Osukuru Industrial Complex

Last updated

Osukuru Industrial Complex
TypePrivate
IndustryManufacturing
FoundedConstruction started 2014
Commissioned October 2018 [1]
HeadquartersSukulu Hills, Tororo, Uganda
Key people
Products Fertilizer, Electricity, Mechanical workshop capable of milling, grinding, boring, planing with milling machines, lathe machine, plasma cutting Steel, Rare Minerals & Sulfuric Acid
Total assets US$620 million (2018) [1]
Number of employees
1,200+ (2018) [1]
Parent Guangzhou Dongsong Energy Group Uganda Limited [2]

The Osukuru Industrial Complex sometimes referred to as Sukulu Industrial Complex, is a set of related industries, in the mining and manufacturing sectors, under construction in Uganda, the third-largest economy in the East African Community. [3] [4]

Contents

Location

The factories of Osukuru Industrial Complex are located in the Sukulu Hills in Osukuru County, Tororo District, Eastern Region of Uganda, just outside the town of Tororo and approximately 206 kilometres (128 mi), by road, east of Kampala, the capital and largest city of Uganda. [5] The approximate coordinates of the Osukuru Industrial Complex are: 0°37'25.0"N, 34°09'13.0"E (Latitude:0.623611; Longitude:34.153611). [6]

Overview

The industrial complex will consist of (1) a phosphate fertilizer factory, (2) a steel manufacturing factory, (3) a sulphuric acid manufacturing factory, (4) a rare earth minerals mining plant, and (5) the Osukuru Thermal Power Station with capacity generation of 12 megawatts. [7] In addition, the complex includes the largest organic fertilizer factory in East Africa, with capacity of 300,000 metric tonnes of organic fertiliser annually. [8]

The industrial complex sits on 26.5 square kilometres (6,500 acres) of land in Osukuru sub-county and in neighboring Rubongi sub-county, Tororo District, close to the international border with Kenya. [9] [10] The industrial complex will support over 1,700 jobs once completed. [7]

History

A considerable amount of minerals, particularly flint, phosphorus and iron, have been known to exist in the Sukulu Hills south-west of the town of Tororo as far back as 1954. [11]

Starting around 2008, the government of Uganda, began engaging various investors, including a local firm Nilefos Limited, a subsidiary of the Madhvani Group, to commercially exploit the deposits. Local landowners in the mining area, however, filed a lawsuit against the government, protesting the development. The landowners lost that case in 2010. [12]

In 2013, the government began negotiations with Guangzhou Dong Song Energy Company Limited from China to set up a mining and manufacturing operation at Osukuru. In 2014, the government and landowners agreed that exploration and construction should begin. [13]

Construction timeline

The project will cost an estimated US$560 million to US$620 million and will be jointly owned by the Government of Uganda and Guangzhou Dong Song Energy Company Limited, a private Chinese company. Construction began in 2014 and was expected to last two years. Commissioning was expected during the fourth quarter of 2016. [14] After delays, construction resumed in October 2015, starting with office blocks and staff housing. Construction is by the 23rd Metallurgical Construction Group Company Limited. When fully operational, the industrial complex is expected to employ more than 1,000 people. Funding is provided by China Export & Credit Insurance Corporation (SINOSURE) and Industrial and Commercial Bank of China (ICBC). [15]

In February 2016, the developers reached financial closure with ICBC for a loan worth US$240 million. [16] Some of the industries in the complex are expected to be commissioned in October 2018. [8]

Starting operations

In March 2018, the industrial complex advertised the first 92 jobs, looking to hire welders, storekeepers, drivers, security guards and supervisors. The MoU that Guangzhou Dongsong Energy Group signed with the government calls for employing people from Tororo District first, going outside the district only when the desired skills or expertise are lacking. [17]

In August 2018, Irene Muloni, Uganda's Minister of Energy, commissioned the Uganda-China Guangdong Free Zone for International Cooperation, in which the 600 acres (2.4 km2) Osukuru Industrial Complex is located. [18] During the same month, Matia Kasaija, Uganda's Finance Minister, commissioned the fertilizer plant, with the steel plant expected online in July 2019. As of August 2018, the industrial complex employed about 1,000 people. [18]

The phosphate fertilizer plant was commissioned on 23 October 2018. Steel production is expected to begin in July 2019. [1] The first phase of the development is expected to employ an estimated 1,400 people at completion. This number s expected to rise to 3,000 people after completion of the second phase. [19]

In November 2018, the Daily Monitor reported that a brick-baking division, embedded within the industrial complex was operational and manufactured 10,000 building bricks daily, with capacity production of 2.6 million bricks annually. [20]

See also

Related Research Articles

<span class="mw-page-title-main">Transport in Uganda</span>

Transport in Uganda refers to the transportation structure in Uganda. The country has an extensive network of paved and unpaved roads.

<span class="mw-page-title-main">Tororo</span> Place in Eastern Region of Uganda, Uganda

Tororo is a town in the Eastern Region of Uganda. It is the main municipal, administrative, and commercial center of Tororo District.

<span class="mw-page-title-main">Uganda Railways Corporation</span> State-owned railway company of Uganda

The Uganda Railways Corporation (URC) is the parastatal railway of Uganda. It was formed after the breakup of the East African Railways Corporation (EARC) in 1977 when it took over the Ugandan part of the East African railways.

<span class="mw-page-title-main">Rift Valley Railways</span>

Rift Valley Railways (RVR) was a consortium established to manage the parastatal railways of Kenya and Uganda. The consortium won the bid for private management of the century-old Uganda Railway in 2005. The Kenya-Uganda railway had previously been run by the East African Railways and Harbours Corporation over the period 1948–77. In 2014, RVR moved 1,334 million net tonne kilometers of rail freight, up from 1,185 million net tonne kilometers the previous year. Both Kenya and Uganda terminated their contracts with RVR in mid-2017, with control of their national rail networks reverting to the Kenya Railways Corporation and the Uganda Railways Corporation, respectively.

<span class="mw-page-title-main">Energy in Uganda</span>

Burning of renewable resources provides approximately 90 percent of the energy in Uganda, though the government is attempting to become energy self-sufficient. While much of the hydroelectric potential of the country is untapped, the government decision to expedite the creation of domestic petroleum capacity coupled with the discovery of large petroleum reserves holds the promise of a significant change in Uganda's status as an energy-importing country.

Cipla Quality Chemical Industries Limited (CiplaQCIL) is a pharmaceutical manufacturing company in Uganda. According to a 2007 published report, it was the only company in Africa that manufactured triple-combination antiretroviral (ARV) drugs. CiplaQCIL also manufactures the antimalarial drug Lumartem, containing artemisinin and lumefantrine, and the Hepatitis B generic medicines Texavir and Zentair.

Isimba Hydroelectric Power Station is a 183.2 megawatts (245,700 hp) hydroelectric power station commissioned on 21 March 2019 in Uganda. Construction of this dam began in April 2015 and was completed in January 2019. Commercial operations began on 21 March 2019.

Tororo Cement Limited (TCL), a Ugandan company, is one of the largest manufacturers of construction materials in East Africa.

Hima Cement Limited (HCL) is a cement manufacturer in Uganda. It is a subsidiary of the Holcim Group, a building materials manufacturer headquartered in Switzerland, with subsidiaries in over 80 countries.

<span class="mw-page-title-main">Jennifer Musisi</span> Ugandan lawyer, administrator and academic

Jennifer Semakula Musisi is a Ugandan lawyer and public administrator. She is the first City Leader in Residence at Bloomberg Harvard City Leadership Initiative at the Ash Center of the Harvard Kennedy School, in Cambridge, Massachusetts, United States. She was appointed to this position in January 2019.

Moroto Cement Limited (MCL), whose full name is Moroto Cement Industries Limited, is a manufacturer of cement in Uganda with approximately 3000 tonnes per day clinker capacity.

The Uganda Oil Refinery is a planned crude oil refinery in Kabaale village, on the Eastern shore of Lake Albert along the Hoima–Kaiso–Tonya Road, Buseruka Sub-county, Hoima District, Western Region, Uganda, near the international border with the Democratic Republic of the Congo. After 5 years of negotiations the Albertine Graben Refinery Consortium (AGRC) formed in 2018 and agreed to design and build the refinery.

The Uganda National Roads Authority (UNRA) is a government agency mandated to develop and maintain the national roads network, advise the government on general roads policy, contribute to the addressing of national transport concerns, and perform certain other functions. UNRA is charged with, among other things, the selection of contractors, the supervision of construction, the scheduling of maintenance, and the prioritization of national road works.

The Kampala–Jinja Expressway, also known as the Jinja–Kampala Expressway, is a proposed four-lane toll highway in Uganda, linking Kampala, the capital and largest city of Uganda, with the city of Jinja in the Eastern Region of Uganda.

The Kampala–Mpigi Expressway, also Busega–Mpigi Expressway, is a four-lane, dual carriage highway under construction in the Central Region of Uganda, connecting, Kampala, the capital city, and Mpigi, the headquarters of Mpigi District.

The Osukuru Thermal Power Station is a planned 12 MW (16,000 hp) chemical-fired thermal power plant in Uganda.

Simba Cement Uganda Limited (SCUL), also National Cement Company Uganda, is a cement manufacturer in Uganda. It is a subsidiary of National Cement Company Limited, the construction materials manufacturer based in Kenya. National Cement is itself a subsidiary of the Devki Group of Companies.

References

  1. 1 2 3 4 Odyek, John (17 October 2018). "Fertiliser factory to open in Tororo". New Vision . Kampala. Retrieved 23 October 2018.
  2. Asiimwe, Dicta (27 October 2017). "Tororo plant to supply homegrown fertiliser to East Africa". The EastAfrican . Nairobi. Retrieved 27 October 2017.
  3. Biryabarema, Elias (23 December 2014). "Chinese Firm To Build Fertiliser Plant In Uganda". Reuters. Archived from the original on 24 December 2014. Retrieved 31 May 2018.
  4. Musisi, Frederic (29 May 2018). "Will Shs2.2 trillion phosphate project turn around Uganda's fortunes?". Daily Monitor . Kampala. Retrieved 31 May 2018.
  5. Globefeed.com (31 May 2018). "Distance between Uganda Post Office, Kampala Road, Kampala, Uganda and Osukuru Hills, Uganda". Globefeed.com. Retrieved 31 May 2018.
  6. Google (31 May 2018). "Approximate Location of Osukuru Industrial Complex" (Map). Google Maps . Google. Retrieved 31 May 2018.
  7. 1 2 Kato, Ronald (24 April 2017). "Tororo phosphate project to create over 1,700 jobs". New Vision . Kampala. Retrieved 25 July 2018.
  8. 1 2 "Uganda To Open East Africa's Largest Organic Fertiliser Plant In KSh65 Billion Chinese Investment". Business Daily Africa Quoting Daily Monitor . Nairobi: Nation Media Group. 25 July 2018. Retrieved 25 July 2018.
  9. John Odyek, and Faustine Odeke (August 2014). "Extortionists Delayed Fertilizer Project - Museveni". New Vision Online . Kampala. Retrieved 31 August 2014.
  10. Tentena, Paul (24 August 2014). "New Phosphates Project for Uganda During 2016". East African Business Week . Kampala. Retrieved 31 August 2014.
  11. URN, Reporter (19 January 2007). "Large Phosphate Deposits Discovered In Tororo". Uganda Radio Network (URN). Retrieved 31 August 2014.
  12. Mutana, Mugarura (12 May 2010). "Government Wins Court Case To Resume Phosphate Mining". Uganda Radio Network (URN). Retrieved 31 August 2014.
  13. Gonza, Paul (25 February 2014). "Phosphate Mining To Start After Government Agrees With Residents". Daily Monitor . Kampala. Retrieved 31 August 2014.
  14. Kisige, Abou (20 September 2013). "Exploration of Sukulu Phosphates Starts". New Vision . kampala. Retrieved 31 August 2014.
  15. Odeke, Faustine (16 October 2015). "Construction of Uganda Sukulu phosphate factory kicks off". New Vision . Kampala. Retrieved 16 October 2015.
  16. Mugabe, David (5 February 2016). "Sukulu Phosphates signs $240 million funding". New Vision . Kampala. Retrieved 19 April 2016.
  17. Sadab Kitatta Kaaya (20 March 2018). "900 apply for Tororo phosphate firm's 92 jobs". The Observer (Uganda) . Kampala. Retrieved 20 March 2018.
  18. 1 2 Musisi, Frederic (13 August 2018). "Shs1 Trillion Spent On Osukuru Mining Project, Says Developer". Daily Monitor . Kampala. Retrieved 13 August 2018.
  19. Vision Reporter (24 October 2018). "President commissions Tororo Sukulu Phosphate Project". New Vision . Kampala. Retrieved 24 October 2018.
  20. Musisi, Frederic (13 November 2018). "Sukulu fertilisers set to hit stores soon". Daily Monitor . Kampala. Retrieved 13 November 2018.

Coordinates: 00°37′25″N34°09′13″E / 0.62361°N 34.15361°E / 0.62361; 34.15361