Kerry Falls Hydro-Electric Scheme

Last updated

Kerry Falls
Hydro-Electric Scheme
Loch Bad an Sgalaig Dam - geograph.org.uk - 646709.jpg
Loch Bad an Sgalaig Dam impounds the water supply for the power station
Highland UK relief location map.jpg
Red pog.svg
Location of Kerry Falls
Hydro-Electric Scheme in Highland
CountryScotland
Location Gairloch, Wester Ross
Coordinates 57°41′07″N5°38′37″W / 57.6852°N 5.6435°W / 57.6852; -5.6435
PurposePower
StatusOperational
Opening date1952
Owner(s) SSE
Kerry Falls
Hydro-Electric Scheme
BSicon uDOCKSe.svg
Loch Kerry (sealoch)
BSicon uexSTR.svg
River Kerry
BSicon uexSTR+FEATURE@l.svg
Kerrysdale
BSicon uexSKRZ-Yu.svg
B8056 bridge
BSicon uexSTR+l.svg
BSicon uexABZq+l.svg
BSicon uexABZgr.svg
BSicon uexBHF.svg
BSicon uexSTR.svg
BSicon uexSTR.svg
Loch na Doire Mòire
BSicon uexBHF.svg
BSicon uexSTR.svg
Lochan Druim na Fearna
BSicon uxWEIRf.svg
Weir
BSicon uxSTRbr.svg
BSicon utSTR+r.svg
Kerry Falls power station
BSicon uexSTR.svg
BSicon utSTR.svg
BSicon uexSTR.svg
BSicon utSTR.svg
BSicon uexBHF.svg
Loch nam Buainichean
BSicon uexSTR.svg
BSicon utSTR3.svg
BSicon uexSTR.svg
River Kerry + pipeline
BSicon uexRESVGe.svg
BSicon uexSTR.svg
Pond and dam
BSicon uexSTR.svg
BSicon uexSTR+l.svg
BSicon uexKHSTeq.svg
BSicon uexBHF.svg
Am Feur-Loch
BSicon uexRESVGDe.svg
BSicon uexSTRr.svg
BSicon uexSTR.svg
Bad an Sgalaig Dam
BSicon uexDOCKSm.svg
BSicon uexSTR.svg
Loch Bad an Sgalaig
BSicon uexSTR+l.svg
BSicon uexDOCKSe.svg
BSicon uexBHF.svg
Lochan a' Chleirich
BSicon uexDOCKS.svg
BSicon uexSTR.svg
Dubh Loch
BSicon uexSTR.svg
Abhainn a' Gharbh Choire
BSicon uexSTR.svg
BSicon uexSTR+l.svg
BSicon uexCONTfq.svg
to Loch Maree
BSicon uexSTR.svg
BSicon uexDOCKSa.svg
Loch Garbhaig
BSicon uexABZg+l.svg
BSicon uexDOCKSe.svg
Abhainn Loch na h-Oidhche
BSicon uexSTR.svg
BSicon uexDOCKSa.svg
Loch na h-Oidhche
BSicon uexDOCKSe.svg

Kerry Falls Hydro-Electric Scheme, sometimes known as Gairloch is a small-scale hydro-electric power station, built by the North of Scotland Hydro-Electric Board and commissioned in 1952. It is located near Gairloch in Wester Ross, part of the Highlands of Scotland. It was originally designed to supply power to local communities in this remote area, but is now connected to the National Grid.

Contents

The River Kerry below the power station is a Special Area of Conservation, due to the presence of an internationally important population of freshwater pearl mussels. It also hosts populations of salmon and trout, without which the mussels could not reproduce. The hydro-electric scheme is thought to contribute to the success of the mussels, as Loch Bad an Sgalaig traps silt, which if deposited on gravel beds can suffocate mussels and fish embryos. The flow on the river is also relatively stable for long periods, although subject to step changes when turbines are switched on or off, and flows are maintained throughout the year, enabling salmon and trout to enter the river.

History

The North of Scotland Hydro-Electric Board was created by the Hydro-electric Development (Scotland) Act 1943, [1] a measure championed by the politician Tom Johnston while he was Secretary of State for Scotland. [2] Johnston's vision was for a public body that could build hydro-electric stations throughout the Highlands. Profits made by selling bulk electricity to the Scottish lowlands would be used to fund "the economic development and social improvement of the North of Scotland." Private consumers would be offered a supply of cheap electricity, and their connection to that supply would not reflect the actual cost of its provision in remote and sparsely-populated areas. [3]

The chairman of the new Board was to be Lord Airlie, who had initially been critical of the 1943 Act because its scope was too limited. The deputy chairman and chief executive was Edward MacColl, an engineer with wide experience of hydro-electric projects and electrical distribution networks. [4] It soon became clear that MacColl intended to push ahead with the aspirations of the Act at breakneck speeds. He produced a list of 102 potential sites in just three months, [5] and in June 1944, the first constructional scheme was published. This was for the Loch Sloy scheme, which had a ready market for bulk supplies to nearby Clydeside, but it included two smaller schemes, to demonstrate the Board's commitment to supplying remote areas. [6]

Kerry Falls was part of Constructional Scheme No.2, and was included as part of the much larger Tummel Hydro-Electric Scheme. When the scheme was published, there were no objections to the Kerry Falls scheme, which was a small scale project capable of generating around 1.25 MW of electricity, but concerted objections to the Tummel scheme, which would include several power stations with a capacity to generate 150 MW. Many within the North of Scotland Hydro-Electric Board thought that it might be better to postpone the scheme, in view of the bitter animosity that they had suffered with the Sloy scheme, but MacColl wanted to push on, in the hope that if this succeeded, there might be less opposition to future schemes. Kerry Falls was caught up in the ensuing furore. [7]

Johnston decided to appoint a tribunal to hear the evidence for and against the scheme, which started on 25 May 1945 and lasted for ten days. The transcript of the hearing ran to 1,188 pages. [8] At the end of it, Mr Hill-Watson, summing up for the opposition, stated that the whole scheme was uneconomic, would destroy the salmon fisheries of the River Tay, wipe out the tourist trade and spoil the amenities of Pitlochry. He stated that the Highlands would barely benefit, as only 350 houses in Gairloch would benefit from an electricity supply, whereas all of the power from the Tummel scheme would be sold to the Lowlands. [9] Although they acknowledged the seriousness of the objections, the tribunal decided that the whole scheme was in the public interest, and should proceed. [10] The bill then had to go before Parliament, where there were further attempts to derail it, and savage attacks on Lord Airlie. However, an annulment order in the House of Commons was rejected, and a similar attempt in the House of Lords was eventually withdrawn, allowing the scheme to be approved on 19 November 1945. The Kerry Falls project could then proceed. [11]

An impounding reservoir was created by building a dam across the outlet of Loch Bad an Sgalaig, at the upper end of the River Kerry. A further small dam and pond were created below the dam, to feed water into a surface pipeline, which runs along the north bank of the river to the site of the turbine house. [12] This creates a head of 183 feet (56 m) for the turbines. [13] There are three turbines, with a combined capacity of 1.25 MW. Originally there were two, but a third, smaller turbine was added to allow water to bypass the main turbines and effectively provide compensation water to the river while still generating electricity. The red sandstone used in the construction of the building was quarried near Dingwall, [14] and the project was completed by the contractor Willie Logan, later known for the creation of the airline Loganair. [15]

Operation

In 2002, the Renewables Obligation (Scotland) legislation was introduced. It was conceived as a way to promote the development of small-scale hydro-electric, wave power, tidal power, photovoltaics, wind power and biomas schemes, but by the time it came into force, the definition of small scale had been increased from 5 MW to 10 MW and then 20 MW, and existing hydro-electric stations that had been refurbished to improve efficiency could be included. [16] Kerry Falls at 1.3 MW thus qualified, and between 2004 and 2007 the station qualified for 14,867 Renewable Obligation Certificates, generating a subsidy for SSE of nearly £710,000. [17] SSE expected to refurbish the turbines at the station during 2008. [18]

Hydrology

The reservoir for the scheme was formed by building a dam across the outlet from Loch Bad an Sgalaig into the River Kerry. This is supplemented by water from Loch Dubh and Am Feur-Loch. [19] Loch Bad an Sgalaig and Loch Dubh are effectively a single loch, with the surface levels of both at 381 feet (116 m) above Ordnance datum (AOD). They cover an area of 0.51 square miles (1.32 km2) and drain a catchment area of 13.01 square miles (33.7 km2). [20] Am Feur-Loch is located to the north-east of the reservoir and is much smaller, covering just 7.4 acres (3 ha) and draining 3.07 square miles (7.95 km2). Its elevation is 384 feet (117 m). [21]

This receives water from Lochan a' Chleirich, of a similar size but at an elevation of 584 feet (178 m), [22] which is to the south east. The Allt Lochan a' Chleirich connects the two water bodies. From the north, the Allt Airigh an Leisteir brings water from Loch nam Buainichean to Am Feur-Loch. [12] This has a surface area of 30 acres (12 ha), drains an area of 0.57 square miles (1.48 km2) and is at an elevation of 659 feet (201 m). [23]

Loch Bad an Sgalaig also receives some water from Loch na h-Oidhche, some distance to the south-east. This is a comparatively deep loch, with a maximum depth of 121 feet (36.9 m). It has a surface area of 0.54 square miles (1.4 km2), drains an area of 3 square miles (7.77 km2), and is located at 1,273 feet (388 m) AOD. [24] Its ouflow descends quite rapidly, but when it reaches Meall Lochan na Geala, a hill that rises to 1,253 feet (382 m), it divides into two. The Abhainn a' Gharbh Coire flows to the left of the hill to reach Loch Bad an Sgalaig, while the Abhainn Loch na h-Oidhche flows to the right of the hill, and passes through Loch Garbhaig to reach Loch Maree. [12]

The valve tower controls flow from Loch Bad an Sgalaig Hydro building on Kerry River - geograph.org.uk - 702668.jpg
The valve tower controls flow from Loch Bad an Sgalaig

Below the Bad an Sgalaig Dam, a valve tower controls flows from the reservoir into the River Kerry. [25] A small dam further downstream forms a smaller storage area, and a similar structure controls flow into the pipeline, which runs on the north bank of the river as it flows to the west. [26] The pipeline is crossed by the A832 road about halfway along its length, and again close to the turbine house, which is located on the right bank of the river, and discharges into the river. Just below it is a weir, which prevents migrating salmon and trout from passing further upstream. Below the weir, the river is a Special Area of Conservation (SAC). [27]

Land to the south of the river is drained by Lochan Druim na Fearna, feeding the Allt Loch Druim na Fearna and Loch na Doire Mòire, feeding the Allt Loch na Doire Mòire. These two streams join the Allt na Claise, before the combined flow enters the River Kerry, which turns to the north at this point. The A832 road has followed the river closely on its right bank for all of its length, and the only major bridge over the river occurs where the B8056 road from Badachro crosses to join the A832. The river passes to the west of the hamlet of Kerrysdale, where it turns to the north-west, and then turns to the south-west to enter Loch Kerry, an inlet which is part of the sealoch Loch Gairloch or Gair Loch. A salmon hatchery is located on the north bank close to the mouth of the River Kerry. [12]

Ecology

The River Kerry is about 3.1 miles (5 km) long and the lower 2.1 miles (3.4 km) from its mouth to the weir below the hydro-electric station is a Special Area of Conservation, as defined by the European Union's Habitats Directive. [28] It has been designated because it provides habitat for an internationally important population of freshwater pearl mussels. It also hosts populations of salmon and trout, without which the mussels could not reproduce. The river is one of the best stretches of water for the endangered mussels in the United Kingdom, and probably Europe. Following a flood event in 1998, a careful survey of the population was made, and it was estimated that there were from 600,000 to 1.2 million mussels in the river and some of its tributaries. The population includes a fairly high proportion of juveniles, indicating that it is in good condition. [29]

Mussels can live for up to 150 years, and live in patches of coarse sand and gravel in fast-flowing, acidic rivers. Fertilised eggs spend the first half year of their life cycle attached to the gill fibres of salmon or trout, living as parasites. They then drop off, and bury themselves in sand or gravel for five years, until they reach the adult stage. An adult mussel filters up to 11 imperial gallons (50 L) of water a day, removing dissolved material to the benefit of the salmon, trout and other species. [30] Some research has concluded that hydro-electric plants usually result in mussel populations declining, but this does not appear to be the case in the Kerry. [31] The Bad an Sgalaig Dam prevents sediment from the upper reaches of the river system entering the Kerry, which is beneficial because silt entering the gravel beds can suffocate mussels and fish embryos. [32] Volumes of water in the river remain relatively stable for long periods, although subject to step changes when the number of turbines in use is changed, [33] and flood events are attenuated by Loch an Sgalaig. All of these factors are thought to contribute to the success of the population of mussels. [34]

Bibliography

Related Research Articles

<span class="mw-page-title-main">Falls of Foyers</span> Waterfall in Highland, Scotland

The Falls of Foyers are two waterfalls on the River Foyers, which feeds Loch Ness, in Highland, Scotland, United Kingdom. They are located on the lower portion of the River Foyers, and consist of the upper falls, with a drop of 46 feet (14 m) and the lower falls, which drop 98 feet (30 m).

<span class="mw-page-title-main">River Shin</span> River in northern Scotland

The River Shin is a river in the Scottish North West Highlands.

<span class="mw-page-title-main">River Conon</span> River in Scotland

The River Conon is a river in the Highlands of Scotland. It begins at Loch Luichart, and flows in a south-easterly direction to be joined by the River Meig at Scatwell before passing through Loch Achonachie. It is joined by the Black Water at Moy Bridge, and the River Orrin at Urray, before flowing past Conon Bridge and into the Cromarty Firth.

<span class="mw-page-title-main">Tummel hydro-electric power scheme</span> Power stations in Perth and Inverness

The Tummel hydro-electric power scheme is an interconnected network of dams, power stations, aqueducts and electric power transmission in the Grampian Mountains of Scotland. Roughly bounded by Dalwhinnie in the north, Rannoch Moor in the west and Pitlochry in the east it comprises a water catchment area of around 1,800 square kilometres and primary water storage at Loch Ericht, Loch Errochty, Loch Rannoch and Loch Tummel, in Perth and Kinross. Water, depending on where it originates and the path it takes, may pass through as many as five of the schemes nine power stations as it progresses from north-west to south-east. The scheme was constructed in the 1940s and 50s incorporating some earlier sites. It is managed by SSE plc.

<span class="mw-page-title-main">Affric-Beauly hydro-electric power scheme</span> Power stations on River Affric and River Beauly in Scottish Highlands

The Affric-Beauly hydro-electric power scheme for the generation of hydro-electric power is located in the western Highlands of Scotland. It is based around Glen Strathfarrar, Glen Cannich and Glen Affric, and Strathglass further downstream.

<span class="mw-page-title-main">Nostie</span> Human settlement and power station in Scotland

Nostie is a small remote hamlet, lying on Nostie Bay, an inlet at the northeastern end of the sea loch, Loch Alsh in the Scottish Highlands and is in the council area of Highland. Nostie lies a short distance from one of Scotland's popular tourist attractions, Eilean Donan Castle.

<span class="mw-page-title-main">River Garry, Inverness-shire</span> River and power stations in Scotland

The River Garry in Inverness-shire is a Scottish river punctuated by two long Lochs, in the region of Lochaber. It flows broadly west to east through Glen Garry, starting in a wilderness to the east of Knoydart and ending at Loch Oich in the Great Glen, which forms part of the Caledonian Canal. There are a few tiny settlements within Glen Garry, but the only village of any size near to the river is Invergarry, at its mouth. Loch Quoich at the western end of the watercourse is dammed by the largest mass earth fill dam in Scotland, and supplies water to Quoich hydroelectric power station. Loch Garry is dammed by a much smaller dam in the gorge where the river begins its descent to Invergarry, and supplies water to Invergarry hydroelectric power station, close to the mouth of the river. Both hydroelectric schemes were built in the 1950s, with the aim of stimulating economic regeneration in the area. They have altered the ecology of the river, as both lochs were made considerably bigger as a result of constructing the dams.

<span class="mw-page-title-main">Loch Sloy Hydro-Electric Scheme</span> Dam in Argyll and Bute

The Loch Sloy Hydro-Electric Scheme is a hydro-electric facility situated between Loch Sloy and Inveruglas on the west bank of Loch Lomond in Scotland.

<span class="mw-page-title-main">River Moriston</span> River and power stations in Scotland

The River Moriston is a river in Inverness-shire, Scotland. It flows broadly east-north-east from the outfall of the dam at Loch Cluanie to Loch Ness. Its waters and those of its tributaries have been harnessed to generate hydro-electric power.

<span class="mw-page-title-main">Breadalbane Hydro-Electric Scheme</span> Multiple power stations in Scotland

The Breadalbane Hydro-Electric Scheme is a hydroelectric scheme in the Breadalbane area of Perthshire, Scotland. It comprises seven power stations which generate 120MW of power from the dams around Loch Lyon, Loch Earn and Loch Tay.

<span class="mw-page-title-main">River Morar</span> River and power station in Scotland

The River Morar is a river that flows from Loch Morar in the west Highlands of Scotland. It flows from the western end of the loch to the estuary of Morar Bay, an inlet of the Sound of Sleat. It is one of Scotland's shortest rivers, and is known for its white sands beaches where it flows through Morar Bay.

<span class="mw-page-title-main">Loch Bad an Sgalaig</span> Freshwater loch and reservoir in Wester Ross, Scotland

Loch Bad an Sgalaig is a small, irregular shaped, freshwater loch and reservoir lying 5 mi (8.0 km) south of the small village of Poolewe, in Wester Ross, Scotland.

<span class="mw-page-title-main">Chliostair Hydro-Electric Scheme</span> Power station on Harris, Outer Hebrides, Scotland

Chliostair Hydro-Electric Scheme is a small scheme promoted by the North of Scotland Hydro-Electric Board on Harris, Outer Hebrides. It consists of a single power station powered with water from Loch Chliostair, and was commissioned in 1960.

<span class="mw-page-title-main">Gisla Hydro-Electric Scheme</span> Power station on Lewis, Outer Hebrides, Scotland

Gisla Hydro-Electric Scheme was a small scheme promoted by the North of Scotland Hydro-Electric Board on the Isle of Lewis, Outer Hebrides, Scotland. It consisted of a single power station powered with water from Loch Coirceabhat, and was commissioned in 1960.

<span class="mw-page-title-main">Shira Hydro-Electric Scheme</span> Power stations near Loch Fyne, Scotland

The Shira Hydro-Electric Scheme is a project initiated by the North of Scotland Hydro-Electric Board to use the waters of the River Shira, the River Fyne and other small streams to generate hydroelectricity. It is located between Loch Fyne and Loch Awe in Argyll and Bute, western Scotland. It consists of three power stations and three impounding dams.

<span class="mw-page-title-main">Awe Hydro-Electric Scheme</span> Power stations near Loch Awe, Scotland

The Awe Hydro-Electric Scheme was the penultimate scheme developed by the North of Scotland Hydro-Electric Board. It centres around Loch Awe, in Argyll and Bute, on the southern edge of the Scottish Highlands. It consists of three power stations, two conventional hydro-electric stations, and the Cruachan power station, the first large pumped storage scheme built by the Board. It was completed in 1965.

<span class="mw-page-title-main">Inver Hydro-Electric Scheme</span> Power station on Jura, Inner Hebrides, Scotland

Inver Hydro-Electric Scheme is a remote hydro-electric plant on the Scottish island of Jura, part of the Inner Hebrides. Construction began in 2011, and it was operational by June 2012. It is the third scheme built on the Inver Estate, but the first to be connected to the National Grid. It can produce 2 MW of electric power.

<span class="mw-page-title-main">Lussa Hydro-Electric Scheme</span> Power station near Peninver, Scotland

Lussa Hydro-Electric Scheme is a small-scale hydro-electric power station, built by the North of Scotland Hydro-Electric Board and commissioned in 1956. It is located near Peninver on the Kintyre peninsula, part of Argyll and Bute in Scotland. It was originally designed to supply power to Campbeltown, but is now connected to the National Grid.

<span class="mw-page-title-main">Striven Hydro-Electric Scheme</span> Power station near Ardtaraig, Scotland

Striven Hydro-Electric Scheme is a small-scale hydro-electric power station, built by the North of Scotland Hydro-Electric Board and commissioned in 1951. It is located near Ardtaraig on the Cowal peninsula, part of Argyll and Bute in Scotland. It is sometimes known as the Cowal Hydro-Electric Scheme. It was originally designed to supply power to the remote communities on the peninsula, but is now connected to the National Grid.

<span class="mw-page-title-main">Loch Dubh Hydro-Electric Scheme</span> Power station near Ullapool, Scotland

Loch Dubh Hydro-Electric Scheme is a small-scale hydro-electric power station, built by the North of Scotland Hydro-Electric Board and commissioned in 1955. It is located near Ullapool in Ross and Cromarty, Scotland. It was originally designed to supply power to the remote communities around Ullapool, but is now connected to the National Grid.

References

  1. Payne 1988, pp. 50, 298.
  2. Miller 2002, pp. 19–20.
  3. Wood 2002, pp. 58–59.
  4. Payne 1988, pp. 50–51.
  5. Payne 1988, p. 55.
  6. Payne 1988, pp. 60–61.
  7. Payne 1988, pp. 63–65.
  8. Payne 1988, p. 65.
  9. Payne 1988, pp. 69–70.
  10. Payne 1988, pp. 71–72.
  11. Payne 1988, pp. 73, 75.
  12. 1 2 3 4 Ordnance Survey, 1:25000 map
  13. "Kerry Falls Power Station". Gazetteer of Scotland. Archived from the original on 28 December 2023.
  14. "Kerryfalls Power Station". Canmore. Archived from the original on 28 December 2023.
  15. "The Kerry Falls between Loch Maree and Gairloch". Am Baile. Archived from the original on 17 April 2021.
  16. Swap 2005, pp. 5–7.
  17. Dekker 2008, p. 28.
  18. Dekker 2008, pp. 182–183.
  19. Payne 1988, p. 301.
  20. "Loch Bad an Sgalaig or Dubh Loch Water body ID 14585". UK Centre for Ecology & Hydrology. Archived from the original on 29 December 2023.
  21. "Am Feur-Loch Water body ID 14578". UK Centre for Ecology & Hydrology. Archived from the original on 29 December 2023.
  22. "Lochan a Chleirich Water body ID 14705". UK Centre for Ecology & Hydrology. Archived from the original on 29 December 2023.
  23. "Loch nam Buainichean Water body ID 14410". UK Centre for Ecology & Hydrology.
  24. "Loch na h-Oidhche Water body ID 15390". UK Centre for Ecology & Hydrology.
  25. Thomas & Hoey 2006, p. 65.
  26. Thomas & Hoey 2006, p. 60.
  27. Thomas & Hoey 2006, p. 55.
  28. Thomas & Hoey 2006, p. 1.
  29. Thomas & Hoey 2006, p. 4.
  30. Thomas & Hoey 2006, p. 5.
  31. Thomas & Hoey 2006, pp. 68–69.
  32. Thomas & Hoey 2006, p. 66.
  33. Thomas & Hoey 2006, p. 17.
  34. Thomas & Hoey 2006, p. 69.

Commons-logo.svg Media related to Kerry Falls hydro-electric scheme at Wikimedia Commons