Highlands of Scotland. It was originally designed to supply power to local communities in this remote area, but is now connected to the National Grid.

<span class="mw-page-title-main">Kilmelfort Hydro-Electric Scheme</span> Power station near Kilmelford, Scotland

Kilmelfort Hydro-Electric Scheme is a small-scale hydro-electric power station, built by the North of Scotland Hydro-Electric Board and commissioned in 1956. It is located near Kilmelford in Argyll and Bute, Scotland. It was originally designed to supply power to the local communities around Kilmelford, but is now connected to the National Grid.

References

  1. Payne 1988, pp. 50, 298.
  2. Miller 2002, pp. 19–20.
  3. Wood 2002, pp. 58–59.
  4. Payne 1988, pp. 50–51.
  5. Payne 1988, p. 55.
  6. Payne 1988, pp. 60–61.
  7. 1 2 "Loch Dubh Power Station". Gazetteer of Scotland. Archived from the original on 9 January 2024.
  8. 1 2 Ordnance Survey, 1:25000 map
  9. Ordnance Survey, Six-inch map, 1913
  10. "Loch Dubh, Dam". Canmore. Archived from the original on 9 January 2024.
  11. "Strath Canaird Power Station". Canmore. Archived from the original on 9 January 2024.
  12. "Strath Canaird Power Station". Canmore.
  13. Fleetwood 2010, p. 40.
  14. "Loch Dubh (Ullapool) Project" (PDF). Edinburgh Gazette. 22 April 1949. p. 176. Archived (PDF) from the original on 9 January 2024.
  15. Miller 2002, p. 256.
  16. "North of Scotland Hydro-Electric Costs". Hansard. 22 January 1957. Archived from the original on 14 June 2023.
  17. Swap 2005, pp. 5–7.
  18. Dekker 2008, p. 28.
  19. Dekker 2008, p. 182.
  20. "Strath Canaird Power Station". Canmore. Archived from the original on 9 January 2024.
  21. "Records of Shearer and Annand, architects". Canmore. Archived from the original on 27 August 2023.
  22. "Loch Ob an Lochain or Loch Dubh Water body ID 12313". UK Centre for Ecology & Hydrology. Archived from the original on 11 January 2024.
  23. "Loch Beinn Deirg Water body ID 12227". UK Centre for Ecology & Hydrology. Archived from the original on 10 January 2024.
  24. "Loch Maoile or Loch Bad na h-Achlaise Water body ID 12233". UK Centre for Ecology & Hydrology.
  25. "Loch Maoile Water body ID 12255". UK Centre for Ecology & Hydrology.
  26. "Loch a Choire Bhuig body ID 12411". UK Centre for Ecology & Hydrology.

Commons-logo.svg Media related to Loch Dubh hydro-electric scheme at Wikimedia Commons