Class overview | |
---|---|
Name | unnamed class |
Builders | Hyundai Heavy Industries |
Operators | ![]() |
Preceded by | Jacinto-class patrol vessel |
Cost |
|
Built | 2024-2028 |
In commission | from 2025 |
Planned | 6 |
General characteristics | |
Type | Offshore patrol vessel |
Displacement | 2,200+ to 2400 tons [Nb 1] |
Length | 94.4 m (309 ft 9 in) |
Beam | 14.3 m (46 ft 11 in) |
Draft | 3.7 m |
Propulsion |
|
Speed | 22 knots (41 km/h; 25 mph) @ 85% MCR |
Range | 5,500 nmi (10,200 km; 6,300 mi) @ 15 knots (28 km/h; 17 mph) |
Boats & landing craft carried | 2 × RHIBs |
Complement | TBC |
Sensors and processing systems |
|
Electronic warfare & decoys |
|
Armament |
|
Aircraft carried | 1 × 10 tonne naval helicopter |
Aviation facilities | flight deck for a 10-tonne helicopter and/or unmanned aerial vehicle |
![]() | It has been suggested that this article be merged with Wonhoe-class offshore patrol vessel . (Discuss) Proposed since June 2024. |
The HDP-2200 Future Offshore Patrol Vessel is a class of six (6) offshore patrol vessels designed and built by Hyundai Heavy Industries (HHI) for the Philippine Navy.
The Philippine Navy is expecting the delivery of six new offshore patrol vessels acquired under its Offshore Patrol Vessel Acquisition Project under the Revised AFP Modernization Program's Horizon 2 phase covering years 2018 to 2022. [2] [4] The Philippines' Department of National Defense (DND) signed a contract with South Korean shipbuilder Hyundai Heavy Industries on 27 June 2022, [1] with the shipbuilder delivering a variant of their HDP-2200+ offshore patrol vessel design. [2]
The ships are as of yet unnamed, with the designation 'HDP-2200' being the marketing designation used by HHI to refer to the type and tonnage of the vessel according to its own product designation system.
Construction is expected to begin in 2023 but didn't happen, so it's expected to be 2024.
In a 2023 September interview with DZBB to vice commander Rear Adm. Caesar Bernard Valencia, he estimated that the navy would receive the ordered 6 HDP-2400 OPVs starting from around 2026-2028 which was worth around PHP30 billion. [5]
The Philippine Navy included plans to procure 6 new next generation offshore patrol vessels as part of its Horizon 2 modernization phase, with the proposal with a budget of PHP30billion (US$555 million) among those approved in-principle by Philippine President Rodrigo Duterte in June 2018. [6]
During the pre-procurement development phase, the Technical Working Group (TWG) assigned for the project has used the Philippine Navy's experience in specifying and building its latest warship, the Jose Rizal-class frigate, as there were numerous lessons learned from the project's development and construction from 2016 to 2020.
Based on open source information, [2] the new patrol vessels would be smaller, less equipped and less armed than frigates and corvettes, and designed more for low to medium intensity conflicts and peacetime operations.
Sensors were believed to include the following: [2] [7]
Weapon systems required by the specifications are the following: [2] [7]
Several offers were made to the Philippine Navy to meet the requirements for new OPVs, including proposals coming from South Korea's Hyundai Heavy Industries, [8] Turkey's ASFAT, [9] Israel Shipyards, Thailand's Bangkok Dock Company, [10] France's Naval Group, Dutch shipbuilder Damen Group, and India's Goa Shipyard. [2]
The Department of National Defense eventually decided for the project to be procured under negotiated process, and undertaken through Government-to-Government (G2G) process, which means a support and participation of the government of the shipbuilder's country of origin. [2]
By 2021, South Korea's Hyundai Heavy Industries and Turkey's ASFAT were shortlisted for the project. HHI offered their HDP-1500 Neo patrol vessel design. [11] On the other hand, ASFAT offered a revised version of their VARD-7 86-meter patrol vessel design. [12]
Ultimately, Hyundai Heavy Industries was selected as the winning contractor for the project, with a Notice of Award released by the DND around May or June 2022, and a contract signed on 27 June 2022. [1]
During the contract signing with the Philippine Department of National Defense, Hyundai Heavy Industries indicated that their offer will be based on their 2,400-ton HDP-2400 corvette design. [1] [13] It is an enlarged and improved design of the HDP-1500 Neo which was believed to be the benchmark of HHI's offer to the Philippines [4] [7] and was first unveiled at the International Maritime Defense Industry Exhibition (MADEX) 2022 in South Korea, [14] with an enlarged hull and other improvements to fit the requirements of the Philippine Navy.
As Critical Design Review was conducted, HHI's designation on the OPV offered to the Philippine Navy was later changed to the HDP-2200+ OPV design, as confirmed by HHI during Euornaval 2022 defense exhibition in Paris, France in October 2022. [15] The dimensions of the ship remains the same as before, but the change in design name indicates that the displacement may have been reduced from 2,400 tons to 2,200 tons. [16]
The HDP-2200+ scale model shown at Euronaval 2022 shows that the patrol vessel will have a 76mm primary naval gun in A-position, and can potentially mix and match different weapon systems like medium caliber 30mm guns in remote controlled stations, close-in weapon stations, short range surface-to-air missile launchers, and anti-ship missiles. The final weapon systems content for the Philippines has not been announced yet. [17]
The ships would also have a hangar and helicopter landing deck, and a rear ramp for Rigid Hull Inflatable Boats (RHIB), and spaces for Multi-Mission Containerized Modules to allow the ships to conduct other roles.
International accredited registrar DNV awarded Hyundai Heavy Industries an approval in principle (AiP) [18] for the new HDP-2400 Offshore Patrol Vessel design, certifying its compliance to regulatory requirements. [19]
Kongsberg Maritime has confirmed that they will be supplying Kamewa 86 A/5 D-B Controllable Pitch Propeller systems to HHI, which will installed on the new offshore patrol vessels being built for the Philippine Navy, with deliveries starting in August 2024. [20]
Hensoldt UK was awarded a contract to supply Mk11 SharpEye navigation radars for HHI's Philippine Navy ship projects. The radars will be fitted on both the 3,200-ton corvettes and the 2,400-ton offshore patrol vessels currently being developed and constructed by HHI for the Philippine Navy. These radars will provide navigation and surface search capabilities for the vessels. [21]
Anschütz Singapore announced that it had secured the contract to provide its Synapsis NX integrated navigation system for Hyundai Heavy Industry's Philippine Navy OPV project. [3]
In 2023 May 12, Hanwha Systems announced they won a contract to supply CMS and TDL (tactical data link) for the six Philippine Navy HDP-2400 OPVs. CMS deal totaled $29.5M or ~$5M per package. While TDL deal totaled $5M or ~$830K per package. This is Hanwha's 4th export contract to the Philippine Navy, bringing it from 7 to 13 CMS units. [22] [23]
In an interview with Naval News, Safran has confirmed that their PASEO XLR extra long range optronic identification & fire control system will be installed on the 2 HDC-3100 corvettes and 6 HDP-2200 offshore patrol vessels being built by HD Hyundai for the Philippine Navy. [24] [2]
Name | Hull number | Builder | Laid down | Launched | Commissioned | Status |
---|---|---|---|---|---|---|
TBC | TBC | Hyundai Heavy Industries | TBC | TBC | TBC | Construction to start in 2023, postponed to 2024 |
TBC | TBC | TBC | TBC | TBC | Construction to start in 2024 | |
TBC | TBC | TBC | TBC | TBC | Construction to start in 2024 | |
TBC | TBC | TBC | TBC | TBC | Construction to start in 2025 | |
TBC | TBC | TBC | TBC | TBC | Construction to start in 2025 | |
TBC | TBC | TBC | TBC | TBC | Construction to start in 2026 |
HD Hyundai Heavy Industries Co., Ltd. is the world's largest shipbuilding company and a major heavy equipment manufacturer. Its headquarters are in Ulsan, South Korea.
A patrol boat is a relatively small naval vessel generally designed for coastal defence, border security, or law enforcement. There are many designs for patrol boats, and they generally range in size. They may be operated by a nation's navy, coast guard, police, or customs, and may be intended for marine, estuarine, or river environments.
The OTO Melara 76 mm gun, marketed as the OTO 76/62 Gun Mount, is a naval autocannon built and designed by the Italian defence company OTO Melara. It is based on the OTO Melara 76/62C and evolved toward 76/62 SR and 76/62 Strales.
The Royal Australian Navy, although a significant force in the Asia-Pacific region, is nonetheless classed as a medium-sized navy. Its fleet is based around two main types of surface combatant, with limited global deployment and air power capability. However, in 2009, a white paper, Defending Australia in the Asia Pacific Century: Force 2030, was produced by the Australian government which set out a programme of defence spending that will see significant improvements to the RAN's fleet and capabilities. In recent times, Australia released its Surface Fleet Review in 2024, which analyses the future of the RAN and shows what the Government will procure.
The Holland-class ocean-going patrol vessels are a class of four ocean-going patrol vessels constructed for the Royal Netherlands Navy. They are designed to fulfill patrol and intervention tasks against lightly armed opponents, such as pirates and smugglers, but have much higher level electronic and radar surveillance capabilities which are used for military stabilization and security roles, short of outright war. Without sonar or long range weapons, they utilize the surveillance capabilities of the Thales integrated mast, which integrates communication systems and two four-faced phased arrays for air and surface search.
The Jacinto-class patrol vessels currently in service with the Philippine Navy are three ships formerly belonging to the Royal Navy's Hong Kong Squadron as Peacock-class corvettes until 1997. The ships have undergone combat, electronics, weapon, propulsion and hull upgrades, with the most recent upgrade completed in August 2019. These increased their capabilities compared to the original Peacock-class vessels.
The Arafura class is a class of offshore patrol vessels being built for the Royal Australian Navy (RAN). Initially proposed in the 2009 Defence White Paper and marked as procurement project SEA 1180, it was originally planned that 20 Offshore Combatant Vessels (OCV) would replace 26 vessels across four separate ship classes: the Armidale-class patrol boats, the Huon-class minehunters, the Leeuwin-class survey vessels, and the Paluma-class survey motor launches. Although having a common design, the ships would use a modular mission payload system to fulfill specific roles; primarily border patrol, mine warfare, and hydrographic survey. The 2013 Defence White Paper committed to the OCV project as a long-term goal, but opted in the short term for an accelerated procurement of an existing design to replace the Armidales, and life-extension refits for the other types. This resulted in the Offshore Patrol Vessel (OPV) project and the number of vessels reduced to 12. However, this was further increased to 14 when 2 further Mine Counter Measures variants were proposed under SEA 1905.
HTMS Krabi (OPV-551) is an offshore patrol vessel (OPV) of the Royal Thai Navy. She is a modified River-class patrol vessel, and was built by Mahidol Adulyadej Naval Dockyard, with design and technology transfer support from BAE Systems Surface Ships. Additional construction took place at the Royal Thai Navy Mahidol Dockyard in Sattahip.
The Falaj 2 class are patrol boats of the United Arab Emirates Navy classified as stealth inshore patrol vessels (IPVs).
The Del Pilar-class are offshore patrol vessels currently in service with the Philippine Navy and previously in service with the US Coast Guard as Hamilton-class high endurance cutters. The Department of National Defense is currently in the process of upgrading their systems and capabilities under a modernization project awarded to Hanwha Systems of South Korea.
The Jose Rizal-class of multi-role guided missile frigates, currently in service with the Philippine Navy, are a heavily modified variant of the ROK Navy's Incheon-class frigates. The ships, which were built by Hyundai Heavy Industries (HHI), are specifically accommodated to fit the requirements of the Philippine Navy. The introduction of the frigates improved the capabilities of the Philippine Navy's Offshore Combat Force, which is mostly composed of ships that were retired from other countries and subsequently transferred to the Philippines.
The KSS-III, often called Dosan Ahn Changho class is a series of diesel-electric attack submarines currently being built for the Republic of Korea Navy (ROKN), jointly by Hanwha Ocean and HD Hyundai Heavy Industries (HHI). The KSS-III is the final phase of the Korean Attack Submarine program, a three-phased program to build 27 attack submarines for the ROKN, between 1994–2029.
BRP Jose Rizal (FF-150) is the lead ship of her class of guided missile frigates of the Philippine Navy. She is the first purpose-built frigate of the service, as its previous major warships were mostly obtained from retired patrol ships of other countries. She is also one of the navy's primary warships able to conduct multi-role operations, such as coastal patrol, anti-air and anti-submarine warfare.
BRP Antonio Luna (FF-151) is the second ship of the Jose Rizal-class of guided missile frigates in service with the Philippine Navy. She is able to conduct multi-role operations such anti-surface warfare (ASUW), anti-submarine warfare (ASW), and limited anti-air warfare (AAW). She is one of the service's primary warships until the introduction of new and more powerful contemporaries.
HMS Spey is a Batch 2 River-class offshore patrol vessel of the Royal Navy. Named after the River Spey in Scotland, she is the eighth Royal Navy ship to be named Spey and is the fifth Batch 2 River-class vessel to commission and is forward deployed long-term to the Indo-Pacific region with her sister ship HMS Tamar.
The Yarmook-class corvette is a class of corvettes in service with the Pakistan Navy. The class is primarily based on Damen Group's Offshore Patrol Vessel (OPV) 1900. The primary role of the class is to patrol the sea area.
The Miguel Malvar-class frigate is a class of frigate that was once derived as the HDC-3100 Corvettes until it eventually reclassified to its current designation, which was designed and currently built by Hyundai Heavy Industries (HHI) for the Philippine Navy.
The Wonhae class are a series of six offshore patrol vessels being built for the Philippine Navy by Hyundai Heavy Industries (HHI) at its Ulsan shipyard in South Korea. The last will be completed in 2028.
The Next-Generation Offshore Patrol Vessel (OPV) program consists of a planned 12 OPV-type patrol vessels to be operated by the Japan Maritime Self-Defense Force (JMSDF).