Shields Ferry

Last updated

Shields Ferry
Ferry symbol.svg
Nexus Ferry logo.jpeg
Shields Ferry (geograph 4110849).jpg
Locale Tyne and Wear, England
Waterway River Tyne
Transit type Pedestrian ferry
Owner North East Joint Transport Committee
Operator Nexus
Began operation1377;645 years ago (1377)
Travel time7 minutes
Headway 30 minutes
No. of lines1
No. of vessels2 [lower-alpha 1]
No. of terminals2 [lower-alpha 2]
Website nexus.org.uk/ferry OOjs UI icon edit-ltr-progressive.svg

The Shields Ferry operates across the River Tyne, between North Shields and South Shields in Tyne and Wear, England. The service is operated by the Nexus, the Tyne and Wear PTE. Prior to takeover by the PTE in 1972, it was known as the Market Place Ferry.

Contents

History

Records suggest that there have been ferries operating across the River Tyne since 1377. By 1929, there were a total of eleven ferries crossing the River Tyne between Newburn and Tynemouth. Following the opening of the Tyne Tunnel between Jarrow and Howdon in October 1967, ferry traffic saw a significant decline. [1] Today, the Shields Ferry is the only ferry service that remains.

The service provides a viable alternative to travelling by Metro via Newcastle, or by road via the Tyne Tunnel. The ferry can be used by cyclists, and is part of the National Cycle Route 1. All vessels in service are also fully wheelchair-accessible.

The ferry service makes just under 25,000 journeys and carries in the region of 500,000 passengers each year. [2] Two vessels currently operate the service, Pride of the Tyne and Spirit of the Tyne.

In August 2008, the service's first female general manager, Carol Timlin, was appointed. [3] Seven years later, in November 2015, Nicola Peach was appointed as the service's first female crew member. [4] [5] Peach was later promoted to be the company's first female captain in May 2016, after obtaining her boat master's licence. [6] [7]

Service

Usually, only one ferry is in operation at a time, although both are used during peak periods. The service typically operates half-hourly, with a seven minute crossing time.

Vessels

Freda Cunningham.jpg
Shieldsman.jpg
20190529-Shields-Ferry-Pride-Tyne.jpg
Waiting for the Spirit of the Tyne (geograph 2896713).jpg
Past and present ferries: Freda Cunningham, Shieldsman, Pride of the Tyne and Spirit of the Tyne.

Freda Cunningham (1972–1993)

Freda Cunningham was commissioned in 1972, as a replacement for the steamship Northumbrian. It was the first diesel ferry to be commissioned, and had a reputation for unreliability. The ferry's name came from the wife of North East Labour Party leader Andy Cunningham, who was later jailed for corruption. She was also the mother of politician and cabinet minister, Jack Cunningham. [8] The vessel was sold in 1993, when the Pride of The Tyne entered service.

Shieldsman (1976–2007)

Shieldsman was constructed by Hancock Shipbuilders, Pembroke Dock, and entered service in 1976. [9] The ferry is double-ended and could operate either way, however she typically worked one way and turned around during the crossing. She could carry 350 passengers in public service, or a reduced capacity of 250 on private hire. The Shieldsman was retired early in 2007 to be replaced by the new Spirit of the Tyne, and is now a houseboat on the River Adur in West Sussex.

Pride of the Tyne (1993–present)

Pride of the Tyne was built by Swan Hunter, Wallsend, at a cost of £1.5 million. It entered service in 1993, and was constructed as a modified version of Shieldsman. [8] The vessel also has a bar, The Admirals Locker, that is available on private hire trips. The vessel was the first river ferry to incorporate all of the new safety features introduced following the Marchioness disaster in August 1989.

Spirit of the Tyne (2007–present)

Spirit of the Tyne entered service in May 2007, as a replacement for Shieldsman. [8] The ferry is an "off-the-shelf" product and differs greatly from its predecessors. It was built in Harlingen, Netherlands, and fitted out in Portsmouth. [10] [11] [12] The design was adapted from the Gosport ferries: Spirit of Gosport and Spirit of Portsmouth . [9]

Landings

North Shields

The ferry landing at North Shields was opened in July 2004, providing better accessibility and passenger waiting facilities than its predecessor.

Passengers at North Shields Ferry Landing can travel to the town centre by 19 or 317 bus. Alternatively, it is a ten minute walk to the town centre via Borough Road.

Future developments

In November 2018, North Tyneside Council announced plans to consider the feasibility of moving the ferry landing at North Shields. [13] An award of £200,000 was made to North Tyneside Council by the North of Tyne Combined Authority in March 2019, to develop a regeneration master plan for North Shields. [14]

Following storm damage to the ferry landing at North Shields, the Shields Ferry was suspended between 11 November and 21 December 2019, whilst repairs were undertaken. [15] [16] [17] [18] [19]

In August 2020, it was confirmed by the Department for Communities and Local Government that it was allocating £47 million to the North East Local Enterprise Partnership from the Get Building Fund for 18 major projects in the region, to help boost the local economy following the COVID-19 pandemic. [20] In January 2021, a total of £8.8 million funding was secured, with the project being partly financed (£5.5 million) by the fund. [21] [22] [23]

In July 2021, it was announced that due to the time constraints of the project, funding from the Government's Getting Building Fund was no longer available. As a result of this, the redevelopment project has been pushed back until at least 2023. [24] [25]

South Shields

The ferry landing at South Shields was opened in July 1999, with construction commencing once there was sufficient room for redevelopment of the area, following the closure of Harton Low Staithes in July 1993. It served as a replacement for the previous landing which opened in 1898, [26] and provides three berths as well as an indoor waiting room, and offices and break rooms for crew.

Parts of the old ferry landing signage survives in storage at South Shields Museum.

At South Shields Ferry Landing, it is a five minute walk to the recently reconstructed South Shields Interchange, which provides connections with bus and Metro.

Ticketing

As of April 2022, a single ticket is £2.10 and a day ticket is £3.40. [lower-alpha 3] Tickets are purchased from a conductor when boarding the ferry.

As the Shields Ferry is operated by Nexus, who also operate the Tyne and Wear Metro, ticketing is integrated with the Metro network. A range of Metro tickets are valid on the Ferry, including all-zone Metro day, week, month and annual tickets, and Transfare tickets, which allow for one-way travel on the Shields Ferry and either a bus or Metro.

Notes

  1. Vessels are named Pride of the Tyne and Spirit of the Tyne.
  2. Ferry landings are located in North Shields ( 55°00′14″N1°26′38″W / 55.0039°N 1.4440°W ) and South Shields ( 54°59′50″N1°26′28″W / 54.9973°N 1.4412°W ).
  3. When using Pop PAYG, a single ticket is £1.45 and a day ticket is £2.55.

Related Research Articles

<span class="mw-page-title-main">Tyne and Wear</span> Metropolitan county in North East England

Tyne and Wear is a metropolitan county in North East England, situated around the mouths of the rivers Tyne and Wear. It was created in 1974, by the Local Government Act 1972, along with five metropolitan boroughs of Gateshead, Newcastle upon Tyne, Sunderland, North Tyneside and South Tyneside. It is bordered by Northumberland to the north and Durham to the south; the county boundary was formerly split between these counties with the border as the River Tyne.

<span class="mw-page-title-main">North Tyneside</span> Metropolitan borough in England

North Tyneside is a metropolitan borough in the metropolitan county of Tyne and Wear, England. It forms part of the greater Tyneside conurbation. North Tyneside Council is headquartered at Cobalt Park, Wallsend.

<span class="mw-page-title-main">Tyne and Wear Metro</span> Rapid-transit rail network in north-east England

The Tyne and Wear Metro is an overground and underground light rail rapid transit system serving Newcastle upon Tyne, Gateshead, North Tyneside, South Tyneside, and the City of Sunderland. The network opened in stages from August 1980 and now serves a total of 60 stations, with two lines covering 77.5 km (48.2 mi) of track. The Metro can be accessed from a mixture of under ground and above ground stations. It has been described as the "first modern light rail system in the United Kingdom". The system is currently owned and operated by the Tyne and Wear Passenger Transport Executive, thus is fully under public ownership and operation.

<span class="mw-page-title-main">Tyne and Wear Passenger Transport Executive</span>

Tyne and Wear PTE is an executive body of the North East Joint Transport Committee and is best known for owning and operating the Tyne and Wear Metro. It replaced the Tyneside PTE on 1 April 1974.

<span class="mw-page-title-main">Heworth Interchange</span> Tyne and Wear Metro and railway station in Gateshead

Heworth Interchange consists of a National Rail, Tyne and Wear Metro and bus station. It is located in the suburb of Heworth, Gateshead in Tyne and Wear, England, and opened on 5 November 1979 for rail and bus services. The station joined the Tyne and Wear Metro network around two years later, on 15 November 1981.

<span class="mw-page-title-main">Tyne Dock Metro station</span> Tyne and Wear Metro station in South Tyneside

Tyne Dock is a Tyne and Wear Metro station, serving South Tyneside Hospital and the suburb of Tyne Dock, South Tyneside in Tyne and Wear, England. It joined the network on 24 March 1984, following the opening of the fifth phase of the network, between Heworth and South Shields.

<span class="mw-page-title-main">Longbenton Metro station</span> Tyne and Wear Metro station in North Tyneside

Longbenton is a Tyne and Wear Metro station, serving the Freeman Hospital and suburb of Longbenton, North Tyneside in Tyne and Wear, England. It joined the network on 11 August 1980, following the opening of the first phase of the network, between Haymarket and Tynemouth via Four Lane Ends.

<span class="mw-page-title-main">Four Lane Ends Interchange</span> Tyne and Wear Metro station in North Tyneside

Four Lane Ends is a Tyne and Wear Metro station, serving the suburbs of Benton and Longbenton, North Tyneside in Tyne and Wear, England. It joined the network on 11 August 1980, following the opening of the first phase of the network, between Haymarket and Tynemouth via Four Lane Ends.

<span class="mw-page-title-main">Palmersville Metro station</span> Tyne and Wear Metro station in North Tyneside

Palmersville is a Tyne and Wear Metro station, serving the village of Holystone and suburb of Forest Hall, North Tyneside in Tyne and Wear, England. It joined the network on 19 March 1986.

<span class="mw-page-title-main">Meadow Well Metro station</span> Tyne and Wear Metro station in North Tyneside

Meadow Well is a Tyne and Wear Metro station, serving the suburbs of Chirton and Meadow Well, North Tyneside in Tyne and Wear, England. It joined the network as Smith's Park on 14 November 1982, following the opening of the fourth phase of the network, between Tynemouth and St James via Wallsend.

<span class="mw-page-title-main">Northumberland Park Metro station</span> Tyne and Wear Metro station in North Tyneside

Northumberland Park is a Tyne and Wear Metro and future National Rail station, serving the village of Backworth and suburbs of Northumberland Park and West Allotment, North Tyneside in Tyne and Wear, England. It joined the network on 11 December 2005, and is the second-newest station on the network as of March 2022.

<span class="mw-page-title-main">Wallsend Metro station</span> Tyne and Wear Metro station in North Tyneside

Wallsend is a Tyne and Wear Metro station, serving the town of Wallsend, North Tyneside in Tyne and Wear, England. It joined the network on 14 November 1982, following the opening of the fourth phase of the network, between Tynemouth and St James via Wallsend.

<span class="mw-page-title-main">West Monkseaton Metro station</span> Tyne and Wear Metro station in North Tyneside

West Monkseaton is a Tyne and Wear Metro station, serving the village of Earsdon and suburb of Monkseaton, North Tyneside in Tyne and Wear, England. It joined the network on 11 August 1980, following the opening of the first phase of the network, between Haymarket and Tynemouth via Four Lane Ends.

<span class="mw-page-title-main">Gateshead Interchange</span> Tyne and Wear Metro station in Gateshead

Gateshead Interchange is a Tyne and Wear Metro station, serving the town of Gateshead in Tyne and Wear, England. It joined the network on 15 November 1981, following the opening of the third phase of the network, between Haymarket and Heworth.

<span class="mw-page-title-main">Jarrow Metro station</span> Tyne and Wear Metro station in South Tyneside

Jarrow is a Tyne and Wear Metro station, serving the town of Jarrow, South Tyneside in Tyne and Wear, England. It joined the network on 24 March 1984, following the opening of the fifth phase of the network, between Heworth and South Shields.

<span class="mw-page-title-main">North Shields Metro station</span> Tyne and Wear Metro station in North Tyneside

North Shields is a Tyne and Wear Metro station, serving the coastal town of North Shields, North Tyneside in Tyne and Wear, England. It joined the network on 14 November 1982, following the opening of the fourth phase of the network, between Tynemouth and St James via Wallsend.

<span class="mw-page-title-main">South Shields Interchange</span> Tyne and Wear Metro station in South Tyneside

South Shields is a Tyne and Wear Metro station, serving the coastal town of South Shields, South Tyneside in Tyne and Wear, England. It joined the network as a terminus station on 24 March 1984, following the opening of the fifth phase of the network, between Heworth and South Shields.

<span class="mw-page-title-main">Hebburn Metro station</span> Tyne and Wear Metro station in South Tyneside

Hebburn is a Tyne and Wear Metro station, serving the town of Hebburn, South Tyneside in Tyne and Wear, England. It joined the network on 24 March 1984, following the opening of the fifth phase of the network, between Heworth and South Shields.

<span class="mw-page-title-main">Kingston Park Metro station</span> Tyne and Wear Metro station in Newcastle upon Tyne

Kingston Park is a Tyne and Wear Metro station, serving the suburb of Kingston Park, Newcastle upon Tyne in Tyne and Wear, England. It joined the network on 15 September 1985.

<span class="mw-page-title-main">Transport in Tyne and Wear</span> Overview of transport in Tyne and Wear

Tyne and Wear is a metropolitan area covering the cities of Newcastle upon Tyne and Sunderland, as well as North and South Tyneside, Gateshead and Washington.

References

  1. Richardson, Ian (12 October 2021). "Special feature: The Shields Ferry". Shipping Today & Yesterday. Retrieved 11 April 2022.
  2. "Shields Ferry still going strong". Nexus . 10 February 2012. Retrieved 11 April 2022.
  3. "Ferry gets first woman boss in 700 years". Shields Gazette . 12 August 2008. Archived from the original on 5 September 2018. Retrieved 11 April 2022.
  4. "Shields Ferry hires first woman crew member". BBC News . 12 November 2015. Retrieved 11 April 2022.
  5. Marsh, Michael (13 November 2015). "History made as Shields Ferry recruits first ever female crew member". Evening Chronicle . Retrieved 11 April 2022.
  6. "Nicola's the first woman to captain the Shields Ferry". Nexus . 9 May 2016. Retrieved 11 April 2022.
  7. "Shields Ferry gets first female skipper in 40 years". BBC News . 11 May 2016. Retrieved 11 April 2022.
  8. 1 2 3 "The Shieldsman ferry leaves the Tyne after 30 years service". News Guardian . 17 February 2009. Archived from the original on 29 March 2017. Retrieved 5 September 2018.
  9. 1 2 "Ferry marks 30 years of service". BBC News . 22 September 2006. Retrieved 11 April 2022.
  10. "Tyneside ferry bidder loses out". 28 April 2005. Retrieved 11 April 2022.
  11. "New Tyne ferry nears completion". 9 April 2006. Retrieved 11 April 2022.
  12. "Spirit of the Tyne celebrates ten years of service". Nexua . 1 March 2017. Retrieved 17 July 2018.
  13. Holland, Daniel (27 November 2018). "A revamped Fish Quay and new Metro line part of regen plans". Evening Chronicle . Retrieved 11 April 2022.
  14. "Ambitious plans for North Shields regeneration to move forward". North Tyneside Council . 22 March 2019. Retrieved 11 April 2022.
  15. "Storm damage shuts Shields Ferry service". BBC News . 11 November 2019. Retrieved 11 April 2022.
  16. Murray, Kieran (11 November 2019). "Shields Ferry suspended for up to a month as 'extensive' repairs take place". Evening Chronicle . Retrieved 11 April 2022.
  17. Dixon, Faye (11 November 2019). "Shields Ferry will remain closed for up to a month due to storm damage". Shields Gazette . Retrieved 11 April 2022.
  18. Holland, Daniel (22 November 2019). "Nexus on hunt for 'urgent funding' to build new Shields Ferry landing at North Shields Fish Quay". Evening Chronicle . Retrieved 11 April 2022.
  19. "Shields Ferry to resume services on Saturday 21 December". Tyne and Wear PTE . 19 December 2019. Retrieved 11 April 2022.
  20. "Plans for a new Shields Ferry landing secure Government support". Tyne and Wear PTE . 6 August 2020. Retrieved 11 April 2022.
  21. Greene, Tommy (29 January 2021). "New £8.8m Shields Ferry landing moves a step closer after plan wins cash backing". Shields Gazette . Retrieved 11 April 2022.
  22. "RMT welcome publicly funded Shields Ferry project in North Tyneside". RMT . 10 February 2021. Retrieved 11 April 2022.
  23. "North Shields Fish quay to get £1.5m refurbishment boost". BBC News . 24 March 2021. Retrieved 11 April 2022.
  24. Holland, Daniel (9 July 2021). "Huge blow for Shields Ferry project as £5.6m funding lost". Evening Chronicle . Retrieved 11 April 2022.
  25. Havery, Gavin (9 July 2021). "Project to create new ferry landing in doubt after funding collapses". Northern Echo . Retrieved 11 April 2022.
  26. Morton, David (22 September 2021). "The South Shields-North Shields ferry across the River Tyne – then and now". Evening Chronicle . Retrieved 11 April 2022.
Next vehicle crossing upstream River Tyne Next vehicle crossing downstream
Tyne Tunnel
A19
Shields FerryNone
North Sea
Next pedestrian crossing upstream River Tyne Next pedestrian crossing downstream
Tyne Pedestrian & Cycle Tunnel Shields FerryNone
North Sea